W9128A-19-B-0002_Drawings_(Part_6_of_6).pdf

PDF 9 MB Posted

Attached to
Repair Building 3004, Schofield Barracks, Hawaii
Solicitation number
W9128A19B0002
Issued by

About this file

W9128A-19-B-0002 Drawings (Part 6 of 6)

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SB

E

E

E

E

J E

E J

E

J

J

E E

E E

EE

J

J

E

E E

J

E

V

V

V

V

V V

VV

V

V

V

J J

J

V

V

V

V

J

E

C

D

E

F

G

8 9 10 11 12 13 14 15

1SG 2

PLTN 2D

PLTN 2C

TRNG 2

OPEN OFC 2B

PLTN 2B

PLTN 2A

SECURE STOR 2

CONF RM

CONF STOR 2

NBC STOR 2

UNIT STOR 2

COMM STOR 2

MULTIPURPOSE

RM

CLASSROOM

ARMS RM 2

TELECOMM RM

WOMEN

STORAGE

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E P

M

A T

C H

LI

N

E

S E

E S

H E

E T

B

E P

MATCHLINE,

SEE SHEET C6 EP103

PROJECTOR

-2A1 10,12,14 10 12

18 20

-2A1 18,20

LFMC

PROJECTOR

PROJECTOR

SCREEN

-2A1 32,34,36

-2A1 22,24

22 24

22 22

-2A2 1,3,5

-2A2 16

LFMC

LFMC

FCU -8

1 MCA, 208V, 1 PH

DH 130

880W, 110V, 1 PH

LFMC

FCU -2-1

1 MCA, 208V, 1 PH

LFMC

WATER COOLER

-2MA 10

-2MA 6,8

PANEL "2AIT"

LFMCWATER COOLER

-2AIT 5

7,9

-2AIT 8,10

-2A2 15

-2A1 26,28,30

5,7

5,7

LFMC

-2MA 5,7

FCU -2-2

1 MCA, 208V, 1 PH

-2A1 16

LFMCLFMC

PROJECTOR

PROJECTOR

SCREEN

13,15 13,15

13,1513,15

FCU 155-3

0.69 MCA, 208V, 1 PH

FCU 155-4

0.69 MCA, 208V, 1 PH

FCU 155-2

0.69 MCA, 208V, 1 PH

FCU 155-1

0.69 MCA, 208V, 1 PH

FCU 153-3

1.2 MCA, 208V, 1 PH

FCU 153-1

1.2 MCA, 208V, 1 PH

FCU 153-2

1.2 MCA, 208V, 1 PH

FCU 153-4

1.2 MCA, 208V, 1 PH

17,19 17,19

17,19 17,19

-2MA 17,19

-2A2 17,21

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

STAIR

S102

CORRIDOR

100J

CORRIDOR

100H

CORRIDOR

100F

LFMC

-2A2 4

VENDING MACHINES

+84"

+84" 28+84"

+84"

+84"

+84"

-2AIT 7,9

-2AIT 1,3

8,10

-2AIT 2,4,6

+6" ABOVE

SINK

-2A2 6,8,10

+84"

+84"

+84"

+84"

+84"

+84"

+84"

-2MA 13,15

-2A1 32

LFMC

11,13

-2AIT 11,13

COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER.

MOUNT FLUSH ON UNDERSIDE OF CEILING. COORDINATE WITH

ARCHITECTURAL DRAWINGS.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP102

P A

R T

IA

L

G R

O U

N D

F

LO

O R

P O

W E

R P

LA

N

P

LA

N E

A S

T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL GROUND FLOOR POWER PLAN 1 - PLAN EAST

KEY PLAN

PLAN 1 -

PLAN EAST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

TRUE NORTH

PLAN NORTH

E

E

E

J

E E E E

J

J

E

J

J

E

E

E

E

E

V

V V

V

V

V

E

J

J

E

E J

E

E

E J

E

E

J

E

J

E

E

E

J

JE

E

A

B

C

3 4 5

ARMS RM 1

MEN

WOMEN

MECH

MATCHLINE,

SEE SHEET A1 EP101

-2A2 14

LFMCLFMC

FCU -7

1 MCA, 208V, 1 PH

DH 102

880W, 110V, 1 PH

LFMC

SF 1-01

1/4 HP, 115V, 1 PH

-2A2 12

-2MA 1,3 -2MA 12

18WATER HEATER

1.5A, 120V 1 PH

FIRE RISER

LFMC

LFMC

-2MA 18

LFMC LFMC LFMC

-2MA 33,35 -2MA 21,23 -2MA 25,27

-2MA 29,31

ACCU-7

15.0 MCA, 208V, 1 PH

ACCU-1

20.0 MCA, 208V, 1 PH

ACCU-2-1

14.1 MCA, 208V, 1 PH

ACCU-2-2

14.1 MCA, 208V, 1 PH

LFMC

WP

+6" ABOVE SINK

+6" ABOVE SINK

EF 1-01

1/6 HP, 115V, 1 PH

LFMC

-2MA 14

LFMC

12TP-2-1

0.28A, 120V, 1 PH

-2MA 24

HWP-2

1/8 HP, 115V, 1 PH

LFMC

-2MA 32,34,36

BP-1

27 FLA, 208V, 3 PH

C

D

E

F

G

15 16

MECHANICAL

OPEN OFC 2A

STORAGE

XO 2

CMDR 2

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E P

-2A2 7,9,11

13 13

AHU 138

3 HP, 460V, 3 PH

DOAS 138

1.5 HP, 460V, 3 PH

+84"

+84"

+84"

+84"

LFMC

TP-3-2

0.28A, 115V, 1 PH

+84"

