22r19-CDC AMR-Am-0004.pdf
PDF 481 KB Posted
- Solicitation number
- W9128A22R0019
About this file
This is a solicitation for a firm fixed-price construction contract to build a Child Development Center at Aliamanu Military Reservation in Oahu, Hawaii. The project includes construction of a large standard-design Child Development Center for children ages six weeks to five years with adjacent outdoor play areas and supporting facilities. Additional work involves site development, utilities, lighting, parking, storm drainage, landscaping, and connecting to energy and intrusion monitoring systems. The period of performance is 1,048 calendar days from notice to proceed, and the project magnitude is $50-100 million. The solicitation will be evaluated on experience, past performance, technical approach, and price using a lowest price technically acceptable source selection. Offerors must register in SAM and the successful contractor must subcontract to small businesses to the maximum extent practicable.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
Am-0004
3. EFFECTIVE DATE
03-Aug-2022
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than item 6) CODE
CONTRACTING DIVISION
BLDG 230 OTAKE ST.
FORT SHAFTER HI 96858
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
9A. AMENDMENT OF SOLICITATION NO.
W9128A22R0019
X 9B. DATED (SEE ITEM 11)
22-Jun-2022
10A. MOD. OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY22 MCA PN 96540 Child Development Center, Aliamanu Military Reservation, Oahu, Hawaii
See Continuation Page.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
W9128A22R0019 Am-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0004)” is shown on each revised page.
a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are bold and/or strike through.
Section 09 30 10, para 2.4.1 and 2.4.3
Section 33 30 00, para 3.3.1.3
b. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 60 00, Appendix A – Requests for Information (#71 to 83)
c. REPLACED SECTION. The following section is replaced in its entirety:
Section 09 30 10, Finishes
Section 33 30 00, Sanitary Sewerage
d. DELETED SECTION. The following sections are to be deleted in its entirety:
N/A
2. CHANGES TO DRAWINGS
a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith:
Sheet ID Mark Revision Date
V-001 4 7/29/2022
AF702 4 7/29/2022
3. Requests for Information due date is 5 August 2022 at 10:00 a.m., Hawaii Standard Time.
4. The proposal due date has changed. See Am-0004, SF1442 Block 13A.
FY22 Military Construction Army (MCA) PN96540 Child Development Center, Aliamanu Military Reservation, Oahu, Hawaii
DAYNA N MATSUMURA (808) 835-4379
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-Jun-2022
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________1047 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by __ __
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
BLDG 230 OTAKE ST.
FORT SHAFTER HI 96858
W9128A
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour) local time __20 Aug 2022___ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. shall Sealed envelopes containing offers be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9128A22R0019 105
1:00 PM
(Am-0004)
FY22 PN 096540 Child Development Center, Aliamanu Military Reservation
W9128A22R0019
RFI # Date Question Response
71 7/13/22
Reference 33 40 00 P3.9.1.3.1&2. Drain system field quality control requires Laser Profiler and Mandrel test for the drain system per the paragraphs. Please clarify those tests will be only for the main DL, from DMH/DI to DMH/DI, but not for the DL laterals, from DMH/DI to DS connections.
All underground drain lines are required to do deflection testing either with Laser Profiler or Mandrel test per specifications.
72 7/13/22 Reference EY502. Please confirm everything MILCON is providing per Sheet Note #1.
Dashed items will be GFGI as noted in the details. All other items that are not dashed are to be provided by the contractor.
73 7/21/22
Per CS102, A504 does not provide details for the concrete SOG at the Mechanical Yard and the Trash enclosure. Please provide Mechanical Yard and Trash Enclosure. a. SOG details, including reinforcing, b.
Subbase requirements.
See Am-0002, response to RFI #46.
See A4/CS501 in conjunction with S-104 and S-602.
74 7/21/22
Per the AF701 Interior room finish, the walls in the Kitchen (Room 305) and Dry Food Storage (Room 305A) are CT-01. However, there are no elevations showing the extent of the wall finishes in these rooms. Please provide
See Am-0002, Response to RFI #41.
75 7/25/22 Please confirm exterior CMU walls do not require painting or water-repellent coating.
Coating is not required.
See Section 04 20 00, para 2.2.2.5 for water repellent admixture.
76 7/25/22 Reference Sheet AJ701. Drawings call for fully grouted CMU as the air barrier system for walls. Please confirm no other type of air barrier coating is required
Confirmed.
77 7/25/22
Please confirm that costs for Bid Option Item 3 is only to provide a finish for the retaining wall using a form liner per Sheet A-505. Also, please confirm that if Option 3 is not exercised, that the retaining wall still needs to be installed as part of the Base Bid
Confirmed.
78 7/25/22
For tile, the Interior Finish Schedule on Sheet AF701 does not correspond to the Finish Materials & Colors Schedule on Sheet AF702. For example Sheet AF701 lists tile wall finish as PT-03, however there is no reference to PT-3 on Sheet AF702. Please clarify desired tile finishes.
See Am-0004, Sheet AF702.
Section 00 60 00, Appendix A, Requests for Information - 1
FY22 PN 096540 Child Development Center, Aliamanu Military Reservation
W9128A22R0019
RFI # Date Question Response
79 7/25/22 Sheet AF701 lists Kitchen 305 and Dry Storage 305A as having CT-01 tile for wall finish. Interior elevations do not show the height of the tile finish.
