Am_0006.pdf

PDF 2 MB Posted

Attached to
CNS Consolidated Helo/TRF Ops/AMU and Alert Facility, FE Warren AFB, WY
Solicitation number
W9128F21R0070
Issued by

About this file

This solicitation seeks proposals for the construction of a consolidated helicopter operations, transportation, aircraft maintenance unit, and alert facility at FE Warren Air Force Base in Wyoming. Offerors must submit proposals by October 5, 2021 at 2:00 PM local time. The work includes construction of a new facility with associated site work. The period of performance is 1,095 calendar days. The place of performance is FE Warren AFB. The solicitation was issued by the U.S. Army Corps of Engineers Omaha District Contracting Office.

View the file

Other files

Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No.0006 W9128F

CONSOLIDATED HELO/TRF OPS/AMU AND ALERT FACILITY AT FE WARREN AFB, WYOMING

See attached documentation for content of the changes to RFP.

Date for receipt of proposals is 5 OCT 2021 at 1400 hours

Government Point of Contact: Brian Finerty, Contract Specialist (402) 996-3715

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

1616 CAPITOL AVE.

OMAHA, NE 68102-4901

See Item 6

W9128F-21-R-0070

09/10/2021

07/30/2021

09/10/2021

Am #0006 - 2 (Continuation SF 30)

10 SEP 2021

Solicitation No. W9128F21R0070

Date of Issue: 30 JUL 2021 Date of Receiving Proposals: 5 OCT 2021

SUBJECT: Amendment No. 0006 to Request for Proposal Solicitation Package for Construction of

CONSOLIDATED HELO/TRF OPS/AMU AND ALERT FACILITY AT FE WARREN AFB, WYOMING

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, changes on the revised specification pages have been tracked in sections listed with asterisks.

Pages or Sections Deleted Pages or Sections Substituted or Added

REGISTER REGISTER

06 20 00 06 20 00* 11 24 40 11 24 40* 31 00 00 31 00 00* ** ** ** 32 11 23 41 22 13.13 ** ** ** ** ** ** 41 22 13.14

b. Drawings (Reissued). The following drawings are revised, with latest revision dates indicated in their title blocks, and reissued with this amendment.

1. Sheet G-001, COVER SHEET

2. Sheet B-103, BORING LOCATIONS - AREA 4

3. Sheet B-108, BORING LOGS

4. Sheet CT101, AIRFIELD JOINTING PLAN - AREA 10

5. Sheet CT102, AIRFIELD JOINTING PLAN - AREA 11

6. Sheet CT106, BID OPTION 2 - ADDITIONAL STORAGE SHELTER BAY - JOINTING PLAN

7. Sheet CT108, AIRFIELD JOINTING ELEVATION PLAN - AREA 10

8. Sheet CT109, AIRFIELD JOINTING ELEVATION PLAN - AREA 11

9. Sheet CT113, BID OPTION 2 - ADDITIONAL STORAGE SHELTER BAY - JOINTING

ELEVATION PLAN

10. Sheet CP103, PAVING PLAN – AREA 3

11. Sheet CP104, PAVING PLAN – AREA 4

12. Sheet CP109, BID OPTION 2 - ADDITIONAL STORAGE SHELTER BAY

13. Sheet C-513, DRAINAGE DETAILS

14. Sheet S-002, STRUCTURAL NOTES

15. Sheet S-004, STRUCTURAL NOTES

16. Sheet SB104, FOUNDATION PLAN – AREA D

17. Sheet SB106, FOUNDATION PLAN – AREA F

18. Sheet SB107, FOUNDATION PLAN – AREA G

19. Sheet S-506, FOUNDATION SECTIONS & DETAILS

20. Sheet A-311, WALL SECTIONS

21. Sheet MP142, HVAC PIPING PLAN – LEVEL 1 – AREA A

22. Sheet MP143, HVAC PIPING PLAN – LEVEL 1 – AREA B

Am #0006 - 3 (Continuation SF 30)

