This is an electrical plan drawing (Sheet E-150) for the Fort Randall Dam Powerhouse passenger elevator replacement project in South Dakota. The drawing shows detailed electrical plans at elevation 1307.0, including both demolition and new installation requirements.
The drawing specifies electrical work including installation of a new 60A/3PH NEMA 1 fusible disconnect switch with 40A RK5 time delay fuses, LED lighting fixtures, 20A GFI duplex receptacles, and junction boxes for various components. Key equipment to be relocated includes the elevator control cabinet, transformer (480/240V, 3PH, 60HZ, 27KVA), choke (5MHY, 1PH 100A 360HZ), and fire alarm control panel. The work involves removing existing wiring containing asbestos, replacing branch circuits, installing new photoelectric smoke detectors, and coordinating with mechanical and elevator contractors for final equipment placement. The drawing is dated November 2024 and is part of solicitation W9128F25R0008 from the US Army Corps of Engineers Omaha District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 01 35 26 Am-0004.pdf | ||
| AM0004 SF30 W9128F25R0008.pdf | ||
| 01 22 00 Am-0004.pdf | ||
| AM_0004 Drawings.pdf | ||
| 14 21 23 Am-0004.pdf | ||
| AM0003 SF30 W9128F25R0008.pdf | ||
| 14 21 23 Am-0002.pdf | ||
| AM0002 SF30 W9128F25R0008.pdf | ||
| AM_0002 Drawings.pdf | ||
| 09 90 00 Am-0001.pdf | ||
| 02 41 00 Am-0001.pdf | ||
| 14 21 23 Am-0001.pdf | ||
| AM0001 SF30 W9128F25R0008.pdf | ||
| AM0001_W9128F25R0008_Fort_Randall_Elevator_DRWG_151.pdf | ||
| 01 35 26 Am-0001.pdf | ||
| Site Visit Roster.pdf | ||
| FR00108 - ADVERTISEMENT.PDF | ||
| W9128F25R0008_Fort_Randall_Elevator_Specs.pdf | ||
| W9128F25R0008.pdf | ||
| ATTACHMENT 2.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MACHINE ROOM
ELEVATOR
EM1
1 2 3 4 5 6 7 8 9 10
A
B
D
F
G
H
J
1 2 3 4 5 7
8 9 10
2A 4A
J
H
GA
A
B
D
F
G
E M
A N
S I
D
R E
P L
A C
E M
E N
T
P O
W E
R H
O U
S E
P A
S S
E N
G E
R E
L E
V A
T O
R
F O
R T
R A
N D
A L
L D
A M
S
O U
T H
D A
K O
T A
W F
R
N O
V E
M B
E R
O M
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
IC
T
F
IL
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
N
L
E C
T R
IC
A
L P
L A
N A
T E
L E
V A
T
IO
N
.0
E-150
D O
T T
E R
B Y
S L
IN
D
G R
N
F R
E
-1
.d g n
O
T T
E R
B Y
S
P
D
:5
:3
P
M
/1
/2
F R
E
-1
.d g n
SMOKE ALARM PANEL
CHOKE
TRANSFORMER
ELEVATOR CONTROL CABINET
ELEVATOR CONTROL CABINET
SYSTEM
PANEL FOR ELEVATOR SUB-
NEW FIRE ALARM CONTROL
TRANSFORMER
CHOKE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T
SCALE: 1/4" = 1'-0"
0 4'4' 2'
KEY PLAN
1"=40'SCALE:
1307.0
ELECTRICAL DEMOLITION PLAN AT ELEVATION
1/4"=1'-0"SCALE:
NEW ELECTRICAL PLAN AT ELEVATION 1307.0
1"=40'SCALE:
SCALE: 1/4" = 1'-0"
0 4'4' 2'
CONTRACTOR.
TO NEW EXHAUST FAN, COORDINATE FINAL LOCATION WITH MECHANICAL
PROVIDE JUNCTION BOX AND CONNECTIONS FOR COMMON-AUX PANELBOARD CB9 13.
CONTRACTOR.
TO NEW SUPPLY FAN, COORDINATE FINAL LOCATION WITH MECHANICAL
PROVIDE JUNCTION BOX AND CONNECTIONS FOR COMMON-AUX PANELBOARD CB9 12.
NEW LOCATION FOR RELOCATED TELEPHONE LINE.11.
PROVIDE JUNCTION BOX FOR RELOCATED EXISTING ELECTRIC UNIT HEATER.10.
CIRCUIT SERVING ELEVATOR MACHINE ROOM LIGHTING AND RECEPTACLES.
LOCATE SWITCH ADJACENT TO DOOR. CONNECT TO DEDICATED BRANCH
PROVIDE 20A SINGLE POLE, LIGHT SWITCH TO CONTROL MACHINE ROOM LIGHT.9.
CONTRACTOR.
