This solicitation announcement and related documents describe a federal construction contract opportunity for a Child Development Center project on Oahu, Hawaii. The U.S. Army Corps of Engineers, Honolulu District is seeking proposals for the construction of a large standard-design Child Development Center and associated outdoor play areas, utilities, site work and landscaping at Aliamanu Military Reservation to care for children ages six weeks to five years. The project value is estimated between $50-100 million and proposals will be evaluated on experience, past performance, technical approach and price under LPTA procedures. The performance period is 1,048 calendar days from notice to proceed. An organized site visit will be held on July 6, 2022 and proposals are due by the date specified in SAM.gov. The NAICS code for this project is 236220 and the small business size standard is $39.5 million average annual revenue. The solicitation encourages maximum practicable subcontracting with various small business categories.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHILLER CH/1
(CHILLER
ENCLOSURE)
COMM
CABLE
TYP CHW
FCUS
TYPICAL
DX SPLIT
SYSTEMS
TYPICAL
EXHAUST FANS
DOMESTIC
WATER HEATING
SYSTEM
DOAS/1
1. CONTRACTOR MUST PROVIDE ADEQUATE NUMBER OF FIELD PANELS TO PERFORM REQUIRED
MONITORING & CONTROL TASKS. ADDITIONAL PANELS TO THOSE SHOWN ON THESE DRAWINGS
MUST BE PROVIDED AS REQUIRED.
2. PROVIDE POWER TO EACH DDC PANEL WHETHER INDICATED OR NOT. CONTROLS CONTRACTOR
MUST PERFORM LOW VOLTAGE WORK (24-V AND BELOW). ELECTRICAL CONTRACTOR MUST
PERFORM ALL OTHER HIGHER VOLTAGE WORK. CONTROLS CONTRACTOR MUST BE
RESPONSIBLE FOR COORDINATING ALL CONTROLS WORK. ALL CONTROL WIRES SHALL BE IN
CONDUIT.
3.
4.
CONTROL PANEL SHALL BE SECURE WITH KEYLOCK, TAMPER SWITCH, AND AUDIBLE ALARM.
5.
SYSTEMS MUST BE BACNET TESTING LABORATORIES (BTL) LISTED.
6.
PROVIDE A NEMA 4 SS ENCLOSURE FOR OUTDOOR PANELS.
7.
PROVIDE ADDITIONAL POINT EXPANSION MODULES AS REQUIRED TO CONNECT TO MECHANICAL
EQUIPMENT. PROVIDE FIELD MANUALS IN DDC PANEL AS REQUIRED.
8.
THE CDC BUILDING HVAC DDC WILL NEED TO BE COMPATIBLE WITH THE BASE-WIDE TRIDIUM
NIAGARA FRONT END THAT IS LOCATED IN SCHOFIELD BUILD 2624. THE CONTRACTOR WILL NEED TO COORDINATE WITH USAG-HI DPW TO VERIFY ANY HARDWARE AND CYBERSECURITY REQUIREMENTS TO ENSURE THEY ALIGN WITH THE EXISTING BASE WIDE UMCS ATO, eMASS ID# 1996.
9.
THE NEC IS RESPONSIBLE FOR ALLOWING THE PORTS, PROTOCOLS, AND SERVICES TO SUPPORT THE NETWORK TRANSPORT FOR THE CONNECTION TO THE BASE WIDE SYSTEM. DPW-HI IS RESPONSIBLE FOR COORDINATING WITH THE NEC ON CONFIGURATION OF THE GFGI LAYER 2/3 (NETWORK) SWITCH.
