This solicitation seeks proposals for the construction of a consolidated helicopter operations, transportation, aircraft maintenance unit, and alert facility at FE Warren Air Force Base in Wyoming. Offerors must submit proposals by October 5, 2021 at 2:00 PM local time. The work includes construction of a new facility with associated site work. The period of performance is 1,095 calendar days. The place of performance is FE Warren AFB. The solicitation was issued by the U.S. Army Corps of Engineers Omaha District Contracting Office.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No.0006 W9128F
CONSOLIDATED HELO/TRF OPS/AMU AND ALERT FACILITY AT FE WARREN AFB, WYOMING
See attached documentation for content of the changes to RFP.
Date for receipt of proposals is 5 OCT 2021 at 1400 hours
Government Point of Contact: Brian Finerty, Contract Specialist (402) 996-3715
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F-21-R-0070
09/10/2021
07/30/2021
09/10/2021
Am #0006 - 2 (Continuation SF 30)
10 SEP 2021
Solicitation No. W9128F21R0070
Date of Issue: 30 JUL 2021 Date of Receiving Proposals: 5 OCT 2021
SUBJECT: Amendment No. 0006 to Request for Proposal Solicitation Package for Construction of
CONSOLIDATED HELO/TRF OPS/AMU AND ALERT FACILITY AT FE WARREN AFB, WYOMING
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, changes on the revised specification pages have been tracked in sections listed with asterisks.
Pages or Sections Deleted Pages or Sections Substituted or Added
REGISTER REGISTER
06 20 00 06 20 00* 11 24 40 11 24 40* 31 00 00 31 00 00* ** ** ** 32 11 23 41 22 13.13 ** ** ** ** ** ** 41 22 13.14
b. Drawings (Reissued). The following drawings are revised, with latest revision dates indicated in their title blocks, and reissued with this amendment.
1. Sheet G-001, COVER SHEET
2. Sheet B-103, BORING LOCATIONS - AREA 4
3. Sheet B-108, BORING LOGS
4. Sheet CT101, AIRFIELD JOINTING PLAN - AREA 10
5. Sheet CT102, AIRFIELD JOINTING PLAN - AREA 11
6. Sheet CT106, BID OPTION 2 - ADDITIONAL STORAGE SHELTER BAY - JOINTING PLAN
7. Sheet CT108, AIRFIELD JOINTING ELEVATION PLAN - AREA 10
8. Sheet CT109, AIRFIELD JOINTING ELEVATION PLAN - AREA 11
9. Sheet CT113, BID OPTION 2 - ADDITIONAL STORAGE SHELTER BAY - JOINTING
ELEVATION PLAN
10. Sheet CP103, PAVING PLAN – AREA 3
11. Sheet CP104, PAVING PLAN – AREA 4
12. Sheet CP109, BID OPTION 2 - ADDITIONAL STORAGE SHELTER BAY
13. Sheet C-513, DRAINAGE DETAILS
14. Sheet S-002, STRUCTURAL NOTES
15. Sheet S-004, STRUCTURAL NOTES
16. Sheet SB104, FOUNDATION PLAN – AREA D
17. Sheet SB106, FOUNDATION PLAN – AREA F
18. Sheet SB107, FOUNDATION PLAN – AREA G
19. Sheet S-506, FOUNDATION SECTIONS & DETAILS
20. Sheet A-311, WALL SECTIONS
21. Sheet MP142, HVAC PIPING PLAN – LEVEL 1 – AREA A
22. Sheet MP143, HVAC PIPING PLAN – LEVEL 1 – AREA B
Am #0006 - 3 (Continuation SF 30)
23. Sheet MP144, HVAC PIPING PLAN – LEVEL 1 – AREA C
24. Sheet MP145, HVAC PIPING PLAN – LEVEL 1 – AREA D
25. Sheet MP146, HVAC PIPING PLAN – LEVEL 1 – AREA E
26. Sheet MP147, HVAC PIPING PLAN – LEVEL 1 – AREA F
27. Sheet MP148, HVAC PIPING PLAN – LEVEL 1 – AREA G
28. Sheet MP149, HVAC PIPING PLAN – LEVEL 1 – AREA H
29. Sheet MP150, BID OPTION 2 - HVAC PIPING PLAN – LEVEL 1 – AREA H
30. Sheet M-401, HVAC ENLARGED PLANS – ENLARGED MECHANICAL ROOM
31. Sheet M-701, HYDRONIC DIAGRAM
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the SF30. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposal/Email. See Section 00 22 00 for how to submit electronic proposals.
