This set of construction documents provides design and technical specifications for the Consolidated Helo/TRF Ops/AMU and Alert Facility project at FE Warren Air Force Base in Wyoming under solicitation number W9128F21R0070. The project involves construction of a new Helo/TRF Ops/AMU and Alert Facility, including a maintenance hangar bay with five shelter bays, seven apron parking spots, and associated site improvements. The specifications include requirements for building codes, design loads, soil testing, foundation design, drainage, and other structural and civil elements. The Department of the Army Corps of Engineers Engineering District Omaha is the contracting agency.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Baysinger Design Group, Inc.
Marion, Illinois 62959
4501 West DeYoung Street, Suite 100B
Fax: 618.998.8032
Phone: 618.998.8015 www.BaysingerDesignGroup.com
Illinois Design Firm No. 184-004212
Jacobs Engineering Group Inc.
777 Main Street, Fort Worth, TX 76102 USA
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL OF ALL DRAWINGS IN THIS SET AS
SHOWN IN THE INDEX
THIS PROJECT WAS DESIGNED UNDER THE OMAHA DISTRICT OF THE U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT
AS REQUIRED BY ER 1110-1-8152
PREPARED BY U.S. ARMY ENGINEERS DISTRICT, OMAHA
CHIEF, GEOTECHNICAL DATE
CHIEF, DESIGN BRANCH DATE
CHIEF, HYDROLOGIC DATE
ENGINEERING & SCIENCES BRANCH
VICINITY MAP
TRUE NORTH
ENGINEERING BRANCH
CHIEF, HYDROLOGIC DATE
ENGINEERING DIVISION, P.E.
SUBMITTED BY:
CHIEF: ARCH SECTION
RA
SUBMITTED BY:
CHIEF: CIVIL/GEOT SECTION
PLA
SUBMITTED BY:
CHIEF: ELECT SECTION
PE
SUBMITTED BY:
CHIEF: ENVR SECTION
PE
SUBMITTED BY:
CHIEF: MECH SECTION
PE
SUBMITTED BY:
CHIEF: STRUCT/INTER SECTION
PE
SUBMITTED BY:
CADD/BIM PROJECT COORDINATION
5250 Cherokee Ave., Suite 420, Alexandria, VA 22312-2050 MAIN 703/658-4400 WEB www.woodspeacock.com
Crawford Consulting Services 239 Highland Avenue
PRIME CONSULTANT CONSULTANTS
PROJECT LOCATION
Terracon Consultants, Inc.
1505 Old Happy Jack Road Cheyenne, Wyoming 82001
R E
G
IS
T
ERED ARCH
IT
E
C T
S T
A T E
O F T EX
A S
C H
R I S
T
O
PHER M
S U
R L
E S
2 3 6 3 8
US Army Corps of Engineers Omaha District ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
A/E CONTRACT NO.:
ISSUE DATE:
M A
R K
D E
S C
R
IP
T
IO
N
D R
A W
IN
G
C O
D E
A F
-1
-0
-W
F
R
M
A R
C H
C H
O F
F F
IL
E
N A
M E
O M
A H
A D
IS
T
R
IC
T
O M
A H
A
N E
B R
A S
K A
F Y
H
E L
O /T
R F
/M A
IN
T
E N
A N
C E
F A
C
IL
IT
Y
P R
O J
E C
T N
U M
B E
R
G H
L N
A
F E
W A
R R
E N
A F
B
W Y
J A
C O
B S
E N
G
IN
E E
R
IN
G G
R O
U P
I N
C
M a in
S tr e e t
F o rt
W o rt h
T X
JEG Proj. No. FDZD7312
READY-TO-ADVERTISE (RTA) DESIGN
READY-TO-ADVERTISE (RTA) DESIGN G-001
C O
V E
R S
H E
E T
C S
U R
L E
S
L F
A L
L O
N
J H
U N
E Y
C U
T T
OMAHA DISTRICT
FE WARREN AFB, WY
FY18 HELO/TRF/MAINTENANCE FACILITY
W9128F21R0070
W9128F-15-D-0004; DO# 0001
31 MARCH 2021
PN GHLN983001A
F E
-G
H L N
A G
-0
BASE BID INCLUDES THE FOLLOWING BID OPTIONS
BASE BID - INCLUDES HELO/TRF FACILITY WITH 5 SHELTER BAYS, 7 APRON PARKING SPOTS AND ASSOCIATED SITE
IMPROVEMENTS.
THE FOLLOWING BID OPTIONS ARE INCLUDED:
BID OPTION 1 - CRASH/FIRE RESCUE FACILITY
BID OPTION 2 - ONE ADDITIONAL STORAGE SHELTER BAY
BID OPTION 3 - ONE ADDITIONAL APRON PARKING SPACE
BID OPTION 4 - SNOW MELT FOR HANGAR DOORS
BID OPTION 5 - HELO/TRF/MAINTENANCE FACILITY AIR COMPRESSORS, 400 HZ GENERATORS, 28 VDC RECTIFIERS AND
AIRCRAFT WASH EQUIPMENT
BID OPTION 6 - CFR AIR COMPRESSORS
BID OPTION 7 - PREFABRICATED POL STORAGE AND HAZMAT STORAGE BUILDINGS
BID OPTION 8 - RELOCATION OF EXISTING PREFABRICATED ARMORY BUILDING
BID OPTION 9 - HELO/TRF/MAINTENANCE FACILITY FURNITURE FIXTURES AND EQUIPMENT (FF&E)
BID OPTION 10 - CFR FURNITURE FIXTURES AND EQUIPMENT (FF&E)
BID OPTION 11 - HELO/TRF/MAINTENANCE FACILITY PUBLIC ADDRESS SYSTEM
BID OPTION 12 - CRF PUBLIC ADDRESS SYSTEM
A
M
R E
V
IS
IO
N
S
-0
-2
CFR
09-09-21
TRUE NORTH
US Army Corps of Engineers
Omaha District ®
SHEET ID
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D x
I S
S U
E
D
A T
E
C O
N T
R A
C
N
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
H
F I L E
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
W
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
B
G
I N
E E
R I N
G
G
R O
C
M a i n t r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
B
30' 60'0
SCALE: 1"=30'
15'
KEY PLAN
AREA 4
KATHYRIYA KENNEDY
TX98244
READY-TO-ADVERTISE (RTA) DESIGN
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE FOR
CONCEPT DESIGN AND NOT
INTENDED FOR CONSTRUCTION
BIDDING OR PERMIT PURPOSES.
THEY WERE PREPARED BY, OR
UNDER SUPERVISION OF:
NAME
REGISTRATION # DATE
04 NOV 2020
SCALE
BORING LOCATIONS - AREA 4
A3
1"=30'
LEGEND
GENERAL NOTES
A BORING LOCATIONS SHOWN ARE
APPROXIMATE.
B REFER TO SHEETS B-104 - B108 FOR
BORING LOG INFORMATION.
B O
R I N
G
L
O C
A T
I O
R E
A
B-103
FOR
REFERENCE
ONLY
BORINGS PERFORMED WITHIN THE
AIRFIELD PAVEMENT AREAS
A-1
NOTE: APPROXIMATE BORING LOCATION,
PERFORMED BY TERRACON CONSULTING, INC.
(AUGUST 2017)
BORINGS DRILLED WITHIN THE
MAIN CONSOLIDATED HELO/TRF
OPERATION/AMU AND ALERT
FACILITY BUILDING AREAS
B-3
BORINGS DRILLED WITHIN PUMP
HOUSE AREAS
PH-1
BORINGS DRILLED WITHIN FIRE
STATION BUILDING AREAS
FS-1
BORINGS DRILLED WITHIN
UNDERGROUND WATER STORAGE
TANK AREAS
W-1
BORINGS DRILLED WITHIN GOV
AND POV PARKING AREAS
P-1
BORINGS DRILLED WITHIN ACCESS
DRIVE AREAS
D-1
BORINGS DRILLED WITHIN UTILITY
ALIGNMENT AREAS
U-1
1 2
A
M
V
I S
I O
N S
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
A R
R
AREA 2 AREA 2
AREA 4 AREA 4
AREA 6 AREA 6
AREA 4 AREA 4
A R
R
R
R
R
R
HANGAR FFE: 6302.78
HANGAR FFE: 6303.20
A R
R
R
HELO OPS BUILDING
A
2A
A
A
A
A
A of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
B
READY-TO-ADVERTISE (RTA) DESIGN
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE FOR
CONCEPT DESIGN AND NOT
INTENDED FOR CONSTRUCTION
BIDDING OR PERMIT PURPOSES.
THEY WERE PREPARED BY, OR
UNDER SUPERVISION OF:
NAME
REGISTRATION # DATE
04 NOV 2020
B O
R I N
G
L
O G
S
B-108
FOR
REFERENCE
ONLY
SCALE
BORING LOGS U-5
D1
NTS SCALE
BORING LOGS U-6
D4
NTS SCALE
BORING LOGS W-1
D6
NTS SCALE
BORING LOGS W-2
D9
NTS
SCALE
BORING LOGS W-3
A1
NTS SCALE
BORING LOGS P-6
A4
NTS SCALE
EXHIBIT C-1 GENERAL NOTES
A6
NTS SCALE
EXHIBIT C-2 USCS
A9
NTS
A
M
V
I S
I O
N S
HEAVY DUTY ASPHALT
PAVEMENT, RE: E4/C-520
BUILDING
HEAVY DUTY CONCRETE
PAVEMENT, RE: E1/C-520
CONCRETE SIDEWALK,
RE: A1/C-520
BID OPTION 4 SNOW MELT FOR
HANGAR DOORS, RE: B4/C-520
AIRFIELD ASPHALT SHOULDER
PAVEMENT, RE: F4/C-520
AIRFIELD CONCRETE
PAVEMENT, RE: F1/C-520
RIP-RAP, RE: A3/C-512
TRUE NORTH
US Army Corps of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C P
30' 60'0
SCALE: 1"=30'
15'
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O N
KEY PLAN
5 6
AREA 3
READY-TO-ADVERTISE (RTA) DESIGN
WYOMING REGISTERED
ENGINEERING FIRM ES-0061
SCALE
PAVING PLAN - AREA 3
A3
1"=30'
LEGEND
GENERAL NOTES - PAVING PLANS
P A
V I N
G
P
L A
N
A
R E
A
CP103
A REFER TO ARCHITECTURAL PLANS FOR
BUILDING DIMENSIONS.
