Amendment 0004 Conformed Copy.pdf

PDF 862 KB Posted

Attached to
General Billy Mitchell ANGB, WI Hydrant Fuel System Replacement Federal contract opportunity
Solicitation number
W9128F-20-R-0079
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This solicitation package is for the replacement of a hydrant fuel system at General Billy Mitchell Air National Guard Base in Wisconsin. The project involves constructing a new consolidated fueling facility including aboveground fuel storage tanks, a pump house with control room, product recovery tank, POL operations building with laboratory, refueling vehicle parking, truck loading and unloading points, motor gas and diesel storage tanks, and supporting facilities. The solicitation includes various bid line item options such as additional canopies, road paving, and soil remediation. Proposals are due by 2:00 PM local time on August 10, 2020 with an anticipated award date of September 22, 2022. The solicitation is issued by the U.S. Army Corps of Engineers Omaha District.

View the file

Other files for this federal contract opportunity

Other files attached to General Billy Mitchell ANGB, WI Hydrant Fuel System Replacement, newest first.
File Type Posted
Question and Answer related to Projnet question 8737383.pdf PDF
Amendment 0004 Modification Copy W9128F-20-R-0079.pdf PDF
02 41 00-Am4.pdf PDF
W9128F20R0079-Drawings-Am-4.pdf PDF
Amendment 0003 W9128F-20-R-0079.pdf PDF
W9128F20R0079-Drawings-Am-2.pdf PDF
W9128F20R0079-Vol-2-Specs-Am2.pdf PDF
Amendment 0002 W9128F-20-R-0079.pdf PDF
Bid Walk sign in list.pdf PDF
Amendment 0001 W9128F-20-R-0079.pdf PDF
W9128F-20-R-0079am_0001 SPECS Chng.pdf PDF
Site Walk and Visitor Access Instructions W9128F20R0079.pdf PDF
ARW Form 11 Visitor Access.pdf PDF
W9128F-20-R-0079-Vol-2-Specs.pdf PDF
Solicitation Gen. Billy Mitchell W9128F-20-R-0079.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9128F20R0079

Replace Type III Hydrant Fuel System Project number PN DESC2001 Gen. Billy Mitchell, Wisconsin ANGB

KATHERINE K FISHER 402-995-2102

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Jul-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________780 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________10 Aug 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F

PAGE OF PAGES

1 OF

CODE W9128F

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

ARMY CORPS OF ENGINEERS

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128F20R0079 151

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Am #0001 - 3 (Continuation SF 30)

Section 00 10 00 - Solicitation

AMENDMENT 0001

22 July 2020 Solicitation No. W9128F20R0079

Date of Issue: 03 JUL 2020 Date of Receiving Proposals: 03 AUG 2020

SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of POL FACILITIES

REPLACEMENT, DESC2001, GENERAL MITCHELL IAP, WISCONSIN.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

None.

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “*Am-1”(underlining of added text and/or strikeout of deleted text).

Pages or Sections Deleted Pages or Sections Substituted or Added 00 01 15 00 01 15 26 24 13 26 24 13 26 28 01.00 10 26 28 01.00 10 26 32 15.00 10 26 32 15.00 10 33 09 53 33 09 53

c. Drawings (Not Reissued). The following drawing is deleted as indicated below.

(1) Sheet EP601A PUMPHOUSE ONE-LINE DIAGRAM (BID OPTION 12)

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged. Drawing revisions associated with the removal of CLIN Item 0012 will be issued by a subsequent amendment.

3. Electronic Proposal/Email. Provide proposals by Email to:

Kathernine.K.Fisher@usace.army.mil John.D.Hickman@usace.army.mil

4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 03 AUG 2020, as stated in the Request For Proposal.

Attachments:

Spec Pages listed in 1.b. above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

22 JUL 2020

drl/2181

Am #0001 - 4

AMENDMENT 0002

24 July 2020 Solicitation No. W9128F20R0079

Date of Issue: 03 JUL 2020 Date of Receiving Proposals: 10 AUG 2020

SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Construction of POL FACILITIES REPLACEMENT, DESC2001, GENERAL MITCHELL IAP, WISCONSIN.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive

Changes.) None.

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “*Am- 2”(underlining of added text and/or strikeout of deleted text).

Pages or Sections Deleted Pages or Sections Substituted or Added 01 30 00.24 01 30 00.24 33 30 00 33 30 00 33 52 10 33 52 10 33 52 43.13 33 52 43.13 33 52 43.14 33 52 43.14 46 25 14 46 25 14

c. Drawings (Reissued). The following drawings are revised with latest revision date of July 2020, and reissued with this amendment.