-2A2 13

LFMC

-2MA 30

LFMC

UV LIGHT

-4A 20,22,24

LFMC -2MA 38

VAV XFMR

-4A 14,16,18

UV LIGHT

A

B

C

12 13

MECHANICAL

MEN

MATCHLINE,

SEE SHEET A1 EP102

EF 1-02

1/6 HP, 115V, 1 PH

LFMC

LFMC

WATER HEATER

1.5A, 170V, 1 PH

-2MA 20

+6" ABOVE SINK

LFMC

-2MA 16

SF 1-02

1/10 HP, 115V, 1 PH LFMC

LFMC

LFMC

LFMC

-4NDSB 7,9,11

-4NDSB 1,3,5

-4NDSB 2,4,6

CHWP 1-1

5 HP, 460V, 3 PH

CHWP 1-2

5 HP, 460V, 3 PH

CHWP 1-3

5 HP, 460V, 3 PH

DDC PANEL 1

-2MA 26

LFMC

LFMC

TP-2-2

0.28A, 120V, 1 PH

-2MA 22

HWP 1

1/25 HP, 115V, 1 PH

COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP103

P A

R T

IA

L

G R

O U

N D

F

LO

O R

P O

W E

R P

LA

N

A

N D

P L A

N E

A S

T A

N D

W E

S T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"C1 PARTIAL GROUND FLOOR POWER PLAN 2 - PLAN WEST

3/16" = 1'-0"B8 PARTIAL GROUND FLOOR POWER PLAN 2 - PLAN EAST

3/16" = 1'-0"C6 PARTIAL GROUND FLOOR POWER PLAN 3 - PLAN EAST

KEY PLAN

PLAN 2 -

PLAN WEST

PLAN 3 -

PLAN EAST

PLAN 2 -

PLAN EAST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

J

J

E

E

E

JE

E J

V

V

V

V

V V

V

V V V V V

V

V

V

V

V V V

E

E

J

E

C

D

E

F

G

1 2 3 4 5 6 7 8

S-4 OIC

S-4 MAINT

S-4 PBO

CMD SUPPLY

BN XO

BN CMDR

CMD OPEN

OFFICE

S-4 OPEN OFFICE

S-4 STOR

STORAGE

CMD RESTROOM

BN CSM

FRSA

DUTY

RETENTION NCO

ASST CHAPLAIN

MECHANICAL

NURSING

228CMD CONF RM

S-1/S-4 CONF RM

FIRE RISER

S-1 OPEN OFFICE

STORAGE

CLASSROOM

STOR

S-1 STOR

S-1 OIC

ELECTRICAL RM

BREAK RM

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E P

MATCHLINE,

SEE SHEET D1 EP106

EP401

D4

-2B1 7,9,11

CHAPLAIN

-2B1 2,4,6

-2B1 8,10,12

-2B1 14,16,18

18 14

38 38

-2B1 1,3,5

-2B1 13,15

PROJECTOR

PROJECTOR

SCREEN

-2B1 31

-2B1 33

LFMC

LFMC

PROJECTOR

PROJECTOR

SCREEN

-2B2 6,8

-2B2 2

LFMC

AHU 229

5 HP, 460V, 3 PH

DOAS 229

3 HP, 460V, 3 PH

LFMC

WATER COOLER

EF-213

-2MB 4

-2B2 18

-4B 19,21,23

STAIR

S201

CORRIDOR

200D

CORRIDOR

200B

-2B1 17,19,21

+6" ABOVE

COUNTER

REFRIG

+84"

+84"

+84"

+84"

-2B1 37,38

+84"

+84"

+84" 6

+84"

+84"

2+84" +84"

+84"

+84"

+84"

+6" ABOVE

SINK

-2BIT 5

+84"

+84"

+84" +84"

LFMC

-4B 13,15,17

LFMC

-2B1 35

-2B1 23,25

-2B1 27,29

LFMC

-2MB 12,14

UV LIGHT

UV LIGHT

VAV XFMR

COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER.

MOUNT FLUSH ON UNDERSIDE OF CEILING. COORDINATE WITH

ARCHITECTURAL DRAWINGS.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP104

P A

R T

IA

L

S E

C O

N D

F

LO

O R

P O

W E

R P

LA

N

P

LA

N W

E S

T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL SECOND FLOOR POWER PLAN 1 - PLAN WEST

KEY PLAN

PLAN 1 -

PLAN WEST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

E

E

E J

E

E E

E

J

J

E E

E J

E

EE

J

J

E J

E

V

V

V

V

J

V V

EJ

E

C

D

E

F

G

8 9 10 11 12 13

CLASSROOM

MECHANICAL

S-2 OPEN OFFICE

MULTIPURPOSE

RM

SEC DOC RM

STORAGE

RECYCLE

FUTURE SIPR

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E P

M

A T

C H

LI

N

E

S E

E S

H E

E T

B

E P

MATCHLINE,

SEE SHEET A1 EP106

PROJECTOR

SCREEN

26 28

-2B1 26,2824

24 20

-2B2 14

AHU 240

5 HP, 460V, 3 PH

-2B1 30,32

30 30

-2B2 4

-2B2 1,3,5

LFMC

FCU -4

1 MCA, 208V, 1 PH

-2BIT 10,12

LFMC

WATER COOLER

-2B2 16

FCU 252-1

1.2 MCA, 208V, 1 PH

5,7

5,7 5,7

FCU 252-3

1.2 MCA, 208V, 1 PH

5,7

FCU 252-4

1.2 MCA, 208V, 1 PH

FCU 252-2

1.2 MCA, 208V, 1 PH

-2MB 5,7

FCU 254-2

0.69 MCA, 208V, 1 PH

LFMC

LFMC

PROJECTOR PROJECTOR

9,11 9,11

9,11 9,11

-2B1 36

-2B1 20,22,24

LFMC

PANEL "2BIT"

LFMC

1,3

FCU -3

1 MCA, 208V, 1 PH

WATER COOLER

TELECOMM RM

1,3

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

CORRIDOR

200B

STAIR

S202

CORRIDOR

200F

CORRIDOR

200H

-2B2 20,22 VENDING

MACHINES

FCU 254-1

0.69 MCA, 208V, 1 PH

FCU 254-4

0.69 MCA, 208V, 1 PH

FCU 254-3

0.69 MCA, 208V, 1 PH

+84"

+84"

+84"

-2BIT 5

-2MB 1,3

2 4 6

7,9 11,13

-2BIT 2,4,6

-2BIT 7,9,11,13

RACK 1

+84"

+84"

LFMC

-4B 14,16,18

-2MB 9,11

LFMC

UV LIGHT

VAV XFMR

-2MB 8,10

14,16

-2BIT 14,16

COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER.