4. Electronic Offers will be received until 2:00 p.m., local time at place of receiving proposals, 5 OCT 2021, as stated in the Request for Proposal.
Attachments:
Spec Pages listed in 1.a., above Drawings listed in 1.b., above (under separate cover)
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
10 SEP 2021
jlb/2099
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 141 PAGES
Consolidated Helo/TRF OPS/AMU & Alert Facility
01 30 00.24 SD-02 Shop Drawings
1.25 G ROEquipment Room Drawings
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.7 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary High Performance
and Sustainable Building Checklist
1.5.3.1 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.1 GFinal High Performance and
Sustainable Building Checklist
1.5.3.1 GFinal Sustainability eNotebook
3.2 GThird Party Certification
Certificates and Plaque
01 33 39.00 10 SD-01 Preconstruction Submittals
1.4.1 G DOAdvanced Modeling Project
Execution Plan (PxP)
1.4.4.3 G DOPxP Demonstration
SD-03 Product Data
1.4.2 G DOAdvanced Modeling Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Am_0006
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 141 PAGES
01 33 39.00 10 SD-11 Closeout Submittals
1.4.2 G DOAdvanced Modeling Submittals
3.4 G DOAs-built Drawings
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
G RODive Operations Plan
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
G ROPortable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 141 PAGES
01 45 00.00 10 3.9Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1Written Practices
3.1.3Written Practices
3.1.1NDT Procedures and Equipment
Calibration Records
3.1.3NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
3.1.2Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Steel Truss Plant
2.1Steel Joist Institute Membership
2.1Certificate of Compliance
1.5.14 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
3.1.3Qualification Records
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 141 PAGES
01 45 35 3.1.1Interim Final Report
3.1.3Interim Final Report
3.1.1 GComprehensive Final Report
3.1.3 GComprehensive Final Report
01 74 19 SD-01 Preconstruction Submittals
1.5 G ROWaste Management Plan
SD-11 Closeout Submittals
1.6Records
01 78 24.00 10 SD-01 Preconstruction Submittals
1.5.1Facility Data Project Execution
Plan
SD-10 Operation and Maintenance
Data
3.1 G DOFacility Data Workbook, Construction Progress
3.1 G DOFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.2 G DOFacility Data Workbook, Construction Final
1.5.3 G DOFacility Document Set, Construction Final
3.2 G DOFacility Document Set, Construction Final
01 78 36.00 24 SD-11 Closeout Submittals
1.2.5Equipment Warranty Booklet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 141 PAGES
01 78 39.00 24 SD-03 Product Data
1.7.2 G DO50 Percent Preliminary As-Built
Drawings
1.7.3 G DO100 Percent Preliminary As-Built
Drawings
SD-11 Closeout Submittals
1.7.4 G DOFinal As-Built Drawings
01 91 00.15 SD-01 Preconstruction Submittals
1.7 G DOCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
1.7.2 G DOTechnical Commissioning
Specialists
1.7 G DOCommissioning Firm's Contract
SD-06 Test Reports
3.1.4 G DODesign Review Report
3.1.3.1 G DOInterim Construction Phase
Commissioning Plan
3.1.3.2 G DOFinal Construction Phase
Commissioning Plan
3.1.3.1.2 G DOTemplate Building Envelope
Inspection Checklists
3.1.6.2 G DOBuilding Envelope Inspection
Checklists
