Bid Abstract for W9128F25B0005.pdf

PDF 359 KB Posted

Attached to
Big Bend Lower Brule Bank Stabilization Federal contract opportunity
Solicitation number
W9128F25B0005
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This is a bid abstract showing the evaluation of 7 construction bids received for solicitation W9128F25B0005, issued by the US Army Corps of Engineers Omaha District for the BB Lower Brule - 12151 project. The abstract was signed by Nadine L. Catania on December 18, 2024.

The project involves construction of L-Head Breakwater Structures including geotextile placement (4,000 SY), clay layer (7,100 CY), and random fill (7,300 CY), along with stone riprap (32,800 tons), spalls and underwater fill (21,400 tons), excavation work, loamy topsoil material, aggregate surface course, and culvert pipe installation. The bids ranged from $7.2M to $13.7M, with Sharpe Enterprises Inc. submitting the lowest bid at $7,208,537.00. The government estimate was $8,655,000.00. All seven bidders (Three Oaks Construction Inc., Medvolt Construction, Perrett Construction Ltd, Highpoint Partners, HSG Park JV, Meridam Partners, and Sharpe Enterprises Inc.) acknowledged three amendments and provided bid security.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

18-Dec-24 17-Dec-24

AND RECORDED ON THIS ABSTRACT

DATE SIGNED

C. REASONABLE CONTRACT

7A 7B 7C D. E. F.

ITEM # DESCRIPTION OF OFFER ITEM

EST.

QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE

ESTIMATED

AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE

ESTIMATED

AMOUNT UNIT PRICE ESTIMATED AMOUNT

Entire work, complete, for placement of the L-Head Breakwater Structures (placement of Geotextile (˜4,000 SY), Clay Layer (˜7,100 CY) and random fill (˜7,300 CY)) as shown on the drawings and in the specifications

1,850 LF 186.96$ 345,876.00$ 234.69$ $434,176.50 770.40$ $1,425,240.00 570.00$ $1,054,500.00 160.00$ $296,000.00 104.00$ $192,400.00 188.00$ $347,800.00 180.00$ $333,000.00

Entire work, complete, for the mobilization / demobilization of all equipment as shown on the drawings & in the specifications

LS Job 128,829.00$ $375,000.00 $3,242,065.00 $1,144,000.00 $1,070,000.00 $1,308,000.00 $200,000.00 63.00$ $2,066,400.00

Entire work, complete, for all plant, material, and labor required for: Stone (Riprap) as shown on the drawings and in the specifications

32,800 Tons 84.64$ 2,776,192.00$ 67.53$ $2,214,984.00 63.25$ $2,074,600.00 135.00$ $4,428,000.00 89.00$ $2,919,200.00 67.30$ $2,207,440.00 94.00$ $3,083,200.00 61.00$ $1,305,400.00

Entire work, complete, for all plant, material, and labor required for: Spalls and Underwater Fill as shown on the drawings and in the specifications

21,400 Tons 75.08$ 1,606,712.00$ 67.86$ $1,452,204.00 61.41$ $1,314,174.00 113.00$ $2,418,200.00 110.00$ $2,354,000.00 66.40$ $1,420,960.00 76.00$ $1,626,400.00 100.00$ $660,000.00

Entire work, complete, for All plant, material, and labor required for: Excavation Cut as shown on the drawings and in the specifications

59,900 CY 2.40$ 143,760.00$ 4.78$ $286,322.00 6.84$ $409,716.00 8.65$ $518,135.00 7.00$ $419,300.00 8.35$ $500,165.00 3.00$ $179,700.00 4.00$ $239,600.00

Entire work, complete, for All plant, material, and labor required for: Excavation Fill as shown on the drawings and in the specifications

35,500 CY 15.61$ 554,155.00$ 6.10$ $216,550.00 13.37$ $474,365.00 9.60$ $340,800.00 6.00$ $213,000.00 2.95$ $104,725.00 4.00$ $142,000.00 4.00$ $142,000.00

Entire work, complete, for All plant, material, and labor required for: Disposal Excess Material as shown on the drawings and in the specifications

