This is Section 01 57 23 of the technical specifications detailing temporary storm water pollution control requirements for the Big Bend Lower Brule Bank Stabilization project for the US Army Corps of Engineers Omaha District.

The specification outlines detailed requirements for erosion and sediment control measures including silt fences, erosion control blankets, inlet protection, stone construction entrances, rock check dams, and diversion dikes. Key requirements include: installing silt fences 16-34 inches above ground with continuous geotextile rolls; using only natural fiber erosion control blankets (jute, coir, coconut) designed to degrade within 12 months; constructing stone entrances with 6-inch thick aggregate layers; performing inspections every 7 days and within 24 hours after 0.5+ inch rainfall events; maintaining detailed inspection reports; and implementing permanent seeding within 14 days of construction completion in disturbed areas. The contractor must develop and follow a Storm Water Pollution Prevention Plan (SWPPP) that meets National Pollutant Discharge Elimination System (NPDES) permit requirements and South Dakota state regulations.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lower Brule N. Ecosystem Restoration Proj. Element 1 Big Bend Dam BB00106

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 23

TEMPORARY STORM WATER POLLUTION CONTROL

PART 1 GENERAL

1.1 REFERENCES

1.2 GENERAL

1.3 SUBMITTALS

1.4 EROSION AND SEDIMENT CONTROLS

1.4.1 Stabilization Practices

1.4.1.1 Permanent Seeding

1.4.1.2 Temporary Seeding and Mulching

1.4.1.3 Erosion Control Blankets

1.4.2 Temporary Structural Practices

1.4.2.1 Silt Fences

1.4.2.2 Storm Drain Inlet Protection

1.4.2.3 Culvert Inlet Protection

1.4.2.4 Rock Check Dams

1.4.2.5 Stone Construction Entrance

1.4.2.6 Silt Fences

1.4.2.7 Diversion Dikes

PART 2 PRODUCTS

2.1 COMPONENTS FOR SILT FENCES

2.1.1 Geotextile

2.1.2 Silt Fence Stakes and Posts

2.1.3 Mill Certificate or Affidavit

2.1.4 Identification Storage and Handling

2.1.5 Support Mesh

2.2 EROSION CONTROL BLANKETS

2.2.1 Netless Erosion Control Blanket

2.2.2 Single-Net Erosion Control Blanket

2.2.3 Double-Net Erosion Control Blanket

2.3 PERMANENT TURF REINFORCEMENT MAT

2.4 COMPONENTS FOR SEDIMENT TRAP

2.5 COMPONENTS FOR INLET PROTECTION

2.6 STONE CONSTRUCTION ENTRANCE

2.7 ROCK CHECK DAMS

2.8 GEOTEXTILES

PART 3 EXECUTION

3.1 INSTALLATION OF SILT FENCES

3.2 EROSION CONTROL BLANKETS

3.3 TURF REINFORCEMENT MAT

3.4 SEDIMENT TRAP

3.5 STONE CONSTRUCTION ENTRANCE

3.6 MAINTENANCE

SECTION 01 57 23 Page 1

Am-0002

3.6.1 Silt Fences

3.6.2 Storm Drain Inlet Protection

3.6.3 Rock Check Dams

3.6.4 Stone Construction Entrance

3.6.5 Sediment Traps

3.6.6 Diversion Dikes

3.7 INSPECTIONS

3.7.1 General

3.7.2 Inspections Details

3.7.3 Inspection Reports

-- End of Section Table of Contents --

SECTION 01 57 23 Page 2

SECTION 01 57 23

TEMPORARY STORM WATER POLLUTION CONTROL

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D448 (2012; R 2017) Standard Classification for Sizes of Aggregate for Road and Bridge Construction

ASTM D4873/D4873M (2017; R 2021) Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 288 (2021) Standard Specification for Geosynthetic Specification for Highway Applications