Please indicate desired height of wall tile finish for these rooms.
See Am-0002, Response to RFI #41.
80 7/25/22 Section 09 30 10, paragraph 2.4.3 specifies a high performance cement grout, however, paragraph 2.4.4 specifies an epoxy resin grout. Plans do not indicate which type of grout is desired. Please clarify.
See Am-0004, Section 09 30 10, para 2.4.3
81 7/25/22 Section 09 30 10, paragraph 2.5.2 specifies aluminum tile trims “as indicated”. No aluminum tile trims were found in the drawings. Please confirm that no tile trims per paragraph 2.5.2 are required for this project.
Required, see Detail C1/A-602
82 7/25/22 Spec section 09 30 10 does not specify any type of waterproofing for tile.
No reference to waterproofing for tile areas was found on the drawings.
Please confirm there is no tile waterproofing required for this project.
Confirmed.
83 7/25/22 The current LEED scorecard shows 2 points for Energy and Atmosphere Credit: Green Power and Carbon Offsets. Please confirm who would be responsible for the cost associated with these points?
Government.
Section 00 60 00, Appendix A, Requests for Information - 2
FY21 PN96540 CHILD DEVELOPMENT CENTER, AMR
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 30 10
CERAMIC, QUARRY, AND GLASS TILING
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.4 QUALITY ASSURANCE
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 ENVIRONMENTAL REQUIREMENTS
1.7 WARRANTY
1.8 EXTRA MATERIALS
PART 2 PRODUCTS
2.1 TILE
2.1.1 Porcelain Tile
2.1.2 Quarry Tile
2.1.3 Glazed Ceramic Wall Tile
2.2 SETTING-BED
2.2.1 Aggregate for Concrete Fill
2.2.2 Portland Cement
2.2.3 Sand
2.2.4 Hydrated Lime
2.3 WATER
2.4 MORTAR, GROUT, AND ADHESIVE
2.4.1 Dry-Set Portland Cement Mortar
2.4.2 Latex-Portland Cement Mortar
2.4.3 Ceramic Tile Grout
2.4.4 Epoxy Resin Grout
2.4.5 Sealants
2.5 SUBSTRATES
2.6 MISCELLANEOUS TRIMS
2.6.1 Transition Strips
2.6.2 Metal Strips
2.7 COLOR, TEXTURE, AND PATTERN
PART 3 EXECUTION
3.1 PREPARATORY WORK AND WORKMANSHIP
3.2 GENERAL INSTALLATION REQUIREMENTS
3.3 INSTALLATION OF SUBSTRATES
3.4 INSTALLATION OF WALL TILE
3.4.1 Ceramic Tile Grout
3.4.2 Epoxy Resin Grout
3.5 INSTALLATION OF FLOOR TILE
3.5.1 Dry-Set and Latex-Portland Cement
SECTION 09 30 10 Page 1
3.5.2 Ceramic Tile Grout
3.5.3 Concrete Fill
3.6 INSTALLATION OF MISCELLANEOUS TRIMS
3.6.1 Metal Trims
3.7 EXPANSION JOINTS
3.7.1 Walls
3.7.2 Floors
3.8 CLEANING AND PROTECTING
-- End of Section Table of Contents --
SECTION 09 30 10 Page 2
SECTION 09 30 10
CERAMIC, QUARRY, AND GLASS TILING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A108/A118/A136.1 (2019) American National Standard Specifications for the Installation of Ceramic Tile
ANSI A137.1 (2019) American National Standards Specifications for Ceramic Tile
ASTM INTERNATIONAL (ASTM)
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C144 (2018) Standard Specification for Aggregate for Masonry Mortar
ASTM C150/C150M (2020) Standard Specification for Portland Cement
ASTM C206 (2014) Standard Specification for Finishing Hydrated Lime
ASTM C207 (2018) Standard Specification for Hydrated Lime for Masonry Purposes
ASTM C648 (2020) Standard Test Method for Breaking Strength of Ceramic Tile
ASTM C1026 (2013; R 2018) Standard Test Method for Measuring the Resistance of Ceramic and Glass Tile to Freeze-Thaw Cycling
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
SECTION 09 30 10 Page 3
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
TILE COUNCIL OF NORTH AMERICA (TCNA)
TCNA Hdbk (2017) Handbook for Ceramic, Glass, and Stone Tile Installation
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Porcelain Tile; G
Recycled Content for Porcelain Tile; S
Quarry Tile; G
Recycled Content for Quarry Tile; S
Glazed Ceramic Wall Tile; G
Recycled Content for Glazed Ceramic Wall Tile; S
Transition Strips
Metal Strips
Setting-Bed
Mortar, Grout, and Adhesive
SECTION 09 30 10 Page 4
SD-04 Samples
Tile; G
Accessories
Transition Strips
Metal Strips
Grout;
SD-07 Certificates
Indoor Air Quality for Adhesives; S
Indoor Air Quality for Sealants; S
SD-08 Manufacturer's Instructions
Manufacturer's Approved Cleaning Instructions
SD-10 Operation and Maintenance Data
Porcelain Tile, Data Package 1
Quarry Tile, Data Package 1
Glazed Ceramic Wall Tile, Data Package 1
Transition Strips, Data Package 1
Metal Strips, Data Package 1
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body.When product does not have certification, provide validation that product meets the indoor air quality product requirements cited in this Section.