MOUNT FLUSH ON UNDERSIDE OF CEILING. COORDINATE WITH

ARCHITECTURAL DRAWINGS.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP105

P A

R T

IA

L

S E

C O

N D

F

LO

O R

P O

W E

R P

LA

N

P

LA

N E

A S

T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL SECOND FLOOR POWER PLAN 1 - PLAN EAST

KEY PLAN

PLAN 1 -

PLAN EAST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

J

E

V V

V

V

V

V

V

V

J

J

A

B

C

4 5

MEN

FIRE RISER

WOMEN

MATCHLINE,

SEE SHEET A1 EP104

LFMC

EF 2-01

1/4 HP, 115V, 1 PH

-2B2 10

-2MB 2

+6 ABOVE

SINK

+6 ABOVE

SINK

A

B

C

12 13

MEN

JAN

WOMEN

MATCHLINE,

SEE SHEET A1 EP105

EF 2-02

1/2 HP, 115V, 1 PH

LFMC

-2MB 6

+6 ABOVE

SINK

+6 ABOVE

SINK

-2B2 12

C

D

E

F

G

13 14 15 16

S-3 OIC

S-3 OPS SGT

S-3 STOR

S-6 OPEN OFFICE

S-6 OIC

S-2 OIC

S-2 STOR

S-6 STOR

S-3 OPEN OFFICE

S-3 CONF RM

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E P

9 7 11 9

-2B2 25,27

212321

-2B2 21,23

15 13

131513

-2B2 13,15

-2B2 29,31

LFMC

-2B2 33

PROJECTOR SCREEN

PROJECTOR

19 17

+84"

+84"

19+84"

+84"

+84"

+84"

-2B2 24

-2B2 7,9,11

+84"

3 5

+84"

-2B2 17,19

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP106

P A

R T

IA

L

S E

C O

N D

F

LO

O R

P O

W E

R P

LA

N

A

N D

P L A

N E

A S

T A

N D

W E

S T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"D1 PARTIAL SECOND FLOOR POWER PLAN 2 - PLAN WEST

3/16" = 1'-0"A1 PARTIAL SECOND FLOOR POWER PLAN 3 - PLAN EAST

3/16" = 1'-0"B6 PARTIAL SECOND FLOOR POWER PLAN 2 - PLAN EAST

KEY PLAN

PLAN 2 -

PLAN

EAST

PLAN 3 -

PLAN EAST

PLAN 2 -

PLAN WEST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

E E

E J

E

J

V

V

V

V

V

V V

V V V

V V

V

V V V V

V

V

V

V

V

V V

V

E

J E

V

J E

E

E

C

D

E

F

G

1 2 3 4 5 6 7 8

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E P

MATCHLINE,

SEE SHEET D1 EP109

S-4 OIC

S-4 PBO

S-4 MAINT

S-4 FOOD SVC

S-4 FINANCE

S-4 OPEN OFFICE

BDE DCO

CMD RESTROOM

BDE CSM

CMD OPEN

OFFICE

BDE CMDR

BDE XO

317 CMD STOR

FRSA

ID NCOIC

RETENTION NCO

ASST CHAPLAIN

CHAPLAIN

S-1 HR TECH

S-1 NCOIC

S-1 OIC

CMD CONF RM

S-4 STOR

MECHANICAL

BREAK RM

ELECTRICAL RM

S-1 STOR

SHARP

EO

S-1 OPEN OFFICE

CORRIDOR

300F EP401

D8

-2C1 33,35,37

4 6

-2C1 2,4,6

-2C1 8,10,12

-2C1 14,16

-2C1 24,26,28

-2C1 18,20,22

221820

-2C2 2

-2C1 32,34

-2C1 17,19

5 1

1 3

-2C1 7,9

9 11

-2C1 11,13,15

PROJECTOR

PROJECTOR

SCREEN

-2C1 27

LFMC

DOAS 328

1.5 HP, 460V, 3 PH

AHU 328

7.5 HP, 460V, 3 PH

LFMC

WATER

COOLER

-2C3 1

LFMC EF 304

-2MC 4

STAIR

S301

CORRIDOR

300B

CORRIDOR

300D

+6" ABOVE

COUNTER

FIRE RISER

REFRIG

+84"

+84"

+84"

+84"

+84"

+84"

10 12 +84"+84"

+84"

+84" 26 28

+84"

+84"

+84"

+84"

+84"

+6" ABOVE

SINK

+84"

+84"

+84"

+84"

+84"

+84"

+84"

+84"

+84"

TP-2-3

0.28A, 120V, 1 PH

LFMC

+84"

-2C1 30

-2C1 21,23,25

+84" -4C 13,15,17

-4C 19,21,23

LFMC

-2MC 17,19

UV LIGHT

VAV XFMR

UV LIGHT

-2C1 1,3,5

COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER.

