This solicitation announcement describes a design-bid-build construction project for a Child Development Center at Aliamanu Military Reservation in Oahu, Hawaii. The project scope includes construction of a large standard-design Child Development Center facility with developmental learning modules, activity areas, support spaces, kitchen, outdoor play areas, site development, utilities, lighting, parking and landscaping. Supporting facilities have higher costs due to steep site conditions requiring earthwork. The facility will include measures for antiterrorism, accessibility, cybersecurity, sustainability and energy efficiency. The performance period is 1,048 calendar days from notice to proceed. The project value is between $50-100 million. The procurement will use LPTA source selection procedures to determine best value. Offerors must register in SAM and place subcontracts with small businesses to the maximum extent practicable in accordance with public law.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
Am-0005
3. EFFECTIVE DATE
05-Aug-2022
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than item 6) CODE
CONTRACTING DIVISION
BLDG 230 OTAKE ST.
FORT SHAFTER HI 96858
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
9A. AMENDMENT OF SOLICITATION NO.
W9128A22R0019
X 9B. DATED (SEE ITEM 11)
22-Jun-2022
10A. MOD. OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY22 MCA PN 96540 Child Development Center, Aliamanu Military Reservation, Oahu, Hawaii
See Continuation Page.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
W9128A22R0019 Am-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0005)” is shown on each revised page.
a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are bold and/or strike through.
Section 03 30 00, para 1.6.5 and 1.6.6.1
b. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 60 00, Appendix A – Requests for Information (#84 to 96)
c. REPLACED SECTION. The following section is replaced in its entirety:
Section 03 30 00, Cast-In-Place Concrete
d. DELETED SECTION. The following sections are to be deleted in its entirety:
N/A
2. CHANGES TO DRAWINGS
a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith:
Sheet ID Mark Revision Date
S-001 5 8/05/2022
S-002 5 8/05/2022
3. The proposal due date has changed. See Am-0005, SF1442 Block 13A.
FY22 Military Construction Army (MCA) PN96540 Child Development Center, Aliamanu Military Reservation, Oahu, Hawaii
DAYNA N MATSUMURA (808) 835-4379
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-Jun-2022
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________1047 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by __ __
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
BLDG 230 OTAKE ST.
FORT SHAFTER HI 96858
W9128A
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour) local time __23 Aug 2022___ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. shall Sealed envelopes containing offers be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9128A22R0019 105
1:00 PM
(Am-0005)
FY22 PN 096540 Child Development Center Aliamanu Military Reservation
W9128A22R0019
RFI # Question Response
Spec. Section 01 33 39.00.10 paragraph 2.1.3 states that “The Government makes no claim or warranty that any of the GFM are complete or fully consistent with the contract drawings. The digital files provided are not part of the contract documents. If there is any discrepancy between the BIM/CIM models, the CAD drawings, and the contract drawings, the contract drawings shall govern. The Government has no responsibility to modify any GFMs due to changes in the design that occur after award, and the Government shall assume no liability for the contents of the files provided.
Please confirm that the “Designer(s) of Record will provide files with all of the “design changes” that occur during the project and that those files will be provided to the Contractor at least 120 days prior to BOD.
Government Furnished Material (GFM) of the design changes will not be provided.
85 Waterproofing is shown detail A5 on sheet S503. Please provide specs for waterproofing for the retaining wall. Provide Damproofing per Am-0002, Section 07 11 13
Spec Section 27 10 00 – 1.6.1.1 – Indicates providing RCDD-approved drawings. Please confirm the RCDD will provide a new set of drawings using the USACE drawings as a basis of design. Please confirm all shop drawings and installation will be per the new drawings and not USACE.
Confirmed.
Spec 26 28 01.00 10 section 2.1 requires Load Flow analysis but there is no further description about the parameters or requirements regarding this analysis. Please confirm that Load Flow / Voltage Drop is required and provide further information if possible.
See Section 26 28 01.00 10, para 2.7 to be conducted by the Contractor, and one-line diagram on EP602.
Reference Drawing sheets A-417, A-104, A-107, A-110. Sheet A-417 detail D1 shows three (3) walls in Central Storage rooms to receive shelving. However, Drawing Plan sheets A-104, A-107, and A-100 shows shelving on two (2) walls. Please advise.
Drawings are correct. Comply with plans and specification.
Section 00 60 00, Appendix A, Requests for Information - 1
W9128A22R0019
RFI # Question Response
Contractors respectfully request a copy of environmental CATEX report (historical and background information on former use of site, archaeological and environmental resources) for information if available.
Denied.
Please confirm if contractor can utilize the area between the grading limit and project limit shown on sheet C-003 & CG-101 for construction of new retaining Wall A (i.e. safety bench sloping, soil nailing, concrete gunite, etc.).
Confirmed area can be utilized.