3.1.6.3 G DOPre-Functional Checklists
1.9Issues Log
3.2 G DOCommissioning Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 141 PAGES
01 91 00.15 SD-07 Certificates
1.10 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.7 G ROTraining Plan
3.1.7 G ROTraining Attendance Rosters
3.1.8 G DOSystems Manual
3.1.9 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.1.3.1 S DOConstruction Phase
Commissioning Plan
3.2 S DOFinal Commissioning Report
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 G AEFormwork
2.2.1 GForm Removal Schedule
SD-03 Product Data
2.2 G AEForm Materials
SD-05 Design Data
2.1 G AECalculations
SD-06 Test Reports
3.2Inspection
03 15 00.00 10 SD-02 Shop Drawings
2.4 G AEWaterstops
SD-03 Product Data
2.2 G AEPreformed Expansion Joint Filler
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 141 PAGES
03 15 00.00 10 2.3 G AESealant
2.4 G AEWaterstops
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
03 20 00.00 10 SD-02 Shop Drawings
3.1 G AEReinforcement
SD-03 Product Data
2.3.1 G AEMechanical Butt-Splices
2.3 G AEReinforcing Steel
SD-06 Test Reports
2.7 G AETests, Inspections, and
Verifications
SD-07 Certificates
2.3 G AEReinforcing Steel
1.3.1 G AEQualified Welders
1.3.2 G AEQualification of Steel Bar
Butt-Splicers
03 30 00.00 10 SD-01 Preconstruction Submittals
1.4.2 G AEQuality Control Plan
1.4.1 G AELaboratory Accreditation
3.8.5.6 G AESampling Plan
SD-03 Product Data
Part 2 G AERecycled Content Products
2.2 G AECementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 141 PAGES
03 30 00.00 10 2.10 G AEVapor Retarder
2.1.5 G AEFloor Finish
2.4 G AEChemical Admixtures
SD-05 Design Data
2.1.1 G AEMixture Proportions
SD-06 Test Reports
2.1.1 G AEMixture Proportions
3.8 G DOTesting and Inspection for CQC
2.2.3Fly Ash
2.3Aggregates
3.8.5.1Air Content
3.8.5.3Slump
3.8.5.6Compressive Strength
2.5Water
SD-07 Certificates
1.4 G AEContractor Quality Control
personnel
3.2.1 G AEReady-Mix Plant
03 35 00.00 10 SD-03 Product Data
Part 2 SRecycled Content Products
SD-04 Samples
1.3.1 GField Test Panels
03 39 00.00 10 SD-03 Product Data
2.1 G AECuring Materials
SD-06 Test Reports
3.2 G AETesting and Inspection for CQC
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 141 PAGES
03 39 00.00 10 SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 45 00 SD-01 Preconstruction Submittals
1.12.5Pre-Installation Meeting
SD-02 Shop Drawings
1.12.1 G AEPrecast Drawings
SD-03 Product Data
2.3Cast-In Embedded Items And
Connectors
2.3.2Connection Devices
2.2.5Admixtures
2.5Gasket
2.6.1Thin Brick Veneer
2.7Bearing Pads
SD-04 Samples
1.12.2 GConcrete Wall Panel Surface
Finish
1.12.4 GMock-up
2.6.1 GBrick Color Chips
2.6.1 GForm Liner
1.12.2 GFull Size Sample Wall Panel
SD-05 Design Data
1.5.4Design Calculations
2.1.1Contractor-Furnished Mix Design
2.4.9Repair of Surface Defects
1.5.5Thermal Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 141 PAGES
03 45 00 SD-06 Test Reports
1.11.2Strength Tests
1.11.2Slump
1.11.2Air Content
1.11.1Test for Concrete Materials
2.2.6Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4Manufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
1.10Erector's Post Audit Declaration
SD-08 Manufacturer’s Instructions
3.3Installation
3.8Cleaning
2.6.1Thin Brick
SD-11 Closeout Submittals
1.12.3Batch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled Content for Silica Fume
04 20 00 SD-02 Shop Drawings
3.3.2.1 G AECut CMU