1.4 QUALITY ASSURANCE
Provide installers having a minimum of two years of experience with a company specializing in performing the type of work described. Each type and color of tile to be provided from a single source. Each type and color of mortar, adhesive, and grout to be provided from the same source.
1.5 DELIVERY, STORAGE, AND HANDLING
Ship tiles in sealed packages and clearly marked with the grade, type of tile, producer identification, and country of origin. Deliver materials to the project site in manufacturer's original unopened containers with seals unbroken and labels and hallmarks intact. Protect materials from
SECTION 09 30 10 Page 5 weather, and store them under cover in accordance with manufacturer's printed instructions. Store and handle tiles per manufacturer's instructions for gauged porcelain tile and gauged porcelain tile panels/slabs.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not perform ceramic tile work unless the substrate and ambient temperature is at least 50 degrees F and rising. Maintain temperature above 50 degrees F while the work is being performed and for at least 7 days after completion of the work. When temporary heaters are used, ventilate the area to the outside to avoid carbon dioxide damage to new tilework.
1.7 WARRANTY
Provide manufacturer's warranty to repair or replace defective tiling materials and workmanship, including tile, mortar and grout products and installation as a system, for a period of one year from date of final acceptance of the work.
1.8 EXTRA MATERIALS
Supply an extra 2 percent of each type tile used in clean and marked cartons.
PART 2 PRODUCTS
2.1 TILE
Provide tiles that comply with ANSI A137.1 and are standard grade tiles.
Provide a minimum breaking strength of 125 lbs. for wall tile and 250 lbs. for floor tile in accordance with ASTM C648. Provide exterior building tile for cold climate projects that is approved by the manufacturer for exterior use when tested in accordance with ASTM C1026.
Provide floor tiles with a minimum wet dynamic coefficient of friction (DCOF) value of 0.42 when tested in accordance with ANSI A137.1 requirements. For materials like tile, accessories, and transition strips submit samples of sufficient size to show color range, pattern, type and joints.
Submit manufacturers' descriptive product data for each type of ceramic, quarry and glass tiling indicated. Include manufacturers' literature, finishes, profiles and thicknesses of materials.
Submit manufacturers' operations and maintenance data for each type of ceramic, quarry and glass tiling indicated in accordance with Section
01 78 23 OPERATIONS AND MAINTENANCE DATA.
2.1.1 Porcelain Tile
Provide tile with a V3 aesthetic classification. Blend tiles in factory and in a packages to have same color range and continuous blend for installation. Provide nominal tile size(s) as indicated on the drawing.
Provide porcelain tiling materials that contain a minimum of 10 percent recycled content. Provide data identifying percentage of recycled content for porcelain tile.
SECTION 09 30 10 Page 6
2.1.2 Quarry Tile
Furnish an unglazed quarry tile, cove base and trim pieces. Provide tile with abrasive surface. Provide nominal tile size(s) as indicated on the drawing.
Provide quarry tiling materials that contain a minimum of 10 percent recycled content. Provide data identifying percentage of recycled content for quarry tile.
2.1.3 Glazed Ceramic Wall Tile
Provide glazed ceramic wall tile that has cushioned edges. Provide nominal tile size as indicated on the drawing.
Provide glazed ceramic wall tile materials that contain a minimum of 3 percent recycled content. Provide data identifying percentage of recycled content for glazed ceramic wall tile.
2.2 SETTING-BED
Submit manufacturer's catalog data. Compose the setting-bed of the following materials:
2.2.1 Aggregate for Concrete Fill
Conform to ASTM C33/C33M for aggregate fill. Do not exceed one-half the thickness of concrete fill for maximum size of coarse aggregate.
2.2.2 Portland Cement
Conform to ASTM C150/C150M for cement, Type I, white for wall mortar and gray for other uses.
2.2.3 Sand
Conform to ASTM C144 for sand.
2.2.4 Hydrated Lime
Conform to ASTM C206 for hydrated lime, Type S or ASTM C207, Type S.
2.3 WATER
Provide potable water.
2.4 MORTAR, GROUT, AND ADHESIVE
Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesives used on the interior of the building meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of GS-36. For products located on the interior of the building (inside of the weatherproofing system, provide certification or validation of indoor air quality for adhesives.
Provide bond coat, mortar, and grout supplied from the same manufacturer.
SECTION 09 30 10 Page 7
2.4.1 Dry-Set Portland Cement Mortar
TCNA Hdbk.
2.4.2 Latex-Portland Cement Mortar
TCNA Hdbk.
2.4.3 Ceramic Tile Grout
TCNA Hdbk; petroleum-free and plastic-free high-performance cement grout (latex-portland cement grout).
2.4.4 Epoxy Resin Grout
TCNA Hdbk. Water cleanable epoxy conforming to ANSI A108/A118/A136.1 ;
provide manufacturer proportioned and packaged kit having hardener, resin and colored filler and horizontal and vertical grade products as applicable. Provide anti-microbial additive designed for prevention of mold and mildew.
2.4.5 Sealants
Comply with applicable regulations regarding toxic and hazardous materials and as specified. Provide sealant that does not change the color or alter the appearance of the grout. Refer to Section 07 92 00 JOINT SEALANTS.
Provide sealants used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . For products located on the interior of the building (inside of the weatherproofing system), provide certification or validation of indoor air quality for sealants.
2.5 SUBSTRATES
Refer to Section 09 29 00 GYPSUM BOARD for cementitious backer units. 2.6
MISCELLANEOUS TRIMS
2.6.1 Transition Strips
Provide nickled anodized aluminum transitions between tile and resilient flooring. Provide types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified. Provide solid surfacing material transitions appropriate for conditions. Refer to Section 06 61 16 SOLID SURFACING FABRICATIONS. Provide transition strips that comply with 36 CFR 1191 requirements.
2.6.2 Metal Strips
Provide Cove,L-shapecorner rounded trim shapes, height to match tile and setting thickness, designed specifically for flooring, and wall applications. Provide extruded nickled anodized aluminum edging at tile surfaces with exposed outside and insidecorners. Provide profiles appropriate for finished floor and wall materials as indicated.
SECTION 09 30 10 Page 8 (Am-0004) j3ec9jl8 Strikethrough
2.4.1 Dry-Set Portland Cement Mortar
TCNA Hdbk.
j3ec9jl8 Strikethrough
2.4.3 Ceramic Tile Grout
TCNA Hdbk; petroleum-free and plastic-free high-performance cement grout (latex-portland cement grout).
2.7 COLOR, TEXTURE, AND PATTERN
Provide color, pattern and texture as indicated on the drawings; colors listed are not intended to limit the selection of equal colors from other manufacturers.
PART 3 EXECUTION
3.1 PREPARATORY WORK AND WORKMANSHIP
Inspect surface to receive tile in conformance to the requirements of TCNA Hdbk for surface conditions for the type setting bed specified and for workmanship. Provide variations of tiled surfaces that fall within maximum values shown below:
TYPE WALLS FLOORS
Dry-Set Mortar 1/8 inch in 8 ft. 1/8 inch in 10 ft.
Organic Adhesives 1/8 inch in 8 ft. 1/16 inch in 3 ft.
Latex-Portland Cement Mortar 1/8 inch in 8 ft. 1/8 inch in 10 ft.
Epoxy 1/8 inch in 8 ft. 1/8 inch in 10 ft.
3.2 GENERAL INSTALLATION REQUIREMENTS
Do not start tile work until roughing in for mechanical and electrical work has been completed and tested, and built-in items requiring membrane waterproofing have been installed and tested. Close space, in which tile is being set, to traffic and other work. Keep closed until tile is firmly set. Do not start floor tile installation in spaces requiring wall tile until after wall tile has been installed. Apply tile in colors and patterns indicated in the area shown on the drawings. Install tile with the respective surfaces in true even planes to the elevations and grades shown. Provide special shapes as required for sills, jambs, recesses, offsets, external corners, and other conditions to provide a complete and neatly finished installation. Solidly back tile bases and coves with mortar. Do not walk or work on newly tiled floors without using kneeling boards or equivalent protection of the tiled surface. Keep traffic off horizontal portland cement mortar installations for at least 72 hours.
Keep all traffic off epoxy installed floors for at least 40 hours after grouting, and heavy traffic off for at least 7 days, unless otherwise specifically authorized by manufacturer. Dimension and draw detail drawings at a minimum scale of 1/4 inch = 1 foot. Include drawings of pattern at inside corners, outside corners, termination points and location of all equipment items such as thermostats, switch plates, mirrors and toilet accessories mounted on surface. Submit drawings showing ceramic tile pattern elevations and floor plans. Submit manufacturer's preprinted installation instructions.
Do not install building construction materials that show visual evidence of biological growth.
3.3 INSTALLATION OF SUBSTRATES
Install as specified in Section 09 29 00 GYPSUM BOARD.
SECTION 09 30 10 Page 9
3.4 INSTALLATION OF WALL TILE
Install wall tile in accordance with the W-series install methods per TCNA Hdbk, method W244C-20 and with grout jointsas recommended by the manufacturer for the type of tile.
3.4.1 Ceramic Tile Grout
Prepare and install ceramic tile grout in accordance with F-series install methods per TCNA Hdbk method. Provide and apply manufacturer's standard product for sealing grout joints in accordance with manufacturer's recommendations.
3.4.2 Epoxy Resin Grout
Prepare and install epoxy resin grout in accordance with TCNA Hdbk method.
3.5 INSTALLATION OF FLOOR TILE
Install floor tile in accordance with TCNA Hdbk method F112-20 and with grout joints as recommended by the manufacturer for the type of tile.
3.5.1 Dry-Set and Latex-Portland Cement
Use dry-setorlatex-portland cement mortar to install tile directly over properly cured, plane, clean concrete slabs in accordance with TCNA Hdbk method. Use latex-portland cement when installing porcelain ceramic tile.
3.5.2 Ceramic Tile Grout
Prepare and install ceramic tile grout in accordance with TCNA Hdbk method.
Provide and apply manufacturer's standard product for sealing grout joints in accordance with manufacturer's recommendations.
3.5.3 Concrete Fill
Provide a 3500 psi concrete fill mix to dry as consistency as practicable. Compose concrete fill by volume of 1 part Portland cement to 3 parts fine aggregate to 4 parts coarse aggregate, and mix with water to as dry a consistency as practicable. Spread, tamp, and screed concrete fill to a true plane, and pitch to drains or levels as shown. Thoroughly damp concrete fill before applying setting-bed material. Reinforce concrete fill with one layer of reinforcement, with the uncut edges lapped the width of one mesh and the cut ends and edges lapped a minimum 2 inch.
Tie laps together with 18 gauge wire every 10 inch along the finished edges and every 6 inch along the cut ends and edges. Provide reinforcement with support and secure in the centers of concrete fills.
Provide a continuous mesh; except where expansion joints occur, cut mesh and discontinue across such joints. Provide reinforced concrete fill under the setting-bed where the distance between the under-floor surface and the finished tiles floor surface is a minimum of 2 inches, and of the same thickness that the mortar setting-bed over the concrete fill with the thickness required in the specified TCNA Hdbk method .
3.6 INSTALLATION OF MISCELLANEOUS TRIMS
3.6.1 Metal Trims
Install trim where indicated. Embed anchoring leg in setting mortar in
SECTION 09 30 10 Page 10 accordance with manufacturer's instructions. During grouting of tile joints, immediately wipe grout from finish surface.
3.7 EXPANSION JOINTS
Form and seal joints as specified in Section 07 92 00 JOINT SEALANTS.
3.7.1 Walls
Provide expansion joints at control joints in backing material. Wherever backing material changes, install an expansion joint to separate the different materials.
3.7.2 Floors
Provide expansion joints over construction joints, control joints, and expansion joints in concrete slabs in accordance with TCNA Hdbk method EJ171 type to suit conditions. Provide expansion joints where tile abuts restraining surfaces such as perimeter walls, curbs and columns and at intervals of 20 to 25 feet each way in large interior floor areas. Extend expansion joints through setting-beds and fill.
3.8 CLEANING AND PROTECTING
Upon completion, thoroughly clean tile surfaces in accordance with manufacturer's approved cleaning instructions. Do not use acid for cleaning glazed tile. Clean floor tile with resinous grout or with factory mixed grout in accordance with printed instructions of the grout manufacturer. After the grout has set, provide a protective coat of a non-corrosive soap or other approved method of protection for tile wall surfaces. Cover tiled floor areas with building paper before foot traffic is permitted over the finished tile floors. Provide board walkways on tiled floors that are to be continuously used as passageways by workmen.
Replace damaged or defective tiles.
-- End of Section --
SECTION 09 30 10 Page 11
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 09 30 10 Page 12
SECTION TABLE OF CONTENTS
DIVISION 33 - UTILITIES
SECTION 33 30 00
SANITARY SEWERAGE
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY CONTROL
1.3.1 Installer Qualifications
1.3.2 Drawings
1.3.3 CCTV Inspection Recordings
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery and Storage
1.4.1.1 Piping
1.4.1.2 Cement, Aggregate, and Reinforcement
1.4.2 Handling
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Sanitary Sewer Gravity Pipeline
2.2 MATERIALS
2.2.1 Gravity Pipe
2.2.1.1 PVC Gravity Sewer Piping
2.2.1.1.1 PVC Gravity Pipe and Fittings
2.2.1.1.2 PVC Gravity Joints and Jointing Material
2.2.2 Cement Mortar
2.2.3 Portland Cement
2.2.4 Portland Cement Concrete
2.2.5 Precast Concrete Manholes
2.2.6 Gaskets and Connectors
2.2.7 External Preformed Rubber Joint Seals
2.2.8 Manhole Inserts
2.2.9 Manhole Coating/Lining
2.2.10 Sewer Cleanout
2.2.11 Frames, Covers, and Gratings for Manholes
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Installation Drawings
3.2 INSTALLATION
3.2.1 Connections to Existing Lines
3.2.2 General Requirements for Installation of Pipelines
3.2.2.1 Location
3.2.2.1.1 Sanitary Sewer Manholes
3.2.2.2 Earthwork
3.2.2.3 Pipe Laying and Jointing
3.2.3 Special Requirements
SECTION 33 30 00 Page 1
3.2.3.1 Installation of PVC Piping
3.2.4 Concrete Work
3.2.5 Manhole Construction
3.2.6 Miscellaneous Construction and Installation
3.2.6.1 Connecting to Existing Manholes
3.2.6.2 Metal Work
3.2.6.2.1 Workmanship and Finish
3.2.6.2.2 Field Painting
3.2.7 Manhole Coating
3.2.8 Sewer Abandonment
3.2.9 Installations of Wye Branches
3.3 FIELD QUALITY CONTROL
3.3.1 Tests
3.3.1.1 Leakage Tests for Nonpressure Lines
3.3.1.2 Manholes
3.3.1.3 Deflection Testing
3.3.1.4 Mil Gauge Test
3.3.2 CCTV Inspection
3.3.3 High Voltage Spark Test
3.3.4 Adhesion Test
3.3.5 Field Tests for Cast-In-Place Concrete
3.3.6 Inspection
3.3.7 Sewer Line Cleaning and Acceptance
-- End of Section Table of Contents --
SECTION 33 30 00 Page 2
SECTION 33 30 00
SANITARY SEWERAGE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A48/A48M (2003; R 2016) Standard Specification for Gray Iron Castings
ASTM C94/C94M (2020) Standard Specification for Ready-Mixed Concrete
ASTM C150/C150M (2020) Standard Specification for Portland Cement
ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C270 (2019) Standard Specification for Mortar for Unit Masonry