23. Sheet MP144, HVAC PIPING PLAN – LEVEL 1 – AREA C

24. Sheet MP145, HVAC PIPING PLAN – LEVEL 1 – AREA D

25. Sheet MP146, HVAC PIPING PLAN – LEVEL 1 – AREA E

26. Sheet MP147, HVAC PIPING PLAN – LEVEL 1 – AREA F

27. Sheet MP148, HVAC PIPING PLAN – LEVEL 1 – AREA G

28. Sheet MP149, HVAC PIPING PLAN – LEVEL 1 – AREA H

29. Sheet MP150, BID OPTION 2 - HVAC PIPING PLAN – LEVEL 1 – AREA H

30. Sheet M-401, HVAC ENLARGED PLANS – ENLARGED MECHANICAL ROOM

31. Sheet M-701, HYDRONIC DIAGRAM

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the SF30. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposal/Email. See Section 00 22 00 for how to submit electronic proposals.

4. Electronic Offers will be received until 2:00 p.m., local time at place of receiving proposals, 5 OCT 2021, as stated in the Request for Proposal.

Attachments:

Spec Pages listed in 1.a., above Drawings listed in 1.b., above (under separate cover)

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

10 SEP 2021

jlb/2099

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 141 PAGES

Consolidated Helo/TRF OPS/AMU & Alert Facility

01 30 00.24 SD-02 Shop Drawings

1.25 G ROEquipment Room Drawings

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.7 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary High Performance

and Sustainable Building Checklist

1.5.3.1 GPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.3.1 GFinal High Performance and

Sustainable Building Checklist

1.5.3.1 GFinal Sustainability eNotebook

3.2 GThird Party Certification

Certificates and Plaque

01 33 39.00 10 SD-01 Preconstruction Submittals

1.4.1 G DOAdvanced Modeling Project

Execution Plan (PxP)

1.4.4.3 G DOPxP Demonstration

SD-03 Product Data

1.4.2 G DOAdvanced Modeling Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Am_0006

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 141 PAGES

01 33 39.00 10 SD-11 Closeout Submittals

1.4.2 G DOAdvanced Modeling Submittals

3.4 G DOAs-built Drawings

01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

G RODive Operations Plan

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

1.14License Certificates

G ROPortable Gauge Operations

Planning Worksheet

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 141 PAGES

01 45 00.00 10 3.9Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1Written Practices

3.1.3Written Practices

3.1.1NDT Procedures and Equipment

Calibration Records

3.1.3NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

3.1.2Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Steel Truss Plant

2.1Steel Joist Institute Membership

2.1Certificate of Compliance

1.5.14 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

3.1.3Qualification Records

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 141 PAGES

01 45 35 3.1.1Interim Final Report

3.1.3Interim Final Report

3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 74 19 SD-01 Preconstruction Submittals

1.5 G ROWaste Management Plan

SD-11 Closeout Submittals

1.6Records

01 78 24.00 10 SD-01 Preconstruction Submittals

1.5.1Facility Data Project Execution

Plan

SD-10 Operation and Maintenance

Data

3.1 G DOFacility Data Workbook, Construction Progress

3.1 G DOFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 G DOFacility Data Workbook, Construction Final

1.5.3 G DOFacility Document Set, Construction Final

3.2 G DOFacility Document Set, Construction Final

01 78 36.00 24 SD-11 Closeout Submittals

1.2.5Equipment Warranty Booklet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 141 PAGES

