EHQ10936_REV_A_APPROVED_FLT_III_GTG1H_and_3H__INSTALLATION_(FULL_SIZE).pdf
PDF 1 MB Posted
- Solicitation number
- W912BU-17-R-0010
About this file
EHQ10936
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
REFERENCES
No. TITLE DRAWING No.
UNDER 12" ±1/8"
12" TO 6'-0" ±1/4"
OVER 6'-0" ±1/2"
PLAN VIEW 4A
BLDG 77H - DDG 51 LBES FLIGHT III
BUILDING KEY PLAN
SCALE: NONE
REVISION STATUS
REV SH DESCRIPTION
A 1 TITLE SHEET, BUILDING KEY PLAN, REFERENCES, NOTES
A 2 PLAN VIEW AND ISOMETRIC VIEWS
A 3 INSTALLATION DETAILS
A 4 LIST OF MATERIAL
NAVAL SURFACE WARFARE CENTER, PHILADELPHIA DIVISION
PHILADELPHIA, PA 19112-5083
DDG 51 LAND BASED ENGINEERING SITE (LBES), BUILDING 77H
FLIGHT III EQUIPMENT INSTALLATION
TITLE
FLT III GTG1H & GTG3H FDN
INSTALLATION DETAILS
DWG NO.CAGE CODESIZE REV
SCALE : AS NOTED SHEET 1 OF 4
89256D EHQ10936 A
CONTRACT No.
N00178-04-D-4089
OFFICAL SIGNATURE DATE
PREPARED D. Merlino 6/13/16
CHECKED M. Dunn
QA R. Chranowski
PROJ MGR M. Lamberto
APPROVED NSWCPD
TECH REVIEW
PROG MGR
DIMENSIONAL TOLERANCES
UNLESS OTHERWISE SPECIFIED
DIMENSIONS IN FEET & INCHES
DECIMAL DIMENSIONS IN INCHES
TOLERANCE ON ANGLES ±.50°
1 PL ±.2, 2 PL ±.06, 3 PL ±.005
INTERPRET DIMENSIONS AND TOLERANCES
PER ASME Y14.5 - 2009
DO NOT SCALE DRAWING
REVISION HISTORY
DESCRIPTIONREVZONE DATE APPROVED
A C A D F
IL
E N
A M E A C A D E
H P 1/
A C A D N
S W C P D D D G
M O D
IF
IC
A T
IO
N S G
T G 1H
G
T G H I N S T A L L A T
IO
N D
E T E H Q R
.D W G
D
C
B
A
D
C
B
A
201918161514131211
12345678
12345678
B
D
E
10 21 22 23 24 25 26 27 2817
FLT III GTG1H & GTG3H FDN
SEE PLAN VIEW 14A
CWE LAND BASED TEST SITE
DDG 51 LAND BASED TEST SITE
NORTH
DDG 51 LBES, BLDG 77H
FLIGHT III EQUIPMENT ARRANGEMENT
EHQ10517
THIS IS A CAD MAINTAINED DRAWING DEVELOPED
IN AUTOCAD R2013 SOFTWARE. CHANGES SHALL BE
INCORPORATED BY THE DESIGN AUTHORITY
DISTRIBUTION STATEMENT D
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE AND U.S. DoD CONTRACTORS ONLY;
CRITICAL TECHNOLOGY, 2/23/2011. OTHER U.S.
REQUESTS SHALL BE REFERRED TO COMMANDER,
NAVAL SEA SYSTEMS COMMAND.
GENERAL NOTES:
DDG 51 LBES, BLDG 77H
FLIGHT III GTG1H & GTG3H FABRICATION DETAILS
EHQ10894
1. DEVIATIONS FROM THIS DRAWING ARE NOT PERMITTED WITHOUT
APPROVAL FROM THE NSWCPD CONSTRUCTION MANAGER (CODE 212) AND
NDI ENGINEERING CO.