(1) G-002 SHEET INDEX 2

(2) S-502 - STANDARD STRUCTURAL DETAIL SHEET 2

(3) S-512 - TANK FOUNDATION SECTIONS AND DETAILS

(4) MF312-SECTIONS - TYPE III PUMPHOUSE - 2

(5) MF411-ENLARGED PLAN - TYPE III HYDRANT SYSTEM PUMP HOUSE

(6) MF801-MECHANICAL EQUIPMENT SCHEDULES (1 OF 2)

(7) E-091 HAZARDOUS AREA CLASSIFICATION PLAN

(8) E-092 HAZARDOUS AREA CLASSIFICATION DETAILS

(9) ES102 DUCTBANK RISER DIAGRAM

(10) ES504 ELECTRICAL SITE DETAILS - 4 (ELEVATIONS)

(11) EP411 PUMPHOUSE CONTROL ROOM POWER PLAN

(12) EP421 POL OPS BUILDING (FCC) POWER PLAN

(13) EP431 ENLARGED PLAN - JET FUEL STORAGE TANK 1

(14) EP432 ENLARGED PLAN - JET FUEL STORAGE TANK 2

(15) EP433 ENLARGED PLAN - PRT & STORAGE TANK

(16) EP441 TRUCK OFFLOAD POSITIONS 1 & 2 POWER PLAN

Am #0001 - 5

(17) EP453 ENLARGED PLAN - MSS FUEL ISLAND

(18) EP601 PUMPHOUSE ONE-LINE DIAGRAM

(19) EP602 CONTROL DIAGRAMS (FP, FTP, MOV)

(20) EP603 EPDS WIRING DIAGRAM

(21) EP604 CONTROL DIAGRAMS (JP-1 & PDP-1, LIGHTING, RECPT)

(22) EP641 TRUCK OFFLOAD DIAGRAMS

Am #0004 - 6

(23) EP653 MSS DIAGRAMS – 3

(24) EP701 PANELBOARD SCHEDULES

(25) EP702 SCHEDULES - POWER CIRCUITS & SPARES

(26) EP721 POL OPS BUILDING (FCC) PANELBOARD SCHEDULES

(27) EL104 SITE LIGHTING PLAN

(28) EL501 LIGHTING FIXTURE DETAILS

(29) EG601 EMP GROUNDING AND BONDING DETAILS

(30) EI505 TYPICAL TERMINAL BLOCK CONNECTIONS-3

(31) EI601 CONTROL SYSTEM DIAGRAM

(32) EI605 SYSTEM I-O – 3

(33) EI701 CIRCUIT SCHEDULE – 1

(34) ET411 PUMPHOUSE COMMUNICATIONS PLAN

(35) ET501 COMMUNICATIONS DETAILS

(36) ET601 RISER DIAGRAM - OUTSIDE PLANT, DDC, & GEN CONTROLS

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposal/Email. Provide proposals by Email to:

Kathernine.K.Fisher@usace.army.mil John.D.Hickman@usace.army.mil

4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 10 AUG 2020, as stated in the Request For Proposal.

Attachments:

Spec Pages listed in 1.b.

above Dwgs. listed in 1.c.

above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

24 JUL 2020

AMENDMENT 0004

3 August 2020 Solicitation No. W9128F20R0079

Date of Issue: 03 JUL 2020 Date of Receiving Proposals: 10 AUG 2020

SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package for Construction of POL FACILITIES REPLACEMENT, DESC2001, GENERAL MITCHELL IAP, WISCONSIN.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

Am #0004 - 7

a. Specifications. (Descriptive Changes.) None.

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “*Am- 4”(underlining of added text and/or strikeout of deleted text).

Pages or Sections Deleted Pages or Sections Substituted or Added 02 41 00 02 41 00

c. Drawings (Not Reissued). The following drawing is revised as indicated below with latest revision date of August 2020. This drawing is not reissued with this amendment.

(1) Sheet ET421, near drawing coordinate D-6,delete wire basket tray dimensions ‘12"Wx16"D’ and substitute ‘12"W x 6"D’.

d. Drawings (Reissued). The following drawing sheets are revised with latest revision date of July 2020, and reissued with this amendment.