01 78 39.00 24 SD-03 Product Data

1.7.2 G DO50 Percent Preliminary As-Built

Drawings

1.7.3 G DO100 Percent Preliminary As-Built

Drawings

SD-11 Closeout Submittals

1.7.4 G DOFinal As-Built Drawings

01 91 00.15 SD-01 Preconstruction Submittals

1.7 G DOCommissioning Firm

1.7.1 G DOLead Commissioning Specialist

1.7.2 G DOTechnical Commissioning

Specialists

1.7 G DOCommissioning Firm's Contract

SD-06 Test Reports

3.1.4 G DODesign Review Report

3.1.3.1 G DOInterim Construction Phase

Commissioning Plan

3.1.3.2 G DOFinal Construction Phase

Commissioning Plan

3.1.3.1.2 G DOTemplate Building Envelope

Inspection Checklists

3.1.6.2 G DOBuilding Envelope Inspection

Checklists

3.1.6.3 G DOPre-Functional Checklists

1.9Issues Log

3.2 G DOCommissioning Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 141 PAGES

01 91 00.15 SD-07 Certificates

1.10 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.7 G ROTraining Plan

3.1.7 G ROTraining Attendance Rosters

3.1.8 G DOSystems Manual

3.1.9 G DOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.1.3.1 S DOConstruction Phase

Commissioning Plan

3.2 S DOFinal Commissioning Report

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G AEFormwork

2.2.1 GForm Removal Schedule

SD-03 Product Data

2.2 G AEForm Materials

SD-05 Design Data

2.1 G AECalculations

SD-06 Test Reports

3.2Inspection

03 15 00.00 10 SD-02 Shop Drawings

2.4 G AEWaterstops

SD-03 Product Data

2.2 G AEPreformed Expansion Joint Filler

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 141 PAGES

03 15 00.00 10 2.3 G AESealant

2.4 G AEWaterstops

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

03 20 00.00 10 SD-02 Shop Drawings

3.1 G AEReinforcement

SD-03 Product Data

2.3.1 G AEMechanical Butt-Splices

2.3 G AEReinforcing Steel

SD-06 Test Reports

2.7 G AETests, Inspections, and

Verifications

SD-07 Certificates

2.3 G AEReinforcing Steel

1.3.1 G AEQualified Welders

1.3.2 G AEQualification of Steel Bar

Butt-Splicers

03 30 00.00 10 SD-01 Preconstruction Submittals

1.4.2 G AEQuality Control Plan

1.4.1 G AELaboratory Accreditation

3.8.5.6 G AESampling Plan

SD-03 Product Data

Part 2 G AERecycled Content Products

2.2 G AECementitious Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 141 PAGES

03 30 00.00 10 2.10 G AEVapor Retarder

2.1.5 G AEFloor Finish

2.4 G AEChemical Admixtures

SD-05 Design Data

2.1.1 G AEMixture Proportions

SD-06 Test Reports

2.1.1 G AEMixture Proportions

3.8 G DOTesting and Inspection for CQC

2.2.3Fly Ash

2.3Aggregates

3.8.5.1Air Content

3.8.5.3Slump

3.8.5.6Compressive Strength

2.5Water

SD-07 Certificates

1.4 G AEContractor Quality Control

personnel

3.2.1 G AEReady-Mix Plant

03 35 00.00 10 SD-03 Product Data

Part 2 SRecycled Content Products

SD-04 Samples

1.3.1 GField Test Panels

03 39 00.00 10 SD-03 Product Data

2.1 G AECuring Materials

SD-06 Test Reports

3.2 G AETesting and Inspection for CQC

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 141 PAGES

03 39 00.00 10 SD-08 Manufacturer’s Instructions

2.1Curing Compound

03 45 00 SD-01 Preconstruction Submittals

1.12.5Pre-Installation Meeting

SD-02 Shop Drawings

1.12.1 G AEPrecast Drawings

SD-03 Product Data

2.3Cast-In Embedded Items And

Connectors

2.3.2Connection Devices

2.2.5Admixtures

2.5Gasket

2.6.1Thin Brick Veneer

2.7Bearing Pads

SD-04 Samples

1.12.2 GConcrete Wall Panel Surface

Finish

1.12.4 GMock-up

2.6.1 GBrick Color Chips

2.6.1 GForm Liner

1.12.2 GFull Size Sample Wall Panel

SD-05 Design Data

1.5.4Design Calculations

2.1.1Contractor-Furnished Mix Design

2.4.9Repair of Surface Defects

1.5.5Thermal Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 141 PAGES

03 45 00 SD-06 Test Reports

1.11.2Strength Tests

1.11.2Slump

1.11.2Air Content

1.11.1Test for Concrete Materials

2.2.6Water

3.6.4Testing Precast Units for Strength

SD-07 Certificates

1.4Manufacturer's Qualifications

1.8.1Fabricator Quality Certifications

1.9Erector Certification

1.10Erector's Post Audit Declaration

SD-08 Manufacturer’s Instructions

3.3Installation

3.8Cleaning

2.6.1Thin Brick

SD-11 Closeout Submittals

1.12.3Batch Ticket Information

2.2.1 SRecycled Content for Fly Ash and

Pozzolan

2.2.1 SRecycled Content for Ground Iron

Blast-Furnace Slag

2.2.1 SRecycled Content for Silica Fume

04 20 00 SD-02 Shop Drawings

3.3.2.1 G AECut CMU

3.4.1.1 G AEDetail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 141 PAGES

04 20 00 SD-03 Product Data

1.5.1 G AEHot Weather Procedures

1.5.2 G AECold Weather Procedures

2.4.1.4Admixtures for Masonry Mortar

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

2.4.1.1 G AECementitious Materials

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2.2 GConcrete Masonry Units (CMU)