3.4.1.1 G AEDetail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 141 PAGES
04 20 00 SD-03 Product Data
1.5.1 G AEHot Weather Procedures
1.5.2 G AECold Weather Procedures
2.4.1.4Admixtures for Masonry Mortar
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
2.4.1.1 G AECementitious Materials
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2.2 GConcrete Masonry Units (CMU)
SD-05 Design Data
2.1.2 G AEMasonry Compressive Strength
2.2.2.4 G AEFire-Rated Concrete Masonry
Units
3.2.4 G AEBracing Calculations
SD-06 Test Reports
2.2.2.4 G AEFire-Rated Concrete Masonry
Units
3.6.1.1 G AEField Testing of Mortar
3.6.1.2 G AEField Testing of Grout
SD-07 Certificates
1.3.2 G AESpecial Masonry Inspector
Qualifications
2.2.2.2 G AEConcrete Masonry Units (CMU)
2.2.3 G AEPrecast Concrete Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 141 PAGES
04 20 00 2.4.1.1 G AECementitious Materials
2.4.1.4 G AEAdmixtures for Masonry Mortar
2.4.2.2 G AEAdmixtures for Grout
2.6.2 G AEAnchors, Ties, and Bar
Positioners
2.6.3 G AEJoint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8 G AETake-Back Program
SD-11 Closeout Submittals
2.2.2.2.1 SRecycled Content
04 43 13 SD-03 Product Data
2.2Simulated Stone Veneer
SD-04 Samples
2.2 GSimulated Stone Veneer
05 05 23.16 SD-01 Preconstruction Submittals
3.2 G AEWelding Quality Assurance Plan
SD-03 Product Data
1.3 G AEWelding Procedure Qualifications
1.3.5 G AEWelder, Welding Operator, and
Tacker Qualification
1.3.6 G AEInspector Qualification
1.3.2 G AEPrevious Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 141 PAGES
05 05 23.16 1.3.3 G AEPre-Qualified Procedures
2.2 G AEWelding Electrodes and Rods
SD-06 Test Reports
3.3 G AENondestructive Testing
SD-07 Certificates
1.3.1 G AECertified Welding Procedure
Specifications (WPS)
1.3.1 G AECertified Brazing Procedure
Specifications (BPS)
1.3.1 G AECertified Procedure Qualification
Records (PQR)
1.3.1 G AECertified Welder Performance
Qualifications (WPQ)
1.3.1 G AECertified Brazer Performance
Qualifications (BPQ)
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G AEErection Drawings
SD-02 Shop Drawings
1.4.2 G AEFabrication Drawings
1.4.2 G AEConnection calculations
SD-03 Product Data
2.6.2 G AEShop Primer
2.4.1 G AEWelding Electrodes and Rods
2.3.2.3 G AEDirect Tension Indicator Washers
2.4.2 G AENon-Shrink Grout
2.3.3 G AETension Control Bolts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 141 PAGES
05 12 00 SD-06 Test Reports
2.6.2 G AEClass B Coating
2.3 G AEBolts, Nuts, and Washers
3.7.2.1 G AEDirect Tension Indicator Washer
Inspection Reports
3.7.3.1 G AEBolt Testing Reports
3.7.4 G AEEmbrittlement Test Reports
SD-07 Certificates
2.2 G AESteel
2.3 G AEBolts, Nuts, and Washers
2.5 G AEGalvanizing
1.3 G AEAISC Fabrication Plant Quality
Certification
1.3 G AEAISC Erector Quality Certification
1.4.3.1 G AEWelding Procedures and
Qualifications
2.4.1 G AEWelding Electrodes and Rods
05 21 00 SD-01 Preconstruction Submittals
1.3.2 G AEWelder Qualification
SD-02 Shop Drawings
1.3.1 G AESteel Joist Framing
SD-05 Design Data
1.5.2 G AEBlast Report
1.5.2.1 G AEBlast Design Calculations
2.2 G AEDesign Calculations
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 141 PAGES
05 21 00 3.4 G AEErection Inspection
3.4 G AEWelding Inspections
SD-07 Certificates
1.3.2Certification of Compliance
1.3.3 G AEBlast Consultant Qualifications
SD-11 Closeout Submittals
2.3 SRecycled Content of Steel
Products
05 30 00 SD-02 Shop Drawings
1.3.5 G AEFabrication Drawings
