Bid Abstract for W9128F25B0005.pdf
PDF 359 KB Posted
- Attached to
- Big Bend Lower Brule Bank Stabilization Federal contract opportunity
- Solicitation number
- W9128F25B0005
About this file
This is a bid abstract showing the evaluation of 7 construction bids received for solicitation W9128F25B0005, issued by the US Army Corps of Engineers Omaha District for the BB Lower Brule - 12151 project. The abstract was signed by Nadine L. Catania on December 18, 2024.
The project involves construction of L-Head Breakwater Structures including geotextile placement (4,000 SY), clay layer (7,100 CY), and random fill (7,300 CY), along with stone riprap (32,800 tons), spalls and underwater fill (21,400 tons), excavation work, loamy topsoil material, aggregate surface course, and culvert pipe installation. The bids ranged from $7.2M to $13.7M, with Sharpe Enterprises Inc. submitting the lowest bid at $7,208,537.00. The government estimate was $8,655,000.00. All seven bidders (Three Oaks Construction Inc., Medvolt Construction, Perrett Construction Ltd, Highpoint Partners, HSG Park JV, Meridam Partners, and Sharpe Enterprises Inc.) acknowledged three amendments and provided bid security.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED
18-Dec-24 17-Dec-24
AND RECORDED ON THIS ABSTRACT
DATE SIGNED
C. REASONABLE CONTRACT
7A 7B 7C D. E. F.
ITEM # DESCRIPTION OF OFFER ITEM
EST.
QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE
ESTIMATED
AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE
ESTIMATED
AMOUNT UNIT PRICE ESTIMATED AMOUNT
Entire work, complete, for placement of the L-Head Breakwater Structures (placement of Geotextile (˜4,000 SY), Clay Layer (˜7,100 CY) and random fill (˜7,300 CY)) as shown on the drawings and in the specifications
1,850 LF 186.96$ 345,876.00$ 234.69$ $434,176.50 770.40$ $1,425,240.00 570.00$ $1,054,500.00 160.00$ $296,000.00 104.00$ $192,400.00 188.00$ $347,800.00 180.00$ $333,000.00
Entire work, complete, for the mobilization / demobilization of all equipment as shown on the drawings & in the specifications
LS Job 128,829.00$ $375,000.00 $3,242,065.00 $1,144,000.00 $1,070,000.00 $1,308,000.00 $200,000.00 63.00$ $2,066,400.00
Entire work, complete, for all plant, material, and labor required for: Stone (Riprap) as shown on the drawings and in the specifications
32,800 Tons 84.64$ 2,776,192.00$ 67.53$ $2,214,984.00 63.25$ $2,074,600.00 135.00$ $4,428,000.00 89.00$ $2,919,200.00 67.30$ $2,207,440.00 94.00$ $3,083,200.00 61.00$ $1,305,400.00
Entire work, complete, for all plant, material, and labor required for: Spalls and Underwater Fill as shown on the drawings and in the specifications
21,400 Tons 75.08$ 1,606,712.00$ 67.86$ $1,452,204.00 61.41$ $1,314,174.00 113.00$ $2,418,200.00 110.00$ $2,354,000.00 66.40$ $1,420,960.00 76.00$ $1,626,400.00 100.00$ $660,000.00
Entire work, complete, for All plant, material, and labor required for: Excavation Cut as shown on the drawings and in the specifications
59,900 CY 2.40$ 143,760.00$ 4.78$ $286,322.00 6.84$ $409,716.00 8.65$ $518,135.00 7.00$ $419,300.00 8.35$ $500,165.00 3.00$ $179,700.00 4.00$ $239,600.00
Entire work, complete, for All plant, material, and labor required for: Excavation Fill as shown on the drawings and in the specifications