Sheet S-001 shows 155mph (ULT) and 122.5mph (ASD). It appears the wind loading shown on S-002 is ULT. This should be reduced to 0.6ULT to get the service/ASD loads, which is what test reports and structural calcs will reference. Please clarify what is the required wind load.
See Am-0005, Sheet S-001 and S-002.
Reference sheet S-001. Wind load for glazing is shown at 155mph (ULT) and 122.5 mph (ASD). The wind loading on S-002 is ULT. Please clarify this should be reduced to 0.6 ULT to get the service/ASD loads. Please note, the test reports and structural calcs reference this as well.
See Am-0005, Sheet S-001 and S-002.
93 Please provide thickness/detail for 5’x4’ concrete pads on C102. See Am-0002, sheet A4/CS501.
Section 00 60 00, Appendix A, Requests for Information - 2
W9128A22R0019
RFI # Question Response
Reference S001, S501- S502, S602, S611 & Spec Section 31 00 00.
Spec 31 00 00, Para defines Select Granular Material/Structural Fill as 3” minus material. Foundation Notes O & P defined 3” minus STRUCTURAL FILL and 2” minus GRANULAR STRUCTURAL FILL for MSE Wall. Note E calls out 24” Structural Fill under footings & SOG, but calls out 12” beyond the edge of footing with Granular Structural Fill, but Details on S501& S502 calls out Structural Fill under and beyond footings and SOG, except E8/S502 calls out Select Granular Fill at Trash Enclosure.
Additionally, SOG detail E1/602, calls out Granular Structural Fill under the SOG. Please clarify 2” Granular Structural Fill is only for the MSE Wall backfill area shown A1/S611 and all the other details call out is 3” minus Granular Structural Fill.
Confirming the particle sizes indicated in note O and P are accurate.
A maximum particle size of 2 inches is required at MSE walls stated in note P.
Reference 33 30 00 p3.3.1.3. Para 3.3.1.3 calls out mandrel test 3 times for the PVC sewer line and 3rd test will be one month prior to the end of the warranty period.
The 3rd mandrel test will be only for the main sewer line from MH to MH since 6” lateral lines will be connected to the building?
See Am-0004, Section 33 30 00, para 3.3.1.3
Reference 33 30 00 p3.3.1.3. Para 3.3.1.3 calls out mandrel test 3 times for the PVC sewer line and 3rd test will be one month prior to the end of the warranty period.
The 3rd mandrel test can be allowed to do during non-business hours, such as during weekend or night time? Otherwise, it might need bypass the existing live sewer flow since the installed sewer lines will be in use.
No.
Section 00 60 00, Appendix A, Requests for Information - 3
SECTION TABLE OF CONTENTS
DIVISION 03 - CONCRETE
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 MODIFICATION OF REFERENCES
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Reinforcement
1.6 QUALITY ASSURANCE
1.6.1 Design Data
1.6.1.1 Concrete Mix Design
1.6.2 Shop Drawings
1.6.2.1 Reinforcing Steel
1.6.3 Control Submittals
1.6.3.1 Concrete Curing Plan
1.6.3.2 Pumping Concrete
1.6.3.3 VOC Content for form release agents, curing compounds, and concrete penetrating sealers
1.6.3.4 Safety Data Sheets
1.6.4 Test Reports
1.6.4.1 Fly Ash and Pozzolan
1.6.4.2 Slag Cement
1.6.4.3 Aggregates
1.6.5 Quality Control Plan
1.6.6 Quality Control Personnel Certifications
1.6.6.1 Concrete Quality Control Specialist Qualifications
1.6.6.2 Field Testing Technician and Testing Agency
1.6.7 Laboratory Qualifications for Concrete Qualification Testing
1.6.8 Laboratory Accreditation
1.7 ENVIRONMENTAL REQUIREMENTS
1.7.1 Submittals for Environmental Performance
1.8 SUSTAINABLE DESIGN REQUIREMENTS
1.8.1 Local/Regional Materials
1.8.2 Forest Stewardship Council (FSC) Certification
PART 2 PRODUCTS
2.1 FORMWORK MATERIALS
2.1.1 Wood Forms
2.1.1.1 Concrete Form Plywood (Standard Rough)
2.1.1.2 Overlaid Concrete Form Plywood (Standard Smooth)
2.1.2 Steel Forms
2.2 FORMWORK ACCESSORIES
2.2.1 Form Ties
2.2.2 Waterstops
2.2.2.1 PVC Waterstop
SECTION 03 30 00 Page 1
2.2.3 Biodegradable Form Release Agent
2.2.4 Chamfer Materials
2.2.5 Construction and movement joints
2.2.6 Other Embedded items
2.3 CONCRETE MATERIALS
2.3.1 Cementitious Materials
2.3.1.1 Portland Cement
2.3.1.2 Fly Ash
2.3.1.3 Other Supplementary Cementitious Materials
2.3.2 Water
2.3.3 Aggregate
2.3.3.1 Normal-Weight Aggregate
2.3.3.2 Recycled Aggregate Materials
2.3.4 Admixtures
2.4 MISCELLANEOUS MATERIALS
2.4.1 Concrete Curing Materials
2.4.2 Nonshrink Grout
2.4.3 Floor Finish Materials
2.4.3.1 Liquid Chemical Floor Hardeners and Sealers
2.4.4 Vapor Retarder
2.5 CONCRETE MIX DESIGN
2.5.1 Properties and Requirements
2.5.2 Durability
2.5.2.1 Alkali-Aggregate Reaction
2.5.2.2 Corrosion and Chloride Content
2.5.2.3 Sulfate Resistance
2.5.2.4 Concrete Temperature
2.5.2.5 Concrete permeability
2.5.3 Ready-Mix Concrete
2.6 REINFORCEMENT
2.6.1 Reinforcing Bars
2.6.1.1 Bar Mats
2.6.1.2 Headed Shear Stud Reinforcement
2.6.2 Mechanical Reinforcing Bar Connectors
2.6.3 Reinforcing Bar Supports
PART 3 EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.2.1 General
3.2.2 Subgrade Under Foundations and Footings
3.2.3 Subgrade Under Slabs on Ground
3.2.4 Edge Forms and Screed Strips for Slabs
3.2.5 Reinforcement and Other Embedded Items
3.3 FORMS
3.3.1 Coating
3.3.2 Reuse
3.3.3 Forms for Standard Rough Form Finish
3.3.4 Forms for Standard Smooth Form Finish
3.3.5 Form Ties
3.3.6 Tolerances for Form Construction
3.3.7 Removal of Forms and Supports
3.3.8 Strength of Concrete Required for Removal of Formwork
3.4 WATERSTOP INSTALLATION AND SPLICES
3.4.1 PVC Waterstop
3.5 PLACING REINFORCEMENT AND MISCELLANEOUS MATERIALS
3.5.1 General
3.5.2 Vapor Retarder
SECTION 03 30 00 Page 2
3.5.3 Reinforcement Supports
3.5.4 Setting Miscellaneous Material
3.5.5 Fabrication
3.5.6 Placing Reinforcement
3.5.7 Spacing of Reinforcing Bars
3.5.8 Concrete Protection for Reinforcement
3.5.9 Welding
3.6 BATCHING, MEASURING, MIXING, AND TRANSPORTING CONCRETE
3.6.1 Measuring
3.6.2 Mixing
3.6.3 Transporting
3.7 PLACING CONCRETE
3.7.1 Footing Placement
3.7.2 Pumping
3.7.3 Hot Weather
3.7.4 Bonding
3.8 WASTE MANAGEMENT
3.8.1 Mixing Equipment
3.8.2 Hardened, Cured Waste Concrete
3.8.3 Reinforcing Steel
3.8.4 Other Waste
3.9 SURFACE FINISHES EXCEPT FLOOR, SLAB, AND PAVEMENT FINISHES
3.9.1 Defects
3.9.2 Not Against Forms (Top of Walls)
3.9.3 Formed Surfaces
3.9.3.1 Tolerances
3.9.3.2 As-Cast Rough Form
3.9.3.3 Standard Smooth Finish
3.9.4 Smooth-Rubbed, Grout-Cleaned Rubbed, or Cork-Floated Finish
3.10 FLOOR, SLAB, AND PAVEMENT FINISHES AND MISCELLANEOUS CONSTRUCTION
3.10.1 Finish
3.10.1.1 Scratched
3.10.1.2 Floated
3.10.1.3 Concrete Containing Silica Fume
3.10.1.4 Steel Troweled
3.10.1.5 Nonslip Finish
3.10.1.6 Broomed
3.10.1.7 Chemical-Hardener Treatment
3.10.2 Flat Floor Finishes
3.10.2.1 Measurement of Floor Tolerances
3.10.2.2 Remedies for Out of Tolerance Work
3.10.3 Concrete Walks
3.10.4 Pits and Trenches
3.10.5 Curbs and Gutters
3.10.6 Splash Blocks
3.11 JOINTS
3.11.1 Construction Joints
3.11.1.1 Maximum Allowable Construction Joint Spacing
3.11.1.2 Construction Joints for Constructability Purposes
3.11.2 Isolation Joints in Slabs on Ground
3.11.3 Contraction Joints in Slabs on Ground
3.11.4 Sealing Joints in Slabs on Ground
3.12 CURING AND PROTECTION
3.12.1 Requirements for Type III, High-Early-Strength Portland Cement
3.12.2 Curing Periods
3.12.3 Curing Formed Surfaces
3.12.4 Curing Unformed Surfaces
3.12.5 Temperature of Concrete During Curing
3.12.6 Protection from Mechanical Injury
SECTION 03 30 00 Page 3
3.12.7 Protection After Curing
3.13 FIELD QUALITY CONTROL
3.13.1 Sampling
3.13.2 Testing
3.13.2.1 Slump Tests
3.13.2.2 Temperature Tests
3.13.2.3 Compressive Strength Tests
3.13.2.4 Air Content
3.13.2.5 Chloride Ion Concentration
3.13.2.6 Strength of Concrete Structure
3.13.2.7 Non-Conforming Materials
3.13.2.8 Testing Concrete Structure for Strength
3.14 REPAIR, REHABILITATION AND REMOVAL
3.14.1 Crack Repair
3.14.2 Repair of Weak Surfaces
3.14.3 Failure of Quality Assurance Test Results
-- End of Section Table of Contents --
SECTION 03 30 00 Page 4
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO
ACI 301 (2016) Specifications for Structural Concrete
ACI 302.1R (2015) Guide for Concrete Floor and Slab Construction
ACI 304.2R (2017) Guide to Placing Concrete by Pumping Methods
ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305.1 (2014) Specification for Hot Weather Concreting
ACI 305R (2010) Guide to Hot Weather Concreting
ACI 306R (2016) Guide to Cold Weather Concreting
ACI 308.1 (2011) Specification for Curing Concrete
ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual of Concrete Inspection
ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (1995; R 2004) Basic Hardboard
SECTION 03 30 00 Page 5
AMERICAN WELDING SOCIETY (AWS)
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A184/A184M (2019) Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement
ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A934/A934M (2016) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars
ASTM A1044/A1044M (2016a) Standard Specification for Steel Stud Assemblies for Shear Reinforcement of Concrete
ASTM C31/C31M (2019a) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C39/C39M (2020) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C42/C42M (2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C78/C78M (2018) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)
ASTM C94/C94M (2020) Standard Specification for Ready-Mixed Concrete
ASTM C143/C143M (2020) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2020) Standard Specification for Portland Cement
ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C173/C173M (2016) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the
SECTION 03 30 00 Page 6
Pressure Method
ASTM C311/C311M (2018) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete
ASTM C494/C494M (2019) Standard Specification for Chemical Admixtures for Concrete
ASTM C595/C595M (2020) Standard Specification for Blended Hydraulic Cements
ASTM C618 (2019) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C803/C803M (2018) Standard Test Method for Penetration Resistance of Hardened Concrete
ASTM C873/C873M (2015) Standard Test Method for Compressive Strength of Concrete Cylinders Cast in Place in Cylindrical Molds
ASTM C900 (2015) Standard Test Method for Pullout Strength of Hardened Concrete
ASTM C989/C989M (2018a) Standard Specification for Slag Cement for Use in Concrete and Mortars
ASTM C1012/C1012M (2018b) Standard Test Method for Length Change of Hydraulic-Cement Mortars Exposed to a Sulfate Solution
ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C1074 (2011) Standard Practice for Estimating Concrete Strength by the Maturity Method
ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
ASTM C1107/C1107M (2020) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1157/C1157M (2020) Standard Performance Specification for Hydraulic Cement
ASTM C1218/C1218M (2020c) Standard Test Method for Water-Soluble Chloride in Mortar and Concrete
ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)
SECTION 03 30 00 Page 7
ASTM C1293 (2008; R 2015) Standard Test Method for Determination of Length Change of Concrete Due to Alkali-Silica Reaction
ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2018) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM C1778 (2016) Standard Guide for Reducing the Risk of Deleterious Alkali-Aggregate Reaction in Concrete
ASTM D5759 (2012; R 2020) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ASTM E329 (2020) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection
ASTM E1155 (2020) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers
ASTM E1643 (2018a) Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs
ASTM E1745 (2017) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2018) Manual of Standard Practice
CRSI RB4.1 (2016) Supports for Reinforcement Used in Concrete
FOREST STEWARDSHIP COUNCIL (FSC)
FSC STD 01 001 (2015) Principles and Criteria for Forest Stewardship
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-07, Structural Plywood
SECTION 03 30 00 Page 8
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Waterstops
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System
1.2 DEFINITIONS
a. "Cementitious material" as used herein must include all portland cement, pozzolan, fly ash, slag cement, and silica fume.
b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.
c. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.
d. "Supplementary cementing materials" (SCM) include coal fly ash, silica fume, slag cement, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in improvement to sustainability and durability and reduced cost.
e. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.
f. "Mass Concrete" is any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement.
In addition, it includes all concrete elements with a section thickness of 3 feet or more regardless of temperature.
g. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.
h. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of concrete.
i. "Pozzolan" is a siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.
j. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).
SECTION 03 30 00 Page 9
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Concrete Curing Plan
Quality Control Plan; G
Quality Control Personnel Certifications; G
Quality Control Organizational Chart
Laboratory Accreditation; G
Maturity Method Data
SD-02 Shop Drawings
Reinforcing Steel; G
SD-03 Product Data
Formwork Materials
Recycled Aggregate Materials; (LEED NC)
Cementitious Materials; (LEED NC)
Vapor Retarder
Concrete Curing Materials
Reinforcement; (LEED NC)
Liquid Chemical Floor Hardeners and Sealers
Admixtures
Mechanical Reinforcing Bar Connectors
Waterstops
Local/Regional Materials; (LEED NC)
Biodegradable Form Release Agent
Pumping Concrete
Nonshrink Grout
SD-04 Samples
SECTION 03 30 00 Page 10
SD-05 Design Data
Concrete Mix Design; G
SD-06 Test Reports
Concrete Mix Design; G
Fly Ash
Pozzolan
Slag Cement
Aggregates
Compressive Strength Tests; GChloride Ion Concentration
Air Content
Slump Tests
Water
SD-07 Certificates
Reinforcing Bars
VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers
Safety Data Sheets
Forest Stewardship Council (FSC) Certification
Field Testing Technician and Testing Agency
SD-08 Manufacturer's Instructions
Liquid Chemical Floor Hardeners and Sealers
Curing Compound
1.4 MODIFICATION OF REFERENCES
Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory.
Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.
1.5 DELIVERY, STORAGE, AND HANDLING
Follow ACI 301, ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until vapor retarder, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store concrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions,. Do not store concrete curing compounds or
SECTION 03 30 00 Page 11 sealers in occupied spaces.
1.5.1 Reinforcement
Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.
1.6 QUALITY ASSURANCE
1.6.1 Design Data
1.6.1.1 Concrete Mix Design
Sixty days minimum prior to concrete placement, submit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand; source and amount of cement, supplementary cementitious materials, and admixtures; and applicable reference specifications. Submit mill test and all other test for cement, supplementary cementitious materials, aggregates, and admixtures. Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size. Provide mix proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required. If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Resubmit data on concrete components if the qualities or source of components changes. For previously approved concrete mix designs used within the past twelve months, the previous mix design may be re-submitted without further trial batch testing if accompanied by material test data conducted within the last six months.
Obtain mix design approval from the contracting officer prior to concrete placement.
1.6.2 Shop Drawings
1.6.2.1 Reinforcing Steel
Indicate bending diagrams, assembly diagrams, splicing and laps of bars, shapes, dimensions, and details of bar reinforcing, accessories, and concrete cover. Do not scale dimensions from structural drawings to determine lengths of reinforcing bars. Reproductions of contract drawings are unacceptable.
1.6.3 Control Submittals
1.6.3.1 Concrete Curing Plan
Submit proposed materials, methods and duration for curing concrete elements in accordance with ACI 308.1.
SECTION 03 30 00 Page 12
1.6.3.2 Pumping Concrete
Submit proposed materials and methods for pumping concrete. Submittal must include mix designs, pumping equipment including type of pump and size and material for pipe, and maximum length and height concrete is to be pumped.
1.6.3.3 VOC Content for form release agents, curing compounds, and concrete penetrating sealers
Submit certification for the form release agent, curing compounds, and concrete penetrating sealers that indicate the VOC content of each product.
1.6.3.4 Safety Data Sheets
Submit Safety Data Sheets (SDS) for all materials that are regulated for hazardous health effects. SDS must be readily accessible during each work shift to employees when they are at the construction site.
1.6.4 Test Reports
1.6.4.1 Fly Ash and Pozzolan
Submit test results in accordance with ASTM C618 for fly ash and pozzolan.
Submit test results performed within 6 months of submittal date.
1.6.4.2 Slag Cement
Submit test results in accordance with ASTM C989/C989M for slag cement.
Submit test results performed within 6 months of submittal date.
1.6.4.3 Aggregates
Submit test results in accordance with ASTM C33/C33M, and ASTM C1293 or ASTM C1567 as required in the paragraph titled ALKALI-AGGREGATE REACTION.
1.6.5 Quality Control Plan
Develop and submit for approval a concrete quality control program in accordance with the guidelines of ACI 121R and as specified herein. The plan must include approved laboratories. Provide direct oversight for the concrete qualification program inclusive of associated sampling and testing. All quality control reports must be provided to the Contracting Officer, Quality Manager and Concrete Supplier. Maintain a copy of ACI SP-15 and CRSI 10MSP at project site.
1.6.6 Quality Control Personnel Certifications
The Contractor must submit for approval the responsibilities of the various quality control personnel, including the names and qualifications of the individuals in those positions and a quality control organizational chart defining the quality control hierarchy and the responsibility of the various positions. Quality control personnel must be employed by the Contractor.
Submit American Concrete Institute certification for the following:
a. CQC personnel responsible for inspection of concrete operations.
b. Lead Foreman or Journeyman of the Concrete Placing, Finishing, and
SECTION 03 30 00 Page 13
Curing Crews.
c. Field Testing Technicians: ACI Concrete Field Testing Technician, Grade I.
1.6.6.1 Concrete Quality Control Specialist Qualifications
The quality specialist must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects. Evidence of extraordinary proven experience may be considered by the Contracting Officer as sufficient to act as the Concrete Quality Control Specialist.
The Concrete Quality Control Specialist shall be at minimum on site for concrete pours and can be off-site for other responsibilities including the review of concrete submittals.
1.6.6.2 Field Testing Technician and Testing Agency
Submit data on qualifications of proposed testing agency and technicians for approval by the Contracting Officer prior to performing testing on concrete.
a. Work on concrete under this contract must be performed by an ACI Concrete Field Testing Technician Grade 1 qualified in accordance with ACI SP-2 or equivalent. Equivalent certification programs must include requirements for written and performance examinations as stipulated in
ACI SP-2.
b. Testing agencies that perform testing services on reinforcing steel must meet the requirements of ASTM E329.
c. Testing agencies that perform testing services on concrete materials must meet the requirements of ASTM C1077.
1.6.7 Laboratory Qualifications for Concrete Qualification Testing
The concrete testing laboratory must have the necessary equipment and experience to accomplish required testing. The laboratory must meet the requirements of ASTM C1077 and be Cement and Concrete Reference Laboratory (CCRL) inspected.
1.6.8 Laboratory Accreditation
Laboratory and testing facilities must be provided by and at the expense of the Contractor. The laboratories performing the tests must be accredited in accordance with ASTM C1077, including ASTM C78/C78M and ASTM C1260. The accreditation must be current and must include the required test methods, as specified. Furthermore, the testing must comply with the following requirements:
a. Aggregate Testing and Mix Proportioning: Aggregate testing and mixture proportioning studies must be performed by an accredited laboratory and under the direction of a registered professional engineer in a U.S.
state or territory competent in concrete materials who is competent in concrete materials and must sign all reports and designs.
b. Acceptance Testing: Furnish all materials, labor, and facilities required for molding, curing, testing, and protecting test specimens at
SECTION 03 30 00 Page 14 the site and in the laboratory. Furnish and maintain boxes or other facilities suitable for storing and curing the specimens at the site while in the mold within the temperature range stipulated by
ASTM C31/C31M.
c. Contractor Quality Control: All sampling and testing must be performed by an approved, onsite, independent, accredited laboratory.
1.7 ENVIRONMENTAL REQUIREMENTS
Provide space ventilation according to material manufacturer recommendations, at a minimum, during and following installation of concrete curing compound and sealer. Maintain one of the following ventilation conditions during the curing period or for 72 hours after installation:
a. Supply 100 percent outside air 24 hours a day.
b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 84 degrees F and humidity is between 30 percent and 60 percent.
c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.
1.7.1 Submittals for Environmental Performance
a. Provide data indication the percentage of post-industrial pozzolan (fly ash, slag cement) cement substitution as a percentage of the full product composite by weight.
b. Provide data indicating the percentage of post-industrial and post-consumer recycled content aggregate.
c. Provide product data indicating the percentage of post-consumer recycled steel content in each type of steel reinforcement as a percentage of the full product composite by weight.
d. Provide product data stating the location where all products were manufactured
e. For projects using FSC certified formwork, provide chain-of-custody documentation for all certified wood products.
f. For projects using reusable formwork, provide data showing how formwork is reused.
g. Provide SDS product information data showing that form release agents meet any environmental performance goals such as using vegetable and soy based products.
h. Provide SDS product information data showing that concrete adhesives meet any environmental performance goals including low emitting, low volatile organic compound products.
SECTION 03 30 00 Page 15
1.8 SUSTAINABLE DESIGN REQUIREMENTS
1.8.1 Local/Regional Materials
Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources.See Section 01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING for cumulative total local material requirements. Concrete materials may be locally available. Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.
1.8.2 Forest Stewardship Council (FSC) Certification
Use FSC-certified wood where specified. Provide letter of certification signed by lumber supplier. Indicate compliance with FSC STD 01 001 and identify certifying organization. Submit FSC certification numbers;
identify each certified product on a line-item basis. Submit copies of invoices bearing the FSC certification numbers.
PART 2 PRODUCTS
2.1 FORMWORK MATERIALS
a. Form-facing material in contact with concrete must be lumber, plywood, tempered concrete-form-grade hardboard, or metal. Submit product information on proposed form-facing materials if different from that specified herein.
b. Design formwork, shores, and backshores to support loads transmitted to them and to comply with applicable building code requirements.
c. Design formwork to withstand pressure resulting from placement and vibration of concrete and to maintain specified tolerances.
d. Design formwork to accommodate waterstop materials in joints at locations indicated in Contract Documents.
e. Provide temporary openings in formwork if needed to facilitate cleaning and inspection.
f. Design formwork joints to inhibit leakage of mortar.
g. Limit deflection of facing materials for concrete surfaces exposed to view to 1/240 of center-to-center spacing of facing supports.
h. Do not use earth cuts as forms for vertical or sloping surfaces.
i. Submit product information on proposed form-facing materials if different from that specified herein.
j. Submit shop drawings for formwork, shoring, reshoring, and backshoring.
Shop drawings must be signed and sealed by a licensed design engineer.
k. Submit manufacturer's product data on form liner proposed for use with each formed surface.
SECTION 03 30 00 Page 16
2.1.1 Wood Forms
Provide lumber that is square edged or tongue-and-groove boards, free of raised grain, knotholes, or other surface defects. Provide plywood that complies with NIST PS 1, B-B concrete form panels or better or AHA A135.4, hardboard for smooth form lining. Submit data verifying that composite wood products contain no urea formaldehyde resins. Virgin wood used must be FSC-certified.
2.1.1.1 Concrete Form Plywood (Standard Rough)
Provide plywood that conforms to NIST PS 1, B-B, concrete form, not less than 5/8-inch thick.
2.1.1.2 Overlaid Concrete Form Plywood (Standard Smooth)
Provide plywood that conforms to NIST PS 1, B-B, high density form overlay, not less than 5/8-inch thick.
2.1.2 Steel Forms
Provide steel form surfaces that do not contain irregularities, dents, or sags.
2.2 FORMWORK ACCESSORIES
a. Use commercially manufactured formwork accessories, including ties and hangers.
b. Form ties and accessories must not reduce the effective cover of the reinforcement.
2.2.1 Form Ties
a. Use form ties with ends or end fasteners that can be removed without damage to concrete.
b. If the breakback distance is less than 3/4 in., use coated or corrosion-resistant ties.
c. Submit manufacturer's data sheet on form ties.
2.2.2 Waterstops
Submit manufacturer's data sheet on waterstop materials and splices.
2.2.2.1 PVC Waterstop
Polyvinylchloride waterstops must conform to COE CRD-C 572.
2.2.3 Biodegradable Form Release Agent
a. Provide form release agent that is colorless, biodegradable, and water-based, with a zero VOC content.
b. Provide product that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
SECTION 03 30 00 Page 17
c. Provide form release agent that reduces formwork moisture absorption, and does not contain diesel fuel, petroleum-based lubricating oils, waxes, or kerosene. Submit documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in project.
d. Submit manufacturer's product data on formwork release agent for use on each form-facing material.
2.2.4 Chamfer Materials
Use lumber materials with dimensions of 3/4 x 3/4 in.
2.2.5 Construction and movement joints
a. Submit details and locations of construction joints in accordance with the requirements herein.
b. Locate construction joints in retaining walls and at tops of footings or slabs.
c. Make construction joints perpendicular to main reinforcement.
d. Submit manufacturer's data sheet on expansion joint materials.
e. Provide keyways where indicated in Contract Documents.
2.2.6 Other Embedded items
Use sleeves, inserts, anchors, and other embedded items of material and design indicated in Contract Documents.
2.3 CONCRETE MATERIALS
2.3.1 Cementitious Materials
2.3.1.1 Portland Cement
a. Unless otherwise specified, provide cement that conforms to ASTM C150/C150M Type I or II and meets low alkali content requirements.
b. Use one brand and type of cement for formed concrete having exposed-to-view finished surfaces.
c. For portland cement manufactured in a kiln fueled by hazardous waste, maintain a record of source for each batch. Supplier must certify that no hazardous waste is used in the fuel mix or raw materials. Supplier must certify that the hazardous waste is neutralized by the manufacturing process and that no additional pollutants are discharged.
d. Submit information along with evidence demonstrating compliance with referenced standards. Submittals must include types of cementitious materials, manufacturing locations, shipping locations, and certificates showing compliance.
e. Cementitious materials must be stored and kept dry and free from contaminants.
SECTION 03 30 00 Page 18
2.3.1.2 Fly Ash
a. ASTM C618, Class F , except that the maximum allowable loss on ignition must not exceed 3 percent.
b. Fly ash content must be a minimum of 15 percent by weight of cementitious material, provided the fly ash does not reduce the amount of cement in the concrete mix below the minimum requirements of local building codes. Where the use of fly ash cannot meet the minimum level, provide the maximum amount of fly ash permittable that meets the code requirements for cement content. Report the chemical analysis of the fly ash in accordance with ASTM C311/C311M. Evaluate and classify fly ash in accordance with ASTM D5759.
2.3.1.3 Other Supplementary Cementitious Materials
Natural pozzolan must be raw or calcined and conform to ASTM C618, Class N, including the optional requirements for uniformity and effectiveness in controlling ASR and must have an ignition loss not exceeding 3 percent.
Class N pozzolan for use in mitigating ASR must have a Calcium Oxide (CaO) content of less than 13 percent and total equivalent alkali content less than 3 percent.
2.3.2 Water
a. Water must comply with the requirements of ASTM C1602/C1602M.
b. Minimize the amount of water in the mix. Improve workability by adjusting the grading of the aggregate and using admixture rather than by adding water.
c. Water must be potable ; free from injurious amounts of oils, acids, alkalis, salts, organic materials, or other substances deleterious to concrete.
d. Protect mixing water from contamination during storage and delivery.
e. Submit test report showing water complies with ASTM C1602/C1602M.
2.3.3 Aggregate
2.3.3.1 Normal-Weight Aggregate
a. Aggregates must conform to ASTM C33/C33M .
b. Aggregates used in concrete must be obtained from the same sources and have the same size range as aggregates used in concrete represented by submitted field test records or used in trial mixtures.
c. Store and handle aggregate in a manner that will avoid segregation and prevents contamination by other materials or other sizes of aggregates.
Store aggregates in locations that will permit them to drain freely.
Do not use aggregates that contain frozen lumps.
d. Submit types, pit or quarry locations, producers' names, aggregate supplier statement of compliance with ASTM C33/C33M, and ASTM C1293 expansion data not more than 18 months old.
SECTION 03 30 00 Page 19
2.3.3.2 Recycled Aggregate Materials
Use a minimum of 25 percent recycled aggregate, depending on local availability and conforming to requirements of the mix design. Recycled aggregate to include: recovered concrete or recovered stone that meets the aggregate requirements specified. Submit recycled material request with the aggregate certification submittals and do not use until approved by the Contracting Officer.
2.3.4 Admixtures
a. Chemical admixtures must conform to ASTM C494/C494M.
b. Chemical admixtures for use in producing flowing concrete must conform to ASTM C1017/C1017M.
c. Do not use calcium chloride admixtures.
d. Use a corrosion-inhibiting admixture for concrete classified under exposure category C1 or C2. Use an ASR-inhibiting admixture for concrete containing aggregate susceptible to ASR.
e. Admixtures used in concrete must be the same as those used in the concrete represented by submitted field test records or used in trial mixtures.
f. Protect stored admixtures against contamination, evaporation, or damage.
g. To ensure uniform distribution of constituents, provide agitating equipment for admixtures used in the form of suspensions or unstable solutions. Protect liquid admixtures from freezing and from temperature changes that would adversely affect their characteristics.
h. Submit types, brand names, producers' names, manufacturer's technical data sheets, and certificates showing compliance with standards required herein.
2.4 MISCELLANEOUS MATERIALS
2.4.1 Concrete Curing Materials
Provide concrete curing material in accordance with ACI 301 Section 5 and ACI 308.1 Section 2. Submit product data for concrete curing compounds.
Submit manufactures instructions for placement of curing compound.
2.4.2 Nonshrink Grout
Nonshrink grout in accordance with ASTM C1107/C1107M.
2.4.3 Floor Finish Materials
2.4.3.1 Liquid Chemical Floor Hardeners and Sealers
a. Hardener must be a colorless aqueous solution containing a blend of inorganic silicate or siliconate material and proprietary components combined with a wetting agent; that penetrates, hardens, and densifies concrete surfaces. Submit manufactures instructions for placement of liquid chemical floor hardener.
SECTION 03 30 00 Page 20
b. Use concrete penetrating sealers with a low (maximum 100 grams/liter, less water and less exempt compounds) VOC content. Submit manufactures instructions for placement of sealers.
2.4.4 Vapor Retarder
ASTM E1745 Class C polyethylene sheeting, minimum 10 mil thickness or other equivalent material with a maximum permeance rating of 0.04 perms per
ASTM E96/E96M.
Consider plastic vapor retarders and adhesives with a high recycled content, low toxicity low VOC (Volatile Organic Compounds) levels.
2.5 CONCRETE MIX DESIGN
2.5.1 Properties and Requirements
a. Use materials and material combinations listed in this section and the contract documents.
b. Cementitious material content must be adequate for concrete to satisfy the specified requirements for strength, w/cm, durability, and finishability described in this section and the contract documents.
The minimum cementitious material content for concrete used in floors must meet the following requirements:
Nominal maximum size of aggregate, in.
Minimum cementitious material content, pounds per cubic yard
1-1/2 470
1 520
3/4 540
3/8 610
c. Selected target slump must meet the requirements this section, the contract documents, and must not exceed 9 in. Concrete must not show visible signs of segregation.
d. The target slump must be enforced for the duration of the project.
Determine the slump by ASTM C143/C143M. Slump tolerances must meet the requirements of ACI 117.
e. The nominal maximum size of coarse aggregate for a mixture must not exceed three-fourths of the minimum clear spacing between reinforcement, one-fifth of the narrowest dimension between sides of forms, or one-third of the thickness of slabs or toppings.
f. Concrete must be air entrained for members assigned…