FOR NEW ELECTRIC UNIT HEATER, COORDINATE FINAL LOCATION WITH MECHANICAL
PROVIDE JUNCTION BOX AND CONNECTIONS TO COMMON-AUX PANELBOARD CB9 8.
FROM PANEL 10L.
LIGHTING ARE CONNECTED TO THE SAME DEDICATED BRANCH CIRCUIT
PROVIDE 20A GFI DUPLEX RECEPTACLES. ENSURE RECEPTACLES AND ROOM7.
BRANCH CIRCUIT SERVING ELEVATOR MACHINE ROOM LIGHTING AND RECEPTACLES.
ELEVATOR, AND FIRE SPRINKLER CONTRACTORS. CONNECT TO DEDICATED
9' ABOVE FINISHED FLOOR. COORDINATE LOCATION WITH MECHANICAL,
PROVIDE LED FIXTURE. PENDANT MOUNT AT APPROXIMATELY6.
INSTALLER.
COMMON-AUX PANELBOARD CB9. COORDINATE CONNECTIONS WITH ELEVATOR
EXISITNG FEEDER. EXISTING FEEDER IS APPROXIMATELY 450' EXTENDING FROM THE
TO ELEVATOR CONTROL AND MOTOR. REUSE EXISTING CONDUIT, REPLACE
RK5 TIME DELAY FUSES, FOR ELEVATOR. PROVIDE CONNECTIONS
PROVIDE 60A/3PH, NEMA 1, FUSIBLE DISCONNECT SWITCH, WITH 40A5.
NEW ELECTRICAL KEYNOTES:
FOR ADDITIONAL INFORMATION.
SHALL BE RECONNECTED TO NEW WIRING. SEE SHEET E-151
1291.0. LIGHTING FIXTURES NOT INDICATED FOR REMOVAL
CONTAINING WIRING BACK TO BREAKER 12 PANEL 12LA AT EL.
REMOVE LIGHTING FIXTURES. REMOVE AND REPLACE ASBESTOS 4.
REMOVE EXISTING DISCONNECT SWITCH.
AND FEEDER TO ELEVATOR CONTROL AND MOTOR.
DISCONNECT EXISTING ELEVATOR DISCONNECT SWITCH3.
WITH MECHANICAL AND ELEVATOR INSTALLER.
CONNECTIONS TO ELEVATOR CONTROL. COORDINATE
RELOCATE ELEVATOR TELEPHONE LINE AS INDICATED. PROVIDE2.
INSTALLER.
SUB-SYSTEM. COORDIATE WITH MECHANICAL AND ELEVATOR
REPLACE FIRE ALARM CONTROL PANEL FOR ELEVATOR
COORDINATE WITH MECHANICAL AND ELEVATOR INSTALLER.
RELOCATE ELEVATOR ELECTRICAL EQUIPMENT AS INDICATED.1.
DEMOLITION ELECTRICAL KEYNOTES: GENERAL NOTES:
SHAFT. COORDINATE WITH ELEVATOR INSTALLER.
CAB 120V CIRCUIT AND CONNECTIONS IN ELEVATOR
CIRCUIT IN ELEVATOR SHAFT. PROVIDE NEW ELEVATOR
DISCONNECT AND REMOVE EXISTING ELEVATOR CAB 120V8.
60HZ, 27KVA UNIT. CHOKE IS A 5MHY, 1PH 100A 360HZ UNIT.
PANEL TO LOCATIONS SHOWN. TRANSFORMER IS A 480/240V, 3PH,
REMOVE AND RESET CHOKE, TRANSFORMER, ELEVATOR CONTROL 7.
.NEW FIRE ALARM SUB-SYSTEMWITH EXISTING
NEW PHOTOELECTRIC SMOKE DETECTORS ARE COMPATIBLE
LOCATIONS SHOWN UNLESS OTHERWISE NOTED. ENSURE
WITH NEW PHOTOELECTRIC SMOKE DETECTORS IN
REPLACE EXISTING PHOTOELECTRIC SMOKE DETECTORS6.
COORDINATE WITH ELEVATOR INSTALLER.
EXTEND BRANCH CIRCUIT DOWN ELEVATOR SHAFT INTO PIT AREA.
WIRING ROUTING FROM PANEL 10L INTO ELEVATOR SHAFT.
REPLACE EXISTING BRANCH CIRCUIT WITH NEW 5.
WIRING IN FINISHED SPACES.
CONCEAL BRANCH CIRCUIT AND FEEDER 4.
SIZE CONDUCTORS PER NEC.
IN BRANCH CIRCUITS AND FEEDERS.
PROVIDE EQUIPMENT GROUNDING CONDUCTORS 3.
PROVIDE 3/4" MINIMUM RIGID METAL CONDUIT.2.
PROVIDE #12 AGE COPPER CONDUCTORS MINIMUM.1.
J
S
J
F4
F4E
J
J
File details come from the government source that posted it. Updated .