(1) S-101 - TANK CONTAINMENT AREA FOUNDATION PLAN

(2) S-102 - TANK CONTAINMENT AREA SLAB PLAN

(3) S-533 - OWS HOLD-DOWN SLAB DETAILS

(4) S-556 - PIPE SUPPORT DETAILS SHEET 6

(5) A-621 OPS BUILDING DOOR SCHEDULE

(6) MF431-ENLARGED PLAN - OPERATING STORAGE TANK 1

(7) MF432-ENLARGED PLAN - OPERATING STORAGE TANK 2

(8) MF522-DETAIL - OIL WATER SEPARATORS - PLAN AND ELEVATION

(OWS- 01 AND OWS-02)

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposal/Email. Provide proposals by Email to: Kathernine.K.Fisher@usace.army.mil John.D.Hickman@usace.army.mil

4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 10 AUG 2020, as stated in the Request For Proposal.

Attachments:

Specs listed in 1.b.

above Dwgs. listed in 1.d. above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

3 AUG JUL 2020

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job Fueling Facilities Replacement

FFP

All work complete to construct a new consolidated fueling facility that includes aboveground fuel storage tanks, pump house with a control room, product recovery tank, POL operations building with a laboratory, refueling vehicle parking, truck loading and unloading points, motor gas storage tank, diesel storage tank, and supporting facilities, including all canopy foundations and the infrastructure for the Automatic Tank Gauging Equipment, excluding Option CLIN Item 0006 below.

FOB: Destination

PSC CD: Z2GC

NET AMT

0002 1 Job OPTION Load/Offload Equipment

FFP

Includes all work to provide Load/Offload Equipment Canopy, including all associated grounding, lighting, and lightning protection.

0003 1 Job OPTION Refueler Parking Space

FFP

Includes all work to provide: Refueler Parking Spaces Canopy (MC), including all associated grounding, lighting, and lightning protection.

0004 1 Job OPTION Military Svc Station

FFP

Military Service Station Canopy (MC). Includes all work to provide Military Service Station Canopy, including all associated grounding, lighting, and lightning protection.

0005 1 Job OPTION Svc Station pump pad

FFP

Military Service Station Pump Pad Canopy (MC). Includes all work to provide Military Service Station Pump Pad Canopy, including all associated grounding, lighting, and lightning protection.

0006 1 Job OPTION Automatic Tank Gauging

FFP

Automatic Tank Gauging (MC). Includes all work to provide Automatic Tank Gauging Equipment.

0007 1 Job OPTION Demo Existing POL Site

FFP

Demo Existing POL Site (DEMO). Includes all work to provide demolition of existing POL Site.

0008 1 Job OPTION South Road Paving

FFP

South Road Paving (MC). Includes all work to provide paving of south road.

0009 1 Job OPTION South Road lighting/co

FFP

South Road lighting/conduit (MC). Includes all work to provide lighting and conduit along south road.

0010 1 Job OPTION Parking Lot

FFP

Parking Lot at existing POL site (MC). Includes all work to provide a parking lot at the existing POL site following demolition. Includes all associated curbing, landscaping and lighting.

0011 25 Cubic

Yard

OPTION MILCON Contaminated soil

FFP

Removal of contaminated soil in lieu of clean soil at MILCON Site. Basic Item includes stockpiling and testing and removal of clean soil )

0012 5,325 Cubic

OPTION POL site remove contam. soil

(Additional amount for removal of fuel contaminated soil in lieu of clean soil at existing POL Site. CLIN Item 0007 includes stockpiling and testing and removal of clean soil.)

0013 25 Cubic

OPTION MILCON Additional soil remove

Additional Contaminated Soil removal at MILCON site. (Additional amount for removal of contaminated soil in lieu of clean soil at MILCON Site. Basic Item includes stockpiling and testing and removal of clean soil)

0014 25 Cubic

OPTION POLAdditional soil remove

Additional contaminated soil removal at POL Site. (Additional amount for removal of fuel contaminated soil in lieu of clean soil at existing POL Site. CLIN Item 0007 includes stockpiling and testing and removal of clean soil.)

0015 1 Each OPTION Additional Warranty Period

FFP

Additional amount to extend Warranty Period from the typical basic 1 year warranty period included in FAR 52.246-21 by 1 year, to a total warranty period of 2 years.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 22-SEP-2022 N/A

0002 22-SEP-2022 1 N/A

0003 22-SEP-2022 1 N/A

0004 22-SEP-2022 1 N/A

0005 22-SEP-2022 1 N/A

0006 22-SEP-2022 1 N/A

0007 22-SEP-2022 1 N/A

0008 22-SEP-2022 1 N/A

0009 22-SEP-2022 1 N/A

0010 22-SEP-2022 1 N/A

0011 22-SEP-2022 25 N/A

0012 22-SEP-2022 5,325 N/A

0013 22-SEP-2022 25 N/A

0014 22-SEP-2022 25 N/A

0015 22-SEP-2022 1 N/A

Section 00 20 00 - Instructions for Procurement

WAGE RATES WI20200001 BUILDING

"General Decision Number: WI20200001 06/19/2020

Superseded General Decision Number: WI20190001

State: Wisconsin

Construction Type: Building

Counties: Milwaukee, Ozaukee, Washington and Waukesha Counties in Wisconsin.