2. THE GTG FOUNDATION LIFTING PADEYES (REF 2) ARE DESIGNED FOR LIFT
OF THE FOUNDATION ONLY. (SEE REF 2 FOR FDN WEIGHT)
3. ANY OTHER RIGGING DEVICES REQUIRED FOR LIFTING THE FOUNDATION
SHALL BE SUPPLIED BY THE INSTALLER. RIGGING DEVICES REQUIRED FOR
LIFTING THE GAS TURBINE GENERATOR SHALL BE SUPPLIED BY THE
INSTALLER.
4. SEE MANUFACTURER'S TECHNICAL BULLETIN FOR OTHER MATERIALS
REQUIRED FOR THE INSTALLATION OF CHOCKING COMPOUND NOT NOTED IN
THE LIST OF MATERIAL.
5. CHOCKING COMPOUND USED FOR LEVELING THE FOUNDATION TO THE FLOOR
SHALL BE APPLIED IN ACCORDANCE WITH TECHNICAL BULLETIN.
INSTALLATION NOTES:
1. INSTALLER SHALL INSTALL THE GTG ATOP THE MOUNTING PLATES AND
SECURE PER SHEET 3.
2. LOCATE FOUNDATION & GTG IN ACCORDANCE WITH SHEET 2.
3. MARK LOCATION OF ANCHOR BOLT HOLES TO BE DRILLED INTO THE
CONCRETE.
4. THE REMOVABLE VERTICAL JACKING PADS, PLAN VIEW 19B ARE DESIGNED
FOR VERTICAL LIFT OF THE COMBINED GENERATOR SET AND FOUNDATION.
EACH PAD HAS A DESIGN CAPACITY OF 31,500 LBS VERTICAL. ALL FOUR
(4) PADS SHALL BE USED AND LOADED EQUALLY, DURING VERTICAL
JACKING.
5. DRILL ANCHOR BOLT HOLES IN CONCRETE. RAISE FOUNDATION ENOUGH TO
ALLOW DRILLING OF HOLES IN CONCRETE.
6. LOWER FOUNDATION AND SHIM SUCH THAT THE MOUNTING PLATES ON
THE TOP OF THE FOUNDATION ARE LEVEL IN THE TRANSVERSE AND
LONGITUDINAL DIRECTIONS. THE NOMINAL SHIM HEIGHT IS 1 1/4" ABOVE
CONCRETE. LOCATE SHIMS BETWEEN CHOCKS AS SHOWN ON SHEET 3.
7. INSTALL ANCHOR BOLTS HAND TIGHT. NOTE ANCHOR BOLTS MUST BE
COATED WITH RELEASE AGENT IN THE AREA THAT WILL CONTACT
CHOCKING COMPOUND - BETWEEN THE FOUNDATION BASE PLATE AND THE
CONCRETE.
8. CHOCKS SHALL BE LOCATED AROUND EACH ANCHOR BOLT AS INDICATED
ON SHEET 3.
9. CLEAN ALL SURFACES THAT THE CHOCKING COMPOUND WILL CONTACT.
10. INSTALL DAMMING MATERIAL IN ACCORDANCE WITH GUIDELINES IN
MANUFACTURER'S TECHNICAL BULLETIN. NOTE THAT CHOCK WILL REST ON
CONCRETE, NOT STEEL. FRONT DAM (ANGLE IRON) SHALL BE PLACED ON
THE CONCRETE ATOP PUTTY OR STRIP CAULK.
11. SPRAY RELEASE AGENT ON FRONT DAM INSIDE FACE AND ON ANY AREAS
WHERE SPILL OF CHOCKING COMPOUND IS EXPECTED.
12. MIX CHOCKING COMPOUND AND POUR FROM ONE CORNER IN EACH OF THE
FORMED AREAS IN ACCORDANCE WITH MANUFACTURER'S TECHNICAL
BULLETIN AND SHEET 3.
13. AFTER POURING ALL 20 CHOCKS, ALLOW TO CURE FOR 48 HOURS.
14. AFTER CURING, TORQUE ANCHOR BOLTS TO 150 FT-LBS.
3 ROLLS-ROYCE GENERATOR SET INSTALLATION, AG9160RF NMM110000
DDG 51 LBES, BLDG 77H
FLIGHT III GTG1H & GTG3H FOUNDATION ANALYSIS
EHQ10935
7/19/16
DDG 51 LBES, BLDG 77H
FLIGHT III GTG 23'-4" LEVEL PLATFORM ARR AND DETAILS
EHQ10946
7/25/16
7/29/16
DDG 51 LBES, BLDG 77H
FLIGHT III EQPT PLATFORM ARR
EHQ10546
L. SKARBEK 1/6/17
A. CAIRNS 1/9/17
INCORPORATED USACE COMMENTS OF 4/14/17,
4/18/17 AND 5/8/17.
PREPARED: R. FOX 5/3/17
CHECKED: M. DUNN 5/3/17
QA: S. VAIDICH 5/3/17
PROJ MGR: M. LAMBERTO 5/3/17
AALL
STEPHEN N VAIDICH, PE
PA# 021788-E
NDI ENGINEERING CO.
TECH REVIEW
L. SKARBEK
PROG MGR
A. CAIRNS
5/15/2017
5/15/2017
DWG NO.CAGE CODESIZE REV
SCALE : AS NOTED SHEET 2
89256D A
D
C
B
A
D
C
B
A
PLAN VIEW 14A
DDG 51 LBES FLIGHT III 0'-0" LEVEL
SCALE: 3/16"=1'-0"
910111213141516
910111213141516
FLT III GTG1H & GTG3H
PLAN VIEW & ISOMETRIC
EHQ10936
ISOMETRIC VIEW 11B
DDG 51 LBES FLIGHT III
GTG FDN ARRANGEMENT
SCALE: NTS
C GTG3H
DDG 51 LAND BASED TEST SITE
GTG3H
GTG1H
L
FLT III PLATFORM
STRUCTURAL COLUMNS
GRAPHIC SCALE 3/16"=1'-0"
C FLT III 23'-4" PLATFORM
STRUCTURAL COLUMNS
REF 5
L
3 2 1
FLT III 23'-4" PLATFORM
STRUCTURAL COLUMNS
REF 5
5'-3
10'-7" 10'-7"
13'-7 "13'-7"
FLT III EQPT ACCESS PLATFORM
INSTALLED AFTER THE GTG
INSTALLATION
REF 6
FRONT OF GTG FDN
FLT III EQPTACCESS PLATFORM
INSTALLED AFTER THE GTG
INSTALLATION
REF 6
DDG 51 EPSW
PLATFORM
NORTH
SCALE : AS NOTED SHEET 3
89256D EHQ10936 A
D
C
B
A
D
C
B
A
1718192021222324
1718192021222324
GRAPHIC SCALE 1 1/2"=1'-0"
GRAPHIC SCALE 1/2"=1'-0"
PLAN VIEW 19D
TOP OF FDN
SCALE: 1/2"=1'-0"
FLT III GTG1H & GTG3H
INSTALLATION DETAILS
PLAN VIEW 19B
BOTTOM OF FDN
SCALE: 1/2"=1'-0"
DETAIL 23A
SCALE: 1 1/2"=1'-0"
DETAIL 23C
16 PLACES
SCALE: 1 1/2"=1'-0"
DETAIL 23D
2 PLACES
SCALE: 1 1/2"=1'-0"
ITEM 1 & 2, 1" ANCHOR BOLT
20 PLACES
C W44x230 BEAML
∅7/8" BOLT, 16 PLACES
ITEM 3, 4 AND 5
TORQUE TO 320 FT/LBS
W44x230 I BEAM
W44x230 I BEAM
REF 2
W44x230 I BEAM 1-1/2" PLATE
2 PLACES
SEE DETAIL 23D
∅7/8" BOLT, 8 PLACES
ITEM 3, 4 AND 5
TORQUE TO 320 FT/LBS
1-1/2" PLATE
16 PLACES
SEE DETAIL 23C
C W44x230 BEAML
W44x230 I BEAM
W44x230 I BEAM
DAMMING MATERIAL
SEE INSTALLATION SEQUENCE NOTE 8
3/4" GUSSET PLATES
REF 2
MIN
FRONT METAL DAM
SEE INSTALLATION SEQUENCE NOTE 8
ITEM 6, CHOCKING COMPOUND
SEE GEN NOTE 4 AND 5
PLAN VIEW 19A
0'-0" FLOOR LEVEL
SCALE: 1/2"=1'-0"
1'
2'
TYP
FOAM DAMMING ON 3 SIDES (TYP)
FRONT METAL DAM (TYP)
" MAX
CHOCKFAST ITEM 6
X X X X X X X X
X X X X X X X X
SHIM LOCATIONS
16 PLACES
BOLT LOCATION DETAIL 19B & 23A
BOTTOM OF W44x230 FDN BEAM
SEE INSTALLATION SEQUENCE NOTE 5
" TO
" MAX
4-1/2"
MIN EMBEDMENT
CONCRETE FLOOR 0'-0" LVL
3'-9
1 1/4" NOMINAL
JACKING PAD (4x)
MACHINED SURFACE REF 2
2X 3
2X 6'-5
2X 9'-6
2X 12'-7
"FIELD DRILL 1 1/16"∅ THRU
HOLES FOR ITEM 1 (6 PLACES)
SCALE : AS NOTED SHEET 4
89256D EHQ10936 A
D
C
B
A
D
C
B
A
LIST OF MATERIAL
LIST OF MATERIAL (FOR 1 FDN)
ITEM QTY DESCRIPTION MATERIAL SPECIFICATION REMARKS
1 26
WEDGE EXPANSION ANCHOR FOR CONCRETE, HEX HD,
1-8UNC-2A, 9" LONG, W/ HEX NUT, 4 1/2" MIN
EMBEDMENT, MINIMUM ALLOWABLE LOAD WITH 4 1/2"
EMBEDMENT IN 4000 PSF CONCRETE IS 4670 LBS
TENSION & 8140 LBS SHEAR
CARBON STEEL COMMERCIAL
2 26 WASHER, STRUCTURAL, 1" BOLT SIZE ALLOY STEEL
ASTM F436
TYPE 1
USE WITH ITEM 1
3 160 BOLT, HEX HD, 7/8-9UNC-2A, 5.00" LONG ALLOY STEEL ASTM A325
4 160 NUT, 7/8-9UNC-2B ALLOY STEEL ASTM A563
5 160 WASHER, STRUCTURAL, 7/8" BOLT SIZE ALLOY STEEL
ASTM F436
TYPE 1
6 -
POURABLE COMPOUND, FOR CHOCKING NON-PRECISELY
ALIGNED EQUIPMENT, INDUSTRIALLY USED UNDER DIESEL
ENGINES, GENERATORS, TURBINES, AND OTHER HEAVY
EQUIPMENT. THE FOLLOWING TECHNICAL ATTRIBUTES
ARE REQUIRED: MIN COMPRESSIVE STRENGTH IS 16,000
PSI, MAX LINEAR SHRINKAGE IS .0003 INCH/INCH, FIRE
RESISTANCE IS SELF EXTINGUISHING, VIBRATION
RESISTANCE TEST PASSED AT 33 CPS @.02 INCH
AMPLITUDE FOR 237,000 CYCLES, PASSED THERMAL
SHOCK RESISTANCE TESTING AT 20° F TO 200° F,
HARDNESS RANGE IS 35-40, SUITABLE FOR EQUIPMENT
OPERATING TEMPERATURE LESS THAN 125° F AND
ROOM TEMP BETWEEN 60°AND 95° F, APPLICATION
POURING LEVEL RANGE OF 1/2" TO 2",
MIN IZOD IMPACT STRENGTH IS 7.2" LBS/INCH, APPROX
CURE TIME NOT GREATER THAN 24 HRS @ 65° F,
POT LIFE NOT LESS THAN 30 MINUTES @ 70° F.
EPOXY BASED
RESIN
COMMERCIAL
2526272829303132
2526272829303132
| EHQ10936-01 |
| EHQ10936-02 |
| EHQ10936-03 |
| EHQ10936-04 |
File details come from the government source that posted it. Updated .