MOUNT FLUSH ON UNDERSIDE OF CEILING. COORDINATE WITH

ARCHITECTURAL DRAWINGS.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP107

P A

R T

IA

L

T H

IR

D

F

LO

O R

P O

W E

R P

LA

N

P L A

N W

E S

T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL THIRD FLOOR POWER PLAN 1 - PLAN WEST

KEY PLAN

PLAN 1 -

PLAN WEST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

J E

E

J E

E

J

V

VV

V

V V

V

E J

E

J E

JE

E

E

C

D

E

F

G

8 9 10 11 12 13

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E P

M

A T

C H

LI

N

E

S E

E S

H E

E T

B

E P

MATCHLINE,

SEE SHEET A1 EP109

LEGAL SJA

S-2 OIC

S-2 SEC STOR

S-6 OIC

S-6 OPEN OFFICE

LEGAL OPEN

OFFICE

CORRIDOR

300F

LEGAL STOR

LEGAL NCOIC

S-2 OPEN OFFICE

S-6 STOR

S-3 STOR

S-2 STOR

RECYCLE

FUTURE SIPR

MECHANICAL

-2C2 6,8,10

-2C2 4

-2C2 27

-2C2 1,3

-2C2 5,7,9

9 17

-2C2 17,19

-2C2 21,23,25

23 25

252123

11 13 15

-2C2 11,13,15

15 17

LFMC

FCU -6

1 MCA, 208V, 1 PH

LFMC

WATER COOLER

LFMC

LFMC

DOAS 340

1.0 HP, 460V, 3 PH

AHU 340

5 HP, 460V, 3 PH

PANEL "2CIT"

-2CIT 10,12

-2C3 3

LFMC

WATER COOLER

7 5

-2C3 5,7

LFMC

FCU -5

1 MCA, 208V, 1 PH

TELECOMM RM

-2CIT 5

-4C 20,22,24

STAIR

S302

CORRIDOR

300B

CORRIDOR

300H

VENDING MACHINES

+84"

+84"

+84"

+84"

-2MC 1,3

2 4 6

-2CIT 2,4,6

7,9 11,13

-2CIT 7,9,11,13

1,3

1,3

RACK 1

+84"9

+84"

+84"

-4C 14,16,18

LFMC

TP-2-4

0.28V, 120V, 1 PH

LFMC 4

20 LFMC

LFMC

LFMC

UV LIGHT

VAV XFMR

UV LIGHT

-2MC 18,20

14,16

-2CIT 14,16

COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP108

P A

R T

IA

L

T H

IR

D

F

LO

O R

P O

W E

R P

LA

N

P L A

N E

A S

T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL THIRD FLOOR POWER PLAN 1 - PLAN EAST

KEY PLAN

PLAN 1 -

PLAN EAST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

J E

E

J E

J

E

V

V V

V

V

V

V

V

V

V

V

J

A

B

C

4 5

MATCHLINE,

SEE SHEET A1 EP107

MEN

WOMEN

LFMC

EF 3-01

1/4 HP, 115V, 1 PH

-2MC 2

-2C3 2

FIRE RISER

CORRIDOR

300A

+6 ABOVE

SINK

+6 ABOVE

SINK

LFMC

TP-4-1

0.28V, 120V, 1 PH

A

B

C

12 13

MATCHLINE,

SEE SHEET A1 EP108

MEN

JAN

WOMEN

EF 3-02

1/2 HP, 115V, 1 PH

LFMC

-2MC 6

-2C3 4

+6 ABOVE

SINK

+6 ABOVE

SINK

TP-4-2

0.28V, 120V, 1 PH

LFMC 4

C

D

E

F

G

13 14 15 16

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E P

SURGEON

S-3 OPS SGM

S-3 OIC

S-3 PLANS

S-3 CHOPS

S-3 TRAINING

S-3 CONF RM

SURGEON OPEN

OFFICE

S-3 OPEN OFFICE

-2C2 29

31 31

35 37

-2C2 32,34,36

-2C2 35,37

PROJECTOR

PROJECTOR SCREEN

-2C2 38

LFMC

-2C2 14,16,18

14 16

-2C2 28,30

-2C2 20,22

24 26

-2C2 24,26

+84"

+84"

+84"

+84"

+84"

28+84"

+84"

+84"

34+84"

+84"

-2C2 31,33

COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER.

MOUNT FLUSH ON UNDERSIDE OF CEILING. COORDINATE WITH

ARCHITECTURAL DRAWINGS.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP109

P A

R T

IA

L

T H

IR

D

F

LO

O R

P O

W E

R P

LA

N

A

N D

P L A

N E

A S

T A

N D

W E

S T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"D1 PARTIAL THIRD FLOOR POWER PLAN 2 - PLAN WEST

3/16" = 1'-0"A1 PARTIAL THIRD FLOOR POWER PLAN 3 - PLAN EAST

3/16" = 1'-0"B6 PARTIAL THIRD FLOOR POWER PLAN 2 - PLAN EAST

KEY PLAN

PLAN 2 -

PLAN

EAST

PLAN 3 -

PLAN EAST

PLAN 2 -

PLAN WEST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

E

E

E

C

D

E

F

G

8 9 10 11 12 13

ACCU - 4

15.0 MCA, 208V, 1 PH

ACCU - 8

15.0 MCA, 208V, 1 PH

ACCU - 5

14.1 MCA, 208V, 1 PH

ACCU - 6

15.0 MCA, 208V, 1 PH

LFMC

LFMC

LFMC

LFMC

-2MC 13,15

-2MC 8,10

-2MC 12,14

-2MC 9,11

LFMC

ACCU - 3

14.1 MCA, 208V, 1 PH -2MC 5,7

WP 16

-2MC 16

COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER.

CONSOLIDATE CONDUITS AND PENETRATE ROOF IN ONE LOCATION.

SEE ARCHITECTURAL DRAWINGS FOR ROOF PENETRATION DETAILS.

NOTES:

2.

