This document is a Bidding Schedule for the Missouri River Levee System Unit R-562 PL84-99 Rehabilitation Project. The detailed bid schedule includes 38 primary bid items and 2 optional bid items, covering extensive levee repair work such as clearing, grubbing, filling underwater breaches, installing drainage structures, performing erosion control, and restoring borrow sites. Key quantities include 171,000 cubic yards of underwater fill, 576,000 cubic yards of cohesive and topsoil fill, 375,000 square yards of erosion control blanket, and various riprap and stone protection materials across multiple project sites.

The bidding schedule provides specific instructions for bid submission, including requirements to enter prices for all items, with the government reserving the right to exercise options within 90 days after the Notice to Proceed. The project involves repairing levee sections near Peru, Nebraska, with work to be completed within 547 calendar days after contract award. Bid quantities are pre-calculated by the government, but contractors are responsible for verifying actual quantities through before and after surveys. The estimated construction cost ranges between $25,000,000 and $50,000,000, and the solicitation is restricted to small businesses under NAICS code 237990.

View the file

Other files

File Type Posted
Bid Abstract - MR562.xlsx XLSX spreadsheet
Solicitation Amendment 0008 W9128F25BA0010008 SF 30.pdf PDF
AMD 0008 R562Bid_Schedule 9.24.2025.pdf PDF
AMD 0007 - R562Volume1of3DrawingsG003_CF272.pdf PDF
AMD 0007 - R562Volume2of3DrawingsCF300toCF509R.pdf PDF
AMD 0007 - 35 31 19.pdf PDF
AMD 0007 - 31 35 19.16.pdf PDF
AMD 0007 - NE20250049 Nemaha Otoe County 9.4.2025.pdf PDF
AMD 0007 Amendment Narrative W9128F26BA001 Att 0003.docx DOCX document
AMD 0007 - Att 0001 Bid Schedule.pdf PDF
AMD 0007 - R562Volume3_3DrawingsCF600toCF920R.pdf PDF
AMD 0007 - 01 22 00.pdf PDF
Solicitation Amendment 0007 W9128F25BA0010007 SF 30.pdf PDF
Amendment 0006 SF30 W9128F25BA0010006.pdf PDF
Amendment 0005 SF30 W9128F25BA0010005.pdf PDF
R562Volume6of6DrawingsCF901_BI005.pdf PDF
R562Volume5of6DrawingsCF651_CF871.pdf PDF
R562Volume4of6DrawingsCF361_CF621A.pdf PDF
R562Volume3of6DrawingsCF300_CF352.pdf PDF
R562Volume1of6DrawingsG001_CF256.pdf PDF
R562Volume2of6DrawingsCF256_CF272.pdf PDF
Successful Step-1 Company List.docx DOCX document
Solicitation W9128F25BA0010004 Step Two.pdf PDF
W9128F25BA001 R-562 Specs Step 2.pdf PDF
Amendment 0004 SF30 W9128F25BA001.pdf PDF
Solicitation Amendment 0003 W9128F25BA0010003 SF 30.pdf PDF
Site Visit Attendee List 5.6.2025.pdf PDF
W9128F25BA0010002 SF 30.pdf PDF
Solicitation Amendment W9128F25BA0010001 SF 30.pdf PDF
Solicitation Amendment - W9128F25BA0010001.pdf PDF
R562-step-1-Plans_Vol2.pdf PDF
Att 0002 W9128F25BA001 R-562 specs step1.pdf PDF
R562-step-1-Plans_Vol1.pdf PDF
R562-step-1-Plans_Vol3.pdf PDF
Att 0002 - W9128F25BA001 R-562 specs.pdf PDF
W9128F25BA001 Step 1.pdf PDF
Att 0001 - MR-562 BID SCHEDULE.docx DOCX document
Att 0003 - PPQ forms.pdf PDF
Att 0004 - NE20250049 Nemaha Otoe County 3.14.2025.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 11 00 Page 3