B SEE SHEETS C-520-C-523 FOR PAVEMENT
SECTIONS.
C SEE STRUCTURAL PLANS FOR HANGAR
FOUNDATION SECTION.
D REFER TO SHEETS CS101-CS106 FOR
SITE DIMENSIONAL CONTROL
E REFER TO SHEETS CP111-CP120 FOR
ROAD PLAN & PROFILES
F
KEYNOTES
223 BID OPTION 4 SNOW MELT FOR HANGAR
DOORS. RE: B4/C-520, E1/S-505
G IF BID OPTION 4 IS NOT ACCEPTED, USE
PROPOSED CONCRETE PAVEMENT FOR
APRON, RE: F1/C-520
REFER TO SHEETS CT101-CT110 FOR
AIRFIELD JOINTING & JOINT GRADING
303 PAVEMENT MARKING, RE: A5/C-501
A
M
V
I S
I O
N S
A
M
V
I S
I O
N S
HELO OPS BUILDING
FFE: 6303.20
X X
X X
X X
X X
AREA 1 AREA 1
A R
R
R
R
R
R
R
R
AREA 3 AREA 3
AREA 3 AREA 3
AREA 5 AREA 5
R E
S T
R I C
T E
D
A
R E
A
A
U T
H O
R I Z
R
S O
N N
E L
O
N L Y
H A
N G
E
H A
N G
E
13.73'
09/09/2021
HEAVY DUTY ASPHALT
PAVEMENT, RE: E4/C-520
BUILDING
AIRFIELD ASPHALT SHOULDER
PAVEMENT, RE: F4/C-520
AIRFIELD CONCRETE
PAVEMENT, RE: F1/C-520
HEAVY DUTY CONCRETE
PAVEMENT, RE: E1/C-520
BID OPTION 4 SNOW MELT FOR
HANGAR DOORS, RE: B4/C-520
TRUE NORTH
US Army Corps of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C P
30' 60'0
SCALE: 1"=30'
15'
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O N
KEY PLAN
AREA 4
5 6
SCALE
PAVING PLAN - AREA 4
A3
1"=30'
GENERAL NOTES - PAVING PLANS
P A
V I N
G
P
L A
N
A
R E
A
CP104
KEYNOTES
A REFER TO ARCHITECTURAL PLANS FOR
BUILDING DIMENSIONS.
B SEE SHEETS C-520-C-523 FOR PAVEMENT
SECTIONS.
C SEE STRUCTURAL PLANS FOR HANGAR
FOUNDATION SECTION.
D REFER TO SHEETS CS101-CS106 FOR
SITE DIMENSIONAL CONTROL
E REFER TO SHEETS CP111-CP120 FOR
ROAD PLAN & PROFILES
F
LEGEND
231 FUTURE TAXIWAY
223 BID OPTION 4 SNOW MELT FOR HANGAR
DOORS. RE: B4/C520 AND E1/S-505
REFER TO SHEETS CT101-CT110 FOR
AIRFIELD JOINTING & JOINT GRADING
G IF BID OPTION 4 IS NOT ACCEPTED, USE
PROPOSED CONCRETE PAVEMENT FOR
APRON, RE: F1/C-520
A
M
V
I S
I O
N S
A
M
V
I S
I O
N S
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
A R
R
AREA 2 AREA 2
AREA 4 AREA 4
AREA 6 AREA 6
AREA 4 AREA 4
A R
R
R
R
R
R
HANGAR FFE: 6302.78
HANGAR FFE: 6303.20
A R
R
R
HELO OPS BUILDING
of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C P
30' 60'0
SCALE: 1"=30'
15'
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O N
KEY PLAN
SCALE
PAVING PLAN - BID OPTION 2 - ADDITIONAL STORAGE SHELTER BAY
A3
1"=30'
LEGEND
GENERAL NOTES - PAVING PLANS
P A
V I N
G
P
L A
N
B
T
I O
D
D I T
I O
N A
L
S
T O
R A
G
E
L T
Y
CP109
A REFER TO ARCHITECTURAL PLANS FOR
BUILDING DIMENSIONS.
B SEE SHEETS C-520-C-523 FOR PAVEMENT
SECTIONS.
C SEE STRUCTURAL PLANS FOR HANGAR
FOUNDATION SECTION.
D REFER TO SHEETS CS101-CS106 FOR
SITE DIMENSIONAL CONTROL
E REFER TO SHEETS CP111-CP121 FOR
ROAD PLAN & PROFILES
F REFER TO SHEETS CT101-CT110 FOR
AIRFIELD JOINTING & JOINT GRADING
KEYNOTES
231 FUTURE TAXIWAY
BID OPTION 4 SNOW MELT FOR HANGAR
DOORS, RE: E1/S-505
BUILDING
BID OPTION 4 SNOW MELT FOR
HANGAR DOORS, RE: B4/C-520
EXPANSION JOINT
AT STRUCTURE
HEAVY DUTY CONCRETE
PAVEMENT, RE: E1/C-520
A
M
V
I S
I O
N S
G IF BID OPTION 4 IS NOT ACCEPTD, USE
PROPOSED CONCRETE PAVEMENT FOR
APRON, RE: F1/C-520
A
M
V
I S
I O
N S
X
X
X X X X X X X X X X X X X X X
X X X X X X X
HANGAR FFE: 6302.78
HANGAR FFE: 6303.20
HELO OPS BUILDING
ADDITIONAL
STORAGE
SHELTER
BAY
of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C T
20' 40'0
SCALE: 1"=20'
10'
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O N
SCALE
AIRFIELD JOINTING PLAN - AREA 10
A3
1"=20'
REFER TO SHEET C-520 & C-523 FOR
JOINTING DETAILS.
JOINTING PLAN LEGEND
JOINTING PLAN GENERAL NOTES
A
A I R
F I E
J
I N
T I N
G
P
L A
N
A
R E
A
CT101
SAWED CONTRACTION JOINT
DOWELED CONSTRUCTION JOINT
REINFORCED SLAB, RE: B1/C-523R
KEYNOTES
240 EXPANSION JOINT AT STRUCTURE,
RE: F9/C-523
241 DOWELED CONSTRUCTION JOINT,
RE: D4/C-523
242 SAWED CONTRACTION JOINT,
RE: D6/C-523
243 THICKENED EDGE BUTT JOINT,
RE: C7/C-520
LEGEND
M A
T C
H L
I N
E
S
E
MATCHLINE - SEE SHEET CT103
IF BID OPTION 4 IS AWARDED, ALL
'SNOW MELT FOR HANGAR DOORS'
PANELS SHALL BE REINFORCED.
B
245 DOWELED CONTRACTION JOINT,
RE: B6/C-523
DOWELED CONTRACTION JOINT
THICKENED EDGE BUTT JOINT
EXPANSION JOINT AT STRUCTURE
12 13
AREA 10
BUILDING
FIRE SUPPRESSION ROOM
CONCRETE AIRFIELD APRON
ASPHALT AIRFIELD SHOULDER
SNOW MELT
MOORING POINT
GROUNDING POINT
SANITARY SEWER MANHOLE
STORM DRAIN MANHOLE
D
S
D
FIRE HYDRANT
A
M
V
I S
I O
N S
HELO OPS BUILDING
FFE: 6303.20
R
R
R
R
R
D
D
R
S SS
S
S
S
S
6 @ 13.72' = 82.33' 36 @ 12.50' = 450.00'
3 @ 13.33' = 40'
R
R
R
RR
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R R R R R R R R R R R R R R R R R R R R R R
R
R
R
R
R
R
R
R
R
R
R
R of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C T
20' 40'0
SCALE: 1"=20'
10'
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O N
SCALE
AIRFIELD JOINTING PLAN - AREA 11
A3
1"=20'
REFER TO SHEET C-520 & C-523 FOR
JOINTING DETAILS.
JOINTING PLAN LEGEND
JOINTING PLAN GENERAL NOTES
A
A I R
F I E
I N
T I N
G
P
L A
N
A
R E
A
CT102
SAWED CONTRACTION JOINT
DOWELED CONSTRUCTION JOINT
REINFORCED SLAB, RE: B1/C-523R
KEYNOTES
240 EXPANSION JOINT AT STRUCTURE,
RE: F9/C-523
241 DOWELED CONSTRUCTION JOINT,
RE: D4/C-523
242 SAWED CONTRACTION JOINT,
RE: D6/C-523
243 THICKENED EDGE BUTT JOINT,
RE: C7/C-520
M A
T C
H L
I N
E
S
E
MATCHLINE - SEE SHEET CT104
245 DOWELED CONTRACTION JOINT,
RE: B6/C-523
231 FUTURE TAXIWAY
DOWELED CONTRACTION JOINT
IF BID OPTION 4 IS AWARDED, ALL 'SNOW
MELT FOR HANGAR DOORS' PANELS
SHALL BE REINFORCED.