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP110

P A

R T

IA

L

R O

O F

P O

W E

R P

LA

N

P

LA

N E

A S

T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL ROOF POWER PLAN 1 - PLAN EAST

KEY PLAN

PLAN 1 -

PLAN EAST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

SB SBSBSB SB

S

J

J

S

J

S

J

C

D

7 8

ELECTRICAL RM

480/277V DISTRIBUTION

SWITCHBOARD "4NDSB"

PANEL "4A"

PANEL "2A2"

T

PANEL "2A1"

PANEL "2A3"

PANEL "2MA"

T

PANEL "2IT"

LFMC

45 KVA

TRANSFORMER "2IT"

208/120V DISTRIBUTION

SWITCHBOARD "2NDSB"

300 KVA DRY-TYPE

TRANSFORMER "2A"

DIST

(ELEC)

MAIN CKT

BREAKER

DIST

(ELEC)

MAIN CKT

BREAKER

-2A1 33

LIGHTING

RELAY PANEL

TO PAD MOUNTED

TRANSFORMER

D

7 8

ELECTRICAL RM

PANEL "4B"PANEL "2B1"

PANEL "2B2"PANEL "2B3"

PANEL "2MB"

-2B1 34

34 34

D

7 8

ELECTRICAL RM

PANEL "4C"

PANEL "2C1"

PANEL "2C2"

PANEL "2MC"

PANEL "2C3"

36 36

-2C1 36

-2A3 7,9

PIT LIGHT TYPE I,

+72" ABOVE PIT

FLOOR

SUMP PUMP, +42"

ABOVE PIT FLOOR

GFCI PIT RECEPTACLE,

+42" ABOVE PIT FLOOR,

WP

WP

WP

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EP401

E N

LA

R

G E

D G

R O

U N

D , S

E C

O N

D A

N D

T H

I R D

F L O

O R

E

LE

C T

R

IC

A L

R M

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

1/4" = 1'-0"D1 ENLARGED GROUND FLOOR ELECTRICAL RM

1/4" = 1'-0"D4 ENLARGED SECOND FLOOR ELECTRICAL RM

1/4" = 1'-0"D8 ENLARGED THIRD FLOOR ELECTRICAL RM

0 2' 4' 8'

SCALE: 1/4" = 1'-0"KEY PLAN

TRUE NORTH

1/4" = 1'-0"A1 ENLARGED ELEVATOR PIT ELECTRICAL PLAN

S

S

S

S

S S

S

S

S

S

S

S

S

S S

S

S

J

J

J

J

J

J

J

OS

OS

RC

J

J

J

J

J

J

J

J J

JJ

JJ OS

JJ

RC J

OS

J

J

J RC

J

J

S

RC

OS

J

OS

J

OS

J J

OS

J

RC

OS

J

RC

J

OS OS

J J

RC

OS

J

RC

OS

OS

J

RC

J J

RC

OS OS

SS

S

J

J

J

J J

S J

S

OS

S

OS

J

RC

OS

V

V

V

V

V V

V

V V

V

V

J

J J

J

J

J J

J

J

J

J J

DS DS

V

V V

V

RC

OS

C

D

E

F

G

1 2 3 4 5 6 7 8

MECHANICAL

XO 1

TRNG 1

PLTN 1A

NBC STOR 1

UNIT STOR 1

COMM STORAGE 1

OPEN OFC 1B

PLTN 1C

SECURE STOR 1

CLASSROOM

ELEV MACH RM

BREAK RM

ELECTRICAL RM

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E L1

MATCHLINE,

SEE SHEET C1 EL103

OPEN OFC 1A

1SG 1

PLTN 1B

CMDR 1

CONF STOR 1

PLTN 1D

OPEN OFC 1B

CONF RM

A3

A3

A3

A3 A3

A3

A3

EM

A3

A3

A3

A3

A3

EM

A1 A1

EM

A3

A3

EM

A3

A3

G

G G

GG

G-EM

G G

G

A1

EM

A1

G

G G-EM

G G

G

H-EM

G G

A1

EM

A1 A1

EM

A1 A1

A1

EM

A1

A1

EMA1

A1

A1

EM

A1

A3

EM

A3

A3

EM

A3

A3

A3

EM

A3 A1

EM

A1

A1

EM

A1

A1 A1

A1

EM

A1

G

G G

G

G

A1

EM

A1

A2

A2

A2

A2

A2 A2

EM

A2 A2

A2

A2

EM

A2

A2

G

A1 A1

EM

A1

A1

G-EM

G

G

G-EM

A1

EM

A2 A2

A2 A2

EM

A2 A2

A2 A2

EM

OS5

OS5

OS5 B

EM

OS5 OS5

OS5

OS5

OS5

OS5

OS5

OS5

A1

OS5

A2

EM

A2

A2

A2

BB

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

SW1

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

SW1

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

CLASSROOM

LFMC

LFMCLFMC

LFMC

LFMC

LFMCLFMC

LFMC

OS5

LFMC LFMC

LFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC LFMC LFMC LFMC

LFMC

LFMC

LFMC

LFMC

STAIR

S101

LFMC

LFMC

LFMC

LFMC

SW1

LV

LV

OS2

OS4

OS4

LV

SW1

OS2

OS2

LV

LV

OS8 OS8

LV

LV

OS5OS5

OS2

OS2

OS2OS2

OS2

OS2

OS2 OS2

5 *

5 *

5 *

5 *

5 *

5 *

5 *

5,5*

5 *

5,5*

5 *

5 *

5 *

5 *

5 *

5 *

5,5*

5 *

5,5*

5 *

5 *

5 *

5 *

5 *

5 *5 *5 *

5 *

5 *

5,5*

5,5*

5,5*

OS5

5 *

5 *

5 *

-4A 5

7 * 7 * 7 *

7 *7 *

7 * 7 * 7 *

7 *7 *

7,7*

7,7*7

7 G G 7

7,7*

7,7*7 *

7 * 7 *

7 *

7 * 7 *

7 *

7 *

7 *

7 *7 *

7 *

7,7*

7,7*

-4A 7

7 *

1,1*

1 *

1,1*

1 1,1* 1 * 1 * 1 *

1,1*

1,1*1 * 1 * 1 * 1 *

LV

1,1*

1 *

1,1*

LV

1 *

1 *1,1*1,1* 1 *

LV

1 *

1 *

3 *

3,3*

3 *

3 *

3 * 3 *

3 *

3 *

SW1

3,3*

UP TO SECOND FLOOR

3 *3 * 3 *

3 *

3 * 3 *

3 *

LV 3

-4A 3

1 *1 * C C

C C 1 * 1 *

1,1*

7,7*

OS5

OS8

LV

OS5

OS8

LV

3,3*

OS4

RC2

OS8

A1 1 *

1 *

A1

I

I

I

I

I I

I

I

I

I

I

1NL

-2A3 1

1NL1NL

1NL

1NL

1NL

1NL 1NL

1NL

1NL

3NL

RC-2

RC-2

RC-4

b b a a a a a a a

LV

RC-4

a a c c c c c c c

RC-4

LV

d e e e e e

LV

RC-4

7 *

AT 11'-0" A.F.F.