BUILDING CONSTRUCTION PROJECTS (Does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/28/2020 3 03/06/2020 4 05/08/2020 5 06/05/2020 6 06/19/2020

ASBE0205-001 06/01/2001

Rates Fringes

Asbestos Removal worker/hazardous material handler

Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not.............$ 17.90 4.45

BOIL0107-001 01/01/2017

Rates Fringes

BOILERMAKER

Boilermaker.................$ 35.65 29.89 Small Boiler Repair (under 25,000 lbs/hr)..............$ 26.91 16.00

BRWI0005-001 06/01/2019

Rates Fringes

TERRAZZO WORKER..................$ 35.25 22.57

TILE LAYER.......................$ 34.25 22.57

BRWI0008-001 06/01/2019

Rates Fringes

BRICKLAYER.......................$ 38.93 24.22

BRWI0008-003 06/01/2019

Rates Fringes

Marble Mason.....................$ 38.93 24.22

CARP0264-001 06/01/2016

Rates Fringes

Carpenter & Soft Floor Layer (Including Acoustical work and Drywall hanging;

Excluding Batt Insulation).......$ 35.78 22.11

CARP2337-002 06/01/2019

Rates Fringes

MILLWRIGHT.......................$ 33.58 21.53

CARP2337-008 06/01/2019

Rates Fringes

PILEDRIVERMAN....................$ 33.77 23.69

* ELEC0494-001 06/01/2020

Rates Fringes

ELECTRICIAN......................$ 42.84 25.54

ELEC0494-003 06/01/2019

Rates Fringes

Sound & Communications Installer...................$ 20.53 18.13 Technician..................$ 30.18 19.58

Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems. Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system.

work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products

ELEV0015-001 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 51.09 34.765+a+b

FOOTNOTE:

a. PAID VACATION: 8% of regular basic for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

b. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0139-001 06/01/2020

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA

COUNTIES

Power Equipment Operator Group 1.....................$ 47.66 23.15 Group 2.....................$ 47.16 23.15 Group 3.....................$ 46.66 23.15 Group 4.....................$ 45.97 23.15 Group 5.....................$ 42.39 23.15

Group 6.....................$ 37.24 23.15

HAZARDOUS WASTE PREMIUMS:

EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or w/o attachments with a lifting capacity of over 100 tons; or Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leads, and/or jib lengths measuring 176 feet or longer; Self-Erecting Tower Cranes over 4000 lbs lifting capacity; All Cranes with Boom Dollies; Boring Machines (directional); Master Mechanic.

$0.50 additional per hour per 100 tons or 100 ft of boom over 200 ft or lifting capacity of crane over 200 tons to a maximum of 300 tons or 300 ft. Thereafter an increase of $0.01 per ft or ton, whichever is greater.

GROUP 2: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less; or Cranes, Tower Cranes Portable Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leadsand/or jib lengths measuring 175 feet or less; Backhoes (excavators) 130,000 lbs and over; Caisson Rigs; Pile Drivers; Boring Machines (vertical or horizontal), Versi-Lift, Tri-Lift, Gantry 20,000 lbs & over.

GROUP 3: Backhoe (excavator) under 130,000 lbs;Self-erecting Tower Crane 4000 lbs & under lifting capacity;Traveling Crane (bridge type); Skid Rigs; Dredge Operator; Mechanic;

Concrete Paver (over 27E); Concrete Spreader and Distributor; Forklift/ Telehandler (machinery- moving / steel erection); Hydro Blaster, 10,000 psi and over

GROUP 4: Material Hoists; Stack Hoists; Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 5 tons or under (tractor or truck mounted); Hoist (tuggers 5 tons & over); Hydro-Excavators/Daylighters; Concrete Pumps Rotec type Conveyors; Tractor/Bulldozer/End Loader (over 40 hp);

Motor Patrol; Scraper Operator; Sideboom; Straddle Carrier;

Welder; Bituminous Plant and Paver Operator; Roller over 5 tons; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Rotary Drill Operator and Blaster; Percussion Drill Operator; Air Track Drill and/or Hammers; Gantrys (under 20,000 lbs); Tencher (wheel type or chain type having 8 inch or larger bucket); Milling Machine; Off-Road Material Haulers.