B
LEGEND
THICKENED EDGE BUTT JOINT
EXPANSION JOINT AT STRUCTURE
12 13
AREA 11
BUILDING
CONCRETE AIRFIELD APRON
ASPHALT AIRFIELD SHOULDER
SNOW MELT
MOORING POINT
GROUNDING POINT
SANITARY SEWER MANHOLE
STORM DRAIN MANHOLE
D
S
D
FIRE HYDRANT
244 THICKENED EDGE EXPANSION JOINT,
RE: D1/C-523
A
M
V
I S
I O
N S
D
D D
D
S S S
S
HANGAR FFE: 6302.78
HANGAR FFE: 6303.20
HELO OPS BUILDING
FFE: 6303.20
R
R
R
R
R
R
R
R
R
R
3 @ 11.75' = 35.25'
R
36 @ 12.50' = 450.00'
8 @ 12.50' = 100'
R R R R R R R R R
R
R
R
R R
4 @ 13.75' = 55'
R
RR
RRRR
RR
RRRR
of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C T
20' 40'0
SCALE: 1"=20'
10'
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O N
SCALE
BID OPTION 2 - ADDITIONAL STORAGE SHELTER BAY - JOINTING PLAN
A3
1"=20'
REFER TO SHEET C-520 & C-523 FOR
JOINTING DETAILS.
JOINTING PLAN GENERAL NOTES
A
B
T
I O
D D
I T
I O
N A
L
S
T O
R A
E
L T
E R
B A
Y
J O
I N
T I N
G
P
L A
N
CT106
KEYNOTES
241 DOWELED CONSTRUCTION JOINT,
RE: D4/C-523
242 SAWED CONTRACTION JOINT,
RE: D6/C-523
243 THICKENED EDGE BUTT JOINT,
RE: C7/C-520
SAWED CONTRACTION JOINT BASE
BID
DOWELED CONSTRUCTION JOINT
BASE BID
REINFORCED SLAB BASE BIDR
LEGEND
R
R
R
R
R
R
A
M
V
I S
I O
N S
SAWED CONTRACTION JOINT
DOWELED CONSTRUCTION JOINT
EXPANSION JOINT AT STRUCTURE
EXPANSION JOINT AT STRUCTURE
BASE BID
THICKENED EDGE BUTT JOINT
THICKENED EDGE BUTT JOINT
BASE BID
240 EXPANSION JOINT AT STRUCTURE,
RE: F9/C-523
REINFORCED SLAB, RE: B1/C-523R
X
X X X X X X X X X X X X X X X
X X X X X X
HANGAR FFE: 6302.78
HANGAR FFE: 6303.20
D
D
D
D
D
CB
CB
D
D
D
D D D
C B
S D
R R
RR
RRRR
R R R R R
RRRRRRRRRRRRRRR
of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C T
20' 40'0
SCALE: 1"=20'
10'
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O N
SCALE
AIRFIELD JOINTING ELEVATION PLAN - AREA 10
A3
1"=20'
A I R
F I E
I N
T I N
G
E
L E
V A
T I O
N
P
L A
N
A
R E
A
CT108
M A
T C
H L
I N
E
S
E
MATCHLINE - SEE SHEET CT108
REFER TO SHEETS CT101 - CT105 FOR
AIRFIELD JOINTING PLAN.
JOINT ELEVATION PLAN
GENERAL NOTES
A
LEGEND
FOR ALL PAVEMENT ELEVATIONS SHOWN
AS 96.00 TO 99.00, ADD 6200 FOR FINAL
ELEVATIONS. FOR ALL OTHER
ELEVATIONS SHOWN, ADD 6300 FOR
FINAL ELEVATIONS.
B
12 13
AREA 10
BUILDING
ASPHALT SHOULDER
CONCRETE APRON
BUILDING
ELEVATION DATA POINT
01.47
A
M
V
I S
I O
N S
HELO OPS BUILDING
FFE = 6303.20
2.870
3.2003.210
2.600 2.490 2.490 2.490 2.490 2.490 2.490 2.490 2.490 2.490 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.5002.5002.500 2.500
2.780
2.490 2.490 2.500 2.500
3.250
2.7602.8903.0103.1803.180
2.530 2.390 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.3702.3702.370 2.3702.370 2.370 2.370 2.3702.6402.7602.9003.0703.180
2.400 2.290 2.240 2.240 2.250 2.250 2.250 2.250 2.250 2.260 2.260 2.270 2.270 2.270 2.270 2.270 2.270 2.2702.2702.270 2.2702.260 2.260 2.270 2.2702.5202.6302.7802.9503.130
2.270 2.210 2.160 2.140 2.120 2.120 2.120 2.120 2.110 2.100 2.100 2.100 2.110 2.110 2.110 2.110 2.120 2.1202.1202.120 2.1302.100 2.100 2.120 2.1302.3902.5002.6602.8303.040
2.210 2.150 2.100 2.050 2.040 2.020 2.010 2.000 2.000 2.000 1.990 1.970 1.950 1.950 1.950 1.950 1.950 1.9601.9601.960 1.9602.000 2.000 1.950 1.9702.2702.3702.5402.6302.720
2.150 2.090 2.040 1.990 1.950 1.940 1.930 1.920 1.900 1.900 1.860 1.840 1.830 1.790 1.780 1.790 1.790 1.8001.8001.790 1.8001.890 1.890 1.790 1.8002.2002.2802.4102.5502.680
2.110 2.040 1.980 1.930 1.880 1.860 1.850 1.840 1.800 1.800 1.760 1.720 1.700 1.670 1.630 1.620 1.630 1.6401.6301.630 1.6401.800 1.770 1.630 1.6402.1902.3002.4102.5502.680
2.100 2.030 1.930 1.860 1.820 1.780 1.770 1.760 1.720 1.710 1.660 1.610 1.570 1.560 1.520 1.470 1.460 1.4701.4701.470 1.4801.710 1.660 1.470 1.4802.2002.3302.4102.5502.680
2.110 2.020 1.910 1.800 1.760 1.710 1.690 1.680 1.650 1.610 1.550 1.510 1.450 1.430 1.400 1.360 1.310 1.3101.3101.310 1.3101.610 1.570 1.300 1.3202.2302.3602.4102.5502.680
2.130 2.020 1.900 1.780 1.690 1.650 1.610 1.600 1.570 1.520 1.430 1.410 1.350 1.310 1.280 1.240 1.200 1.1501.1501.140 1.1501.510 1.480 1.160 1.1402.2502.3802.4202.5502.680
2.150 2.030 1.900 1.770 1.660 1.580 1.540 1.520 1.500 1.440 1.330 1.310 1.250 1.200 1.160 1.120 1.080 0.9700.9801.000 0.9701.410 1.390 1.040 0.9702.2802.4102.4502.5502.680
2.180 2.050 1.910 1.770 1.640 1.530 1.470 1.440 1.430 1.370 1.250 1.210 1.150 1.100 1.040 1.000 0.970 0.8400.8700.900 0.8101.310 1.310 0.930 0.7902.3102.4302.4802.5502.680
2.200 2.080 1.920 1.780 1.640 1.510 1.410 1.360 1.350 1.300 1.160 1.100 1.050 1.000 0.950 0.900 0.870 0.7400.7700.800 0.7201.240 1.220 0.840 0.6902.3302.4602.5002.5502.680
2.230 2.080 1.920 1.780 1.650 1.520 1.390 1.300 1.270 1.230 1.070 1.010 0.960 0.920 0.870 0.820 0.780 0.6500.6700.710 0.6201.170 1.120 0.740 0.5902.3602.4802.5302.5602.680
2.250 2.080 1.920 1.790 1.650 1.520 1.390 1.260 1.190 1.160 0.990 0.940 0.880 0.840 0.790 0.740 0.690 0.5500.5800.610 0.5201.100 1.040 0.650 0.4902.3802.5102.5502.5902.680
2.270 2.090 1.930 1.790 1.660 1.530 1.400 1.270 1.140 1.090 0.910 0.860 0.810 0.750 0.710 0.660 0.610 0.4500.4800.520 0.4201.030 0.970 0.560 0.3902.4102.5402.5802.6202.680
2.270 2.110 1.910 1.730 1.600 1.490 1.370 1.260 1.140 1.020 0.850 0.790 0.730 0.680 0.630 0.580 0.530 0.3500.3900.420 0.3200.960 0.900 0.480 0.3002.4302.5602.6002.6402.680
2.280 2.140 1.910 1.730 1.570 1.400 1.280 1.170 1.060 0.960 0.780 0.720 0.660 0.600 0.550 0.500 0.460 0.2600.2900.340 0.2300.890 0.830 0.400 0.2002.4602.5902.6302.6702.700
2.330 2.140 1.920 1.740 1.570 1.400 1.230 1.080 0.980 0.910 0.710 0.650 0.590 0.530 0.470 0.420 0.370 0.1600.2100.270 0.1300.840 0.770 0.320 0.1002.4702.6102.6602.6902.730
2.370 2.150 1.920 1.740 1.570 1.410 1.230 1.040 0.920 0.850 0.640 0.580 0.520 0.460 0.400 0.340 0.290 0.0800.1300.190 0.0300.780 0.710 0.240 0.0002.5102.6402.6802.7202.760
2.420 2.160 1.930 1.730 1.540 1.360 1.170 0.980 0.880 0.790 0.580 0.510 0.450 0.390 0.330 0.270 0.210 0.0500.1100.720 0.650 0.1602.5502.6702.6902.7202.740 99.94
99.86
2.290 2.010 1.870 1.680 1.490 1.300 1.110 0.930 0.830 0.740 0.530 0.460 0.390 0.320 0.260 0.200 0.140 99.9199.97
0.0300.670 0.590 0.080
99.85 99.77
2.170 1.920 1.790 1.620 1.430 1.250 1.060 0.870 0.780 0.700 0.470 0.400 0.330 0.260 0.200 0.140 0.07
99.8399.8999.95
0.610 0.540 0.01
99.77 99.69
2.040 1.840 1.700 1.560 1.380 1.190 1.000 0.830 0.740 0.650 0.410 0.340 0.27 0 0.200 0.13
0 0.070 0.01
99.7499.8099.87
0.570 0.480
99.94 99.68 99.61
2.700 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.640 2.6502.6502.650 2.6502.640 2.640 2.660 2.6502.8403.0003.1503.1803.210
2.780 2.780 2.780 2.780 2.780 2.780 2.7802.7802.780 2.7802.7802.780 2.780 2.780 2.780 2.780 2.780 2.780 2.780 2.7802.780 2.780 2.780
3.030
3.240
3.220
3.180
3.180
3.180
3.050
2.780
2.780
2.780
2.780
2.780
2.780
2.780
2.780
2.780
2.780
2.780
2.500
2.370
2.270
2.130
1.970
1.810
1.640
1.480
1.310
1.140
0.960
0.790
0.660
0.560
0.460
0.370
0.270
0.170
0.070
99.9
99.78
99.69
99.60
99.52
2.650
00.00
2.780
2.780
2.780
2.780
2.780
2.760
2.780
2.780 of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C T
20' 40'0
SCALE: 1"=20'
10'
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O N
SCALE
AIRFIELD JOINTING ELEVATION PLAN - AREA 11
A3
1"=20'
A I R
F I E
I N
T I N
G
E
L E
V A
T I O
N
P
L A
N
A
R E
A
CT109
M A
T C
H L
I N
E
S
E
MATCHLINE - SEE SHEET CT109
REFER TO SHEETS CT101 - CT105 FOR
AIRFIELD JOINTING PLAN.
