W9128A-19-B-0002_Specifications_(Part_2_of_4).pdf
PDF 11 MB Posted
- Attached to
- Repair Building 3004, Schofield Barracks, Hawaii Federal contract opportunity
- Solicitation number
- W9128A19B0002
About this file
W9128A-19-B-0002 Specifications (Part 2 of 4)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19b2-BidAbstract.pdf | ||
| sf30-19b2-am4.pdf | ||
| sf30-19b2-am3.pdf | ||
| W9128A-19-B-0002_Am-0003_Drawings_Part2.pdf | ||
| W9128A-19-B-0002_Am-0003_Drawings_Part1.pdf | ||
| W9128A-19-B-0002_Am-0003_Specifications.pdf | ||
| W9128A-19-B-0002_Am-0002.pdf | ||
| W9128A-19-B-0002_Am-0001.pdf | ||
| W9128A-19-B-0002_Drawings_(Part_5_of_6).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_4_of_6).pdf | ||
| W9128A-19-B-0002_Invitation_for_Bid.pdf | ||
| W9128A-19-B-0002_Specifications_(Part_4_of_4).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_1_of_6).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_6_of_6).pdf | ||
| W9128A-19-B-0002_Specifications_(Part_3_of_4).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_2_of_6).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_3_of_6).pdf | ||
| W9128A-19-B-0002_Specifications_(Part_1_of_4).pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 02 - EXISTING CONDITIONS
02 84 16 - HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND MERCURY
| DIVISION 03 - CONCRETE |
| 03 01 30.71 - CONCRETE REHABILITATION |
| 03 11 13.00 10 - STRUCTURAL CAST-IN-PLACE CONCRETE FORMING |
| 03 15 00.00 10 - CONCRETE ACCESSORIES |
| 03 20 00.00 10 - CONCRETE REINFORCING |
| 03 30 00.00 10 - CAST-IN-PLACE CONCRETE |
| 03 35 00.00 10 - CONCRETE FINISHING |
| 03 37 13 - SHOTCRETE |
| 03 39 00.00 10 - CONCRETE CURING |
| 03 42 13.00 10 - PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION |
| DIVISION 05 - METALS |
| 05 12 00 - STRUCTURAL STEEL |
| 05 30 00 - STEEL DECKS |
| 05 50 13 - MISCELLANEOUS METAL FABRICATIONS |
| 05 51 00 - METAL STAIRS |
| 05 51 33 - METAL LADDERS |
| 05 52 00 - METAL RAILINGS |
| DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES |
| 06 10 00 - ROUGH CARPENTRY |
| 06 20 00 - FINISH CARPENTRY |
| 06 41 16.00 10 - PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS |
| 06 61 16 - SOLID SURFACING FABRICATIONS |
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION |
| 07 05 23 - PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS |
| 07 14 00 - FLUID-APPLIED WATERPROOFING |
| 07 21 16 - MINERAL FIBER BLANKET INSULATION |
| 07 22 00 - ROOF AND DECK INSULATION |
| 07 27 10.00 10 - BUILDING AIR BARRIER SYSTEM |
| 07 27 26 - FLUID-APPLIED MEMBRANE AIR BARRIERS |
| 07 52 00 - MODIFIED BITUMINOUS MEMBRANE ROOFING |
| 07 62 10 - COPPER SHEET METAL FLASHING |
| 07 62 13 - COPPER SHEET METAL FLASHING AND TRIM |
| 07 84 00 - FIRESTOPPING |
| 07 92 00 - JOINT SEALANTS |
| DIVISION 08 - OPENINGS |
| 08 11 13 - STEEL DOORS AND FRAMES |
| 08 14 00 - WOOD DOORS |
| 08 34 59 - VAULT DOORS AND DAY GATES |
| 08 34 73 - SOUND CONTROL DOOR ASSEMBLIES |
| 08 51 13 - ALUMINUM WINDOWS |
File details come from the government source that posted it.