Abbrievated - EM 385-1-1 APP.docx

Engineer Manual DOCX document 14 KB Posted

Attached to
Grounds Maintenance Services at US Army Corps of Engineers Garrison Project/Lake Sakakawea
Solicitation number
W9128F-11-T-0027
Issued by

About this file

Accident Prevention Plan

View the file

Other versions and copies of EM 385-1-1

File Revision Posted Attached to
Attach4_EM_385-1-1_W912C324Q0004_Generator B379_20240715.pdf Jul 15, 2024 AMENDMENT 0001 Power Generator Installation, B379, Fort Buchanan, PR
Attach4_EM_385-1-1_W912C324Q0003_Repairs_B676_20240711.pdf Jul 11, 2024 AMENDMENT 0001-General Repairs BLDG. 676 at Fort Buchanan, PR
Attachment 4_EM 385-1-1 15 Mar 24 3.15.24es (002).pdf Mar 15, 2024 Defensible Tree Removal
APPENDIX C - EM 385-1-1 _EFFECTIVE 15March2024.pdf Mar 15, 2024 Industry Day and Presolicitation Notice HITS-UIII
EM 385-1-1 _EFFECTIVE 15March2024.pdf Mar 15, 2024 Potable and Chilled Water Sampling and Testing Services
EM 385-1-1 _EFFECTIVE 15 March 2024.pdf Mar 15, 2024 Natick Soldier Systems Center Multiple Award Task Order Contract (MATOC) for Construction
Attachment 4_EM 385-1-1 15 Mar 24 3.15.24es (002).pdf Mar 15, 2024 Rogue River Basin Grounds Maintenance
Attachment 4_EM 385-1-1 15 Mar 24 3.15.24es (002).pdf Mar 15, 2024 GROUNDS MAINTENANCE IN WILLAMETTE VALLEY
EM 385-1-1 _EFFECTIVE 15March2024.pdf Mar 15, 2024 Demolition & Construction of New Boundary Wall- LOCHAB Phase Two
Attachment 4_EM 385-1-1 15 Mar 24 3.15.24es (002).pdf Mar 15, 2024 Ivan Oakes Campground Host
Attachment 1_EM 385-1-1 15 Mar 24 3.15.24es (002).pdf Mar 15, 2024 Crane Rental and Operator at Dexter Dam (Services)
Attachment 0005 EM 385-1-1 _EFFECTIVE 15March2024.pdf Mar 15, 2024 Lease of One Survey Vessel
EM 385-1-1 15 MAR 2024.pdf Mar 15, 2024 B. Everett Jordan Dam Bypass Pumping
EM 385-1-1 _EFFECTIVE 15March2024.pdf Mar 15, 2024 Janitorial Services for the Repair and Supply Base
EM 385-1-1 2014 Section 01.pdf 2014 BLDG 110 Hangar Doors
EM_385-1-1.pdf Revision not stated WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
EM_385-1-1.pdf Revision not stated Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
W9127826RA009_EM 385-1-1.pdf Revision not stated Aircraft Maintenance Hangar at CSL Comalapa, El Salvador
EM_385-1-1.pdf Revision not stated TINKER AFB MAC BOA WWYK090020 - Replace Multiple Roofs B1049 & B7038
EM_385-1-1.pdf Revision not stated TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
Show all 20

Who attaches EM 385-1-1

Other files

File Type Posted
ACTIVITY_HAZARD_ANALYSIS.doc DOC document
W9128F-11-T-0027.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLANS

An Accident Prevention Plan (APP) is a safety and health policy and program document. The following areas are typically addressed in an APP, but an APP shall be job-specific and shall also address any unusual or unique aspects of the project or activity for which it is written.

The APP shall interface with the employer’s overall safety and health program, and a copy shall be available on the work site. Any portions of the overall safety and health program that are referenced in the APP shall be included as appropriate.

ANSI/ASSE A10.38 should be referenced for Programmatic Issues.

ABBREVIATED APP for LIMITED-SCOPE SERVICE, SUPPLY AND R&D CONTRACTS. If service, supply and R&D contracts with limited scopes are awarded, the contractor may submit an abbreviated Accident Prevention Plan. This APP shall address the following areas at a minimum. If other areas of the EM 385-1-1 are pertinent to the contract, the contractor must assure these areas are addressed as well.

a. Title, signature, and phone number of the plan preparer.

b. Background Information to include: Contractor; Contract number; Project name; Brief project description, description of work to be performed, and location (map); The project description shall provide a means to evaluate the work being done (see AHA requirements in 01.A.13) and associated hazards involved. Contractor’s APP shall address the identified hazards involved and the control measures to be taken.

c. Statement of Safety and Health Policy detailing their commitment to providing a safe and healthful workplace for all employees.

d. Responsibilities and Lines of Authorities – to include a statement of the employer’s ultimate responsibility for the implementation of his SOH program; Identification and accountability of personnel responsible for safety at all levels to include designated site safety and health officer (SSHO) and associated qualifications. The District SOHO will review the qualifications for acceptance.

e. Training - new hire SOH orientation training at the time of initial hire of each new employee and any periodic retraining/recertification requirements.

f. Procedures for job site inspections - assignment of responsibilities and frequency.

g. Procedures for reporting man-hours worked and reporting and investigating any accidents as soon as possible but not more than 24 hours afterwards to the Contracting Officer/Representative (CO/COR). An accident that results in a fatal injury, permanent partial or permanent total disability shall be immediately reported to the Contracting Officer.

h. Emergency Planning. Employees working alone shall be provided an effective means of emergency communication. This may be cellular phone, two-way radio or other acceptable means. The selected means of communication must be readily available and must be in working condition.

i. Drinking Water provisions, toilet and washing facilities.

j. First Aid and CPR training (at least two employees on each shift shall be qualified/certified to administer first aid and CPR) and provision of first aid kit (types/size).

k. Personal Protective Equipment.

(1) WORK CLOTHING - Minimum Requirements. Employees shall wear clothing suitable for the weather however minimum requirements for work shall be short-sleeve shirt, long pants (excessively long or baggy pants are prohibited) and leather work shoes. If analysis determines that safety-toed (or other protective) footwear is necessary (i.e., mowing, weedeating, chain saw use, etc), they shall be worn.

(2) Eye and Face Protection. Eye and face protection shall be worn as determined by an analysis of the operations being performed HOWEVER, all involved in chain saw use, chipping, stump grinding, pruning operations, grass mowing, weedeating and blowing operations shall be provided safety eyewear (Z87.1) as a minimum.

(3) Hearing Protection. Hearing protection must be worn by all those exposed to high noise activities (to include grass mowing and trimming, chainsaw operations, tree chipping, stump grinding and pruning).

(4) Head Protection. Hard hats shall comply with ANSI Z89.1 and shall be worn by all workers when a head hazard exists. At a minimum, hard hats shall be worn when performing activities identified in (2) above.

(5) High Visibility Apparel shall comply with ANSI/ISEA 107, Class 2 requirements at a minimum and shall be worn by all workers exposed to vehicular or equipment traffic.

(6) Protective Leg chaps shall be worn by all chainsaw operators.

(7) Gloves of the proper type shall be worn by persons involved in activities that expose the hands to cuts, abrasions, punctures, burns and chemical irritants.

(8) If work is being performed around water and drowning is a hazard, PFDs must be provided and worn as appropriate.

l. Machine Guards and safety devices. Lawn maintenance equipment must have appropriate guards and safety devices in place and operational.

m. Hazardous Substances. When any hazardous substances are procured, used, stored or disposed, a hazard communication program must be in effect and MSDSs shall be available at the worksite. Employees shall have received training in hazardous substances being used. When the eyes or body of any person may be exposed to corrosives, irritants or toxic chemicals, suitable facilities for quick drenching or flushing of the eyes and body shall be provided within 10 seconds of the worksite.

n. Traffic control shall be accomplished in accordance with DOT’s MUTCD.

o. Control of Hazardous Energy (Lockout/Tagout). Before an employee performs any servicing or maintenance on any equipment where the unexpected energizing or startup of the equipment could occur, procedures must be in place to ensure adequate control of this energy.

p. Driving, working on (i.e., working with equipment/mowers) while on slopes, working from/in boats/skiffs, etc shall also be considered and dealt with accordingly.

File details come from the government source that posted it. Updated .