JOINT ELEVATION PLAN
GENERAL NOTES
A
LEGEND
B
KEYNOTES
231 FUTURE TAXIWAY
FOR ALL PAVEMENT ELEVATIONS SHOWN
AS 96.00 TO 99.00, ADD 6200 FOR FINAL
ELEVATIONS. FOR ALL OTHER
ELEVATIONS SHOWN, ADD 6300 FOR
FINAL ELEVATIONS.
AREA 11
12 13
BUILDING
ASPHALT SHOULDER
CONCRETE APRON
BUILDING
ELEVATION DATA POINT
01.47
A
M
V
I S
I O
N S
HANGAR FFE: 6302.78
HANGAR FFE: 6303.20
HELO OPS BUILDING
2.6502.650 2.650 2.650 2.670 2.670 2.670 2.670 2.670 2.670 2.670 2.670 2.670 2.670 2.800 2.800 2.670 2.420 2.310
1.980
2.5502.670 2.670 2.340
1.740
2.5002.500 2.500 2.500 2.500 2.500 2.500 2.510 2.510 2.510 2.510 2.510 2.510 2.510 2.610 2.580 2.510 2.260 2.170
1.910
2.3902.500 2.510 2.030
1.740
2.3702.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.380 2.380 2.380 2.380 2.410 2.380 2.350 2.130 2.050
1.910
2.2502.370 2.370 1.960
1.740
2.2702.270 2.270 2.270 2.270 2.270 2.270 2.270 2.270 2.270 2.270 2.270 2.260 2.250 2.210 2.180 2.150 2.010 1.960
1.860
2.1102.270 2.270 1.910
1.740
2.1402.130 2.140 2.140 2.140 2.150 2.150 2.150 2.150 2.150 2.140 2.130 2.120 2.100 2.070 2.030 1.990 1.890 1.850
1.780
1.9402.150 2.150 1.820
1.740
1.9701.970 1.980 1.980 1.980 1.980 1.990 1.990 1.980 1.980 1.960 1.940 1.940 1.930 1.920 1.870 1.820 1.690 1.650
1.580
1.7701.980 1.980 1.620
1.470
1.8101.810 1.810 1.820 1.820 1.820 1.810 1.810 1.810 1.800 1.780 1.770 1.750 1.740 1.740 1.700 1.660 1.520 1.450
1.370
1.6001.820 1.800 1.420
1.200
1.4801.480 1.480 1.480 1.470 1.470 1.460 1.460 1.460 1.450 1.430 1.420 1.400 1.380 1.370 1.360 1.320 1.170 1.090
0.890
1.2501.470 1.450 1.010
0.780
1.3101.310 1.300 1.300 1.300 1.290 1.290 1.290 1.280 1.280 1.260 1.240 1.230 1.210 1.190 1.180 1.150 0.990 0.920
0.710
1.0801.290 1.280 0.840
0.600
1.6501.650 1.650 1.650 1.650 1.640 1.640 1.640 1.630 1.630 1.610 1.590 1.580 1.560 1.550 1.530 1.490 1.340 1.260
1.100
1.4301.640 1.630 1.220
0.950
1.1301.140 1.130 1.130 1.120 1.120 1.110 1.110 1.110 1.100 1.080 1.070 1.050 1.030 1.020 1.000 0.980 0.830 0.750
0.560
0.9101.120 1.100 0.680
0.420
0.9600.960 0.950 0.950 0.950 0.940 0.940 0.940 0.930 0.930 0.910 0.890 0.880 0.860 0.840 0.830 0.810 0.660 0.580
0.430
0.7400.940 0.930 0.510
0.270
0.7800.790 0.780 0.780 0.770 0.770 0.760 0.760 0.760 0.750 0.730 0.720 0.700 0.680 0.670 0.650 0.640 0.510 0.420
0.270
0.5900.770 0.750 0.340
0.130
0.6100.630 0.600 0.600 0.600 0.590 0.590 0.590 0.580 0.580 0.560 0.540 0.530 0.510 0.500 0.480 0.470 0.350 0.270
0.110
0.4300.590 0.580 0.190
0.000
0.5100.530 0.480 0.450 0.420 0.420 0.410 0.410 0.410 0.400 0.380 0.370 0.350 0.340 0.320 0.310 0.300 0.190 0.110
99.91
0.2800.420 0.400 0.030
99.75
0.4100.440 0.380 0.350 0.320 0.270 0.240 0.240 0.230 0.230 0.210 0.190 0.180 0.170 0.150 0.140 0.120 0.040 99.92
99.69
0.1100.290 0.230 99.79
99.59
0.3100.340 0.280 0.250 0.230 0.170 0.140 0.110 0.080 0.060 0.040 0.020 0.010
100.00 100.00 99.99 99.99 99.88 99.78
99.58
99.97
0.200 0.050
99.68
99.48
0.2100.240 0.180 0.160 0.130 0.070 0.040 0.010
99.98 99.93 99.91 99.97 99.97 99.97 99.96 99.96 99.89 99.73 99.64
99.45
99.81 0.100
99.88 99.55
99.37
0.1100.140 0.090 0.060 0.030
99.95 99.90 99.85 99.80 99.75 99.69 99.72 99.90 99.93 99.90 99.81 99.73 99.58 99.50
99.34
99.65 0.000
99.70 99.41
99.27
0.0200.040
99.98 99.73 99.68 99.63 99.58 99.45 99.4799.53
99.8699.91 99.81 99.76 99.71 99.61 99.56 99.51 99.46 99.41 99.2599.66 99.36
99.6999.73 99.64 99.59 99.54 99.44 99.39 99.34 99.29 99.24 99.09 98.9499.49 99.19
99.5499.62 99.46 99.41 99.36 99.26 99.21 99.16 99.11 99.06 98.92 98.8399.31 99.01
99.4599.53 99.38 99.30 99.22 99.09 99.04 98.99 98.94 98.89 98.75 98.7199.15 98.84
99.3699.44 99.29 99.21 99.13 98.98 98.91 98.83 98.77 98.72 98.61 98.6099.06 98.67
99.93 99.88 99.83 99.78
99.92 99.82 99.73 99.65 99.50 99.43
99.29
99.58 99.36
99.22
99.65
2.780 2.780 2.780 2.780 2.780 2.780 2.780 2.780 2.780 2.780 2.780 2.7802.780 2.780
2.880 2.910 2.780 2.530 2.870
2.120
2.660 2.490
1.740
2.780
99.13
99.42
2.1902.3202.4302.5402.660
2.0602.1802.3502.5502.680
2.1302.2702.4702.6702.830
2.780 of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C T
20' 40'0
SCALE: 1"=20'
10'
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O N
SCALE
BID OPTION 2-ADDITIONAL STORAGE SHELTER BAY-JOINTING ELEVATION
A3
1"=20'
B
T
I O
N
A
D D
I T
I O
N A
L
S
T O
R A
E
L T
E R
B A
Y J O
I N
T I N
G
E
L E
V A
T I O
N
CT113
M A
T C
H L
I N
E
S
E
MATCHLINE - SEE SHEET CT109
REFER TO SHEETS CT101 - CT105 FOR
AIRFIELD JOINTING PLAN.
JOINT ELEVATION PLAN
GENERAL NOTES
A
LEGEND
B
KEYNOTES
231 FUTURE TAXIWAY
FOR ALL PAVEMENT ELEVATIONS SHOWN
AS 96.00 TO 99.00, ADD 6200 FOR FINAL
ELEVATIONS. FOR ALL OTHER
ELEVATIONS SHOWN, ADD 6300 FOR
FINAL ELEVATIONS.
AREA 11
12 13
BUILDING
HEAVY DUTY CONCRETE
PAVEMENT BASE BID
CONCRETE AIRFIELD APRON
BASE BID
HEAVY DUTY CONCRETE
PAVEMENT, RE: E1/C-520
CONCRETE SIDEWALK BASE
BID
A
M
V
I S
I O
N S
X X
X
X
X X X X X X X X X X X X X X X X X
X
X X X X
HANGAR FFE: 6302.78
HANGAR FFE: 6303.20
HELO OPS BUILDING
2.780 2.780 2.780 2.7802.780
2.870
2.780
2.270
1.6902.310
2.560
2.290
2.010
2.070
2.070
1.810
1.790
1.620
1.600
1.520
1.500
1.810
1.820
1.680
1.810
1.630
2.040
1.780
1.440
1.240
2.610 of Engineers
Omaha District ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S x
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
I N
G
C
O D
E
A F
-W F
R
M
A R
C
H
O F
F
F I
M
E
O M
A H
A
D
I S
T R
I C
T
O M
A H
A
N
E B
R A
S K
A
F Y
H
E L
O T
R P
M
A I N
T E
N A
N C
E
F
A C
I L
I T
Y
P R
O J E
M
B E
R
G
H L
N A
R
R E
N
A
F B
W
Y O
M I N
G
J A
C O
G
I N
E E
R I N
G
G
R O
C
M a r e e t
F o r t
W o r t h
T
X
F E
G
H L N
A
C
N
H
A Y
E S
T
K
A T
T E
L M
A N
J
E
M E
R S
O
D R
A I N
A G
E
D
E T
A I L
S
C-513
S
Q U
A R
E
S
Q U
A R
E
SLOPE 1" PER FOOT
SLOPE 1" PER FOOT
NO. 4 @ 12" VERT EF
NO. 4 @ 9" HOR EF
BENCH
MH OPENING
A A
B
B
2'-0"1'-10" 1'-10"
REINFORCE ALL PIPE (& BOX DRAIN) OPENINGS
THUS:
NO. 5 EF
FINISHED GRADE
NO. 4 @ 12" VERT EF
NO. 4 @ 9" HOR EF
MANHOLE RUNGS @ 12" TO
16" O.C.