SD-05 Design Data

2.1.2 G AEMasonry Compressive Strength

2.2.2.4 G AEFire-Rated Concrete Masonry

Units

3.2.4 G AEBracing Calculations

SD-06 Test Reports

2.2.2.4 G AEFire-Rated Concrete Masonry

Units

3.6.1.1 G AEField Testing of Mortar

3.6.1.2 G AEField Testing of Grout

SD-07 Certificates

1.3.2 G AESpecial Masonry Inspector

Qualifications

2.2.2.2 G AEConcrete Masonry Units (CMU)

2.2.3 G AEPrecast Concrete Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 141 PAGES

04 20 00 2.4.1.1 G AECementitious Materials

2.4.1.4 G AEAdmixtures for Masonry Mortar

2.4.2.2 G AEAdmixtures for Grout

2.6.2 G AEAnchors, Ties, and Bar

Positioners

2.6.3 G AEJoint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8 G AETake-Back Program

SD-11 Closeout Submittals

2.2.2.2.1 SRecycled Content

04 43 13 SD-03 Product Data

2.2Simulated Stone Veneer

SD-04 Samples

2.2 GSimulated Stone Veneer

05 05 23.16 SD-01 Preconstruction Submittals

3.2 G AEWelding Quality Assurance Plan

SD-03 Product Data

1.3 G AEWelding Procedure Qualifications

1.3.5 G AEWelder, Welding Operator, and

Tacker Qualification

1.3.6 G AEInspector Qualification

1.3.2 G AEPrevious Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 141 PAGES

05 05 23.16 1.3.3 G AEPre-Qualified Procedures

2.2 G AEWelding Electrodes and Rods

SD-06 Test Reports

3.3 G AENondestructive Testing

SD-07 Certificates

1.3.1 G AECertified Welding Procedure

Specifications (WPS)

1.3.1 G AECertified Brazing Procedure

Specifications (BPS)

1.3.1 G AECertified Procedure Qualification

Records (PQR)

1.3.1 G AECertified Welder Performance

Qualifications (WPQ)

1.3.1 G AECertified Brazer Performance

Qualifications (BPQ)