SD-03 Product Data
2.2 G AEAccessories
2.1 G AEDeck Units
2.1.4 G AEGalvanizing Repair Paint
2.1.4 G AETouch-Up Paint
1.3.3 G AEWelding Equipment
1.3.3 G AEWelding Rods and Accessories
SD-05 Design Data
2.1 G AEDeck Units
SD-07 Certificates
1.3.2 G AEPowder-Actuated Tool Operator
1.3.3 G AEWelder Qualifications
1.3.3 G AEWelding Procedures
1.3.4.1 G AEFire Safety
1.3.4.2 G AEWind Storm Resistance
1.3.1 G AEManufacturer's Certificate
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 141 PAGES
05 30 00 2.2.11 G AEStud Manufacture's Certification
2.2.11 G AEStud Manufacture's Test Reports
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 40 00 SD-02 Shop Drawings
1.6.1 G AEFraming Components
SD-03 Product Data
2.1Studs
SD-05 Design Data
1.6.2 G AEMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
2.4Expansion Joint Covers
2.6 GFloor Gratings
2.7 GBollards/Pipe Guards
2.10 G AEAngles and Plates
2.12 GRoof Hatches
2.8 GFloor Access Hatch
2.5 GElevator Pit Gratings And Frame
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 141 PAGES
05 50 13 SD-03 Product Data
2.4Expansion Joint Covers
2.6Floor Gratings
2.8Floor Access Hatch
2.12Roof Hatches
2.9 GDownspout Terminations
2.1 GCertificates of Compliance
2.1 SRecycled Content
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 G AEMetal Stair System
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.3 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.2 GHot-Rolled Carbon Steel Bars
2.3.2Concrete Inserts
2.3.3 GMasonry Anchorage Devices
2.2.3 GProtective Coating
2.2.2 GSteel Pan Stairs
2.3.1 GSteel Stairs
SD-07 Certificates
1.3.1 GWelding Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 141 PAGES
05 51 00 1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.4.1Structural-Steel Plates, Shapes, and Bars
2.4.4Gray Iron Castings
2.4.5Malleable Iron Castings
2.2.3Protective Coating
2.3.3Masonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.3 G AELadders
SD-03 Product Data
2.3Ladders
2.3.2Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 G AEFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1 GStructural Steel Plates, Shapes, and Bars
2.2.2 GStructural Steel Tubing
2.2.3 GHot-Rolled Carbon Steel Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 141 PAGES
05 52 00 2.2.4 GConcrete Inserts
2.2.5 GMasonry Anchorage Devices
2.1.2 GProtective Coating
2.2.7 GSteel Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.8.1Certificates of Grade
1.8.2 SCertified Sustainably Harvested
Wood
1.7Preservative Treatment
1.8.3Indoor Air Quality
SD-11 Closeout Submittals
2.3.1 SCertified Sustainably Harvested
Framing Lumber
06 18 00 SD-02 Shop Drawings
2.1.1Fabrication Drawings
3.1.2 G DOInstallation Drawings
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 141 PAGES
06 18 00 1.3.3 G AEExposed-to-View Surfaces
SD-07 Certificates
1.3.2Glued-Laminated Structural
Members
1.3.2Structural Members
1.3.2Design Load Compliance
SD-08 Manufacturer’s Instructions
3.1.1Laminated Wood Materials
3.1.1Adhesive
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 GWood Products
1.4 GTreated Wood Products
2.5 GHardware and Accessories
SD-04 Samples
1.5 GSamples
SD-07 Certificates
1.7.1.1 SCertificates of Grade
06 41 16.00 10 SD-02 Shop Drawings
1.5.2 G AEShop Drawings
3.1Installation
SD-03 Product Data
2.1 G AEWood Materials
1.5.3 G AECertification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 141 PAGES
06 41 16.00 10 SD-04 Samples