SEE RUNG DET B1/C-514
ROUNDED ENTRANCE
FLOW
INVERT ELEVATION OF
MANHOLE IS INVERT
ELEVATION OF OUTLET
CROWN OF INLET &
OUTLET PIPES TO BE
SAME ELEVATION
CONCRETE FILL
FLOW
OF PIPES
TOP OF BENCH OF CROWN
NO. 4 @ 6" B.W.NO. 4 @ 9" B.W.
NO. 4 @ 12 VERT EF
NO. 4 @ 9 HOR EF
2-NO. 7
NOTE:
PIPE SIZES VARY. SEE DRAINAGE PLANS.
MANHOLE COVER LETTERING
SEWER LINE "SANITARY SEWER"
INDUSTRIAL
WASTE LINE
"INDUSTRIAL WASTE"
STORM DRAIN LINE "STORM DRAIN"
PLAN
SECTION A-A
SECTION B-B
1'-10"
2'-0"
MANHOLE
10"
10"
AIRCRAFT RATED FRAME & COVER
COVER SHALL BE LETTERED ACCORDING
TO TABLE BELOW
NOTE: CONTRACTOR TO ADD BITUMASTIC
COATING TO THE EXTERIOR OF MANHOLES.
SCALE
MANHOLE DETAIL (AIRFIELD GRADE)
A2
NTS
NOTES:
1. THE TRENCH SHALL BE SLOPED NOT MORE THAN 1 VERTICAL ON 10
HORIZONTAL FOR THE DEPTH OF FROST PENETRATION.
2. REFER TO DRAINAGE PLANS FOR SUBDRAIN LAYOUT.
3. FROST DEPTH IS 59"; SUBDRAIN PIPE IS TO BE LOCATED BELOW
THE FROST DEPTH.
3"
(MIN)
OVERLAP
6" (MIN)
6" (MIN)
6" (MIN)
1'-6"
(MIN)
OVERLAP
1'-6"
SCALE
AIRFIELD CONCRETE SUBDRAIN PAVEMENT
E5
NTS
6" DIA PERFORATED
PVC SUBDRAIN PIPE
8" PORTLAND CEMENT CONCRETE,
PER SPEC 32 13 14.13
4" DRAINAGE LAYER MATERIAL PER SPEC 32 11 23.23
4" SEPARATION LAYER,
PER SPEC 32 11 20
FILTER FABRIC
SUBGRADE PER SPEC
SCALE
JUNCTION BOX
A7
NTS
A
M
V
I S
I O
N S
A
M
V
I S
I O
N S
A. BUILDING AND DESIGN CODES.
1. IBC INTERNATIONAL BUILDING CODE (2015), CITY OF CHEYENNE BUILDING CODE
2. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) 7-10 – MINIMUM DESIGN LOADS FOR BUILDINGS AND
OTHER STRUCTURES.
3. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) MANUAL OF STEEL CONSTRUCTION, 14TH EDITION.
4. ANSI/AISC 360-10, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS AND CODE OF STANDARD PRACTICE.
5. ACI 318-14; BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE.
6. ACI 530-13; BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES.
7. CRSI MANUAL OF STANDARD PRACTICE, THE LATEST EDITION ADOPTED BY GOVERNING CODES.
8. AISC 303-10 – CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES.
9. AMERICAN WELDING SOCIETY (AWS) D1.1-10.
10. UFC 1-200-01 –DOD BUILDING CODE (GENERAL BUILDING REQUIREMENTS) (2016).
11. UFC 3-260-02 –PAVEMENT DESIGN FOR AIRFIELDS, (2001).
12. UFC 3-301-01 – STRUCTURAL ENGINEERING, WITH CHANGE 2 (2016).
13. UFC 3-310-04 – SEISMIC DESIGN FOR BUILDINGS, WITH CHANGE 1 (2016).
14. UFC 4-010-01 – DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, (2018).
15. UFC 4-211-01 – AIRCRAFT MAINTENANCE HANGARS (2020).
16. UFC 4-211-02 – AIRCRAFT CORROSION CONTROL AND PAINT FACILITIES (2012).
17. AR 190-11 - PHYSICAL SECURITY OF ARMS, AMMUNITION, AND EXPLOSIVES.
18. UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS).
19. STANDARD SPECIFICATIONS AND LOAD TABLES FOR STEEL JOIST (SJI K-10) AND JOIST GIRDERS
(SJI JG-10) BY STEEL JOIST INSTITUTE (SJI).
20. STANDARD FOR DESIGN OF COMPOSITE DECKS (SDI - C - 2011), FLOOR DECKS (ANSI/NC1.0-10), AND
ROOF DECKS, (ANSI/RD1.0-10).
B. DESIGN LOADS:
1. HANGAR BAY SUPERIMPOSED DEAD LOADS:
a. SUSPENDED MEP 5 PSF
b. SUSPENDED BOTTOM CHORD MISC 10 PSF
c. ROOFING 5 PSF
d. MECHANICAL EQUIPMENT: REFER TO MECHANICAL DRAWINGS FOR EQUIPMENT WEIGHT.
2. OFFICE AREAS SUPERIMPOSED DEAD LOADS:
a. SUSPENDED CEILING 10 PSF b SUSPENDED MEP 5 PSF
c. MECHANICAL EQUIPMENT: REFER TO MECHANICAL DRAWINGS FOR EQUIPMENT WEIGHT.
d. ROOFING 5 PSF
3. SHOP AREAS SUPERIMPOSED DEAD LOADS:
a. SUSPENDED MEP 10 PSF
b. MECHANICAL EQUIPMENT: REFER TO MECHANICAL DRAWINGS FOR EQUIPMENT WEIGHT.
c. ROOFING 5 PSF
4. CRASH/ FIRE/ RESCUE STATION SUPERIMPOSED DEAD LOADS:
a. SUSPENDED CEILING 10 PSF b SUSPENDED MEP 5 PSF
c. MECHANICAL EQUIPMENT: REFER TO MECHANICAL DRAWINGS FOR EQUIPMENT WEIGHT.
d. ROOFING 5 PSF
5. LIVE LOADS: UNIFORM LOAD
a. ROOF LIVE LOADS (REDUCIBLE) : 20 PSF
b. FLOOR LIVE LOADS:
i. OFFICE AREAS 80 PSF
ii. STAIRS/CORRIDORS/LOBBIES/FITNESS 100 PSF
iii. MECHANICAL/ELECTRICAL AREAS/LAUNDRY 150 PSF
iv. CATWALK AT HANGAR BAY 40 PSF
v. SLAB ON GRADE (OFFICE) 100 PSF
vi. PARTITION WALLS 15 PSF c.
d. FALL ARREST SYSTEM: PER UFC 3-301-01 SECTION 2-1.2.5
6. WIND LOADS:
a. RISK CATEGORY - III (HANGAR BAY/ OFFICE/ SHOP AREAS)
i. RISK CATEGORY - IV (CRASH/ FIRE/ RESCUE STATION)
b. ENCLOSURE CLASSIFICATION:
i. PARTIALLY ENCLOSED –HANGAR BAY
ii. ENCLOSED – OFFICE/SHOP AREAS
iii. ENCLOSED – CRASH/ FIRE/ RESCUE STATION
GENERAL NOTES
c. BASIC WIND SPEED (ULTIMATE - 3 SECOND GUST):
i. HANGAR DOORS CLOSED: 120 mph
ii. HANGAR DOORS OPEN: 60 mph
iii. OFFICE/SHOP AREAS: 120 mph
iv. CRASH/ FIRE/ STATION: 120 mph
d. EXPOSURE - C
e. INTERNAL PRESSURE COEFFICIENT – CGpi:
i. PARTIALLY ENCLOSED= +/-0.55 (HANGAR BAYS)
ii. ENCLOSED= +/-0.18 (OFFICE/ SHOP AREAS)
iii. ENCLOSED= +/-0.18 (CRASH/ FIRE/ RESCUE STATION)
7. SEISMIC LOADS:
a. RISK CATEGORY - III (HANGAR BAY/ OFFICE/ SHOP AREAS)
i. RISK CATEGORY - IV (CRASH/ FIRE/ RESCUE STATION)
b. SEISMIC IMPORTANCE FACTOR - Ie = 1.25 (HANGAR BAY/ OFFICE/ SHOP AREAS)
i. SEISMIC IMPORTANCE FACTOR - le = 1.50 (CRASH/ FIRE/ RESCUE)
c. MAPPED SPECTRAL RESPONSE ACCELERATIONS - Ss = 0.165g, S1 = 0.055g
d. SITE CLASS - D
e. SPECTRAL RESPONSE ACCELERATIONS - Sds = 0.176g, Sd1= 0.089g
f. SEISMIC DESIGN CATEGORY B (HANGAR BAY/ OFFICE/ SHOP AREAS)
i. SEISMIC DESIGN CATEGORY C (CRASH/ FIRE/ RESCUE STATION)
g. LATERAL FORCE RESISTING SYSTEM
i. HANGAR BAY - STEEL SYSTEMS NOT SPECIFICALLY DETAILED FOR SEISMIC RESISTANCE.