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G AEErection Drawings

SD-02 Shop Drawings

1.4.2 G AEFabrication Drawings

1.4.2 G AEConnection calculations

SD-03 Product Data

2.6.2 G AEShop Primer

2.4.1 G AEWelding Electrodes and Rods

2.3.2.3 G AEDirect Tension Indicator Washers

2.4.2 G AENon-Shrink Grout

2.3.3 G AETension Control Bolts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 141 PAGES

05 12 00 SD-06 Test Reports

2.6.2 G AEClass B Coating

2.3 G AEBolts, Nuts, and Washers

3.7.2.1 G AEDirect Tension Indicator Washer

Inspection Reports

3.7.3.1 G AEBolt Testing Reports

3.7.4 G AEEmbrittlement Test Reports

SD-07 Certificates

2.2 G AESteel

2.3 G AEBolts, Nuts, and Washers

2.5 G AEGalvanizing

1.3 G AEAISC Fabrication Plant Quality

Certification

1.3 G AEAISC Erector Quality Certification

1.4.3.1 G AEWelding Procedures and

Qualifications

2.4.1 G AEWelding Electrodes and Rods

05 21 00 SD-01 Preconstruction Submittals

1.3.2 G AEWelder Qualification

SD-02 Shop Drawings

1.3.1 G AESteel Joist Framing

SD-05 Design Data

1.5.2 G AEBlast Report

1.5.2.1 G AEBlast Design Calculations

2.2 G AEDesign Calculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 141 PAGES

05 21 00 3.4 G AEErection Inspection

3.4 G AEWelding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

1.3.3 G AEBlast Consultant Qualifications

SD-11 Closeout Submittals

2.3 SRecycled Content of Steel

Products

05 30 00 SD-02 Shop Drawings

1.3.5 G AEFabrication Drawings

SD-03 Product Data

2.2 G AEAccessories

2.1 G AEDeck Units

2.1.4 G AEGalvanizing Repair Paint

2.1.4 G AETouch-Up Paint

1.3.3 G AEWelding Equipment

1.3.3 G AEWelding Rods and Accessories

SD-05 Design Data

2.1 G AEDeck Units

SD-07 Certificates

1.3.2 G AEPowder-Actuated Tool Operator

1.3.3 G AEWelder Qualifications

1.3.3 G AEWelding Procedures

1.3.4.1 G AEFire Safety

1.3.4.2 G AEWind Storm Resistance

1.3.1 G AEManufacturer's Certificate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 141 PAGES

05 30 00 2.2.11 G AEStud Manufacture's Certification

2.2.11 G AEStud Manufacture's Test Reports

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 40 00 SD-02 Shop Drawings

1.6.1 G AEFraming Components

SD-03 Product Data

2.1Studs

SD-05 Design Data

1.6.2 G AEMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.4Expansion Joint Covers

2.6 GFloor Gratings

2.7 GBollards/Pipe Guards

2.10 G AEAngles and Plates

2.12 GRoof Hatches

2.8 GFloor Access Hatch

2.5 GElevator Pit Gratings And Frame

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 141 PAGES

05 50 13 SD-03 Product Data

2.4Expansion Joint Covers

2.6Floor Gratings

2.8Floor Access Hatch

2.12Roof Hatches

2.9 GDownspout Terminations

2.1 GCertificates of Compliance

2.1 SRecycled Content

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.1 G AEMetal Stair System

SD-03 Product Data

2.4.1 GStructural-Steel Plates, Shapes, and Bars

2.4.3 GHot-Rolled Carbon Steel Sheets

and Strips

2.4.2 GHot-Rolled Carbon Steel Bars

2.3.2Concrete Inserts

2.3.3 GMasonry Anchorage Devices

2.2.3 GProtective Coating

2.2.2 GSteel Pan Stairs

2.3.1 GSteel Stairs

SD-07 Certificates

1.3.1 GWelding Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 141 PAGES

05 51 00 1.3.1 GWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1Structural-Steel Plates, Shapes, and Bars

2.4.4Gray Iron Castings

2.4.5Malleable Iron Castings

2.2.3Protective Coating

2.3.3Masonry Anchorage Devices

05 51 33 SD-02 Shop Drawings

2.3 G AELadders

SD-03 Product Data

2.3Ladders

2.3.2Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 G AEFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 GStructural Steel Plates, Shapes, and Bars