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

FHWA FP-14 (2014) FP-14 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

1.2 GENERAL

The Contractor shall implement the storm water pollution prevention measures specified in this section in a manner which will meet the requirements of Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and the requirements of the National Pollution Discharge Elimination System (NPDES) permit specified in Section 01 41 26.01 24 (SOUTH DAKOTA) NPDES PERMIT REQUIREMENTS FOR STORM WATER DISCHARGE FROM CONSTRUCTION SITES. The Contractor shall install and maintain stabilization and structural best management practices which will minimize erosion and sediment pollution from the construction site to the extent attainable. The Contractor shall be responsible for selection of appropriate best management practices as specified herein.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not haveing a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SECTION 01 57 23 Page 3

SD-07 Certificates

Mill Certificate or Affidavit

1.4 EROSION AND SEDIMENT CONTROLS

*Am-2

The controls and measures required by the Contractor are described in the Storm Water Pollution Prevention Plans (SWPPP) per Section 01 41 26.01 24

(SOUTH DAKOTA) NPDES PERMIT REQUIREMENTS FOR STORM WATER DISCHARGES FROM

CONSTRUCTION SITES.

The controls and measures required by the Contractor are described [in the Storm Water Pollution Prevention Plans (SWPPP) per Section 01 41 26.__ 24

NPDES PERMIT REQUIREMENTS FOR STORM WATER DISCHARGES FROM CONSTRUCTION

SITES][below].[Reference the Colorado Springs' Stormwater Construction Manual (SCM) in the erosion and sediment control design specifications https:/coloradosprings.gov/stormwater-enterprise/page/stormwater-criteria .]

**Am-2

1.4.1 Stabilization Practices

The stabilization practices to be implemented may include temporary seeding, mulching, sod stabilization, vegetative buffer strips, erosion control blankets, protection of trees, preservation of mature vegetation, etc. Record the dates when the major grading activities occur on the daily CQC report; when construction activities temporarily or permanently cease on a portion of the site; and when stabilization practices are initiated.

1.4.1.1 Permanent Seeding

Disturbed areas of the site where construction activities permanently ceases shall be stabilized with permanent seeding no more than 14 days after the construction activity ceases, except as follows. When the initiation of permanent seeding is stopped due to snow cover or arid conditions, permanent seeding shall be initiated as soon as practicable.

1.4.1.2 Temporary Seeding and Mulching

Areas where construction activities will temporarily cease for more than one year shall be temporarily seeded and mulched. Disturbed areas of the site where construction activities temporarily cease for more than 21 days and less than one year shall be stabilized with either temporary seeding and mulching or mulching not more than 14 days after construction activity ceases, except as follows. When the initiation of temporary stabilization measures is stopped due to snow cover or arid conditions, stabilization measures shall be initiated as soon as practicable.

1.4.1.3 Erosion Control Blankets

Erosion control blanket may be installed on steep slopes and in drainage swales and ditches to protect finished grades from erosion. Only ECBs composed of natural fibers such as jute cord, coir or coconut fiber that are designed to degrade within 12 months shall be used. No materials comprised of synthetic plastics or phytodegradable synthetic material may

SECTION 01 57 23 Page 4 be utilized. See Section 2.7.1 Erosion Control Blanket in Spec 32 92 19 SEEDING for requirements of material.

1.4.2 Temporary Structural Practices

Temporary structural practices shall be implemented to divert flows from exposed soils, temporarily store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site to the degree attainable. Temporary structural practices shall be implemented in a timely manner during the construction process to minimize erosion and sediment runoff. Temporary structural practices shall include but not be limited to the following devices.

1.4.2.1 Silt Fences

The Contractor shall provide silt fences as a temporary structural practice to minimize erosion and sediment runoff. Silt fences shall be properly installed to effectively retain sediment immediately after completing each phase of work where erosion would occur in the form of sheet and rill erosion (e.g. clearing and grubbing, excavation, embankment, and grading). Silt fence barriers shall be installed along the down slope boundary of all disturbed areas prior to beginning land-disturbing activities in those areas. Silt fence barriers may be installed across ditches or swales but not where the drainage area is greater than 1 acre. Removal of silt fence barriers shall be approved by the CO.

1.4.2.2 Storm Drain Inlet Protection

Storm drain inlet protection shall be installed at each new and existing inlet which receives storm runoff from disturbed areas of 1 acre of less.

The protection at each inlet shall be removed once the disturbed area has been finally stabilized.