ii. OFFICE/ SHOP AREAS – STEEL SYSTEMS NOT SPECIFICALLY DETAILED FOR SEISMIC RESISTANCE.
iii. CRASH/ FIRE/ RESCUE STATION – ORDINARY REINFORCED MASONRY SHEAR WALLS
h. ANALYSIS PROCEDURE - EQUIVALENT LATERAL FORCE PROCEDURE
i. RESPONSE MODIFICATION FACTOR- R = 3 (HANGAR BAY/OFFICE/SHOP AREAS), R = 2 (CRASH/FIRE/RESCUE)
j. SEISMIC RESPONSE COEFFICIENT - Cs = 0.072 (HANGAR BAY/OFFICE/SHOP AREAS)
8. SNOW LOADS:
a. RISK CATEGORY - III (HANGAR BAY/ OFFICE/ SHOP AREAS)
i. RISK CATEGORY - IV (CRASH/ FIRE/ RESCUE STATION)
b. GROUND SNOW LOAD – Pg = 30 PSF
c. FLAT ROOF SNOW LOAD – Pf = 26 PSF (HANGAR BAY/ OFFICE/ SHOP AREAS)
i. FLAT ROOF SNOW LOAD – Pf = 25.2 PSF (CRASH/ FIRE/ RESCUE STATION)
d. IMPORTANCE FACTOR – Is = 1.1 (HANGAR BAY/ OFFICE/ SHOP AREAS)
i. IMPORTANCE FACTOR – Is = 1.2 (CRASH/ FIRE/ RESCUE STATION)
e. EXPOSURE – Ce = 1.0
f. THERMAL FACTOR – Ct = 1.1 (HANGAR BAY/ OFFICE/ SHOP AREAS)
i. THERMAL FACTOR – Ct = 1.0 (CRASH/ FIRE/ RESCUE STATION)
g. FROST DEPTH = 59 in
9. CRANE LOADS
a. CRANE AT MAINTENANCE HANGAR BAY - 5 TON
b. CRANE AT AIRCRAFT MAINTENANCE UNITS - 2 TON
c. FUTURE CRANE AT AIRCRAFT SIMULATOR - 2.5 TON
C. GENERAL REQUIREMENTS:
1. SPECIFICATIONS ARE PART OF THE CONSTRUCTION DOCUMENTS AND MUST BE USED IN CONJUNCTION
WITH THE DRAWINGS.
2. VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING WORK OR FABRICATING MATERIALS.
NOTIFY CONTRACTING OFFICER OF DISCREPANCIES BEFORE PROCEEDING WITH ANY PHASE OF WORK.
3. VERIFY THE LOCATION OF CHASES, INSERTS, OPENINGS, SLEEVES, FINISHES, DEPRESSIONS, PADS, AND
WALL OPENINGS.
4. DO NOT SCALE DRAWINGS FOR THE PURPOSE OF ESTABLISHING DIMENSIONS.
5. DETAILS LABELED "TYPICAL DETAILS" ON DRAWINGS APPLY TO SITUATIONS OCCURRING ON THE PROJECT THAT ARE THE SAME OR SIMILAR TO THOSE SPECIFICALLY DETAILED. SUCH DETAILS APPLY WHETHER OR NOT DETAILS ARE REFERENCED AT EACH LOCATION. NOTIFY ENGINEER OF CONFLICTS REGARDING
APPLICABILITY OF "TYPICAL DETAILS".
6. DO NOT LOAD THE SLAB ON GRADE OR SUPPORTED SLAB WITH ERECTION CRANES OR ERECTION EQUIPMENT. THE SLABS HAVE NOT BEEN DESIGNED FOR CRANE LOADS AND WILL REQUIRE AN INCREASE IN THICKNESS AND/OR REINFORCEMENT. OBTAIN A/E APPROVAL ON PROPOSED CRANE/ERECTION
EQUIPMENT SUPPORT PLAN FOR SLABS PRIOR TO COMMENCING WORK.
7. DO NOT STORE OR STACK CONSTRUCTION MATERIALS ON POURED OR ERECTED FLOORS/ROOFS IN
EXCESS OF 80 PERCENT OF LIVE LOAD. GENERAL CONTRACTOR WILL ENSURE THAT ALL SUB-
CONTRACTORS ARE INFORMED OF LOADING RESTRICTIONS. AVOID IMPACT WHEN PLACING MATERIALS
ON POURED OR ERECTED FLOORS OR ROOF.
8. THE CONTRACT STRUCTURAL DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THE CONTRACTOR IS RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION. PROVIDE ALL MEASURES REQUIRED TO PROTECT THE STRUCTURE, WORKMEN, AND OTHER PERSONS DURING CONSTRUCTION; INCLUDING
BRACING, SHORING FOR CONSTRUCTION EQUIPMENT, SHORING FOR THE BUILDING, FORMS AND
SCAFFOLDING, SHORING OF RETAINING WALLS AND OTHER TEMPORARY SUPPORTS AS REQUIRED.
9. PRINCIPAL OPENINGS THROUGH THE FRAMING ARE SHOWN ON DRAWINGS. EXAMINE THE ARCHITECTURAL AND MECHANICAL DRAWINGS FOR THE REQUIRED OPENINGS AND PROVIDE FOR REQUIRED OPENINGS WHETHER SHOWN ON THE STRUCTURAL DRAWINGS OR NOT. VERIFY SIZE AND LOCATION OF OPENINGS WITH THE MECHANICAL CONTRACTOR. DEVIATIONS FROM THE OPENINGS SHOWN ON THE STRUCTURAL
DRAWINGS MUST BE APPROVED PRIOR TO IMPLEMENTING THE CHANGES.
10. DO NOT CUT OR DRILL THROUGH EXISTING REINFORCING. X-RAY OR USE PACHOMETER TO LOCATE REINFORCING AT LOCATIONS REQUIRING CUTTING OR CORING PRIOR TO START OF CONSTRUCTION.
SUBMIT REINFORCEMENT LOCATION IN CONFLICT WITH DRAWINGS FOR COR REVIEW.
GENERAL NOTES (CONT)
AIRCRAFT LOADING PASSES
MEDIUM-LIFT
AIRCRAFT
MH-139A
16,300 LBS 50,000
A. FOUNDATION DESIGN IS BASED UPON THE SOILS EXPLORATION REPORT BY TERRACON CONSULTANTS, INC., PROJECT NO. 24175004, TITLED "CONSOLIDATE HELO/TRF OPS/AMU AND ALERT FACILITY, FE WARREN
AIRFORCE BASE, CHEYENNE, WYOMING". DATED JANUARY 15, 2018.
B. FOOTINGS FOR THE BUILDING ARE DESIGNED FOR AN ALLOWABLE NET BEARING PRESSURE OF 2500 PSF, WITH A 1/3 INCREASE FOR LOAD COMBINATIONS INCLUDING SHORT-TERM LOADS (SEISMIC AND WIND), CONSIDERING A BEARING LAYER WITH A MINIMUM SPT N-VALUE OF 30. SEE BELOW FOR REQUIRED SOIL
IMPROVEMENTS.
C. PROTECT PIPES AND CONDUITS RUNNING THRU WALLS AND SLABS WITH 5/8" EXPANSION MATERIAL.
LOWER CONTINUOUS FOOTINGS AND GRADE BEAMS PERPENDICULAR TO PIPE RUNS, TO ALLOW PIPES TO PASS ABOVE THE FOOTINGS OR THOUGH THE GRADE BEAMS. ALTERNATIVELY, PROVIDE A CONCRETE JACKET IF PIPES ARE LOW ENOUGH TO BE PLACED BELOW THE FOOTINGS AND GRADE BEAMS. LOWER FOOTINGS AND GRADE BEAMS PARALLEL TO PIPE RUNS TO AVOID SURCHARGE ONTO ADJACENT TRENCH
EXCAVATIONS.
D. MAINTAIN SUBGRADE AND FILL MOISTURE CONTENT UNTIL FOUNDATIONS ARE PLACED.
E. ARRANGE FOR INDEPENDENT TESTING AGENCY (SPECIAL INSPECTOR) TO MONITOR CUT AND FILL OPERATIONS, AND PERFORM FIELD DENSITY AND MOISTURE CONTENT TESTS TO VERIFY COMPACTION
AND APPROVE FOOTING SUBGRADE PRIOR TO PLACING CONCRETE.
F. DO NOT PLACE FOOTINGS OR SLABS AGAINST SUBGRADE CONTAINING FREE WATER OR FROST.
G. MAINTAIN PROPER SITE DRAINAGE DURING CONSTRUCTION TO ENSURE SURFACE RUNOFF AWAY FROM STRUCTURES AND TO PREVENT PONDING OF SURFACE RUNOFF NEAR THE STRUCTURES. KEEP OPEN EXCAVATIONS AROUND BUILDING DRY. BACKFILL AGAINST FOUNDATIONS AND GRADE BEAMS AS SOON AS PRACTICAL. PUMP WATER OUT OF OPEN EXCAVATIONS IF FLOODED PRIOR TO BACKFILLING.
H. REFER TO CIVIL DRAWINGS FOR LIMITS OF EXCAVATIONS.
I. FOUNDATION SOIL IMPROVEMENT
1. SOIL IMPROVEMENT IS REQUIRED BELOW BUILDING FOOTINGS AND BELOW HANGAR BAY SLAB. SOIL
IMPROVEMENT MUST PROVIDE A MINIMUM BEARING PRESSURE FOR FOOTINGS OF 2500 PSF.
2. SOIL IMPROVEMENT BELOW FOOTINGS AND HANGAR BAY SLAB SHALL BE COORDINATED WITH THE
RECOMMENDATIONS OF THE SPECIFICATIONS.