2.3 G AEPlastic Laminates
2.6 G AECabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
SD-11 Closeout Submittals
1.3 SLEED Documentation
06 61 16 SD-02 Shop Drawings
1.5.2 G AEDetail Drawings
3.1 G AEInstallation
SD-03 Product Data
2.1 G AESolid Polymer Material
1.5.1Qualifications
2.3Fabrications
1.5.3Certification
1.5.3VOC Content
SD-04 Samples
2.1 G AEMaterial
2.3.5 G AECounter and Vanity Tops
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 141 PAGES
06 61 16 SD-10 Operation and Maintenance
Data
3.2Clean-up
SD-11 Closeout Submittals
1.3 SLEED Documentation
07 05 23 SD-01 Preconstruction Submittals
1.4 G AEWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-06 Test Reports
3.5 G AEPressure Test Procedures
3.5.6 G AEAir Leakage Test Report
3.6.5 G AEDiagnostic Test Report
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
07 13 53 SD-03 Product Data
1.3Manufacturer's Standard Details
2.2Elastomeric Waterproofing Sheet
Material
2.6Protection Board
1.4Primers, Adhesives, and Mastics
2.2Primers, Adhesives, and Mastics
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 141 PAGES
07 13 53 2.2Elastomeric Waterproofing Sheet
Material
3.6Protective Covering
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
1.4Primers, Adhesives, and Mastics
2.2Primers, Adhesives, and Mastics
1.4Protective Coverings
1.8Special Warranties
1.8Special Warranties
2.1.1Certificates Of Compliance
2.1.2Certificates Of Compliance
SD-08 Manufacturer’s Instructions
1.4Primers, Adhesives, and Mastics
2.2Primers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1.1Certificates Of Compliance
2.1.2Certificates Of Compliance
07 14 00 SD-03 Product Data
2.1 GFluid-applied membrane
2.2 GMembrane primer
2.8 GElastomeric sheet
2.10 GFlexible foam-backed elastomeric
sheet
3.3 GSolvent
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 141 PAGES
07 14 00 3.4.1 GMoisture meter
2.11 GProtection board
2.7 GBond breaker
SD-11 Closeout Submittals
1.6Warranty
3.6Information Card
3.5Instructions To Government
Personnel
07 19 00 SD-03 Product Data
2.2Water repellents
SD-06 Test Reports
1.3.2Water absorption
1.3.2Moisture vapor transmission
1.3.2Water Penetration and Leakage
SD-07 Certificates
1.3.1Manufacturer's qualifications
1.3.1Applicator's qualifications
1.3.3Evidence of acceptable variation
1.11Warranty
SD-08 Manufacturer’s Instructions
3.4Application
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.1 GBoard Insulation
2.2 GPressure Sensitive Tape
1.4 GProtection Board or Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 141 PAGES
07 21 13 2.4 GAccessories
SD-07 Certificates
2.1Board Insulation
2.3Protection Board or Coating
3.3.3Protection Board or Coating
SD-08 Manufacturer’s Instructions
2.1Board Insulation
2.4.1Adhesive
SD-11 Closeout Submittals
1.5 SULE Greenguard
07 21 16 SD-03 Product Data
2.2Blanket Insulation
2.3Sill Sealer Insulation
2.5Vapor Retarder
2.6Pressure Sensitive Tape
2.7Accessories
SD-08 Manufacturer’s Instructions
3.3.1Insulation
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SReduce Volatile Organic
Compounds (VOC)
07 21 33 SD-03 Product Data
2.1 G AEConcrete faced insulated
wall-panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 141 PAGES
07 21 33 2.1.1Metal cap flashing
SD-08 Manufacturer’s Instructions
2.1Concrete faced insulated wall-panels
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3Verification of Existing Conditions
SD-03 Product Data
2.2 G AEInsulation
1.4 G AECover Board