(TYP)

d

RC-4

LV

d b b b b a a

LV

b b

RC-4

SW5

RC-4

SW5

RC-4

b b a a a a b b b b b b a a a a b a a b

LV

Pc-1

LV

Pc-1

5,5*

5,5*

RC-4

OS8

5,5*

VIA LIGHTING

RELAY PANEL

2A3-3, VIA LIGHTING

RELAY PANEL

INDICATES CONTROLLED BY LIGHT SWITCH AND/OR OCCUPANCY

SENSOR LOCATED IN THE SAME ROOM OR HALLWAY. SEE LIGHTING

CONTROL DEVICE SCHEDULE AND LIGHTING CONTROL WIRING

DIAGRAM ON SHEET E-603.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EL101

P A

R T

IA

L

G R

O U

N D

F

LO

O R

L

IG

H T

IN

G

P

LA

N

P

LA

N

W E

S T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL GROUND FLOOR LIGHTING PLAN 1 - PLAN WEST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"KEY PLAN

PLAN 1 -

PLAN WEST

S S S S

S

S

SS

S

S

S

S

S

S

S

J

J

OS

RC

J

J

OS

RC

J

J J

J J

RC

OS

RC

J

OS

S

OS

OS

RC

RCJ

J

J J J J

OS OS RC

J

OS

JJ

OS

RC

J J

OS RC OS

OS OS

RC

J

S

J

OS RC

J

OS

J J

OS

OSRC

S

J J

J

J

J

S

J

S

J

OS OS

OS

J

V

V

V

V

V V

VV

V

V

V

J

J J J

J

J J

J

J J

OS

OS

J

RC

DS DS

DS

S

S

V

V

V

V

OS

RC

C

D

E

F

G

8 9 10 11 12 13 14 15

CLASSROOM

TELECOMM RM

ARMS RM 2

WOMEN

STORAGE

MULTIPURPOSE

RM

COMM STOR 2

UNIT STOR 2

NBC STOR 2

SECURE STOR 2

CONF RM

PLTN 2A

TRNG 2

PLTN 2C

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E L1

M

A T

C H

LI

N

E

S E

E S

H E

E T

B

E L1

MATCHLINE,

SEE SHEET C5 EL103

CONF STOR 2

PLTN 2B

PLTN 2D

1SG 2

OPEN OFC 2B

H

H-EM

H-EM

H

A1

EM

A1 A1 A1

EM A1

A1 A1

EM

GG

G-EM

G G G G G

A1

A1

A3

EM

A3

A3

EM A3

A3

A3A3

A3

A1

A1

EM

A1

EM

A1

A2

EM

A2

A2

EM

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

EM

A2

A2

EM

A2

A2

EM

A2

A2

EM

A2

A2

A2

A2

A2

A2

EM

A2

A2

EM

A2

A

A1

A1

A1

EM

A1

EM A1

A1

A1

EM

A

A1

EM

A1

EM

A1

A1

EM

A1A1A1

EM

A2

A2

EM

A2

EM

A2

A2

A2

A2

EM

A2

A3

A3

EM

A3

A3

A3

EM

A3

A3

EM

H-EM

GG G G G

G

G-EM G

G

G

G

G-EM G

G

G

OS5

OS5

OS5OS5

OS5

OS5

OS5

OS5OS5

G

STAIR

S102

CLASSROOM

LFMCLFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

SW1

OS5

C C

LFMC

LFMC LFMC

LFMC

C C

LFMC

LFMC

C

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

C C

OS5

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

OS8 OS8

LV

LV

OS8

LV

OS8

SW1

LV

OS4

OS4LV

LV

SW1

LV

OS4

OS4

OS2 OS2

OS2

OS2

OS2 OS2

OS2

OS2

OS2

OS2

OS5

4 * 4 *

4 *

4 * 4 *

4 *

4,4*

4,4*

4 -4A 4

LV

4 * 4 *

4 *

4 * 4 *

4 *

4,4*

4,4*

4 *

LV

4 * 4 *

4 *

4 *

4 * 4 * 4 *

4 *

4,4*

4,4*

4,4*

4,4*

4 4 * 4

1,1*

1 *

1,1*

4 * 4 * 4 *

4 *

4 *

4 *

4 *

4,4*

4,4*

4,4*

4 *

4 *

6 *

6 *

-4A 6

6 *

6,6*

6 *

6,6*

6 *

6 *

6 * 6 *

6 *

6 *

1,1*

1,1*

1,1*

1 * 1 * 1 *

11 *

1,1*

1 *

1 *

1 1 *

1 *1 *

1 *

1 *

1,1*

1 *1 *

1 * 1 *

1,1*

1 *

1,1*

1,1*

1,1*

1 *1 *1,1*

1 *1 * 1

2 *

2 *2 *

2 *2 *

2 *

2 *

SW12

2 *

2 *

SW1

2,2*

CC

C

EM

C

EM

-4A 2

2,2*

2 * 2,2*

2 *

2 * 2 * 2 *

2 *2 *

G-EM

2,2*

2,2*

2 * 2 *

2 *

2 *

2,2* C 2 *

UP TO SECOND FLOOR

2,2*

4,4*

OS8

LV

OS8

LV

OS8

LV

G-EM

2,2*

I

I

I

III

2,2*

1NL

3NL 3NL 3NL

3NL

3NL

I 3NL

I 3NL 3NLI

e

RC-2

RC-4

RC-4 RC-4

f h h

RC-4

h

RC-2

RC-4i i i i

LV

i i f f g g g g g g g

LV

RC-4

e e e e e e

LV

LV

b b a a b b b b f f

LV

LV

Pc-1

A.F.F.9' - 0"