NETWORK COMM CABINET
6 1
(N)MANAGED
ETHERNET SWITCH
IN (N)NETWORK
COMM CABINET
(N)DDC ROUTER
(IF NECESSARY)
MECHANICAL ROOM 302
(N)FIBER TO PATCH PANEL BY ELECTRICAL
COORDINATE NUMBER OF STRANDS WITH
THE CONTRACTING OFFICER AS REQUIRED
NEW MAIN DDC
PANEL
120V
24V
CONDUIT AND BACNET/IP
COMM CABLE INSTALLED AND
TESTED BY DDC CONTRACTOR
ENCLOSURE FOR MANAGED ETHERNET SWITCH:
NETWORK CABINET, LOCKABLE WALL MOUNTED ELECTRICAL CABINET, NEMA 2 WITH
PERFORATED BACKPANEL FOR DIN MOUNTED EQUIPMENT AND WITH FOLLOWING
COMPONENTS;
1. ENTERPRISE LEVEL SWITCH: NETWORK SWITCH TO BE PROVIDED AND PROGRAMMED BY THE GOVERNMENT.
2. MIDDLEWARE PANEL (JACE) AS REQUIRED
3. FIBER PATCH PANEL
4. MIDDLEWARE PANEL AC/DC CONVERTER (AS REQUIRED)
5. ENTERPRISE LEVEL SWITCH AC/DC CONVERTER (AS REQUIRED)
6. ONE ICS DEDICATED GROUND BUS BAR BONDED TO THE TELECOMMUNICATION GROUNDING SYSTEM
THE CONTRACTOR WILL BE RESPONSIBLE FOR INSTALLING, INTEGRATION, AND PROGRAMMING OF THE HVAC/DDC EQUIPMENT AT THE CDC BUILDING LEVEL. THIS INCLUDES THE JACE CONTROLLER
THAT WILL BE COMMUNICATING OVER BACNET IP TO A GFGI LAYER 2/3 SWITCH.
HEAT PUMP
WATER
HEATERS
(CHILLER
ENCLOSURE)
(MECHANICAL
ROOM)
(MECHANICAL
ROOM)
AHU/1
(MECHANICAL
ROOM)
DESUPERHEATER
(CHILLER
ENCLOSURE)
TYPICAL
SUPPLY FANS
CHILLED WATER
PUMPS
(MECHANICAL
ROOM)
(REFER TO
ELECTRICAL
DRAWINGS)
BUILDING POWER
METER
(REFER TO ELECTRICAL
DRAWINGS)
12. IN ACCORDANCE WITH DPW REQUIREMENTS, THE CONTRACTOR MUST HAVE AN INFORMATION SYSTEMS SECURITY MANAGER (ISSM) CERTIFY THE DDC SYSTEM COMPLETELY, INCLUDING UPDATING ALL DOCUMENTATION TO REFLECT ADDING THE NEW DDC SYSTEM TO THE GOVERNMENT LAN. COORDINATE
SUBMITTAL OF DOCUMENTATION WITH THE CONTRACTING OFFICER.
IRRIGATION
WATER METER
(REFER TO
LANDSCAPE
DRAWINGS)
NOTES ON NEW DDC SYSTEM
10. ALL COMM. WIRES MUST BE IN CONDUIT.
11. THE CONTRACTOR MUST OBTAIN PERMISSION FROM NETCOM TO CONNECT TO THE NETWORK SWITCH.
LICENSED
PROFESSIONAL
ENGINEER
No. 9301-M .
H
A W A I I U S
A
O R
R S
T S A
A N
K A
EXP. DATE 04/30/2024
This drawing was prepared by me or under my supervision.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
FY
P N
C
H
IL
D D
EV
EL
O
PM
EN
T
C
EN
TE
R
AL
IA
M
AN
U M
IL
IT
AR
Y
R
ES
ER
VA
TI
O
N , O
AH
U
, H
AW
AI
I
H O
N O
LU
LU
D
IS
TR
IC
T, B
U
IL
D
IN
G
FO
R T
SH
AF
TE
R
, O
AH
U , H
AW
AI
I 9
-5
R
EG
IO
N
AL
E
N G
IN
EE
R
IN
G C
EN
TE
R H
O N
O
LU
LU
E
N G
IN
EE
R
IN
G D
IS
TR
IC
T
H O
N O
LU
LU
, H
AW
AI
I
M-653
D D
C S
YS
TE
M A
R C
H
IT
EC
TU
R E
R R
T
M
EI
R R
T
M
AY
N /A
N /A
DESIGN COMPLETE
SCALE: NTS
DDC SYSTEM ARCHITECTUREA1
AD
D
EN
D U
M
7/ 8/
2 0
| Sheets |
| M-653 - DDC SYSTEM ARCHITECTURE |