1.4.2.3 Culvert Inlet Protection

Culvert inlet protection shall be installed at all culverts with a drainage area of 1 acre or less.

1.4.2.4 Rock Check Dams

Rock check dams may be used to reduce erosion of temporary or permanent ditches or swales. Use type 1 rock check dams when the upstream drainage area is less than 2 acres. Use type 2 rock check dams when the upstream area is 2 to 10 acres.

1.4.2.5 Stone Construction Entrance

A stone construction entrance shall be constructed wherever traffic will be leaving the construction site and move directly onto a paved road.

Stone construction entrances shall be removed after the site has been finally stabilized.

1.4.2.6 Silt Fences

Sediment traps may be constructed below disturbed areas where the total contributing drainage area is less than 3 acres. Sediment traps, when used, should be constructed prior to disturbance of upslope areas.

Sediment traps must have an initial storage volume of 134 cubic yards per

SECTION 01 57 23 Page 5 acre of drainage area, half of which shall be in the form of a permanent pool or wet storage to provide a stable settling medium. The remaining half shall be in the form of a drawdown or dry storage which will provide extended settling time during less frequent, larger storm events.

1.4.2.7 Diversion Dikes

Diversion dikes may be constructed to divert runoff from upslope drainage areas away from unprotected disturbed areas and slopes to a stabiilized outlet or to divert sediment-laden runoff from a disturbed area to a sediment-trapping facility such as a sediment trap or sediment basin.

Diversion dikes shall have a maximum channel slope of 2 percent and shall be adequately compacted to prevent failure. The minimum height measured from the top of the dike to the bottom of the channel shall be 18 inches.

The minimum base width shall be 6 feet and the minimum top width shall be 2 feet. The Contractor shall ensure that the diversion dikes are not damaged by construction operations or traffic.

PART 2 PRODUCTS

2.1 COMPONENTS FOR SILT FENCES

2.1.1 Geotextile

The geotextile shall comply with the requirements of AASHTO M 288 for temporary silt fence.

2.1.2 Silt Fence Stakes and Posts

Use either wooden stakes or steel posts for fence construction. Wooden stakes utilized for silt fence construction, shall have a minimum cross section of 2 inches by 2 inches when oak is used and 4 inches by 4 inches when pine is used, and shall have a minimum length of 3 feet. Steel posts (standard "U" or "T" section) utilized for silt fence construction, shall have a minimum weight of 1.33 pounds per linear foot and a minimum length of 5 feet.

2.1.3 Mill Certificate or Affidavit

Provide a mill certificate or affidavit attesting that the geotextile and factory seams meet chemical, physical, and manufacturing requirements specified above. The mill certificate or affidavit shall specify the actual Minimum Average Roll Values and shall identify the fabric supplied by roll identification numbers. Submit a mill certificate or affidavit signed by a legally authorized official from the company manufacturing the geotextile.

2.1.4 Identification Storage and Handling

Geotextile shall be identified, stored and handled in accordance with

ASTM D4873/D4873M .

2.1.5 Support Mesh

Support mesh shall be 14-1/2 gage or heavier steel wire with a mesh spacing of 6 by 6 inch or a prefabricated polymeric mesh of equivalent strength.

SECTION 01 57 23 Page 6

2.2 EROSION CONTROL BLANKETS

Installation staple patterns shall be clearly marked on the erosion control blanket with environmentally safe paint.

2.2.1 Netless Erosion Control Blanket

Erosion control blankets shall be a machine-produced mat with a biodegradable agricultural straw matrix (approximately 0.50 lb/sq yd).

The blanket shall have a 12-month typical functional longevity and be designed for use on geotechnically stable slopes with gradients up to 1V:4H and channels with shear stresses up to 0.50 pounds per square foot.

2.2.2 Single-Net Erosion Control Blanket

Erosion control blankets shall be a machine-produced mat with a biodegradable agricultural straw matrix (approximately 0.50 lb/sq yd) and photodegradable netting on the top side. The blanket shall be sewn together with degradable thread. The blanket shall have a 12-month typical functional longevity and be designed for use on geotechnically stable slopes with gradients up to 1V:3H and channels with shear stresses up to 1.50 pounds per square foot.

