About this file

This solicitation announcement and related documents describe a federal construction contract opportunity for a Child Development Center project on Oahu, Hawaii. The U.S. Army Corps of Engineers, Honolulu District is seeking proposals for the construction of a large standard-design Child Development Center and associated outdoor play areas, utilities, site work and landscaping at Aliamanu Military Reservation to care for children ages six weeks to five years. The project value is estimated between $50-100 million and proposals will be evaluated on experience, past performance, technical approach and price under LPTA procedures. The performance period is 1,048 calendar days from notice to proceed. An organized site visit will be held on July 6, 2022 and proposals are due by the date specified in SAM.gov. The NAICS code for this project is 236220 and the small business size standard is $39.5 million average annual revenue. The solicitation encourages maximum practicable subcontracting with various small business categories.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHILLER CH/1

(CHILLER

ENCLOSURE)

COMM

CABLE

TYP CHW

FCUS

TYPICAL

DX SPLIT

SYSTEMS

TYPICAL

EXHAUST FANS

DOMESTIC

WATER HEATING

SYSTEM

DOAS/1

1. CONTRACTOR MUST PROVIDE ADEQUATE NUMBER OF FIELD PANELS TO PERFORM REQUIRED

MONITORING & CONTROL TASKS. ADDITIONAL PANELS TO THOSE SHOWN ON THESE DRAWINGS

MUST BE PROVIDED AS REQUIRED.

2. PROVIDE POWER TO EACH DDC PANEL WHETHER INDICATED OR NOT. CONTROLS CONTRACTOR

MUST PERFORM LOW VOLTAGE WORK (24-V AND BELOW). ELECTRICAL CONTRACTOR MUST

PERFORM ALL OTHER HIGHER VOLTAGE WORK. CONTROLS CONTRACTOR MUST BE

RESPONSIBLE FOR COORDINATING ALL CONTROLS WORK. ALL CONTROL WIRES SHALL BE IN

CONDUIT.

3.

4.

CONTROL PANEL SHALL BE SECURE WITH KEYLOCK, TAMPER SWITCH, AND AUDIBLE ALARM.

5.

SYSTEMS MUST BE BACNET TESTING LABORATORIES (BTL) LISTED.

6.

PROVIDE A NEMA 4 SS ENCLOSURE FOR OUTDOOR PANELS.

7.

PROVIDE ADDITIONAL POINT EXPANSION MODULES AS REQUIRED TO CONNECT TO MECHANICAL

EQUIPMENT. PROVIDE FIELD MANUALS IN DDC PANEL AS REQUIRED.

8.

THE CDC BUILDING HVAC DDC WILL NEED TO BE COMPATIBLE WITH THE BASE-WIDE TRIDIUM

NIAGARA FRONT END THAT IS LOCATED IN SCHOFIELD BUILD 2624. THE CONTRACTOR WILL NEED TO COORDINATE WITH USAG-HI DPW TO VERIFY ANY HARDWARE AND CYBERSECURITY REQUIREMENTS TO ENSURE THEY ALIGN WITH THE EXISTING BASE WIDE UMCS ATO, eMASS ID# 1996.

9.

THE NEC IS RESPONSIBLE FOR ALLOWING THE PORTS, PROTOCOLS, AND SERVICES TO SUPPORT THE NETWORK TRANSPORT FOR THE CONNECTION TO THE BASE WIDE SYSTEM. DPW-HI IS RESPONSIBLE FOR COORDINATING WITH THE NEC ON CONFIGURATION OF THE GFGI LAYER 2/3 (NETWORK) SWITCH.