LV

Pc-1

LV

Pc-1a a aa bb bb

RC-4

SW5 SW5

b b b b a a a a

SW5 SW5

b b b b b b a a a a aa

LV

RC-2

OS5

OS5

RC-4

RC-4 4

6,6*

6,6*

6,6*

RC-4

OS8

RC-4

INDICATES CONTROLLED BY LIGHT SWITCH AND/OR OCCUPANCY

SENSOR LOCATED IN THE SAME ROOM OR HALLWAY. SEE LIGHTING

CONTROL DEVICE SCHEDULE AND LIGHTING CONTROL WIRING

DIAGRAM ON SHEET E-603.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EL102

P A

R T

IA

L

G R

O U

N D

F

LO

O R

L

IG

H T

IN

G

P

LA

N

P

LA

N

E A

S T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL GROUND FLOOR LIGHTING PLAN 1 - PLAN EAST

KEY PLAN

PLAN 1 -

PLAN EAST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

OS

RCJ

S

OS

S

S

OS

RC

J

RCJ

OS

S

J

J

OS

RC

J

S

OSS

JJ

J

J J

J

J

OS

S

S

J

J

J

J

J

J

J

J

RC

OS

OS

S

S

SS

J

OS S

OS

RC

J

V

V V

V

V

V

J

J

J

J

A

B

C

3 4 5

ARMS RM 1

MEN

MECH

MATCHLINE,

SEE SHEET A1 EL101

G

G-EM

G G G

G-EMG-EM

G G

OS5

G

C

C

C

EM

C

C C

EM

CC

EM

C C

LFMC

LFMC

OS2

SW1

SW1

OS2

OS2

OS2

OS5

G

G

3 *

3 *

1 *

1,1*

3 *

3 *

3,3*

3 *

3 *

LV

3,3*

3 * 3 *

3 * 3,3*

3 *

3 * 3 * 3 *

3 * 3 *

OS5

LV

3,3*

LV

SW1

3,3* 3,3*

G-EM

II

I

1NL1NL

1NL

I 1NL 1NLI

I

1NL

RC-2

RC-2

LV

RC-2

RC-2

A

B

C

12 13

MECHANICAL

MEN

MATCHLINE,

SEE SHEET A1 EL102

G

G

G G

C

EM

C

EM

C C

C

C

OS5

SW1

OS2

2 *

2 *

2 *

2 *

2 * 2 *

2 *

2 *

2,2*

2,2*

I

3NL

I

3NL

I 3NL

I

3NL

LV

C

D

E

F

G

15 16

XO 2

MECHANICAL

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E L1

CMDR 2

OPEN OFC 2A

A3

A3

A3

A3

EM

A3

A3

A3

A3

G

G G

G-EM

G

G G

B

EM

OS5

OS5

OS5

LFMC

LFMC

LFMC

LFMC

LFMC

OS2

OS2

LV

LV

SW1

OS4

OS4

SW1

6 *

6 *

6 *

6 *

6 *

6 *

6,6*

6 *

6,6*

6 *

6 * 6 *

6 *

6 *

LV

6,6*

6 *

3NLI

I

3NL

I

3NL

I

3NL

RC-2

RC-4

INDICATES CONTROLLED BY LIGHT SWITCH AND/OR OCCUPANCY

SENSOR LOCATED IN THE SAME ROOM OR HALLWAY. SEE LIGHTING

CONTROL DEVICE SCHEDULE AND LIGHTING CONTROL WIRING

DIAGRAM ON SHEET E-603.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EL103