2.2.2 GStructural Steel Tubing

2.2.3 GHot-Rolled Carbon Steel Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 141 PAGES

05 52 00 2.2.4 GConcrete Inserts

2.2.5 GMasonry Anchorage Devices

2.1.2 GProtective Coating

2.2.7 GSteel Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.8.1Certificates of Grade

1.8.2 SCertified Sustainably Harvested

Wood

1.7Preservative Treatment

1.8.3Indoor Air Quality

SD-11 Closeout Submittals

2.3.1 SCertified Sustainably Harvested

Framing Lumber

06 18 00 SD-02 Shop Drawings

2.1.1Fabrication Drawings

3.1.2 G DOInstallation Drawings

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 141 PAGES

06 18 00 1.3.3 G AEExposed-to-View Surfaces

SD-07 Certificates

1.3.2Glued-Laminated Structural

Members

1.3.2Structural Members

1.3.2Design Load Compliance

SD-08 Manufacturer’s Instructions

3.1.1Laminated Wood Materials

3.1.1Adhesive

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1 GWood Products

1.4 GTreated Wood Products

2.5 GHardware and Accessories

SD-04 Samples

1.5 GSamples

SD-07 Certificates

1.7.1.1 SCertificates of Grade

06 41 16.00 10 SD-02 Shop Drawings

1.5.2 G AEShop Drawings

3.1Installation

SD-03 Product Data

2.1 G AEWood Materials

1.5.3 G AECertification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 141 PAGES

06 41 16.00 10 SD-04 Samples

2.3 G AEPlastic Laminates

2.6 G AECabinet Hardware

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

SD-11 Closeout Submittals

1.3 SLEED Documentation

06 61 16 SD-02 Shop Drawings

1.5.2 G AEDetail Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1 G AESolid Polymer Material

1.5.1Qualifications

2.3Fabrications

1.5.3Certification

1.5.3VOC Content

SD-04 Samples

2.1 G AEMaterial

2.3.5 G AECounter and Vanity Tops

SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.5.1Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 141 PAGES

06 61 16 SD-10 Operation and Maintenance

Data

3.2Clean-up

SD-11 Closeout Submittals

1.3 SLEED Documentation

07 05 23 SD-01 Preconstruction Submittals

1.4 G AEWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-06 Test Reports

3.5 G AEPressure Test Procedures

3.5.6 G AEAir Leakage Test Report

3.6.5 G AEDiagnostic Test Report

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

07 13 53 SD-03 Product Data

1.3Manufacturer's Standard Details

2.2Elastomeric Waterproofing Sheet

Material

2.6Protection Board

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 141 PAGES

07 13 53 2.2Elastomeric Waterproofing Sheet

Material

3.6Protective Covering

SD-07 Certificates

2.2Elastomeric Waterproofing Sheet

Material

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

1.4Protective Coverings

1.8Special Warranties

1.8Special Warranties

2.1.1Certificates Of Compliance

2.1.2Certificates Of Compliance

SD-08 Manufacturer’s Instructions

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1.1Certificates Of Compliance

2.1.2Certificates Of Compliance

07 14 00 SD-03 Product Data

2.1 GFluid-applied membrane

2.2 GMembrane primer

2.8 GElastomeric sheet

2.10 GFlexible foam-backed elastomeric

sheet

3.3 GSolvent

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 141 PAGES

07 14 00 3.4.1 GMoisture meter

2.11 GProtection board

2.7 GBond breaker

SD-11 Closeout Submittals

1.6Warranty

3.6Information Card

3.5Instructions To Government

Personnel

07 19 00 SD-03 Product Data

2.2Water repellents

SD-06 Test Reports

1.3.2Water absorption

1.3.2Moisture vapor transmission

1.3.2Water Penetration and Leakage

SD-07 Certificates

1.3.1Manufacturer's qualifications

1.3.1Applicator's qualifications

1.3.3Evidence of acceptable variation

1.11Warranty

SD-08 Manufacturer’s Instructions

3.4Application

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.1 GBoard Insulation

2.2 GPressure Sensitive Tape

1.4 GProtection Board or Coatings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 141 PAGES

07 21 13 2.4 GAccessories

SD-07 Certificates

2.1Board Insulation

2.3Protection Board or Coating

3.3.3Protection Board or Coating

SD-08 Manufacturer’s Instructions

2.1Board Insulation

2.4.1Adhesive

SD-11 Closeout Submittals

1.5 SULE Greenguard

07 21 16 SD-03 Product Data

2.2Blanket Insulation

2.3Sill Sealer Insulation

2.5Vapor Retarder

2.6Pressure Sensitive Tape

2.7Accessories

SD-08 Manufacturer’s Instructions

3.3.1Insulation

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

2.1.2 SReduce Volatile Organic

Compounds (VOC)

07 21 33 SD-03 Product Data

2.1 G AEConcrete faced insulated

wall-panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 141 PAGES

07 21 33 2.1.1Metal cap flashing

SD-08 Manufacturer’s Instructions

2.1Concrete faced insulated wall-panels

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3Verification of Existing Conditions