Missouri River Levee System Unit R-562 PL84-99 Rehabilitation Project

BIDDING SCHEDULE

BASIC � R562

Item Estimated Unit No. Description Quantity Unit Price Amount

0001 Clearing and Grubbing Job L.S. ------ $_______

0002 Stripping Job L.S. ------ $_______

0003 Riverside Existing Ditch Fill 17,000 C.Y. $________ $_______

0004 Underwater Fill (Breach A, Breach C) 171,000 C.Y. $________ $_______

0005 Toe Trench Drain Pervious Material 62,300 Tons $________ $_______

0006 Toe Trench Drain Spalls Cover 8,000 Tons $________ $_______

0007 Seepage Berm Pervious Fill 190,000 C.Y. $________ $_______

0008 Cohesive and Topsoil Fill 576,000 C.Y. $________ $_______

0009 Topsoil 192,000 C.Y. $________ $_______

0010 Gravel Surfacing 24,500 Tons $________ $_______

0011 Seeding & Mulching 150 Acres $________ $_______

0012 Erosion Control Blanket 375,000 Sq Yd $________ $_______

0013 Stone Protection

0013A Riprap Type A 5,000 Tons $________ $_______

0013B Riprap Type B 10,000 Tons $________ $_______

0013C Riprap Type C 31,000 Tons $________ $_______

0013D Spalls 28,000 Tons $________ $_______

0013E Bedding 23,000 Tons $________ $_______

0014 Drainage Structure Sta. 357+40 Removal Job L.S. ------ $_______

00 11 00 Page 4

0015 Drainage Structure Sta. 654+50 - Job L.S. ------ $_______ Removal/Replacement

0016 Drainage Structure Sta. 673+45, 115� Rt. Job L.S. ------ $_______ Removal/Install

0017 Drainage Structure Sta. 673+60, 150� Lt. Job L.S. ------ $_______ Removal

0018 Drainage Structure Sta. 673+80, 430� Lt. Job L.S. ------ $_______

0019 Install Relief Well Manholes and Job L.S. ------ $_______ Removal Appurtenances

0020 Anchor Reinforced Vegetation System Job L.S. ------ $_______

Subtotal Bid Items No. 0001 � 0020) $__________________

DAMAGE REPAIRS STA. 272+91.27TO 329+00, 381+00 to 494+50, 496+50 to 546+00, and 550+00 to 590+00

0021 Tilling - Riverside Regrading 280,000 Sq. Ft. $________ $_______

0022 Riverside and Landside 23,000 Linear $________ $_______ Levee Toe Repairs Feet

0023 Riverside and Landside 840,000 Sq. Ft. $________ $_______

Levee Side Slope Repairs

0024 Levee Crest Erosion Repairs Grading 5,000 Linear $________ $_______ Feet

0025 Landside Seepage Berm Repairs 450,000 Sq. Ft. $________ $_______

0026 Existing Toe Trench Drain Cover 8,700 Linear $________ $_______ Sediment Removal Feet

Sub Total (Bid Items No. 0020 � 0026) $__________________

BORROW AREA SITE RESTORATIONS

0027 R562 Riverside Sand Borrow Site Job L.S. ------ $_______ Clearing & Grubbing, and Stripping

00 11 00 Page 5

0028 Upper Hamburg Bend Sand Borrow Sites Job L.S. ------ $_______ Clearing & Grubbing, and Stripping

0029 South Nishnabotna Bend Sand & Cohesive Job L.S. ------ $_______ Borrow Sites Clearing & Grubbing, and Stripping

0030 Private Topsoil Borrow Site Job L.S. ------ $_______ Clearing & Grubbing, and Stripping

0031 Private Cohesive Borrow Site Job L.S. ------ $_______ Clearing & Grubbing, and Stripping

0032 Private Camp Creek Surface Sand, and Topsoil Job L.S. ------ $_______ and Sand Stockpiles Borrow Site Restorations

0033 North Nishnabotna Bend Surface Sand Job L.S. ------ $_______ Borrow Site Restoration

0034 Upper Hamburg Bend Sand Borrow Sites Job L.S. ------ $_______ Restoration

0035 South Nishnabotna Bend Sand & Cohesive Job L.S. ------ $_______ Borrow Area Site Restoration

0036 Private Topsoil Borrow Site Job L.S. ------ $_______ Restoration

0037 Private Cohesive Borrow Site Job L.S. ------ $_______ Restoration

0038 All Remaining Work (excluding

Bid Items No. 0001 thru 0037) Job L.S. ------ $_______

TOTAL AMOUNT (Basic Bid Items No. 0001 thru 0038) $__________________

OPTION 1 - R562 Drainage Structure Sta. 673+45. 115� Rt.

0016A Drainage Structure Sta. 673+45, 115� Rt. Job L.S. ------ $_______ Removal/Install

TOTAL AMOUNT OPTION 1 Bid Items No. 0016A $__________________

00 11 00 Page 6

OPTION 2 - R562 Drainage Structure Sta. 673+80. 430� Lt.

0018A Drainage Structure Sta. 673+80, 430� Lt. Job L.S. ------ $_______

TOTAL AMOUNT OPTION 2 Bid Items No. 0018A $__________________

Notes for Bidding Schedule (BASIC and OPTIONS)

1. Bid prices must be entered for all items of the schedule. Total amount bids submitted without bid prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered the bid. In case of variation between the individual bid item prices and the total amount, the individual bid prices will be considered the bid.

2. See SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of the options. The Government reserves the right to exercise the options within 90 days after issuance of Notice to Proceed.

3. A modification to a bid, which provides for a single adjustment to the total amount bid, should state the application of the adjustment to each respective unit price and lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Basic Bid Item No. 38

4. Reference Specification Section 01 22 00.00 10 MEASUREMENT AND PAYMENT, for additional information on bid items.

5. Bid quantities included on this bid sheet have been calculated by the Government. The Contractor shall be responsible for proving any discrepancy between bid and actual quantities during construction by performing before and after surveys, and submitting this information to the Government.