Amendment 0002 W9128F-20-R-0079.pdf

PDF 184 KB Posted

Attached to
General Billy Mitchell ANGB, WI Hydrant Fuel System Replacement Federal contract opportunity
Solicitation number
W9128F-20-R-0079
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This amendment modifies a solicitation for the construction of new fuel facilities at General Billy Mitchell Air National Guard Base in Wisconsin. Key changes include extending the proposal due date to August 10, 2020, modifying line item descriptions and quantities, revising specifications and drawings, and adding an option for a two-year warranty period. Offerors are advised to review all specification and drawing revisions. The U.S. Army Corps of Engineers seeks to award a firm-fixed-price contract to construct a new consolidated fueling facility with aboveground storage tanks, a pump house, product recovery tank, operations building, refueling parking, truck loading and unloading points, gas and diesel tanks, and supporting facilities.

View the file

Other files for this federal contract opportunity

Other files attached to General Billy Mitchell ANGB, WI Hydrant Fuel System Replacement, newest first.
File Type Posted
Question and Answer related to Projnet question 8737383.pdf PDF
W9128F20R0079-Drawings-Am-4.pdf PDF
02 41 00-Am4.pdf PDF
Amendment 0004 Modification Copy W9128F-20-R-0079.pdf PDF
Amendment 0004 Conformed Copy.pdf PDF
Amendment 0003 W9128F-20-R-0079.pdf PDF
W9128F20R0079-Vol-2-Specs-Am2.pdf PDF
W9128F20R0079-Drawings-Am-2.pdf PDF
Bid Walk sign in list.pdf PDF
W9128F-20-R-0079am_0001 SPECS Chng.pdf PDF
Amendment 0001 W9128F-20-R-0079.pdf PDF
Site Walk and Visitor Access Instructions W9128F20R0079.pdf PDF
ARW Form 11 Visitor Access.pdf PDF
Solicitation Gen. Billy Mitchell W9128F-20-R-0079.pdf PDF
W9128F-20-R-0079-Vol-2-Specs.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9128F20R0079

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

General Billy Mitchell, WI

Amendment 0002 includes changes to Specifications and Draw ings detailed in the Narrative; also included is a change to 52.211-10and posted as attachement in Beta.sam.gov. Proposal due date is extended to 10 Aug 2020.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F20R0079

X 9B. DATED (SEE ITEM 11)

03-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jul-2020

CODE

ARMY CORPS OF ENGINEERS

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Am #0001 - 2 (Continuation SF 30)

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 03-Aug-2020 02:00 PM to 10-Aug-

2020 02:00 PM.

CLIN 0002

The CLIN description has changed from BID OPTION 001- Load/Offload Equipment to Load/Offload Equipment.

The pricing detail quantity 1.00 has been added.

CLIN 0003

The CLIN description has changed from BID OPTION 002 - Refueler Parking Space to Refueler Parking Space.

The CLIN extended description has changed from:

Includes all work to provide: Refueler Parking Spaces Canopy, including all associated grounding, lighting, and lightning protection.

To:

Includes all work to provide: Refueler Parking Spaces Canopy (MC), including all associated grounding, lighting, and lightning protection.

CLIN 0004

The CLIN description has changed from BID OPTION 003 - Military Svc Station to Military Svc Station.

CLIN 0005

The CLIN description has changed from BID OPTION 004 - Svc Station pump pad to Svc Station pump pad.

Am #0001 - 3

CLIN 0006

The CLIN description has changed from BID OPTION 005 - Automatic Tank Gauging to Automatic Tank Gauging.

CLIN 0007

The CLIN description has changed from BID OPTION 006 - Demo Existing POL Site to Demo Existing POL Site.

CLIN 0008

The CLIN description has changed from BID OPTION 007 - South Road Paving to South Road Paving.

Exhibit A has been deleted.

CLIN 0009

The CLIN description has changed from BID OPTION 008 - South Road lighting/co to South Road lighting/co.

CLIN 0010

The CLIN description has changed from BID OPTION 009 - Parking Lot to Parking Lot.

CLIN 0011

The CLIN description has changed from OPTION 010 MILCON Contaminated soil to MILCON Contaminated soil.