2.2.3 Double-Net Erosion Control Blanket

Erosion control blankets shall be a machine-produced mat with a biodegradable agricultural straw matrix (approximately 0.50 lb/sq yd) and photodegradable netting on each side. The blanket shall be sewn together with degradable thread. The blanket shall have a 12-month typical functional longevity and be designed for use on geotechnically stable slopes with gradients up to 1V:2H and channels with shear stresses up to

1.75 pounds per square foot. Only ECBs composed of natural fibers such as jute cord, coir or coconut fiber shall be used. No materials comprised of synthetic plastics or phytodegradable synthetic material may be utilized.

See Section 2.7.1 Erosion Control Blanket in Spec 32 92 19 SEEDING for requirements of material.

2.3 PERMANENT TURF REINFORCEMENT MAT

Turf reinforcement matting shall conform to FHWA FP-14, Section 713, Type 5.A.

2.4 COMPONENTS FOR SEDIMENT TRAP

Coarse aggregate shall conform to ASTM D448, Size 3, 357, or 5. Minor variations from the gradations specified will be permitted. Stone for riprap shall consist of field stone or rough unhewn quarry stone of approximately rectangular shape. The stone shall be hard and angular and of such quality that it will not disintegrate on exposure to water or weathering. The specific gravity of individual stones shall be at least

2.5. Riprap stones shall weigh between 50 and 150 pounds each, except that approximately 10 percent may weigh 50 pounds or less. At least 60 percent shall weight more than 100 pounds. Geotextile shall conform to paragraph GEOTEXTILES.

2.5 COMPONENTS FOR INLET PROTECTION

Aggregates for gravel filter should be sized to get the greatest amount of filtering action possible (by using smaller-sized stone), while not

SECTION 01 57 23 Page 7 creating significant ponding problems.

2.6 STONE CONSTRUCTION ENTRANCE

Aggregate for construction entrance shall conform to ASTM D448, Size 1.

Minor variations from the gradation specified will be permitted.

Geotextile shall conform to paragraph GEOTEXTILES.

2.7 ROCK CHECK DAMS

Coarse aggregate shall conform to ASTM D448 size number 1 or approved equal. Riprap shall consist of field stone or rough unhewn quarry stone of approximately rectangular shape. Riprap shall be hard and angular.

The specific gravity of individual stones shall be at least 2.5. Concrete rubble may be used provided it has a density of at least 150 pcf.

Individual stones shall have a weight of 50 to 150 lbs except that a maximum of 10 percent of stone may weigh less than 50 lbs. At least 60 percent of stones shall weigh more than 100 lbs.

2.8 GEOTEXTILES

Geotextile for other than silt fence shall comply with the requirements of AASHTO M 288 for a separation geotextile.

PART 3 EXECUTION

3.1 INSTALLATION OF SILT FENCES

Silt fences shall extend a minimum of 16 inches above the ground surface and shall not exceed 34 inches above the ground surface. Geotextile shall be from a continuous roll cut to the length of the barrier to avoid the use of joints. When joints are unavoidable, geotextile shall be spliced together at a support post, with a minimum 6 inch overlap, and securely sealed. Silt fence may be installed using either the trench or soil slicing method. Silt fences shall be removed upon approval by the Contracting Officer.

3.2 EROSION CONTROL BLANKETS

Installation of erosion control blankets shall conform to the manufacturer's recommendations.

3.3 TURF REINFORCEMENT MAT

Installation of turf reinforcement matting shall conform to the manufacturer's recommendations.

3.4 SEDIMENT TRAP

The area under the embankment shall be cleared, grubbed, and stripped of any vegetation and root mat. Fill material for the embankment shall be placed in accordance with Section 31 00 00 EARTHWORK. A geotextile shall be placed between the riprap and subgrade.

3.5 STONE CONSTRUCTION ENTRANCE

The area of the entrance shall be cleared of all vegatation, roots, and other objectionable material. The aggregate layer shall have a minimum total thickness of 6 inches. A geotextile shall be placed beneath

SECTION 01 57 23 Page 8 aggregate for the full width and length of the entrance. A minimum of 3 inches of the aggregate shall be placed in a cut section to provide stability and secure the geotextile. If conditions on the site are such that the majority of the mud is not removed by the vehicles traveling over the stone, then the tires of the vehicles shall be washed before entering the road. Wash water must be carried away from the entrance to an approved settling area to remove sediment. A wash rack may also be installed for washing of vehicles.