35,500 CY 15.61$ 554,155.00$ 6.10$ $216,550.00 13.37$ $474,365.00 9.60$ $340,800.00 6.00$ $213,000.00 2.95$ $104,725.00 4.00$ $142,000.00 4.00$ $142,000.00
Entire work, complete, for All plant, material, and labor required for: Disposal Excess Material as shown on the drawings and in the specifications
24,400 CY 11.71$ 285,724.00$ 8.74$ $213,256.00 21.29$ $519,476.00 10.80$ $263,520.00 20.00$ $488,000.00 7.15$ $174,460.00 7.00$ $170,800.00 4.00$ $97,600.00
Entire work, complete, for All plant, material, and labor required for: Loamy Topsoil Material as shown on the drawings and in the specifications
27,400 CY 19.76$ 541,424.00$ 14.01$ $383,874.00 62.33$ $1,707,842.00 50.00$ $1,370,000.00 19.00$ $520,600.00 173.00$ $4,740,200.00 31.00$ $849,400.00 16.00$ $438,400.00
Entire work, complete, for aggregate surface course as shown on the drawings and in the specifications
6,600 CY 38.83$ 256,278.00$ 20.63$ $136,158.00 89.51$ $590,766.00 137.00$ $904,200.00 90.00$ $594,000.00 60.60$ $399,960.00 127.00$ $838,200.00 24,800.00$ $347,200.00
Entire work, complete, for All plant, material, and labor required for: Placement of culvert pipes as shown on the drawings and in the specifications
14 EA 73,825.00$ 1,033,550.00$ 28,054.40$ $392,761.60 14,874.00$ $208,236.00 41,000.00$ $574,000.00 34,000.00$ $476,000.00 32,100.00$ $449,400.00 27,900.00$ $390,600.00 $865,024.00
0011 All remaining work Except for Option Items listed below LS Job 982,500.00$ $1,590,762.67 $712,920.00 $678,000.00 $1,360,000.00 $1,564,000.00 $1,136,900.00 $713,913.00
TOTAL 8,655,000.00$ $7,696,048.77 $12,679,400.00 $13,693,355.00 $10,710,100.00 $13,061,710.00 $8,965,000.00 $7,208,537.00
UEI: QGKURV69M6H9
Bid Security Yes
C. AMENDMENTS ACKNOWLEDGED - 3
NO.6
A. OFFEROR
Meridam Partners 1001 W Arizona AVE Denver, Colorado Cage: 809D3
UEI: P11HYLRJMKK1
Bid Security Yes
C. AMENDMENTS ACKNOWLEDGED - 3
NO. 3
A. OFFEROR
Perrett Construction Ltd 120 S Macomb ST Valentine, Nebraska Cage: 1EKT3
6. NUMBER OF AMENDMENTS ISSUED - 3
W9128F25B0005 BB Lower Brule - 12151
UEI: HWSZR9YRRHV4
Cage: 85W22
UEI: MF3UT6EJGJR3
Bid Security Yes
C. AMENDMENTS ACKNOWLEDGED - 3
Bid Security Yes
C. AMENDMENTS ACKNOWLEDGED - 3
Three Oaks Construction, Inc Medvolt Construction
North Sioux City, SD Kansas City, MO Cage: 9PPC1B. REASONABLE CONTRACT
(Without Profit)
(Including Profit)
A. OFFEROR A. OFFEROR
IGE 515 South Flynn Street 2345 Grand Blvd Ste 700
A. HIRED LABOR
NO. 1 NO. 2
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F25B0005
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE 9. OFFERS
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
- Nadine L. Catania -
I CERTIFY THAT I HAVE OPENED, READ,
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
ALL OFFERS RECEIVED IN RESPONSE
Harvey, North Dakota Cage: 9KD00
NO. 4
A. OFFEROR
Highpoint Partners 1004 W Boaz ST Newkirk, Oklahoma Cage: 7UNG2
UEI: F1JWKEL887A6
Bid Security Yes
C. AMENDMENTS ACKNOWLEDGED - 3
NO.5
A. OFFEROR
UEI: DVA3F2LWCD59
Bid Security: Yes
C. AMENDMENTS ACKNOWLEDGED - 3
HSG Park JV
2972 25TH ST NE
UEI: JCP6F9KM9TN9
Bid Security Yes
C. AMENDMENTS ACKNOWLEDGED - 3
NO.7
A. OFFEROR
Sharpe Enterprises Inc 1908 N Garfield AVE Pierre, South Dakota Cage: 46V78
18 December 2024
File details come from the government source that posted it. Updated .