NETWORK COMM CABINET

6 1

(N)MANAGED

ETHERNET SWITCH

IN (N)NETWORK

COMM CABINET

(N)DDC ROUTER

(IF NECESSARY)

MECHANICAL ROOM 302

(N)FIBER TO PATCH PANEL BY ELECTRICAL

COORDINATE NUMBER OF STRANDS WITH

THE CONTRACTING OFFICER AS REQUIRED

NEW MAIN DDC

PANEL

120V

24V

CONDUIT AND BACNET/IP

COMM CABLE INSTALLED AND

TESTED BY DDC CONTRACTOR

ENCLOSURE FOR MANAGED ETHERNET SWITCH:

NETWORK CABINET, LOCKABLE WALL MOUNTED ELECTRICAL CABINET, NEMA 2 WITH

PERFORATED BACKPANEL FOR DIN MOUNTED EQUIPMENT AND WITH FOLLOWING

COMPONENTS;

1. ENTERPRISE LEVEL SWITCH: NETWORK SWITCH TO BE PROVIDED AND PROGRAMMED BY THE GOVERNMENT.

2. MIDDLEWARE PANEL (JACE) AS REQUIRED

3. FIBER PATCH PANEL

4. MIDDLEWARE PANEL AC/DC CONVERTER (AS REQUIRED)

5. ENTERPRISE LEVEL SWITCH AC/DC CONVERTER (AS REQUIRED)

6. ONE ICS DEDICATED GROUND BUS BAR BONDED TO THE TELECOMMUNICATION GROUNDING SYSTEM

THE CONTRACTOR WILL BE RESPONSIBLE FOR INSTALLING, INTEGRATION, AND PROGRAMMING OF THE HVAC/DDC EQUIPMENT AT THE CDC BUILDING LEVEL. THIS INCLUDES THE JACE CONTROLLER

THAT WILL BE COMMUNICATING OVER BACNET IP TO A GFGI LAYER 2/3 SWITCH.

HEAT PUMP

WATER

HEATERS

(CHILLER

ENCLOSURE)

(MECHANICAL

ROOM)

(MECHANICAL

ROOM)

AHU/1

(MECHANICAL

ROOM)

DESUPERHEATER

(CHILLER

ENCLOSURE)

TYPICAL

SUPPLY FANS

CHILLED WATER

PUMPS

(MECHANICAL

ROOM)

(REFER TO

ELECTRICAL

DRAWINGS)

BUILDING POWER

METER

(REFER TO ELECTRICAL

DRAWINGS)

12. IN ACCORDANCE WITH DPW REQUIREMENTS, THE CONTRACTOR MUST HAVE AN INFORMATION SYSTEMS SECURITY MANAGER (ISSM) CERTIFY THE DDC SYSTEM COMPLETELY, INCLUDING UPDATING ALL DOCUMENTATION TO REFLECT ADDING THE NEW DDC SYSTEM TO THE GOVERNMENT LAN. COORDINATE

SUBMITTAL OF DOCUMENTATION WITH THE CONTRACTING OFFICER.

IRRIGATION

WATER METER

(REFER TO

LANDSCAPE

DRAWINGS)

NOTES ON NEW DDC SYSTEM

10. ALL COMM. WIRES MUST BE IN CONDUIT.

11. THE CONTRACTOR MUST OBTAIN PERMISSION FROM NETCOM TO CONNECT TO THE NETWORK SWITCH.

LICENSED

PROFESSIONAL

ENGINEER

No. 9301-M .

H

A W A I I U S

A

O R

R S

T S A

A N

K A

EXP. DATE 04/30/2024

This drawing was prepared by me or under my supervision.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

P N

C

H

IL

D D

EV

EL

O

PM

EN

T

C

EN

TE

R

AL

IA

M

AN

U M

IL

IT

AR

Y

R

ES

ER

VA

TI

O

N , O

AH

U

, H

AW

AI

I

H O

N O

LU

LU

D

IS

TR

IC

T, B

U

IL

D

IN

G

FO

R T

SH

AF

TE

R

, O

AH

U , H

AW

AI

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

E

N G

IN

EE

R

IN

G D

IS

TR

IC

T

H O

N O

LU

LU

, H

AW

AI

I

M-653

D D

C S

YS

TE

M A

R C

H

IT

EC

TU

R E

R R

T

M

EI

R R

T

M

AY

N /A

N /A

DESIGN COMPLETE

SCALE: NTS

DDC SYSTEM ARCHITECTUREA1

AD

D

EN

D U

M

7/ 8/

2 0

Sheets
M-653 - DDC SYSTEM ARCHITECTURE

File details come from the government source that posted it. Updated .