2.4 G AEFasteners
SD-06 Test Reports
1.8.1 G AEFlame Spread Rating
SD-07 Certificates
1.9 SVolatile Organic Compounds
(VOC) Content
1.6 G ROInstaller Qualifications
SD-08 Manufacturer’s Instructions
2.4Fasteners
2.2Insulation
SD-11 Closeout Submittals
1.9 SVolatile Organic Compounds
(VOC) Content
07 27 10.00 10 SD-04 Samples
3.1.2 G ROMock-Up
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 141 PAGES
07 27 10.00 10 1.8 G DODesign Review Report
3.1.3 G ROTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.8.1Qualifications of Manufacturer
1.8.2Qualifications of Installer
SD-02 Shop Drawings
1.4Self-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.3 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4Self-adhering Air Barrier
SD-06 Test Reports
1.6 G AEField Peel Adhesion Test
1.4.4 G AEFlame Propagation of Wall
Assemblies
1.4.4 G AEFlame Spread and Smoke
Developed Index Ratings
3.4.1 G AESite Inspections and Testing
SD-07 Certificates
1.4 G AESelf-adhering Air Barrier
1.8.1 G AEQualifications of Manufacturer
1.8.2 G AEQualifications of Installer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 141 PAGES
07 27 19.01 SD-08 Manufacturer’s Instructions
1.4Self-adhering Air Barrier
2.3Primers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1 SVolatile Organic Compound
(VOC) Content
07 27 26 SD-01 Preconstruction Submittals
1.9.1Qualifications of Manufacturer
1.9.2Qualifications of Installer
SD-02 Shop Drawings
1.4Fluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 G AEFluid-Applied Membrane Air
Barrier
2.4 G AETransition Membrane
2.3 G AEPrimers, Adhesives, and Mastics
2.7 G AEReinforcement
1.4.2 G AESafety Data Sheets
SD-04 Samples
1.4.3Mockup
SD-06 Test Reports
1.6 G AECapillary Moisture Test
1.4.4 G AEField Peel Adhesion Test
1.4.4 G AEFlame Propagation of Wall
Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 141 PAGES
07 27 26 1.4.4 G AEFlame Spread and Smoke
Developed Index Ratings
3.4.1 G AESite Inspections
SD-07 Certificates
1.4Fluid-Applied Membrane Air
Barrier
2.4Transition Membrane
1.9.1Qualifications of Manufacturer
1.9.2Qualifications of Installer
SD-08 Manufacturer’s Instructions
1.4Fluid-Applied Membrane Air
Barrier
2.4Transition Membrane
2.3Primers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1 SVolatile Organic Compound
(VOC) Content
07 30 12 SD-03 Product Data
2.1Materials
07 41 63 SD-01 Preconstruction Submittals
1.4.1 GQualification of Manufacturer
1.4.1 GQualification of Installer
1.4.1 GQualifications for Welding
1.4.1 GOn-Site Inspection and
Acceptance Procedure
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 141 PAGES
07 41 63 1.4.1 GGutter/Downspout Assembly
SD-03 Product Data
1.4.1 GSustainable Acquisition
1.4.1 GFactory Color Finish
1.4.1 GSub-girts and Formed Shapes
1.4.1 GClosure Materials
1.4.1 GInsulation
1.4.1 GPressure-Sensitive Tape
1.4.1 GSealants and Caulking
1.4.1 GRated Wall Assembly
1.4.1 GAccessories
SD-04 Samples
1.4.1 G AEManufacturer's Color Charts and
Chips
SD-05 Design Data
1.4.1Wind Design Analysis
SD-06 Test Reports
3.4.1.2 GLeakage Tests
1.4.1 GFire Rating Test Report
3.1 GCoatings and Base Metals of
Metal Roofing
1.4.1 GFactory Finish and Color
Performance Requirements
1.4.1 GWind Uplift Test Report
SD-07 Certificates
2.3.1.2Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 141 PAGES
07 41 63 1.4.1Galvanizing Repair Paint
1.4.1Safety Data Sheets
2.4.2Coating Physical Properties:
SD-08 Manufacturer’s Instructions