J. REFER TO A1/S-502 AND A4/S-502 FOR SUBGRADE PREPARATION
K. OVER-EXCAVATION THAT EXTENDS BELOW THE BOTTOM OF THE FOUNDATION ELEVATION SHALL EXTEND LATERALLY BEYOND ALL EDGES OF THE FOOTING AT LEAST 8 INCHES PER FOOT OF OVER- EXCAVATION DEPTH BELOW THE FOOTING BASE ELEVATION. THE OVER-EXCAVATION SHALL BE BACKFILLED TO THE
FOOTING BASE ELEVATION.
L. THE IMPORTED FILL LAYERS SHALL BE NON-EXPANSIVE AS MEASURED ON A SAMPLE COMPACTED TO APPROXIMATELY 90% OF THE MAXIMUM DRY UNIT WEIGHT AS DETERMINED BY ASTM D1557 AT OPTIMUM
MOISTURE CONTENT AND CONFINED UNDER A 100 PSF SURCHARGE AND SUBMERGED.
M. THE USE OF HEAVY COMPACTION EQUIPMENT IS NOT PERMITTED WITHIN A HORIZONTAL DISTANCE OF 5ft BEHIND RETAINING WALLS AND TANK WALLS. BACKFILL BEHIND RETAINING WALLS WITHIN THE 5ft ZONE
SHALL BE COMPACTED USING LIGHTWEIGHT CONSTRUCTION EQUIPMENT SUCH AS HANDHELD
COMPACTORS, TO AVOID OVERSTRESSING THE WALL.
N. PRIOR TO FILL OPERATIONS, ALL DEBRIS, SURFACE VEGETATION, DELETERIOUS MATERIAL, AND SURFACE SOILS CONTAINING ROOTS AND PERISHABLE MATERIALS SHALL BE STRIPPED AND REMOVED FROM THE SITE. ANY UNSUITABLE MATERIALS UNCOVERED BY THE STRIPPING OPERATION SHALL BE EXCAVATED TO
EXPOSE A FIRM SURFACE OR UNDISTURBED NATURAL SOIL.
O. CLAY SOILS SHALL BE COMPACTED TO AT LEAST 90% OF THE MAXIMUM DRY DENSITY (ASTM D1557).
GRANULAR SOILS (PI<5 AND LL<25) SHALL BE COMPACTED TO AT LEAST 100% OF THE MAXIMUM DRY DENSITY (ASTM D1557) FOR THE UPPER 6 INCHES, THEN 95% GREATER THAN 6 INCHES IN DEPTH.
P. CONTRACTOR SHALL TAKE CARE WITH EXCAVATIONS TO NOT CAUSE LOSS OF BEARING AND/OR LATERAL
SUPPORT OF EXISTING STRUCTURES OR UTILITIES.
Q. PRIOR TO COMPACTION, FILL MATERIALS SHALL BE THOROUGHLY MIXED AND MOISTURE CONDITIONED, WHEN NECESSARY FROM 0 TO +3% OF OPTIMUM MOISTURE CONTENT FOR COHESIVE SOIL (CLAY) AND FROM - 3% TO +3% OF OPTIMUM MOISTURE CONTENT FOR COHESSIONLESS SOIL (SAND). FILL SHALL BE INSTALLED PER THE COMPACTION REQUIREMENTS AND MAXIMUM LIFT THICKNESS INDICATED IN THE
SPECIFICATIONS. LABORATORY COMPACTION TESTS (MODIFIED PROCTOR TESTS) SHALL BE
CONDUCTED IN ACCORDANCE WITH ASTM D1557 TEST METHOD. FILL MATERIAL SHALL BE TESTED FOR MOISTURE CONTENT AND COMPACTION DURING PLACEMENT. MOISTURE CONDITIONED CLAY MATERIALS
SHALL NOT BE ALLOWED TO DRY OUT.
R. QUALITY CONTROL FOR EARTHWORK DURING THE CONSTRUCTION STAGE SHALL INCLUDE THE
VERIFICATION OF THE COMPACTION REQUIREMENTS INDICATED IN THE SPECIFICATIONS. A
TESTING PROGRAM SHALL BE ESTABLISHED AT THE BEGINNING OF THE CONSTRUCTION WORK.
S. WHEN POCKETS OF SOFT, LOOSE, OR OTHERWISE UNSUITABLE MATERIALS ARE ENCOUNTERED AT THE BOTTOM OF THE FOOTING EXCAVATIONS, THE DESIGN FOOTING ELEVATION SHALL BE RE-ESTABLISHED BY OVER-EXCAVATING THE UNSUITABLE SOIL AND BACKFILLING WITH COMPACTED ENGINEERED FILL OR
LEAN CONCRETE.
T. SHORING SYSTEMS USED IN EXCAVATIONS FOR UNDERGROUND WATER STORAGE TANKS SHALL
COMPLY WITH THE REQUIREMENTS INDICATED IN S-004, ADDITIONAL SUBMITTALS.
FOUNDATION NOTES
ABRAHAM ABEL AVALOS
OF TEXASS
TATE
ALNOI
SS
E
F O
R P
ENGIN
E
E R
NSEDECI
L 114070
US Army Corps of Engineers Omaha District ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
D R
A W
IN
G
C O
D E
A F
-1
-0
-W F
R
M
A R
C H
C H
O F
F F
IL
E
N A
M E
O M
A H
A D
IS
T
R
A H
A
N E
B R
A S
K A
F Y
H
E L
O /T
R F
/M A
IN
T
E N
A N
C E
F A
C
IL
IT
Y
P R
O J E
C T
N U
M B
E R
G
H L
N A
F E
W A
R R
E N
A F
B
W Y
J A
C O
B S
E N
G
IN
E E
R
IN
G G
R O
U P
I N
C
M a in
S tr e e t
F o rt
W o rt h
T X
READY-TO-ADVERTISE (RTA) DESIGN
TEXAS REGISTERED
ENGINEERING FIRM F-2966
S-002
S T
R U
C T
U R
A L N
O T
E S
C V
A L L
E N
IL
L A
S .D
R A
S K
O V
IC
A .A
V A
L O
S
F E
-G
H L
N
A S
-0
A
M
R E
V
IS
IO
N
-0
-2
A. INSTALL BOLTS IN ACCORDANCE WITH CURRENT ICC-ES REPORT OR EQUIVALENT TESTING PROGRAM
QUALIFYING THE BOLTS FOR USE IN CRACKED CONCRETE UNDER IBC 2015 (ACI 355.2 AS
SUPPLEMENTED BY ACI 193). CONTRACTOR SHALL SUBMIT MANUFACTURER REPORTS INDICATING
COMPLIANCE WITH IBC/ACI.
B. INSTALL BOLTS PERPENDICULAR TO THE FACE OF CONCRETE. DEVIATION FROM PERPENDICULAR
GREATER THAN 10 DEGREES WILL NOT BE ACCEPTABLE.
C. CREATE A TEMPLATE AT EACH EXPANSION BOLT CONNECTION LOCATION PRIOR TO FABRICATING HOLES IN CONNECTION PLATES. MAKE TEMPLATE BY LOCATING EXISTING REBAR WITH A PACHOMETER.
REPOSITION BOLTS A MAXIMUM OF 1 1/2" TO AVOID CONFLICTS WITH EXISTING REINFORCING.
D. DRILL HOLES TO DEPTH AND DIAMETER RECOMMENDED BY MANUFACTURER. DO NOT ENLARGE OR
REDIRECT HOLES ALONG LENGTH OF BOLT.
E. DRILL HOLES IN CONTINUOUS OPERATION. BLOW DUST FROM THE HOLE USING COMPRESSED AIR.
F. FILL ABANDONED HOLES WITH EPOXY GROUT.
G. AIM WEDGES AWAY FROM CONCRETE EDGES LESS THAN 9" FROM THE CENTER LINE OF THE HOLE.
TIGHTEN NUTS AGAINST SMOOTH WASHERS TO MINIMUM TORQUE RECOMMENDED BY MANUFACTURER.
H. PROVIDE HOLES IN CONNECTION PLATES NO MORE THAN 1/8" LARGER THAN THE BOLT DIAMETER. IF
LARGER HOLES ARE NEEDED FOR ERECTION PURPOSES, PROVIDE PLATE WASHERS WELDED TO
CONNECTION PLATE TO TRANSFER THE BOLT LOAD.
FIELD INSTALLED EXPANSION BOLT NOTES
A. INSTALL EPOXY ANCHORED BOLTS AND DOWELS IN ACCORDANCE WITH CURRENT ICC-ES REPORTS OR EQUIVALENT TESTING PROGRAM QUALIFYING THE ANCHORING SYSTEM FOR USE IN CRACKED CONCRETE UNDER IBC 2015. CONTRACTOR SHALL SUBMIT MANUFACTURER REPORTS INDICATING COMPLIANCE WITH
IBC/ACI.
B. INSTALL BOLTS AND DOWELS PERPENDICULAR TO THE FACE OF CONCRETE, UNLESS OTHERWISE
INDICATED IN THE DRAWINGS.
C. CREATE A TEMPLATE AT EACH BOLT CONNECTION LOCATION PRIOR TO FABRICATING HOLES IN CONNECTION PLATES. MAKE TEMPLATE BY LOCATING EXISTING REBAR WITH PACHOMETER. REPOSITION
BOLTS A MAXIMUM OF 1 1/2" TO AVOID CONFLICTS WITH EXISTING REINFORCING.
D. DIAMETER OF DRILLED HOLES SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
DO NOT REDIRECT HOLES ALONG LENGTH OF BOLT.
E. DRILL HOLES IN CONTINUOUS OPERATION. BLOW DUST FROM THE HOLE USING COMPRESSED AIR.
F. FILL ABANDONED HOLES WITH EPOXY GROUT.
G. PROVIDE HOLES IN CONNECTION PLATES NO MORE THAN 1/8" LARGER THAN THE BOLT DIAMETER. IF
LARGER HOLES ARE NEEDED FOR ERECTION PURPOSES, PROVIDE PLATE WASHERS WELDED TO
CONNECTION PLATE TO TRANSFER THE BOLT LOAD.