SD-03 Product Data

2.2 G AEInsulation

1.4 G AECover Board

2.4 G AEFasteners

SD-06 Test Reports

1.8.1 G AEFlame Spread Rating

SD-07 Certificates

1.9 SVolatile Organic Compounds

(VOC) Content

1.6 G ROInstaller Qualifications

SD-08 Manufacturer’s Instructions

2.4Fasteners

2.2Insulation

SD-11 Closeout Submittals

1.9 SVolatile Organic Compounds

(VOC) Content

07 27 10.00 10 SD-04 Samples

3.1.2 G ROMock-Up

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 141 PAGES

07 27 10.00 10 1.8 G DODesign Review Report

3.1.3 G ROTesting and Inspection

SD-07 Certificates

1.7 G ROAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1Qualifications of Manufacturer

1.8.2Qualifications of Installer

SD-02 Shop Drawings

1.4Self-adhering Air Barrier

SD-03 Product Data

1.4 GSelf-adhering Air Barrier

2.3 GPrimers, Adhesives, and Mastics

1.4.2 GSafety Data Sheets

SD-04 Samples

1.4Self-adhering Air Barrier

SD-06 Test Reports

1.6 G AEField Peel Adhesion Test

1.4.4 G AEFlame Propagation of Wall

Assemblies

1.4.4 G AEFlame Spread and Smoke

Developed Index Ratings

3.4.1 G AESite Inspections and Testing

SD-07 Certificates

1.4 G AESelf-adhering Air Barrier

1.8.1 G AEQualifications of Manufacturer

1.8.2 G AEQualifications of Installer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 141 PAGES

07 27 19.01 SD-08 Manufacturer’s Instructions

1.4Self-adhering Air Barrier

2.3Primers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 SVolatile Organic Compound

(VOC) Content

07 27 26 SD-01 Preconstruction Submittals

1.9.1Qualifications of Manufacturer

1.9.2Qualifications of Installer

SD-02 Shop Drawings

1.4Fluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 G AEFluid-Applied Membrane Air

Barrier

2.4 G AETransition Membrane

2.3 G AEPrimers, Adhesives, and Mastics

2.7 G AEReinforcement

1.4.2 G AESafety Data Sheets

SD-04 Samples

1.4.3Mockup

SD-06 Test Reports

1.6 G AECapillary Moisture Test

1.4.4 G AEField Peel Adhesion Test

1.4.4 G AEFlame Propagation of Wall

Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 141 PAGES

07 27 26 1.4.4 G AEFlame Spread and Smoke

Developed Index Ratings

3.4.1 G AESite Inspections

SD-07 Certificates

1.4Fluid-Applied Membrane Air

Barrier

2.4Transition Membrane

1.9.1Qualifications of Manufacturer

1.9.2Qualifications of Installer

SD-08 Manufacturer’s Instructions

1.4Fluid-Applied Membrane Air

Barrier

2.4Transition Membrane

2.3Primers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 SVolatile Organic Compound

(VOC) Content

07 30 12 SD-03 Product Data

2.1Materials

07 41 63 SD-01 Preconstruction Submittals

1.4.1 GQualification of Manufacturer

1.4.1 GQualification of Installer

1.4.1 GQualifications for Welding

1.4.1 GOn-Site Inspection and

Acceptance Procedure

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 141 PAGES

07 41 63 1.4.1 GGutter/Downspout Assembly

SD-03 Product Data

1.4.1 GSustainable Acquisition

1.4.1 GFactory Color Finish

1.4.1 GSub-girts and Formed Shapes

1.4.1 GClosure Materials

1.4.1 GInsulation

1.4.1 GPressure-Sensitive Tape

1.4.1 GSealants and Caulking

1.4.1 GRated Wall Assembly

1.4.1 GAccessories

SD-04 Samples

1.4.1 G AEManufacturer's Color Charts and

Chips

SD-05 Design Data

1.4.1Wind Design Analysis

SD-06 Test Reports

3.4.1.2 GLeakage Tests

1.4.1 GFire Rating Test Report

3.1 GCoatings and Base Metals of

Metal Roofing

1.4.1 GFactory Finish and Color

Performance Requirements

1.4.1 GWind Uplift Test Report

SD-07 Certificates

2.3.1.2Fasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 141 PAGES

07 41 63 1.4.1Galvanizing Repair Paint

1.4.1Safety Data Sheets

2.4.2Coating Physical Properties:

