AMD 0007 - Att 0001 Bid Schedule.pdf
PDF 150 KB Posted
- Attached to
- Missouri River Levee R-562 Repair
- Solicitation number
- W9128F25BA001
About this file
This document is a Bidding Schedule for the Missouri River Levee System Unit R-562 PL84-99 Rehabilitation Project. The comprehensive bid schedule includes 38 primary bid items and two optional items, covering extensive levee rehabilitation work across multiple areas. Key work categories include clearing and grubbing, fill materials (riverside, underwater, toe trench, seepage berm), cohesive and topsoil fill, surfacing, seeding, erosion control, stone protection, drainage structure removals and replacements, relief well work, and site restoration for various borrow areas. The project involves detailed quantitative specifications for each bid item, with quantities ranging from job-specific lump sum tasks to specific measurements like 17,000 cubic yards of riverside existing ditch fill, 555,000 cubic yards of compacted embankment, and 375,000 square yards of erosion control blanket. The bidding schedule includes a base bid and two optional items related to drainage structure pipe sections, with the government reserving the right to exercise options within 360 days after the Notice to Proceed.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 11 00 Page 3
Missouri River Levee System Unit R-562
PL84-99 Rehabilitation Project
BIDDING SCHEDULE
BASIC – R562
Item Estimated Unit
No. Description Quantity Unit Price Amount
0001 Clearing and Grubbing Job L.S. ------ $_______
0002 Stripping Job L.S. ------ $_______
0003 Riverside Existing Ditch Fill 17,000 C.Y. $________ $_______
0004 Underwater Fill (Breach A, Breach C) 171,000 C.Y. $________ $_______
0005 Toe Trench Drain Pervious Material 62,300 Tons $________ $_______
0006 Toe Trench Drain Spalls Cover 8,000 Tons $________ $_______
0007 Seepage Berm Pervious Fill 175,000 C.Y. $________ $_______
0008 Cohesive Fill
0008AA Compacted Embankment 555,000 C.Y. $________ $_______
0008AB Topsoil Fill 78,000 C.Y. $________ $_______
0009 Topsoil 150,000 C.Y. $________ $_______
0010 Surfacing
0010AA Gravel Surfacing 24,000 Tons $________ $_______
0010AB Trail Gravel Surfacing 500 Tons $________ $_______
0011 Seeding & Mulching 150 Acres $________ $_______
0012 Erosion Control Blanket 375,000 Sq Yd $________ $_______
0013 Stone Protection
0013AA Riprap Type A 5,000 Tons $________ $_______
00 11 00 Page 4
0013AB Riprap Type B 10,000 Tons $________ $_______
0013AC Riprap Type C 31,000 Tons $________ $_______
0013AD Spalls 28,000 Tons $________ $_______
0013AE Bedding 23,000 Tons $________ $_______
0014 Drainage Structure Sta. 357+40 Removal Job L.S. ------ $_______
0015 Drainage Structure Sta. 654+50 - Job L.S. ------ $_______
Removal/Replacement
0016 Drainage Structure Sta. 673+45, 115’ Rt. Job L.S. ------ $_______
Removal/Install Using Salvaged Pipe Sections
0017 Drainage Structure Sta. 673+60, 150’ Lt. Job L.S. ------ $_______
Removal
0018 Drainage Structure Sta. 673+80, 430’ Lt. Job L.S. ------ $_______
Using Salvaged Pipe Sections
0019 Relief Wells
0019AA Existing Relief Well Manhole 31 Each. $________ $_______
Removals
0019AB Installation of Relief Well Manholes 21 Each. $________ $_______ and Appurtenances
0020 Anchor Reinforced Vegetation System Job L.S. ------ $_______
Subtotal Bid Items No. 0001 – 0020) $__________________
DAMAGE REPAIRS STA. 272+91.27TO 329+00, 381+00 to 494+50, 496+50 to 546+00, and
550+00 to 590+00
0021 Tilling - Riverside Regrading 280,000 Sq. Ft. $________ $_______
0022 Riverside and Landside 23,000 Linear $________ $_______
Levee Toe Repairs Feet
0023 Riverside and Landside 840,000 Sq. Ft. $________ $_______
Levee Side Slope Repairs
00 11 00 Page 5
0024 Levee Crest Erosion Repairs Grading 5,000 Linear $________ $_______
Feet
0025 Landside Seepage Berm Repairs 450,000 Sq. Ft. $________ $_______
0026 Existing Toe Trench Drain Cover 8,700 Linear $________ $_______
Sediment Removal Feet
Sub Total (Bid Items No. 0020 – 0026) $__________________
BORROW AREA SITE RESTORATIONS
0027 North Nishnabotna Surface Sand Borrow Site Job L.S. ------ $_______
Clearing & Grubbing, and Stripping
0028 Upper Hamburg Bend Sand Borrow Sites Job L.S. ------ $_______
0029 South Nishnabotna Bend Sand & Cohesive Job L.S. ------ $_______
Borrow Sites Clearing & Grubbing, and Stripping
0030 Private Topsoil Borrow Site Job L.S. ------ $_______
0031 Private Cohesive Borrow Site Job L.S. ------ $_______
0032 Private Camp Creek Surface Sand, and Topsoil Job L.S. ------ $_______ and Sand Stockpiles Borrow Site Restorations
0033 North Nishnabotna Bend Surface Sand Job L.S. ------ $_______
Borrow Site Restoration
0034 Upper Hamburg Bend Sand Borrow Sites Job L.S. ------ $_______
Restoration
0035 South Nishnabotna Bend Sand & Cohesive Job L.S. ------ $_______
Borrow Area Site Restoration
0036 Private Topsoil Borrow Site Job L.S. ------ $_______
0037 Private Cohesive Borrow Site Job L.S. ------ $_______
0038 All Remaining Work (excluding
00 11 00 Page 6
Bid Items No. 0001 thru 0037) Job L.S. ------ $_______
TOTAL AMOUNT (Basic Bid Items No. 0001 thru 0038) $__________________
OPTION 1 - R562 Drainage Structure Sta. 673+45. 115’ Rt.
0016AA Drainage Structure Sta. 673+45, 115’ Rt. Linear $________ $_______
New Pipe Sections Feet
TOTAL AMOUNT OPTION 1 Bid Items No. 0016AA $__________________
OPTION 2 - R562 Drainage Structure Sta. 673+80. 430’ Lt.
0018AA Drainage Structure Sta. 673+80, 430’ Lt. Linear $________ $_______
New Pipe Sections Feet
TOTAL AMOUNT OPTION 2 Bid Items No. 0018AA $__________________
Notes for Bidding Schedule (BASIC and OPTIONS)
1. Bid prices must be entered for all items of the schedule. Total amount bids submitted without bid prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered the bid. In case of variation between the individual bid item prices and the total amount, the individual bid prices will be considered the bid.
2. See SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of the options. The Government reserves the right to exercise the options within 360 days after issuance of Notice to Proceed.
3. A modification to a bid, which provides for a single adjustment to the total amount bid, should state the application of the adjustment to each respective unit price and lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Basic Bid Item No. 38
4. Reference Specification Section 01 22 00.00 10 MEASUREMENT AND PAYMENT, for additional information on bid items.
00 11 00 Page 7
5. Bid quantities included on this bid sheet have been calculated by the Government. The Contractor shall be responsible for proving any discrepancy between bid and actual quantities during construction by performing before and after surveys and submitting this information to the
Government.
File details come from the government source that posted it. Updated .