GROUP 5: Backfiller; Concrete Auto Breaker (large); Concrete Finishing Machines (road type); Rubber Tired Roller;

Concrete Batch Hopper; Concrete Conveyor Systems; Grout Pumps; Concrete Mixers (14S or over); Screw Type Pumps and Gypsum Pumps; Tractor, Bulldozer, End Loader (under 40 hp);

Trencher (chain type, bucket under 8 inch); Industrial Locomotives; Rollers under 5 tons; Stump Grinder/Chipper (Large); Timber Equipment; Firemen (pile drivers and derricks); Personnel Hoist, Telehandler over 8000 lbs;

Robotic Tool Carrier with or without attachments

GROUP 6: Tampers - Compactors (riding type); Assistant Engineer; A-Frames and Winch Trucks; Concrete Auto Breaker;

Hydrohammers (small); Brooms and Sweepers; Hoist (tuggers under 5 tons); Boats (Tug, Safety, Work Barges, Launch);

Shouldering Machine Operator; Prestress Machines; Screed Operator; Stone Crushers and Screening Plants; Screed Operators (milling machine), Farm or Industrial Tractor Mounted Equipment; Post Hole Digger; Fireman (asphalt plants); Air Compressors over 400 CFM; Generators, over 150 KW; Augers (vertical and horizontal); Air, Electric, Hydraulic Jacks (slipform); Skid Steer Loaders (with or without attachments); Boiler Operators (temporary heat);

Refrigeration Plant/Freeze Machines; Power Pack Vibratory/Ultra Sound Drivers and Extractors; Welding Machines; Heaters (mechanical); Pumps; Winches (small electric); Oiler and Greaser; Rotary Drill Tender;

Conveyor; Forklifts/Telehandler 8000 lbs & under;

Elevators: Automatic Hoists; Pumps (well points);

Combination Small Equipment Operators

* IRON0008-005 06/01/2020

Rates Fringes

IRONWORKER.......................$ 39.11 27.87

Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.

LABO0113-001 06/03/2019

Rates Fringes

LABORER

(1) General Laborer (Including Plaster Tender)..$ 32.73 20.31

(2) Air & Electric Equipment, Mortar Mixer, Scaffold Builder, Erector, and Swing Stage.............$ 32.85 20.31

(3) Jackhammer Operator, Gunnite Machine Man.........$ 32.98 20.31

(4) Caisson Worker - Topman.$ 33.07 20.31

(5) Construction Specialist.$ 33.27 20.31

(6) Nozzleman...............$ 33.30 20.31

(7) Caisson Work............$ 33.45 20.31

(8) Barco Tamper............$ 34.06 20.31

LABO0113-010 06/03/2019

Rates Fringes

Asbestos Laborer Asbestos Abatement [Preparation, removal, and encapsulation of hazardous materials from non-mechanical systems].........$ 32.73 20.31

PAIN0781-001 06/01/2019

Rates Fringes

Painters:

(1) Brush, Roller...........$ 32.95 23.86

(2) Spray & Sandblast.......$ 33.70 23.86

(3) Drywall Taper/Finisher..$ 33.30 23.86

PAIN1204-002 06/01/2019

Rates Fringes

GLAZIER..........................$ 37.50 22.04

PLAS0599-004 06/01/2017

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 33.95 21.93

PLAS0599-005 06/01/2017

Rates Fringes

PLASTERER........................$ 32.65 22.55

PLUM0075-001 06/01/2016

Rates Fringes

PLUMBER (Including HVAC work)....$ 40.27 21.47

PLUM0601-001 06/03/2019

Rates Fringes

PIPEFITTER (Including HVAC work)............................$ 46.89 25.29

SFWI0183-001 01/01/2020

Rates Fringes

SPRINKLER FITTER.................$ 44.56 24.85

SHEE0018-001 06/01/2019

Rates Fringes

Sheet Metal Worker (Including HVAC duct work and Technicians).....................$ 45.44 24.12

TEAM0662-003 06/01/2019

Rates Fringes

TRUCK DRIVER

1 & 2 Axles.................$ 29.57 22.03

3 or more Axles.............$ 29.72 22.03

SUWI2002-002 01/23/2002

Rates Fringes

Asbestos Worker/Heat and Frost Insulator..................$ 25.36 8.37

Laborers:

Concrete Worker.............$ 16.34 3.59 Landscape...................$ 8.73 8.40

ROOFER...........................$ 18.01 3.28

Tile & Marble Finisher...........$ 13.89 7.43

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

WAGE RATES WI20200015 HEAVY

"General Decision Number: WI20200015 06/19/2020

Superseded General Decision Number: WI20190015

State: Wisconsin

Construction Type: Heavy

Counties: Wisconsin Statewide.