The CLIN extended description has changed from:

BID OPTION 010 Removal of contaminated soil in lieu of clean soil at MILCON Site. Basic

Am #0001 - 4

Item includes stockpiling and testing and removal of clean soil ) Not to exceed 25CY.

Removal of contaminated soil in lieu of clean soil at MILCON Site. Basic Item includes stockpiling and testing and removal of clean soil )

The pricing detail quantity 25.00 has been added.

CLIN 0012

The CLIN description has changed from OPTION 011- POL site remove contam. soil to POL site remove contam. soil.

The CLIN extended description has changed from:

BID OPTION 011 - (Additional amount for removal of fuel contaminated soil in lieu of clean soil at existing POL Site. CLIN Item 0007 includes stockpiling and testing and removal of clean soil.) NTE 5350CY

(Additional amount for removal of fuel contaminated soil in lieu of clean soil at existing POL Site. CLIN Item 0007 includes stockpiling and testing and removal of clean soil.)

The pricing detail quantity 5,325.00 has been added.

CLIN 0013

The CLIN description has changed from OPTION 012-MILCON Additional soil remove to MILCON Additional soil remove.

The CLIN extended description has changed from:

BID OPTION 012 Additional Contaminated Soil removal at MILCON site. (Additional amount for removal of contaminated soil in lieu of clean soil at MILCON Site. Basic Item includes stockpiling and testing and removal of clean soil ) NTE 25CY

Additional Contaminated Soil removal at MILCON site. (Additional amount for removal of contaminated soil in lieu of clean soil at MILCON Site. Basic Item includes stockpiling and testing and removal of clean soil)

Am #0001 - 5

CLIN 0014

The CLIN description has changed from OPTION 013- POLAdditional soil remove to POLAdditional soil remove.

The CLIN extended description has changed from:

BID OPTION 013 - Additional contaminated soil removal at POL Site. (Additional amount for removal of fuel contaminated soil in lieu of clean soil at existing POL Site. CLIN Item 0007 includes stockpiling and testing and removal of clean soil.) NTE 25CY

Additional contaminated soil removal at POL Site. (Additional amount for removal of fuel contaminated soil in lieu of clean soil at existing POL Site. CLIN Item 0007 includes stockpiling and testing and removal of clean soil.)

CLIN 0015 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0015 1 Each OPTION Additional Warranty Period

FFP

Additional amount to extend Warranty Period from the typical basic 1 year warranty period included in FAR 52.246-21 by 1 year, to a total warranty period of 2 years.

FOB: Destination

PSC CD: Z2GC

NET AMT

The following Delivery Schedule item for CLIN 0002 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

Am #0001 - 6

22-SEP-2022 N/A

CAGE

22-SEP-2022 1 N/A

The following Delivery Schedule item for CLIN 0003 has been changed from:

CAGE

CAGE

The following Delivery Schedule item for CLIN 0004 has been changed from:

CAGE

CAGE

The following Delivery Schedule item for CLIN 0005 has been changed from:

CAGE

Am #0001 - 7

CAGE

The following Delivery Schedule item for CLIN 0006 has been changed from:

CAGE

CAGE

The following Delivery Schedule item for CLIN 0007 has been changed from:

CAGE

CAGE

The following Delivery Schedule item for CLIN 0008 has been changed from:

CAGE

Am #0001 - 8

CAGE

The following Delivery Schedule item for CLIN 0009 has been changed from:

CAGE

CAGE

The following Delivery Schedule item for CLIN 0010 has been changed from:

CAGE

CAGE

The following Delivery Schedule item for CLIN 0011 has been changed from:

CAGE

Am #0001 - 9

22-SEP-2022 25 N/A

The following Delivery Schedule item for CLIN 0012 has been changed from:

CAGE

CAGE

22-SEP-2022 5,325 N/A

The following Delivery Schedule item for CLIN 0013 has been changed from:

CAGE

CAGE

The following Delivery Schedule item for CLIN 0014 has been changed from:

CAGE

Am #0001 - 10

The following Delivery Schedule for CLIN 0015 has been added:

CAGE

The following have been added by full text:

AMENDMENT 0002

24 July 2020 Solicitation No. W9128F20R0079

Date of Issue: 03 JUL 2020 Date of Receiving Proposals: 03 AUG 2020

SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Construction of POL FACILITIES REPLACEMENT, DESC2001, GENERAL MITCHELL IAP, WISCONSIN.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive

Changes.) None.