SD-08 Manufacturer’s Instructions

1.4.1Installation of Roof Panel

Assemblies

SD-11 Closeout Submittals

1.7 G AEWarranty

3.3.5 GInformation Form and Placard

1.4.1Safety Data Sheets

1.4.1Application Instructions

07 42 63 SD-01 Preconstruction Submittals

1.5.3 GQualification of Manufacturer

1.5.4 GQualification of Installer

1.5.4.1 GQualifications for Welding Work

SD-02 Shop Drawings

1.5.1 GWall Panel Assemblies

1.5.1 GFlashing and Accessories

1.5.1 GAnchorage Systems

SD-03 Product Data

1.5.9 GCertification

1.5.1 GFactory Color Finish

1.5.1 GSub-girts and Formed Shapes

1.5.1 GClosure Materials

1.5.1 GInsulation

1.5.1 GPressure Sensitive Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 141 PAGES

07 42 63 2.4.4.1 GSealants and Caulking

1.5.1 GAccessories

SD-04 Samples

1.5.1 G AEManufacturer's Color Charts and

Chips

SD-05 Design Data

1.5.1Wind Design Analysis

SD-06 Test Reports

3.7.2 GLeakage Tests

1.3.2 GWind Load Tests

1.3.2 GSeismic Tests

1.5.1 GFactory Color Finish

SD-07 Certificates

1.5.1Fasteners

1.5.3Qualification of Manufacturer

1.5.4Qualification of Installer

1.5.1wall system assembly wind load listings

SD-08 Manufacturer’s Instructions

1.5.1Installation of Wall panels

SD-11 Closeout Submittals

1.8Warranty

1.5.1Instructions

1.5.1Material Safety Data Sheets

07 54 19 SD-02 Shop Drawings

1.7 GDetail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 141 PAGES

07 54 19 1.7 GRoof Plan

SD-03 Product Data

3.2.2 GPVC Roofing Membrane

2.1.2Bonding Adhesive

1.6.5Flashing

3.2.2.2Flashing

2.1.7Roof Insulation

2.1.5Pre-Manufactured Accessories

3.6.1Water Cutoffs

2.1.1Information Card

SD-05 Design Data

1.3.2 G AEWind Uplift Resistance

SD-07 Certificates

1.6.1Qualification of Manufacturer

1.6.2Qualifications of Applicator

1.6.4Qualification of Engineer of

Record

1.3.2Wind Uplift Resistance

1.3.1Fire Resistance

2.1.1Minimum Polymer Thickness

2.1.4Minimum Polymer Thickness

1.11 GSample Certificate

SD-08 Manufacturer’s Instructions

2.1.4Membrane Flashing

3.3.2Membrane Flashing

2.1.5Pre-Manufactured Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 141 PAGES

07 54 19 1.9Cold Weather

SD-11 Closeout Submittals

1.4LEED Documentation

1.11 G AEWarranty

2.1.1 G AEInformation Card

3.9 G AEInstructions to Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.16 GGutters

3.1.17 GDownspouts

3.1.24 GExpansion Joints

2.2.1 GGravel Stops and Fasciae

3.1.21 GSplash Pans

3.1.18 GFlashing for Roof Drains

3.1.11 GBase Flashing

3.1.12 GCounterflashing

3.1.25 GFlashing at Roof Penetrations

and Equipment Supports

2.2.11 GReglets

3.1.19 GScuppers

3.1.28 GCopings

3.1.15 GDrip Edges

3.1.20 GConductor Heads

3.1.22 GEave Flashing

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 141 PAGES

07 60 00 1.4.2 GFinish Samples

SD-07 Certificates

2.1 GCertificates of Compliance

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

SD-11 Closeout Submittals

2.1 SRecycled Content

07 72 53 SD-02 Shop Drawings

2.2 G AESnow Guards

SD-03 Product Data

2.2Snow Guards

SD-04 Samples

2.3 GFinish

07 84 00 SD-02 Shop Drawings

2.1 G AEFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 141 PAGES

07 84 00 1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.2 GSealants

2.3 GPrimers

2.4 GBond Breakers

2.5 GBackstops

3.1 GField Adhesion

SD-07 Certificates

1.4.1 SIndoor Air Quality

SD-11 Closeout Submittals

2.2.1 SIndoor Air Quality For Interior

Sealants

2.2.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.2.4 SIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

2.1Doo…