HEAVY CONSTRUCTION PROJECTS (Excluding Tunnel, Sewer, and Water Lines).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor

1 01/24/2020 2 02/28/2020 3 03/06/2020 4 06/05/2020 5 06/12/2020 6 06/19/2020

BOIL0107-001 01/01/2017

Rates Fringes

BOILERMAKER

Boilermaker.................$ 35.65 29.89 Small Boiler Repair (under 25,000 lbs/hr)..............$ 26.91 16.00

BRWI0001-002 06/03/2019

CRAWFORD, JACKSON, JUNEAU, LA CROSSE, MONROE, TREMPEALEAU, AND

VERNON COUNTIES

BRICKLAYER.......................$ 33.80 24.28

BRWI0002-002 06/01/2019

ASHLAND, BAYFIELD, DOUGLAS, AND IRON COUNTIES

Rates Fringes

BRICKLAYER.......................$ 39.94 23.30

BRWI0002-005 06/01/2019

ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA,

CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC,

FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE,

LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE,

OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST CROIX, SAUK,

SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA,

WINNEBAGO, AND WOOD COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 35.51 23.37

BRWI0003-002 06/03/2019

BROWN, DOOR, FLORENCE, KEWAUNEE, MARINETTE, AND OCONTO COUNTIES

Rates Fringes

BRICKLAYER.......................$ 34.18 23.90

BRWI0004-002 06/01/2019

KENOSHA, RACINE, AND WALWORTH COUNTIES

Rates Fringes

BRICKLAYER.......................$ 38.43 25.10

BRWI0006-002 06/01/2019

ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MARATHON, MENOMINEE,

ONEIDA, PORTAGE, PRICE, TAYLOR, VILAS AND WOOD COUNTIES

BRICKLAYER.......................$ 35.06 23.02

BRWI0007-002 06/03/2019

GREEN, LAFAYETTE, AND ROCK COUNTIES

Rates Fringes

BRICKLAYER.......................$ 35.57 24.22

BRWI0008-002 06/01/2019

MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

Rates Fringes

BRICKLAYER.......................$ 38.93 24.22

BRWI0009-001 06/03/2019

GREEN LAKE, MARQUETTE, OUTAGAMIE, SHAWANO, WAUPACA, WASHARA,

AND WINNEBAGO COUNTIES

BRICKLAYER.......................$ 34.18 23.90

BRWI0011-002 06/03/2019

CALUMET, FOND DU LAC, MANITOWOC, AND SHEBOYGAN COUNTIES

Rates Fringes

BRICKLAYER.......................$ 34.18 23.90

BRWI0013-002 06/03/2019

DANE, GRANT, IOWA, AND RICHLAND COUNTIES

Rates Fringes

BRICKLAYER.......................$ 35.56 24.23

BRWI0019-002 06/03/2019

BARRON, BUFFALO, BURNETT, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN,

PIERCE, POLK, RUSK, ST. CROIX, SAWYER AND WASHBURN COUNTIES

BRICKLAYER.......................$ 33.40 24.68

BRWI0021-002 06/03/2019

DODGE AND JEFFERSON COUNTIES

Rates Fringes

BRICKLAYER.......................$ 35.75 24.02

BRWI0034-002 06/03/2019

COLUMBIA AND SAUK COUNTIES

Rates Fringes

BRICKLAYER.......................$ 35.56 24.23

CARP0087-001 05/01/2016

BURNETT (W. of Hwy 48), PIERCE (W. of Hwy 29), POLK (W. of Hwys 35, 48 & 65), AND ST. CROIX (W. of Hwy 65) COUNTIES

Carpenter & Piledrivermen........$ 36.85 18.39

CARP0252-002 06/01/2016

ADAMS, BARRON, BAYFIELD (Eastern 2/3), BROWN, BUFFALO, BURNETT (E. of Hwy 48), CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DANE, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE (except area bordering Michigan State Line), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE (except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE (E.

of Hwys 29 & 65), POLK (E. of Hwys 35, 48 & 65), PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST CROIX (E. of Hwy 65), TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD

CARPENTER

CARPENTER...................$ 33.56 18.00

MILLWRIGHT..................$ 35.08 18.35

PILEDRIVER..................$ 34.12 18.00

CARP0252-010 06/01/2016

ASHLAND COUNTY

Rates Fringes

Carpenters Carpenter...................$ 33.56 18.00 Millwright..................$ 35.08 18.35 Pile Driver.................$ 34.12 18.00