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “*Am- 2”(underlining of added text and/or strikeout of deleted text).

Pages or Sections Deleted Pages or Sections Substituted or Added 01 30 00.24 01 30 00.24 33 30 00 33 30 00 33 52 10 33 52 10 33 52 43.13 33 52 43.13 33 52 43.14 33 52 43.14 46 25 14 46 25 14

c. Drawings (Reissued). The following drawings are revised with latest revision date of July 2020, and reissued with this amendment.

(1) G-002 SHEET INDEX 2

(2) S-502 - STANDARD STRUCTURAL DETAIL SHEET 2

Am #0001 - 11

(3) S-512 - TANK FOUNDATION SECTIONS AND DETAILS

(4) MF312-SECTIONS - TYPE III PUMPHOUSE - 2

(5) MF411-ENLARGED PLAN - TYPE III HYDRANT SYSTEM PUMP HOUSE

(6) MF801-MECHANICAL EQUIPMENT SCHEDULES (1 OF 2)

(7) E-091 HAZARDOUS AREA CLASSIFICATION PLAN

(8) E-092 HAZARDOUS AREA CLASSIFICATION DETAILS

(9) ES102 DUCTBANK RISER DIAGRAM

(10) ES504 ELECTRICAL SITE DETAILS - 4 (ELEVATIONS)

(11) EP411 PUMPHOUSE CONTROL ROOM POWER PLAN

(12) EP421 POL OPS BUILDING (FCC) POWER PLAN

(13) EP431 ENLARGED PLAN - JET FUEL STORAGE TANK 1

(14) EP432 ENLARGED PLAN - JET FUEL STORAGE TANK 2

(15) EP433 ENLARGED PLAN - PRT & STORAGE TANK

(16) EP441 TRUCK OFFLOAD POSITIONS 1 & 2 POWER PLAN

(17) EP453 ENLARGED PLAN - MSS FUEL ISLAND

(18) EP601 PUMPHOUSE ONE-LINE DIAGRAM

(19) EP602 CONTROL DIAGRAMS (FP, FTP, MOV)

(20) EP603 EPDS WIRING DIAGRAM

(21) EP604 CONTROL DIAGRAMS (JP-1 & PDP-1, LIGHTING, RECPT)

(22) EP641 TRUCK OFFLOAD DIAGRAMS

(23) EP653 MSS DIAGRAMS – 3

(24) EP701 PANELBOARD SCHEDULES

(25) EP702 SCHEDULES - POWER CIRCUITS & SPARES

(26) EP721 POL OPS BUILDING (FCC) PANELBOARD SCHEDULES

(27) EL104 SITE LIGHTING PLAN

(28) EL501 LIGHTING FIXTURE DETAILS

(29) EG601 EMP GROUNDING AND BONDING DETAILS

(30) EI505 TYPICAL TERMINAL BLOCK CONNECTIONS-3

(31) EI601 CONTROL SYSTEM DIAGRAM

(32) EI605 SYSTEM I-O – 3

(33) EI701 CIRCUIT SCHEDULE – 1

(34) ET411 PUMPHOUSE COMMUNICATIONS PLAN

(35) ET501 COMMUNICATIONS DETAILS

(36) ET601 RISER DIAGRAM - OUTSIDE PLANT, DDC, & GEN CONTROLS

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposal/Email. Provide proposals by Email to:

Kathernine.K.Fisher@usace.army.mil John.D.Hickman@usace.army.mil

4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 03 AUG 2020, as stated in the Request For Proposal.

Attachments:

Spec Pages listed in 1.b.

above Dwgs. listed in 1.c.

above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

24 JUL 2020

drl/2181

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 0015:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 780 calendar days for the base item unless adjusted by the exercising of options through billateral modification.

(End of clause)

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 240 calendar days for Option CLINs 0002-0010, and at anytime during the period of performance of the contract for Option CLINs 0011-0014. Option CLIN 0015 will only be able to be exercised concurrent with contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .