About this file

This is an electrical plan drawing (Sheet E-150) for the Fort Randall Dam Powerhouse passenger elevator replacement project in South Dakota. The drawing shows detailed electrical plans at elevation 1307.0, including both demolition and new installation requirements.

The drawing specifies electrical work including installation of a new 60A/3PH NEMA 1 fusible disconnect switch with 40A RK5 time delay fuses, LED lighting fixtures, 20A GFI duplex receptacles, and junction boxes for various components. Key equipment to be relocated includes the elevator control cabinet, transformer (480/240V, 3PH, 60HZ, 27KVA), choke (5MHY, 1PH 100A 360HZ), and fire alarm control panel. The work involves removing existing wiring containing asbestos, replacing branch circuits, installing new photoelectric smoke detectors, and coordinating with mechanical and elevator contractors for final equipment placement. The drawing is dated November 2024 and is part of solicitation W9128F25R0008 from the US Army Corps of Engineers Omaha District.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Randall Powerhouse Elevator Replacement, newest first.
File Type Posted
01 35 26 Am-0004.pdf PDF
AM0004 SF30 W9128F25R0008.pdf PDF
01 22 00 Am-0004.pdf PDF
AM_0004 Drawings.pdf PDF
14 21 23 Am-0004.pdf PDF
AM0003 SF30 W9128F25R0008.pdf PDF
14 21 23 Am-0002.pdf PDF
AM0002 SF30 W9128F25R0008.pdf PDF
AM_0002 Drawings.pdf PDF
09 90 00 Am-0001.pdf PDF
02 41 00 Am-0001.pdf PDF
14 21 23 Am-0001.pdf PDF
AM0001 SF30 W9128F25R0008.pdf PDF
AM0001_W9128F25R0008_Fort_Randall_Elevator_DRWG_151.pdf PDF
01 35 26 Am-0001.pdf PDF
Site Visit Roster.pdf PDF
FR00108 - ADVERTISEMENT.PDF PDF
W9128F25R0008_Fort_Randall_Elevator_Specs.pdf PDF
W9128F25R0008.pdf PDF
ATTACHMENT 2.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MACHINE ROOM

ELEVATOR

EM1

1 2 3 4 5 6 7 8 9 10

A

B

D

F

G

H

J

1 2 3 4 5 7

8 9 10

2A 4A

J

H

GA

A

B

D

F

G

E M

A N

S I

D

R E

P L

A C

E M

E N

T

P O

W E

R H

O U

S E

P A

S S

E N

G E

R E

L E

V A

T O

R

F O

R T

R A

N D

A L

L D

A M

S

O U

T H

D A

K O

T A

W F

R

N O

V E

M B

E R

O M

A H

A

N E

C A

P

IT

O L

A V

E

O M

A H

A D

IS

T

R

IC

T

F

IL

E

N U

M B

E R

F

IL

E N

A M

E

S L

IN

D

G R

N

L

E C

T R

IC

A

L P

L A

N A

T E

L E

V A

T

IO

N

.0

E-150

D O

T T

E R

B Y

S L

IN

D

G R

N

F R

E

-1

.d g n

O

T T

E R

B Y

S

P

D

:5

:3

P

M

/1

/2

F R

E

-1

.d g n

SMOKE ALARM PANEL

CHOKE

TRANSFORMER

ELEVATOR CONTROL CABINET

ELEVATOR CONTROL CABINET

SYSTEM

PANEL FOR ELEVATOR SUB-

NEW FIRE ALARM CONTROL

TRANSFORMER

CHOKE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A D

V E

R T

IS

E

M E

N T

SCALE: 1/4" = 1'-0"

0 4'4' 2'

KEY PLAN

1"=40'SCALE:

1307.0

ELECTRICAL DEMOLITION PLAN AT ELEVATION

1/4"=1'-0"SCALE:

NEW ELECTRICAL PLAN AT ELEVATION 1307.0

1"=40'SCALE:

SCALE: 1/4" = 1'-0"

0 4'4' 2'

CONTRACTOR.

TO NEW EXHAUST FAN, COORDINATE FINAL LOCATION WITH MECHANICAL

PROVIDE JUNCTION BOX AND CONNECTIONS FOR COMMON-AUX PANELBOARD CB9 13.

CONTRACTOR.

TO NEW SUPPLY FAN, COORDINATE FINAL LOCATION WITH MECHANICAL

PROVIDE JUNCTION BOX AND CONNECTIONS FOR COMMON-AUX PANELBOARD CB9 12.

NEW LOCATION FOR RELOCATED TELEPHONE LINE.11.

PROVIDE JUNCTION BOX FOR RELOCATED EXISTING ELECTRIC UNIT HEATER.10.

CIRCUIT SERVING ELEVATOR MACHINE ROOM LIGHTING AND RECEPTACLES.

LOCATE SWITCH ADJACENT TO DOOR. CONNECT TO DEDICATED BRANCH

PROVIDE 20A SINGLE POLE, LIGHT SWITCH TO CONTROL MACHINE ROOM LIGHT.9.

CONTRACTOR.

FOR NEW ELECTRIC UNIT HEATER, COORDINATE FINAL LOCATION WITH MECHANICAL

PROVIDE JUNCTION BOX AND CONNECTIONS TO COMMON-AUX PANELBOARD CB9 8.

FROM PANEL 10L.

LIGHTING ARE CONNECTED TO THE SAME DEDICATED BRANCH CIRCUIT

PROVIDE 20A GFI DUPLEX RECEPTACLES. ENSURE RECEPTACLES AND ROOM7.

BRANCH CIRCUIT SERVING ELEVATOR MACHINE ROOM LIGHTING AND RECEPTACLES.

ELEVATOR, AND FIRE SPRINKLER CONTRACTORS. CONNECT TO DEDICATED

9' ABOVE FINISHED FLOOR. COORDINATE LOCATION WITH MECHANICAL,

PROVIDE LED FIXTURE. PENDANT MOUNT AT APPROXIMATELY6.

INSTALLER.

COMMON-AUX PANELBOARD CB9. COORDINATE CONNECTIONS WITH ELEVATOR

EXISITNG FEEDER. EXISTING FEEDER IS APPROXIMATELY 450' EXTENDING FROM THE

TO ELEVATOR CONTROL AND MOTOR. REUSE EXISTING CONDUIT, REPLACE

RK5 TIME DELAY FUSES, FOR ELEVATOR. PROVIDE CONNECTIONS

PROVIDE 60A/3PH, NEMA 1, FUSIBLE DISCONNECT SWITCH, WITH 40A5.

NEW ELECTRICAL KEYNOTES:

FOR ADDITIONAL INFORMATION.

SHALL BE RECONNECTED TO NEW WIRING. SEE SHEET E-151

1291.0. LIGHTING FIXTURES NOT INDICATED FOR REMOVAL

CONTAINING WIRING BACK TO BREAKER 12 PANEL 12LA AT EL.

REMOVE LIGHTING FIXTURES. REMOVE AND REPLACE ASBESTOS 4.

REMOVE EXISTING DISCONNECT SWITCH.

AND FEEDER TO ELEVATOR CONTROL AND MOTOR.

DISCONNECT EXISTING ELEVATOR DISCONNECT SWITCH3.

WITH MECHANICAL AND ELEVATOR INSTALLER.

CONNECTIONS TO ELEVATOR CONTROL. COORDINATE

RELOCATE ELEVATOR TELEPHONE LINE AS INDICATED. PROVIDE2.

INSTALLER.

SUB-SYSTEM. COORDIATE WITH MECHANICAL AND ELEVATOR

REPLACE FIRE ALARM CONTROL PANEL FOR ELEVATOR

COORDINATE WITH MECHANICAL AND ELEVATOR INSTALLER.

RELOCATE ELEVATOR ELECTRICAL EQUIPMENT AS INDICATED.1.

DEMOLITION ELECTRICAL KEYNOTES: GENERAL NOTES:

SHAFT. COORDINATE WITH ELEVATOR INSTALLER.

CAB 120V CIRCUIT AND CONNECTIONS IN ELEVATOR

CIRCUIT IN ELEVATOR SHAFT. PROVIDE NEW ELEVATOR

DISCONNECT AND REMOVE EXISTING ELEVATOR CAB 120V8.

60HZ, 27KVA UNIT. CHOKE IS A 5MHY, 1PH 100A 360HZ UNIT.

PANEL TO LOCATIONS SHOWN. TRANSFORMER IS A 480/240V, 3PH,

REMOVE AND RESET CHOKE, TRANSFORMER, ELEVATOR CONTROL 7.

.NEW FIRE ALARM SUB-SYSTEMWITH EXISTING

NEW PHOTOELECTRIC SMOKE DETECTORS ARE COMPATIBLE

LOCATIONS SHOWN UNLESS OTHERWISE NOTED. ENSURE

WITH NEW PHOTOELECTRIC SMOKE DETECTORS IN

REPLACE EXISTING PHOTOELECTRIC SMOKE DETECTORS6.

COORDINATE WITH ELEVATOR INSTALLER.

EXTEND BRANCH CIRCUIT DOWN ELEVATOR SHAFT INTO PIT AREA.

WIRING ROUTING FROM PANEL 10L INTO ELEVATOR SHAFT.

REPLACE EXISTING BRANCH CIRCUIT WITH NEW 5.

WIRING IN FINISHED SPACES.

CONCEAL BRANCH CIRCUIT AND FEEDER 4.

SIZE CONDUCTORS PER NEC.

IN BRANCH CIRCUITS AND FEEDERS.

PROVIDE EQUIPMENT GROUNDING CONDUCTORS 3.

PROVIDE 3/4" MINIMUM RIGID METAL CONDUIT.2.

PROVIDE #12 AGE COPPER CONDUCTORS MINIMUM.1.