ASTM C443 (2020) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets
ASTM C478 (2018) Standard Specification for Circular Precast Reinforced Concrete Manhole Sections
ASTM C828 (2011) Low-Pressure Air Test of Vitrified Clay Pipe Lines
ASTM C923 (2008; R 2013; E 2016) Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals
ASTM C972 (2000; R 2011) Compression-Recovery of Tape Sealant
ASTM C990 (2009; R 2014) Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic
SECTION 33 30 00 Page 3
Elastomers - Tension
ASTM D624 (2000; R 2020) Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers
ASTM D638 (2014) Standard Test Method for Tensile Properties of Plastics
ASTM D695 (2015) Standard Test Method for Compressive Properties of Rigid Plastics
ASTM D790 (2017) Standard Test Method for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials
ASTM D1248 (2016) Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable
ASTM D2240 (2015; R2021) Standard Test Method for Rubber Property-Durometer Hardness
ASTM D2321 (2020) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications
ASTM D3034 (2016) Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings
ASTM D3212 (2007; R 2020) Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals
ASTM D4541 (2017) Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers
ASTM D4787 (2013; R2018) Standard Practice for Continuity Verification of Liquid or Sheet Linings Applied to Concrete Substrates
ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 33 30 00 Page 4
Contractor's License
SD-02 Shop Drawings
Installation Drawings
SD-03 Product Data
Precast Concrete Manholes
Frames, Covers, and Gratings
Gravity Pipe
SD-06 Test Reports
Hydrostatic Sewer Test; G , Aqua Engineers
Exfiltration Tests; G , Aqua Engineers
Low-Pressure Air Tests; G , Aqua Engineers
Deflection Testing; G , Aqua Engineers
Vacuum Test; G, Aqua Engineers
High Voltage Spark Test; G, Aqua Engineers
Adhesion Test; G, Aqua Engineers
CCTV Inspection; G, Aqua Engineers
SD-07 Certificates
Portland Cement
Gaskets
1.3 QUALITY CONTROL
1.3.1 Installer Qualifications
Install specified materials by a licensed underground utility Contractor licensed for such work in the state where the work is to be performed.
Verify installing Contractor's License is current and state certified or state registered.
1.3.2 Drawings
a. Submit Installation Drawings showing complete detail, both plan and side view details with proper layout and elevations.
b. Submit As-Built Drawings for the complete sanitary sewer system showing complete detail with all dimensions, both above and below grade, including invert elevation.
SECTION 33 30 00 Page 5
1.3.3 CCTV Inspection Recordings
Submit CCTV Inspection recordings to Aqua Engineers after the following works has been completed: all sewer laterals and mains are installed and backfilled; all sewer structures are in place, complete and pipes are accessible from structures; and sewer pipes to be inspected have been completed.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery and Storage
Check upon arrival; identify and segregate as to types, functions, and sizes. Store off the ground in a manner affording easy accessibility and not causing excessive rusting or coating with grease or other objectionable materials.
1.4.1.1 Piping
Inspect materials delivered to site for damage; store with minimum of handling. Store materials on site in enclosures or under protective coverings. Store plastic piping and jointing materials and rubber gaskets under cover out of direct sunlight. Do not store materials directly on the ground. Keep inside of pipes and fittings free of dirt and debris.
1.4.1.2 Cement, Aggregate, and Reinforcement
As specified in Section 03 30 00 CAST-IN-PLACE CONCRETE.
1.4.2 Handling
Handle pipe, fittings, and other accessories in such manner as to ensure delivery to the trench in sound undamaged condition. Take special care not to damage linings of pipe and fittings; if lining is damaged, make satisfactory repairs. Carry, do not drag, pipe to trench. Store solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install the plastic pipe in accordance with the manufacturer's recommendation and discard those materials if the storage period exceeds the recommended shelf life. Discard solvents in use when the recommended pot life is exceeded.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Sanitary Sewer Gravity Pipeline
Provide mains and laterals 6-8 inch lines of polyvinyl chloride (PVC) plastic pipe. Provide building connections 6 inch lines of polyvinyl chloride (PVC) plastic pipe. Provide new and modify existing exterior sanitary gravity sewer piping and appurtenances. Provide each system complete and ready for operation. The exterior sanitary gravity sewer system includes equipment, materials, installation, and workmanship as specified herein more than 5 feet outside of building walls.
2.2 MATERIALS
Provide materials conforming to the respective specifications and other
SECTION 33 30 00 Page 6 requirements specified below. Submit manufacturer's product specification,standard drawings or catalog cuts.
2.2.1 Gravity Pipe
2.2.1.1 PVC Gravity Sewer Piping
2.2.1.1.1 PVC Gravity Pipe and Fittings
AAWA C900 DR18 or thicker with ends suitable for elastomeric gasket joints.
Size 6 inch through 12 inch diameters.
2.2.1.1.2 PVC Gravity Joints and Jointing Material
Provide joints conforming to ASTM D3212. Gaskets are to conform to
ASTM F477.
2.2.2 Cement Mortar
Provide cement mortar conforming to ASTM C270, Type M with Type II cement.
2.2.3 Portland Cement
Submit certificates of compliance stating the type of cement used in manufacture of precast manholes. Provide portland cement conforming to ASTM C150/C150M, Type II or V for concrete used in manholes and type optional for cement used in concrete cradle, concrete encasement, and thrust blocking. Use air-entraining admixture conforming to ASTM C260/C260M with Type V cement.
2.2.4 Portland Cement Concrete
Provide portland cement concrete conforming to ASTM C94/C94M, compressive strength of 4000 psi at 28 days, except for concrete cradle and encasement or concrete blocks for manholes. Concrete used for cradle and encasement is to have a compressive strength of 2500 psi minimum at 28 days. Protect concrete in place from moisture loss for 7 days.
2.2.5 Precast Concrete Manholes
Provide precast concrete manholes, risers, base sections, and tops conforming to ASTM C478 and be manufactured in accordance with Section
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION; base and first riser are to be monolithic. Manhole walls and joints shall be watertight. Provide gasket for manhole joints as indicated in PARAGRAPH GASKETS AND CONNECTORS. Provide coating to walls and bench as indicated in PARAGRAPH MANHOLE COATING/LINING.
2.2.6 Gaskets and Connectors
Provide gaskets for joints between manhole and wet well sections conforming to ASTM C443. Resilient connectors for making joints between manhole wet well and pipes entering manhole are to conform to ASTM C923 or
ASTM C990.
2.2.7 External Preformed Rubber Joint Seals
An external preformed rubber joint seal is an accepted method of sealing cast iron covers to precast concrete sections to prevent ground water
SECTION 33 30 00 Page 7 infiltration into sewer systems. All finished and sealed manholes constructed in accordance with paragraph entitled "Manhole Construction" are to be tested for leakage in the same manner as pipelines as described in paragraph entitled "Leakage Tests." The seal is to be multi-section with a neoprene rubber top section and all lower sections made of Ethylene Propylene Diene Monomer (EPDM) rubber with a minimum thickness of 60 mils.
Each unit is to consist of a top and bottom section and have mastic on the bottom of the bottom section and mastic on the top and bottom of the top section. The mastic is to be a non-hardening butyl rubber sealant and seal to the cone/top slab of the manhole/catch basin and over the lip of the casting. Extension sections are to cover up to two more adjusting rings. Properties and values are listed in the following table:
Properties, Test Methods and Minimum Values for Rubber used in Preformed Joint Seals
Physical Properties Test Methods EPDM Neoprene Butyl Mastic
Tensile, psi ASTM D412 1840 2195 --
Elongation, percent ASTM D412 553 295 350
Tear Resistance, ppi ASTM D624 (Die B)
280 160 --
Rebound, percent, 5 minutes ASTM C972 (mod.) -- -- 11
Rebound, percent, 2 hours ASTM C972 -- -- 12
2.2.8 Manhole Inserts
a. Provide manhole inserts on new and modified manholes. Fully seat manhole insert around the manhole frame rim to prevent water from infiltrating between the cover and the manhole frame rim. Manhole frame shall be cleaned of all dirt and debris prior to placing the manhole insert on the rim.
b. Manhole insert material shall be of the type and dimensions suitable to seal manholes with Type "SA" cast iron manhole frames. The inserts shall be made of corrosion proof material suitable for atmospheres containing hydrogen sulfide and diluted sulfuric acid as well as other gases associated with wastewater collection. Manhole inserts shall be made of high density polyethylene copolymer material that meets ASTM D1248, Class A, Category 5, Type 111 (extra high molecular weight hexane copolymer).
The insert shall have a minimum impact brittleness temperature of -180 degrees F. The thickness shall be uniform 0.12 inch or greater. The insert shall be manufactured to the dimensions to fit manhole frame and cover indicated on the drawings to allow easy installation within the manhole frame. The material shall be firm enough such that the inserts will not fold and fall into the manhole due to any accumulation of debris and water. It shall also be resistant to environmental stress cracking. The gasket shall be made of closed cell neoprene. The gasket shall have pressure sensitive adhesive on one side and be placed under the weight bearing surface of
SECTION 33 30 00 Page 8 the manhole insert by the manufacturer. The adhesive must be compatible with the insert material to form a long lasting bond in wet or dry conditions.
c. A lift strap shall be attached to the rising edge of the bowl of the manhole inserts with a stainless steel rivet. The lift strap shall be made of one inch width woven polypropylene web and shall be seared on all cut ends to prevent unraveling. The lift strap shall be attached to the insert by means of a stainless steel rivet. Location of the lift strap shall be such as to provide easy visual location. Ventilation of the Insert shall be via a vent hole located on the side wall of the dish 3/4-inch below the lip. The hole thus placed allows a maximum release of 10 gallons per 24 hours and is not affected by debris that might collect at the bottom of the dish.