3.6 MAINTENANCE

The Contractor shall maintain the temporary and permanent vegetation, erosion and sediment control measures, and other protective measures in good and effective operating condition by performing routine inspections to determine condition and effectiveness, by restoration of destroyed vegetative cover, and by repair of erosion and sediment control measures and other protective measures. Maintenance of protective measures shall conform to the requirements in the SWPPP. The following procedures shall be followed to maintain the protective measures.

3.6.1 Silt Fences

Inspect silt fences in accordance with paragraph INSPECTIONS. Make any required repairs promptly. Pay close attention to the repair of damaged silt fence resulting from end runs and undercutting. Should the fabric on a silt fence decompose or become ineffective, and the barrier is still necessary, replace the fabric promptly. Remove sediment deposits when deposits reach one-third of the height of the barrier. Remove silt fence when it is no longer required. Shape the immediate area occupied by the fence and any sediment deposits to an acceptable grade. Seed the areas disturbed by this shaping in accordance with Section 32 92 19 SEEDING.

3.6.2 Storm Drain Inlet Protection

Inspect inlet protection structures after each rainfall and make repairs as needed. Remove sediment and restore the trap to its original dimensions when the sediment has accumulated to one half the design depth.

3.6.3 Rock Check Dams

Check dams should be checked for sediment after each runoff-producing storm event. Remove sediment when it reaches one half the original height of the measure.

3.6.4 Stone Construction Entrance

Maintain stone construction entrances in a conditon which will prevent tracking or flow of mud onto paved roads. This may require periodic top dressing with additional stone or the washing and reworking of existing stone as conditions demand and repair and/or cleanout of any structures used to trap sediment. The use of water trucks to remove materials dropped, washed, or tracked onto roadways will not be permitted under any circumstances.

3.6.5 Sediment Traps

Remove sediment restore the trap to its original dimensions when the sediment has accumulated to one half the design volume of the wet storage. Check filter stone regularly to ensure that filtration

SECTION 01 57 23 Page 9 performance is maintained. Remove stone choked with sediment and clean or replace. Inspect the structure regularly to ensure that it is structurally sound and has not been damaged by erosion or construction equipement. Inspect the height of the stone outlet to ensure that its center is a least 1 foot below the top of the embankment.

3.6.6 Diversion Dikes

Inspect diversion dikes in accordance with paragraph INSPECTIONS. Pay close attention to the repair of damaged diversion dikes and promptly accomplish necessary repairs. When diversion dikes are no longer required, they shall be shaped to an acceptable grade. Seed the areas disturbed by this shaping in accordance with Section 32 92 19 SEEDING.

3.7 INSPECTIONS

3.7.1 General

The Contractor shall inspect disturbed areas of the construction site, areas used for storage of materials that are exposed to precipitation that have not been finally stabilized, stabilization practices, structural practices, other controls, and area where vehicles exit the site at least once every seven (7) calendar days and within 24 hours of the end of any storm that produces 0.5 inches or more rainfall at the site. Where sites have been finally stabilized, such inspection shall be conducted at least once every month. Inspection of protective measures shall conform to the requirements in the SWPPP.

3.7.2 Inspections Details

Inspect disturbed areas and areas used for material storage that are exposed to precipitation for evidence of, or the potential for, pollutants entering the drainage system. Observe erosion and sediment control measures to ensure that they are operating correctly. Inspect discharge locations or points to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters. Inspect locations where vehicles exit the site for evidence of offsite sediment tracking.

3.7.3 Inspection Reports

For each inspection conducted, prepare a report summarizing the scope of the inspection, name(s) of personnel making the inspection, the date(s) of the inspection, major observations relating to the implementation of the storm water pollution prevention measures, maintenance performed, and actions taken. Furnish the report to the Contracting Officer within 24 hours of the inspection as a part of the Contractor's daily CQC REPORT.

-- End of Section --

SECTION 01 57 23 Page 10