CARP0264-003 06/01/2016

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WAUKESHA, AND WASHINGTON

CARPENTER........................$ 35.78 22.11

CARP0361-004 05/01/2018

BAYFIELD (West of Hwy 63) AND DOUGLAS COUNTIES

CARPENTER........................$ 36.15 20.43

CARP2337-001 06/01/2016

ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON

ZONE B: KENOSHA & RACINE

PILEDRIVERMAN

Zone A......................$ 31.03 22.69 Zone B......................$ 31.03 22.69

CARP2337-003 06/01/2019

Rates Fringes

MILLWRIGHT

Zone A......................$ 33.58 21.53 Zone B......................$ 33.58 21.53

ZONE DEFINITIONS

ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON COUNTIES

ZONE B: KENOSHA & RACINE COUNTIES

ELEC0014-002 06/03/2019

ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK

(except Maryville, Colby, Unity, Sherman, Fremont, Lynn & Sherwood), CRAWFORD, DUNN, EAU CLAIRE, GRANT, IRON, JACKSON, LA

CROSSE, MONROE, PEPIN, PIERCE, POLK, PRICE, RICHLAND, RUSK, ST

CROIX, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN

Electricians:....................$ 35.59 20.87

ELEC0014-007 06/03/2019

REMAINING COUNTIES

Rates Fringes

Teledata System Installer Installer/Technician........$ 27.25 14.34

Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).

ELEC0127-002 06/01/2020

KENOSHA COUNTY

Rates Fringes

Electricians:....................$ 41.62 30%+12.70

ELEC0158-002 06/03/2019

BROWN, DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES

Electricians:....................$ 33.52 29.75%+10.26

ELEC0159-003 06/01/2019

COLUMBIA, DANE, DODGE (Area West of Hwy 26, except Chester and Emmet Townships), GREEN, LAKE (except Townships of Berlin, Seneca, and St. Marie), IOWA, MARQUETTE (except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), and SAUK

Electricians:....................$ 40.30 22.24

ELEC0219-004 06/01/2016

FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)

Electricians:

Electrical contracts over $180,000....................$ 32.38 18.63 Electrical contracts under $180,000....................$ 30.18 18.42

ELEC0242-005 05/16/2018

DOUGLAS COUNTY

Rates Fringes

Electricians:....................$ 36.85 26.17

ELEC0388-002 06/03/2019

ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARATHON, MARINETTE (Beecher, Dunbar, Goodman & Pembine), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Aniwa and Hutchins), VILAS

AND WOOD COUNTIES

Electricians:....................$ 33.56 26%+11.01

* ELEC0430-002 06/01/2020

RACINE COUNTY (Except Burlington Township)

Rates Fringes

Electricians:....................$ 41.86 22.66

* ELEC0494-005 06/01/2020

MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

Rates Fringes

Electricians:....................$ 42.84 25.54

* ELEC0494-006 06/01/2020

CALUMET (Township of New Holstein), DODGE (East of Hwy 26 including Chester Township), FOND DU LAC, MANITOWOC (Schleswig), and SHEBOYGAN COUNTIES

Electricians:....................$ 36.32 22.51

ELEC0494-013 06/01/2019

DODGE (East of Hwy 26 including Chester Twp, excluding Emmet Twp), FOND DU LAC (Except Waupuin), MILWAUKEE, OZAUKEE, MANITOWOC (Schleswig), WASHINGTON, AND WAUKESHA COUNTIES

Sound & Communications Installer...................$ 20.53 18.13 Technician..................$ 30.18 19.58

Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems.

Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system. work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products

ELEC0577-003 06/01/2019

CALUMET (except Township of New Holstein), GREEN LAKE (N. part including Townships of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), OUTAGAMIE, WAUPACA, WAUSHARA, AND WINNEBAGO

Electricians:....................$ 33.15 28.50%+10.00

ELEC0890-003 06/01/2020

DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, RACINE (Burlington Township), ROCK AND WALWORTH COUNTIES

Electricians:....................$ 37.41 25.95%+11.11

ELEC0953-001 06/02/2019

Rates Fringes

Line Construction:

(1) Lineman.................$ 47.53 21.43

(2) Heavy Equipment Operator....................$ 42.78 19.80

(3) Equipment Operator......$ 38.02 18.40

(4) Heavy Groundman Driver..$ 33.27 16.88

(5) Light Groundman Driver..$ 30.89 16.11

(6) Groundsman..............$ 26.14 14.60

ENGI0139-001 06/01/2020

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA

Power Equipment Operator Group 1.....................$ 47.66 23.15 Group 2.....................$ 47.16 23.15 Group 3.....................$ 46.66 23.15 Group 4.....................$ 45.97 23.15 Group 5.....................$ 42.39 23.15 Group 6.....................$ 37.24 23.15

HAZARDOUS WASTE PREMIUMS:

EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or w/o attachments with a lifting capacity of over 100 tons; or Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leads, and/or jib lengths measuring 176 feet or longer; Self-Erecting Tower Cranes over 4000 lbs lifting capacity; All Cranes with Boom Dollies; Boring Machines (directional); Master Mechanic.