24,400 CY 11.71$ 285,724.00$ 8.74$ $213,256.00 21.29$ $519,476.00 10.80$ $263,520.00 20.00$ $488,000.00 7.15$ $174,460.00 7.00$ $170,800.00 4.00$ $97,600.00

Entire work, complete, for All plant, material, and labor required for: Loamy Topsoil Material as shown on the drawings and in the specifications

27,400 CY 19.76$ 541,424.00$ 14.01$ $383,874.00 62.33$ $1,707,842.00 50.00$ $1,370,000.00 19.00$ $520,600.00 173.00$ $4,740,200.00 31.00$ $849,400.00 16.00$ $438,400.00

Entire work, complete, for aggregate surface course as shown on the drawings and in the specifications

6,600 CY 38.83$ 256,278.00$ 20.63$ $136,158.00 89.51$ $590,766.00 137.00$ $904,200.00 90.00$ $594,000.00 60.60$ $399,960.00 127.00$ $838,200.00 24,800.00$ $347,200.00

Entire work, complete, for All plant, material, and labor required for: Placement of culvert pipes as shown on the drawings and in the specifications

14 EA 73,825.00$ 1,033,550.00$ 28,054.40$ $392,761.60 14,874.00$ $208,236.00 41,000.00$ $574,000.00 34,000.00$ $476,000.00 32,100.00$ $449,400.00 27,900.00$ $390,600.00 $865,024.00

0011 All remaining work Except for Option Items listed below LS Job 982,500.00$ $1,590,762.67 $712,920.00 $678,000.00 $1,360,000.00 $1,564,000.00 $1,136,900.00 $713,913.00

TOTAL 8,655,000.00$ $7,696,048.77 $12,679,400.00 $13,693,355.00 $10,710,100.00 $13,061,710.00 $8,965,000.00 $7,208,537.00

UEI: QGKURV69M6H9

Bid Security Yes

C. AMENDMENTS ACKNOWLEDGED - 3

NO.6

A. OFFEROR

Meridam Partners 1001 W Arizona AVE Denver, Colorado Cage: 809D3

UEI: P11HYLRJMKK1

Bid Security Yes

C. AMENDMENTS ACKNOWLEDGED - 3

NO. 3

A. OFFEROR

Perrett Construction Ltd 120 S Macomb ST Valentine, Nebraska Cage: 1EKT3

6. NUMBER OF AMENDMENTS ISSUED - 3

W9128F25B0005 BB Lower Brule - 12151

UEI: HWSZR9YRRHV4

Cage: 85W22

UEI: MF3UT6EJGJR3

Bid Security Yes

C. AMENDMENTS ACKNOWLEDGED - 3

Bid Security Yes

C. AMENDMENTS ACKNOWLEDGED - 3

Three Oaks Construction, Inc Medvolt Construction

North Sioux City, SD Kansas City, MO Cage: 9PPC1B. REASONABLE CONTRACT

(Without Profit)

(Including Profit)

A. OFFEROR A. OFFEROR

IGE 515 South Flynn Street 2345 Grand Blvd Ste 700

A. HIRED LABOR

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F25B0005

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE 9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

- Nadine L. Catania -

I CERTIFY THAT I HAVE OPENED, READ,

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

ALL OFFERS RECEIVED IN RESPONSE

Harvey, North Dakota Cage: 9KD00

NO. 4

A. OFFEROR

Highpoint Partners 1004 W Boaz ST Newkirk, Oklahoma Cage: 7UNG2

UEI: F1JWKEL887A6

Bid Security Yes

C. AMENDMENTS ACKNOWLEDGED - 3

NO.5

A. OFFEROR

UEI: DVA3F2LWCD59

Bid Security: Yes

C. AMENDMENTS ACKNOWLEDGED - 3

HSG Park JV

2972 25TH ST NE

UEI: JCP6F9KM9TN9

Bid Security Yes

C. AMENDMENTS ACKNOWLEDGED - 3

NO.7

A. OFFEROR

Sharpe Enterprises Inc 1908 N Garfield AVE Pierre, South Dakota Cage: 46V78

18 December 2024