H. INSTALLATION OF EPOXY ANCHORED DOWELS AND BOLTS SHALL BE CONTINUOUSLY INSPECTED BY THE TESTING LABORATORY TO ENSURE THAT HOLES ARE OF THE PROPER DIAMETER AND LENGTH, ARE
PROPERLY CLEANED, AND THAT BOLTS ARE INSTALLED CORRECTLY.
I. EPOXY ANCHORED BOLTS SHALL NOT BE USED IN OVERHEAD INSTALLATION.
EPOXY ANCHORED BOLTS AND DOWELS NOTES
A. PROVIDE ALL STUDS AND/OR JOISTS AND ACCESSORIES OF THE TYPE, SIZE, GAUGE AND SPACING
SHOWN ON THE DRAWINGS.
B. DESIGN ALL STRUCTURAL MEMBERS IN ACCORDANCE WITH AMERICAN IRON AND STEEL INSTITUTE (AISI) "SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL MEMBERS", LATEST
EDITION.
LIGHT GAUGE STEEL NOTES
C. ALL COLD-FORMED STUDS, RUNNERS, BLOCKING AND JOIST DESIGNATIONS ARE IN ACCORDANCE
WITH THE MANUFACTURING CATALOG, LATEST EDITION.
D. FORM ALL FRAMING MEMBERS FROM CORROSION RESISTANT STEEL CORRESPONDING TO THE
REQUIREMENTS OF ASTM A653 WITH A MINIMUM YIELD OF 33ksi.
E. PLACE ALL COLD-FORMED STEEL STUD WALL BRIDGING EVEN HORIZONTALLY WITH A MAXIMUM VERTICAL SPACING OF 4 FEET UNLESS OTHERWISE NOTED. AS AN OPTION, CONTINUOUS COLD- FORMED CHANNELS MAY BE POSITIONED THROUGH THE STUD PUNCH OUTS AS BRIDGING PROVIDED
THE CHANNEL IS PROPERLY FASTENED TO EACH STUD.
F. PRIOR TO FABRICATION OF FRAMING, SUBMIT FABRICATION AND ERECTION DRAWINGS TO THE
CONTRACTING OFFICER FOR REVIEW.
G. INSTALL AXIALLY-LOADED STUDS IN A MANNER WHICH WILL ASSURE THAT THEIR ENDS ARE
POSITIONED AGAINST THE INSIDE OF THE RUNNER WEB PRIOR TO FASTENING.
H. FASTEN COMPONENTS WITH SELF-DRILLING SCREWS OR WELDING. PROVIDE SCREWS OF SUFFICIENT
SIZE TO INSURE THE STRENGTH OF THE CONNECTION. WIRE TYING OF COMPONENTS IS NOT
PERMITTED. TOUCH UP ALL WELDS WITH A ZINC-RICH PAINT.
I. WELDING OF COLD-FORMED STUDS AND JOISTS MAY BE PERFORMED USING A MINIMUM 3/16" AWS
TYPE 6013 WELDING ROD.
J. SECURELY ANCHOR RUNNERS TO THE SUPPORTING STRUCTURE. PROVIDE COMPLETE, UNIFORM AND
LEVEL BEARING SUPPORT FOR THE BOTTOM RUNNER.
K. SECURELY ANCHOR ABUTTING LENGTHS OF RUNNER TO A COMMON STRUCTURAL ELEMENT, BUTT-
WELDED OR SPLICED.
L. PLUMB, ALIGN AND SECURELY ATTACH STUDS TO THE FLANGES OF BOTH UPPER AND LOWER
RUNNERS. SPLICES IN STUDS ARE NOT PERMITTED.
M. PROVIDE HEADERS AND SUPPORTING STUDS FOR FRAMING OF WALL OPENINGS.
LIGHT GAUGE STEEL NOTES (CONT)
A. REINFORCED MASONRY WORK AND MATERIALS TO BE IN ACCORDANCE WITH THE BUILDING CODE
REQUIREMENTS FOR MASONRY STRUCTURES ACI 530/ ASCE 5/ TMS 402.
B. REINFORCED MASONRY TO CONFORM TO THE SPECIFICATIONS FOR MASONRY STRUCTURES
ACI 530.1/ASCE 6/ TMS 602 (WITH THE EXCEPTIONS NOTED IN JOB SPECIFICATIONS).
C. PROVIDE CONCRETE MASONRY UNITS (CMU) OF NORMAL WEIGHT (125 PCF MINIMUM), CONFORMING TO THE LATEST EDITION ASTM C 90. FOR CRASH/ FIRE/ RESCUE USE MEDIUM WEIGHT (105-125 PCF).
LAY UNITS IN RUNNING BOND UNLESS OTHERWISE NOTED.
D. PROVIDE MASONRY MORTAR MEETING THE REQUIREMENTS OF TYPE S PER ASTM C 270. PROVIDE
AGGREGATES FOR MORTAR CONFORMING TO ASTM C 404. PROVIDE MORTAR WITH A MINIMUM
COMPRESSIVE STRENGTH OF 1,800 PSI AT 28 DAYS.
E. PROVIDE MASONRY GROUT WITH MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 2,000 PSI
TESTED IN ACCORDANCE WITH ASTM C 1019. GROUT TO MEET THE MINIMUM REQUIREMENTS
SPECIFIED IN ASTM C 476.
F. PROVIDE MASONRY ASSEMBLAGES WITH MINIMUM PRISM STRENGTH (F'm) OF 1,500 PSI, TESTED IN
ACCORDANCE WITH ASTM C1314.
G. PROVIDE CONCRETE MASONRY UNITS IN ACCORDANCE WITH ASTM C 426 LIMITS FOR DRYING
SHRINKAGE OF CONCRETE BLOCKS.
H. PROVIDE VERTICAL REINFORCEMENT IN CMU WALLS AS SHOWN IN DRAWINGS. FILL THE
REINFORCED CELLS SOLIDLY WITH GROUT. MAXIMUM HEIGHT OF GROUT POURS TO BE AS PER
ACI 530, TABLE 1.15.1.
I. PROVIDE HORIZONTAL JOINT REINFORCING IN WALLS AT 16 INCHES ON CENTER VERTICAL
SPACING. JOINT REINFORCING TO BE HOT DIP GALVANIZED NO. 9 GAGE LADDER TYPE WITH CROSS TIES AT 16 INCHES ON CENTER, CONFORMING TO ASTM A 82. SPACE JOINT REINFORCEMENT AT 8 INCHES ON CENTER IN THE PARAPETS. LAP SPLICE ENDS A MINIMUM OF 12 INCHES AT SPLICES.
J. LAY HOLLOW UNITS WITH FULL MORTAR COVERAGE ON HORIZONTAL AND VERTICAL FACE
SHELLS. PROVIDE FULL MORTAR COVERAGE FOR WEBS WHEN ADJACENT TO GROUTED CELLS.
K. ALIGN VERTICAL CELLS TO BE FILLED WITH GROUT TO PROVIDE CONTINUOUS UNOBSTRUCTED VERTICAL CELLS. REMOVE OVERHANGING MORTAR OR OTHER OBSTRUCTION AND DEBRIS FROM THE INSIDES OF SUCH CELL WALLS. PROVIDE GROUT WITH 8 INCH SLUMP AND CONSOLIDATE BY MEANS
OF HAND TAMPING TO ENSURE COMPLETE FILLING OF CELLS.
L. PROVIDE AN 8 INCH HIGH BOND BEAM (MINIMUM DEPTH UNLESS OTHERWISE NOTED) AT TOP OF ALL CMU WALLS. REINFORCE BOND BEAM PER DETAIL(S). IF BOND BEAMS AT INTERSECTING WALLS MEET
AT DIFFERENT ELEVATIONS, EXTEND BOND BEAMS AROUND INTERSECTING CORNER TO FIRST
INTERIOR REINFORCED CELL, BUT NOT LESS THAN 4 FEET. CONSTRUCT BOND BEAMS WITH
PORTLAND CEMENT GROUT 2,000 PSI MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS AND A
MAXIMUM AGGREGATE SIZE OF 3/4 INCH.
M. PROVIDE VERTICAL REINFORCING AT CORNERS OF CMU WALLS, AT ENDS OF WALLS, EACH SIDE OF CONTROL JOINT, AND EACH SIDE OF WALL OPENINGS PER DETAIL(S). PROVIDE MINIMUM 3/8 INCH THROUGH-WALL CONTROL JOINTS AT 24'-0" MAXIMUM SPACING OR 2.5 THE HEIGHT OF THE WALL OR
12'-0" FROM CORNERS UNLESS OTHERWISE NOTED ON DRAWINGS.
N. INSTALL ANCHORS, ACCESSORIES, AND OTHER ITEMS TO BE BUILT IN AS WORK PROGRESSES.
O. LAP SPLICE VERTICAL REINFORCING MINIMUM OF 48 BAR DIAMETERS OR 24 INCHES, WHICHEVER IS
GREATER.
P. PERFORM CUTTING AND FITTING OF MASONRY WITH MASONRY SAWS PROVIDING CUT FINISHED
UNITS.
Q. CELLS AT OR BELOW FINISHED GRADE ARE TO BE GROUTED SOLID.
R. WHEN A FOUNDATION DOWEL DOES NOT LINE UP WITH A VERTICAL CORE, DO NOT SLOPE DOWEL
MORE THAN ONE HORIZONTAL TO SIX VERTICAL.
S. WHEN VERTICAL DOUBLE REINFORCED CELLS ARE SPECIFIED, PROVIDE 1/4 INCH CLEARANCE FROM INSIDE FACE OF THE BLOCK MASONRY CELL OR MINIMUM OF ONE BAR DIAMETER, WHICHEVER IS GREATER. ENSURE THAT ALL VERTICAL REINFORCING STEEL IS POSITIONED AND HELD IN PLACE BY
MEANS OF WIRE SPACERS.
STRUCTUR…