$0.50 additional per hour per 100 tons or 100 ft of boom over 200 ft or lifting capacity of crane over 200 tons to a maximum of 300 tons or 300 ft. Thereafter an increase of $0.01 per ft or ton, whichever is greater.

GROUP 2: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less; or Cranes, Tower Cranes Portable Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leadsand/or jib lengths measuring 175 feet or less; Backhoes (excavators) 130,000 lbs and over; Caisson Rigs; Pile Drivers; Boring Machines (vertical or horizontal), Versi-Lift, Tri-Lift, Gantry 20,000 lbs & over.

GROUP 3: Backhoe (excavator) under 130,000 lbs;Self-erecting Tower Crane 4000 lbs & under lifting capacity;Traveling Crane (bridge type); Skid Rigs; Dredge Operator; Mechanic;

Concrete Paver (over 27E); Concrete Spreader and Distributor; Forklift/ Telehandler (machinery- moving / steel erection); Hydro Blaster, 10,000 psi and over

GROUP 4: Material Hoists; Stack Hoists; Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 5 tons or under (tractor or truck mounted); Hoist (tuggers 5 tons & over); Hydro-Excavators/Daylighters; Concrete Pumps Rotec type Conveyors; Tractor/Bulldozer/End Loader (over 40 hp);

Motor Patrol; Scraper Operator; Sideboom; Straddle Carrier;

Welder; Bituminous Plant and Paver Operator; Roller over 5 tons; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Rotary Drill Operator and Blaster; Percussion Drill Operator; Air Track Drill and/or Hammers; Gantrys (under 20,000 lbs); Tencher (wheel type or chain type having 8 inch or larger bucket); Milling Machine; Off-Road Material Haulers.

GROUP 5: Backfiller; Concrete Auto Breaker (large); Concrete Finishing Machines (road type); Rubber Tired Roller;

Concrete Batch Hopper; Concrete Conveyor Systems; Grout Pumps; Concrete Mixers (14S or over); Screw Type Pumps and Gypsum Pumps; Tractor, Bulldozer, End Loader (under 40 hp);

Trencher (chain type, bucket under 8 inch); Industrial Locomotives; Rollers under 5 tons; Stump Grinder/Chipper (Large); Timber Equipment; Firemen (pile drivers and derricks); Personnel Hoist, Telehandler over 8000 lbs;

Robotic Tool Carrier with or without attachments

GROUP 6: Tampers - Compactors (riding type); Assistant

Engineer; A-Frames and Winch Trucks; Concrete Auto Breaker;

Hydrohammers (small); Brooms and Sweepers; Hoist (tuggers under 5 tons); Boats (Tug, Safety, Work Barges, Launch);

Shouldering Machine Operator; Prestress Machines; Screed Operator; Stone Crushers and Screening Plants; Screed Operators (milling machine), Farm or Industrial Tractor Mounted Equipment; Post Hole Digger; Fireman (asphalt plants); Air Compressors over 400 CFM; Generators, over 150 KW; Augers (vertical and horizontal); Air, Electric, Hydraulic Jacks (slipform); Skid Steer Loaders (with or without attachments); Boiler Operators (temporary heat);

Refrigeration Plant/Freeze Machines; Power Pack Vibratory/Ultra Sound Drivers and Extractors; Welding Machines; Heaters (mechanical); Pumps; Winches (small electric); Oiler and Greaser; Rotary Drill Tender;

Conveyor; Forklifts/Telehandler 8000 lbs & under;

Elevators: Automatic Hoists; Pumps (well points);

Combination Small Equipment Operators

ENGI0139-003 06/03/2019

REMAINING COUNTIES

Rates Fringes

Power Equipment Operator Group 1.....................$ 41.52 22.45 Group 2.....................$ 40.27 22.45 Group 3.....................$ 38.97 22.45 Group 4.....................$ 38.44 22.45 Group 5.....................$ 36.37 22.45 Group 6.....................$ 34.84 22.45

HAZARDOUS WASTE PREMIUMS:

EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of over 100 tons;

Cranes, Tower Cranes, and Derricks with boom, leads and/or jib lengths 176 ft or longer.

GROUP 2: Backhoes (Excavators) weighing 130,00 lbs and over;

Cranes,…