This is a submittal register for the Lower Brule N. Ecosystem Restoration Project Element 1 at Big Bend Dam, detailing all required contractor submissions for the project. The register specifies various submittals across multiple specification sections including preconstruction submittals, shop drawings, product data, test reports, certificates, and closeout documentation.

Key required submittals include: Proposed Methods of Operation, Construction Right-of-Way plans, Temporary Traffic Control plans, Care of Water drawings, Contractor Quality Control Plan, Environmental Protection Plan, Accident Prevention Plan, Storm Water Pollution Prevention Plan, and various construction-related submissions for earthwork, geotextile materials, stone placement, and erosion control. Many submittals require government approval (marked as G AO or G DO) from either the Administrative Officer or District Office. The register provides specific paragraph references, classification codes, and tracking columns for submission dates, approvals, and review status. This serves as the master tracking document for all contractor deliverable requirements throughout the project lifecycle.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES

Lower Brule N. Ecosystem Restoration Proj. Element 1 Big Bend Dam

01 12 00 SD-01 Preconstruction Submittals

1.9 G AOProposed Methods of Operation

1.2Construction Right-of-Way

1.7.5State and Federal Highways

1.7.6State and Local Public Roads

1.7.3 G AOTemporary Traffic Control (TTC)

SD-02 Shop Drawings

1.4 G AOCare of Water

SD-11 Closeout Submittals

1.12Warranty of Construction

01 30 00.24 SD-01 Preconstruction Submittals

1.20.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G AOProject Scheduler Qualifications

3.4.1 G AOPreliminary Project Schedule

3.4.2 G AOInitial Project Schedule

3.6.2 G AOPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G AOSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.8 G AOAccident Prevention Plan (APP)

SD-06 Test Reports

1.12.2 G AOAccident Reports

1.12.3LHE Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Am-0003

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES

01 35 26 1.5 G AOMonthly Exposure Reports

SD-07 Certificates

1.9 G AOActivity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

1.12.4 G AOStandard Lift Plan

01 41 26.01 24 SD-01 Preconstruction Submittals

3.2.1Notice of Intent

3.2.2Authorization Letter

3.2.4Storm Water Pollution Prevention

Plan

3.2.7Notice of Termination

SD-06 Test Reports

Reports

01 45 00 SD-01 Preconstruction Submittals

1.5.2 G AOContractor Quality Control (CQC)

Plan

SD-06 Test Reports

1.12.3Verification Statement

01 57 20.00 10 SD-01 Preconstruction Submittals

1.8Environmental Protection Plan

01 57 23 SD-07 Certificates

2.1.3Mill Certificate or Affidavit

01 78 39.00 24 SD-03 Product Data

1.7.2 G DO100 Percent Preliminary As-Built

Drawings

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES

01 78 39.00 24 1.7.3 G DOFinal As-Built Drawings

31 00 00 SD-01 Preconstruction Submittals

G AOShoring and Sheeting Plan

1.6 G AODewatering Work Plan

3.1Earthwork Notification

Source of Borrow Material; G-AO

G AOBreakwater Construction Work

Plan

SD-06 Test Reports

Borrow Site Testing: G-AO

3.14Testing

SD-07 Certificates

3.14 G AOTesting

31 05 19 SD-03 Product Data

2.2Manufacturing Quality Control

Sampling and Testing

Geotextile, G-AO

SD-04 Samples

3.1Quality Assurance Samples and

Tests

SD-07 Certificates

2.1.1Geotextile

32 05 33 SD-01 Preconstruction Submittals

2.3Integrated Pest Management

Plan

GG, DO

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES

32 05 33 SD-07 Certificates

3.3.1Maintenance Inspection Report

SD-10 Operation and Maintenance

Data

1.6Maintenance

32 11 23 SD-03 Product Data

2.1Plant, Equipment, and Tools

SD-06 Test Reports

1.4 G DOSampling and Testing

1.4.2.2 G ROField Density Tests

32 92 19 SD-03 Product Data

2.1.2 G DOSeed Mixtures

SD-06 Test Reports

2.3.3 G DOPlanting Soil Composition Tests

SD-07 Certificates

2.1 G DOSeed

SD-08 Manufacturer’s Instructions

2.7 G DOErosion Control Materials

33 40 01 SD-03 Product Data

3.3 G AOPlacing Pipe

SD-07 Certificates

G AOFrame and Cover or Gratings

35 31 19 SD-03 Product Data

3.1 G AOLocation of Material Sources for

Stone

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES

35 31 19 3.1.1 G AOSamples of Stone

SD-05 Design Data

3.1 G AOLetter of Clearance

SD-06 Test Reports

G AOTests, service records, field performance, quarry operations, curing, storage, stockpile, and results

35 31 20 SD-03 Product Data

3.2 G AOSilt Curtain

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

File details come from the government source that posted it. Updated .