2.2.9 Manhole Coating/Lining
Coating/lining for manhole walls and manhole bench shall be ultra-high build, solvent free epoxy coating formulated for high physical use and chemical resistant. Coating shall meet the following requirements:
Test Test Methods Min. Requirements
Tensile Strength, psi ASTM D638 >9,000
Tensile Elongation,% ASTM D638 >6%
Compressive Strength, psi ASTM D695 >17,500
Flexural Strength, psi ASTM D790 >14,500
Hardness, Shore D ASTM D2240 >80
2.2.10 Sewer Cleanout
Cleanout shall be PVC pipe and installed on all building connections at the 5-foot line and on sewer lines where indicated on plans. Cleanout shall be 6 inches in diameter. Cleanout cap shall be brass countersunk plug type. Cleanout tops shall be provided with a 24-inch square or diameter by 6 inch thick concrete collar reinforced with #3 rebar on all sides.
2.2.11 Frames, Covers, and Gratings for Manholes
Frame and cover are to be cast gray iron, ASTM A48/A48M, Class 35B, and shall be cast to pattern with appropriate markings as shown on the drawings.
Frames and covers are to be circular with vent holes. Size are to be as indicated on the plans. Stamp or cast the words "Sanitary Sewer" into covers so that it is plainly visible. The bearing faces of the frames and covers shall be machined and fitted together to prevent rocking.
SECTION 33 30 00 Page 9
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Installation Drawings
Submit Installation Drawings showing complete detail, both plan and side view details with proper layout and elevations.
3.2 INSTALLATION
Backfill after inspection by the Contracting Officer. Before, during, and after installation, protect plastic pipe and fittings from any environment that would result in damage or deterioration to the material. Keep a copy of the manufacturer's instructions available at the construction site at all times and follow these instructions unless directed otherwise by the Contracting Officer.
3.2.1 Connections to Existing Lines
Obtain approval from the Contracting Officer, CQC Manager, Aqua Engineers, before making connection to existing manhole. Conduct work so that there is minimum interruption of service on existing line.
3.2.2 General Requirements for Installation of Pipelines
These general requirements apply except where specific exception is made in the following paragraphs entitled "Special Requirements."
3.2.2.1 Location
Terminate the work covered by this section at a point approximately 5 feet from the building, unless otherwise indicated.
3.2.2.1.1 Sanitary Sewer Manholes
No water piping shall pass through or come in contact with any part of a sanitary sewer manhole.
3.2.2.2 Earthwork
Perform earthwork operations in accordance with Section 31 00 00 EARTHWORK.
3.2.2.3 Pipe Laying and Jointing
Inspect each pipe and fitting before and after installation; replace those found defective and remove from site. Provide proper facilities for lowering sections of pipe into trenches. Lay nonpressure pipe with the bell ends in the upgrade direction. Adjust spigots in bells to give a uniform space all around. Blocking or wedging between bells and spigots will not be permitted. Replace by one of the proper dimensions, pipe or fittings that do not allow sufficient space for installation of joint material. At the end of each work day, close open ends of pipe temporarily with wood blocks or bulkheads. Provide batterboards not more than 25 feet apart in trenches for checking and ensuring that pipe invert elevations are as indicated. Laser beam method may be used in lieu of batterboards for the same purpose. Construct branch connections by use of regular fittings or solvent cemented saddles as approved. Provide saddles for PVC pipe conforming to Table 4 of ASTM D3034.
SECTION 33 30 00 Page 10
3.2.3 Special Requirements
3.2.3.1 Installation of PVC Piping
Install pipe and fittings in accordance with paragraph entitled "General Requirements for Installation of Pipelines" of this section and with the requirements of ASTM D2321 for laying and joining pipe and fittings. Make joints with the gaskets specified for joints with this piping and assemble in accordance with the requirements of ASTM D2321 for assembly of joints.
Make joints to other pipe materials in accordance with the recommendations of the plastic pipe manufacturer.
3.2.4 Concrete Work
Cast-in-place concrete is included in Section 03 30 00 CAST-IN-PLACE CONCRETE. Support the pipe on a concrete cradle, or encased in concrete where indicated or directed.
3.2.5 Manhole Construction
Construct base slab of cast-in-place concrete or use precast concrete base sections. Make inverts in cast-in-place concrete and precast concrete bases with a smooth-surfaced semi-circular bottom conforming to the inside contour of the adjacent sewer sections. For changes in direction of the sewer and entering branches into the manhole, make a circular curve in the manhole invert of as large a radius as manhole size will permit. For cast-in-place concrete construction, either pour bottom slabs and walls integrally or key and bond walls to bottom slab. No parging will be permitted on interior manhole walls. For precast concrete construction, make joints between manhole sections with the gaskets specified for this purpose; install in the manner specified for installing joints in concrete piping. Parging will not be required for precast concrete manholes.
Perform cast-in-place concrete work in accordance with the requirements specified under paragraph entitled "Concrete Work" of this section. Make joints between concrete manholes and pipes entering manholes with the resilient connectors specified for this purpose; install in accordance with the recommendations of the connector manufacturer. Where a new manhole is constructed on an existing line, remove existing pipe as necessary to construct the manhole. Cut existing pipe so that pipe ends are approximately flush with the interior face of manhole wall, but not protruding into the manhole.