1.4.1Installation of Roof Panel
Assemblies
SD-11 Closeout Submittals
1.7 G AEWarranty
3.3.5 GInformation Form and Placard
1.4.1Safety Data Sheets
1.4.1Application Instructions
07 42 63 SD-01 Preconstruction Submittals
1.5.3 GQualification of Manufacturer
1.5.4 GQualification of Installer
1.5.4.1 GQualifications for Welding Work
SD-02 Shop Drawings
1.5.1 GWall Panel Assemblies
1.5.1 GFlashing and Accessories
1.5.1 GAnchorage Systems
SD-03 Product Data
1.5.9 GCertification
1.5.1 GFactory Color Finish
1.5.1 GSub-girts and Formed Shapes
1.5.1 GClosure Materials
1.5.1 GInsulation
1.5.1 GPressure Sensitive Tape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 141 PAGES
07 42 63 2.4.4.1 GSealants and Caulking
1.5.1 GAccessories
SD-04 Samples
1.5.1 G AEManufacturer's Color Charts and
Chips
SD-05 Design Data
1.5.1Wind Design Analysis
SD-06 Test Reports
3.7.2 GLeakage Tests
1.3.2 GWind Load Tests
1.3.2 GSeismic Tests
1.5.1 GFactory Color Finish
SD-07 Certificates
1.5.1Fasteners
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
1.5.1wall system assembly wind load listings
SD-08 Manufacturer’s Instructions
1.5.1Installation of Wall panels
SD-11 Closeout Submittals
1.8Warranty
1.5.1Instructions
1.5.1Material Safety Data Sheets
07 54 19 SD-02 Shop Drawings
1.7 GDetail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 141 PAGES
07 54 19 1.7 GRoof Plan
SD-03 Product Data
3.2.2 GPVC Roofing Membrane
2.1.2Bonding Adhesive
1.6.5Flashing
3.2.2.2Flashing
2.1.7Roof Insulation
2.1.5Pre-Manufactured Accessories
3.6.1Water Cutoffs
2.1.1Information Card
SD-05 Design Data
1.3.2 G AEWind Uplift Resistance
SD-07 Certificates
1.6.1Qualification of Manufacturer
1.6.2Qualifications of Applicator
1.6.4Qualification of Engineer of
Record
1.3.2Wind Uplift Resistance
1.3.1Fire Resistance
2.1.1Minimum Polymer Thickness
2.1.4Minimum Polymer Thickness
1.11 GSample Certificate
SD-08 Manufacturer’s Instructions
2.1.4Membrane Flashing
3.3.2Membrane Flashing
2.1.5Pre-Manufactured Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 141 PAGES
07 54 19 1.9Cold Weather
SD-11 Closeout Submittals
1.4LEED Documentation
1.11 G AEWarranty
2.1.1 G AEInformation Card
3.9 G AEInstructions to Government
Personnel
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.16 GGutters
3.1.17 GDownspouts
3.1.24 GExpansion Joints
2.2.1 GGravel Stops and Fasciae
3.1.21 GSplash Pans
3.1.18 GFlashing for Roof Drains
3.1.11 GBase Flashing
3.1.12 GCounterflashing
3.1.25 GFlashing at Roof Penetrations
and Equipment Supports
2.2.11 GReglets
3.1.19 GScuppers
3.1.28 GCopings
3.1.15 GDrip Edges
3.1.20 GConductor Heads
3.1.22 GEave Flashing
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 141 PAGES
07 60 00 1.4.2 GFinish Samples
SD-07 Certificates
2.1 GCertificates of Compliance
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
SD-11 Closeout Submittals
2.1 SRecycled Content
07 72 53 SD-02 Shop Drawings
2.2 G AESnow Guards
SD-03 Product Data
2.2Snow Guards
SD-04 Samples
2.3 GFinish
07 84 00 SD-02 Shop Drawings
2.1 G AEFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 141 PAGES
07 84 00 1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.2 GSealants
2.3 GPrimers
2.4 GBond Breakers
2.5 GBackstops
3.1 GField Adhesion
SD-07 Certificates
1.4.1 SIndoor Air Quality
SD-11 Closeout Submittals
2.2.1 SIndoor Air Quality For Interior
Sealants
2.2.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.2.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1Doo…