P A

R T

IA

L

G R

O U

N D

F

LO

O R

L I G

H T

IN

G

P

LA

N

A N

D

P

L A N

E A

S T

A N

D W

E S

T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"C1 PARTIAL GROUND FLOOR LIGHTING PLAN 2 - PLAN WEST

3/16" = 1'-0"C5 PARTIAL GROUND FLOOR LIGHTING PLAN 3 - PLAN EAST

3/16" = 1'-0"B7 PARTIAL GROUND FLOOR LIGHTING PLAN 2 - PLAN EAST

KEY PLAN

PLAN 2 -

PLAN WEST

PLAN 3 -

PLAN EAST

PLAN 2 -

PLAN EAST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

S

S

S

S

S

S

S

S

S

OS

RC

S S S S S S S J J

OS OS

RC

J

RC

S

S

S

S

J

OS

RC

J

JJ

OS

J

J

S

OS

J

J

J

OS

RC S

J J

RCOS OS

J

OS

J

OSRC

S

J

J

J

J

OS

OS

RC

J

J

OS

RC

OS

OS OS JRCJJJ OS

S

S

J

J

J

J

OS

RC

J

RC

OS

OS

J

J

J

J OS

S

S

V

V

V

V

V V

V

V V V V V

V

V

V

V

DS

V V V

C

D

E

F

G

1 2 3 4 5 6 7 8

S-4 PBO

S-4 OPEN OFFICE

S-4 STOR

CMD SUPPLY

CMD RESTROOM

BN XO

CMD OPEN

OFFICE

CMD CONF RM

S-1/S-4 CONF RM

MECHANICAL

NURSING

S-1 OPEN OFFICE

STORAGE

CLASSROOM

STOR

S-1 STOR

BREAK RM

ELECTRICAL RM

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E L1

MATCHLINE,

SEE SHEET D1 EL106

BN CMDR

BN CSM

FRSA

DUTY

RETENTION NCO

ASST CHAPLAIN

CHAPLAIN

S-1 OIC

S-4 OIC

A3 A3

A3

G

A2

EM

A2

A2

A2

A2

EM

A2

A2

A2

G

G-EM

G-EM G-EM

G

G

G-EM

H-EM

G

G

G-EM

G

A3

A3

A3 A2

EM

A2 A2

A2

EM

A2 A2

EM

A2 A2

G

G

A1

GG

A2

EM

OS5

OS5

OS5

OS5

A2

EM

A2

A2

A2 A2

EM

B

A2

A2

EM

A3 OS5

A2 A2

OS5

A1A1

STORAGE

A1 A1

EM

A1 A1

A1

EM

A1

A1

EM

A1

A1

A1

EM

H-EM

A3 A2 A2A3 A3 A3 A3

G

G

OS5

A2

OS5

A1

EM

A1

A1

EM

A1

A1

A1

EM

A

A1 A1

EM

A1 A1

EM

A1 A1

EM

A1A1

OS5

A1

EM A1

A1 A1

EM

A1 A1

OS5 OS5 OS5 OS5OS5OS5 OS5

LFMC

LFMC

LFMC LFMC

LFMC LFMC

LFMC

LFMC

OS5

OS5

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMCLFMC

LFMC LFMC

LFMC

LFMC

LFMCLFMC

LFMC LFMC

LFMC

LFMCLFMCLFMC

OS5

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMCLFMCLFMC LFMC

LFMC

LFMC

OS5

SW1

SW1SW1

STAIR

S201

OS5

SW1

OS2

LV

LV

LV

OS8

OS8

OS2

OS2 OS2

OS2

OS2

OS2

LFMC

LFMC

LFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LV

LV

A2 A2

A2 A2

A2

EM

A2

A2 A2

A2 A2

A2

LV

LV

G G

OS4

OS4

LV

LV

DOWN TO

FIRST FLOOR

UP TO THIRD

FLOOR

3,3* 3,3*

LV

7,7* 7,7*

7,7*

LV

LV

A2

SW1

LV

LFMC

LFMC

LFMC

LFMC

OS8

OS2

OS2

LFMC

LFMC

OS5

1 *

1 * 1 *

1 * 1 * 1 *

1 *

1 *

1 *

1 *

1 *

1 *

1 * 1 *

1,1*

1,1*

1,1*

1,1*

1,1*

OS2

1,1*

OS2

1,1*

1,1*

1 *

1 *

1,1* 1,1*

7 *

7 *

7 *

-4B 7

7 *

7 *

7 *

7 *

7 *

7 *7 *

7 *7 *

7 * 7 * 7 *

7 *

7 *7 *

7,7*

7,7*

7,7*

7 *A2 A2

A2

EM

A2

EM

OS8

OS8

3 * 3 *

3 * 3 *

3 *

-4B 3

3,3*

3 *

3 *

3 *

3 *

3 *

3 *3 *

3 *

3 *

3,3*3,3*

3,3*

3,3*

3 *

3 * 3 *

5 *

5 *

5 *

5 *

5 *

5,5*

5 *

5 *

5 * 5,5* 5 *

5,5*

5 * 5 *

5 *

5,5*

5 *5 * 5 * 5 *

5 *

5 *

5 *

-4B 5

5,5*

5 * 5 * 5 * 5 * 5 *

5 * 5 * 5 * 5 *

5 * 5 *

OS8

OS8

OS8 OS8

LV

7,7*

LFMC

LFMC

LFMC

LFMC

A2

3 *

A2

EM

RC-4

a a

LV

a a a a

LV

a

LV a f

RC-4

b b b b

RC-4

RC-2

d d d d

RC-4

d e e e e

RC-4

RC-2

LV

Pc-1

LV

LV RC-4

RC-4

c c c cRC-4 a a a a b b b b b b b b

SW5

RC-4 RC-4

SW5

7,7*

5,5*

INDICATES CONTROLLED BY LIGHT SWITCH AND/OR OCCUPANCY

SENSOR LOCATED IN THE SAME ROOM OR HALLWAY. SEE LIGHTING

CONTROL DEVICE SCHEDULE AND LIGHTING CONTROL WIRING

DIAGRAM ON SHEET E-603.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EL104

P A

R T

IA

L

S E

C O

N D

F

LO

O R

L

IG

H T

IN

G

P

LA

N

P

LA

N

W E

S T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL SECOND FLOOR LIGHTING PLAN 1 - PLAN WEST

KEY PLAN

PLAN 1 -

PLAN WEST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

S S

J

J

OS

OS

RC

OS

OS RC

J

J

J

J J

J

J

OS

OS

RC

J J

JJ

OS OS

RC

S

J

OS

J

OS

OS

J

OS OS

JJJ

S

OS

RC

OSOS

JJ J

RC OS

S S

OS

J

J

S

S

J

V

V

V

VDS DS DS DS

V V

C

D

E

F

G

8 9 10 11 12 13

TELECOMM RM

FUTURE SIPR

RECYCLE

STORAGE

SEC DOC RM

CLASSROOM

STORAGE

MULTIPURPOSE

RM

S-2 OPEN OFFICE

MECHANICAL

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E L1

M

A T

C H

LI

N

E

S E

E S

H E

E T

B

E L1

MATCHLINE,

SEE SHEET A1 EL106

A2 A2

A2 A2

EM

A2 A2

A2 A2

EM

A1

A1

EM

A1 A1

G-EM G-EM

G-EM G-EM

G-EM

G

G

G

G-EM

G

G

H-EM

G-EM G

G G

A2 A2

A2

EM A2

A2 A2

A2

EM A2

G

SW1SW1

B

A2

EM

A2 A2

EM

A2

A2

B

A2 A2

EM

A2

A2

A2

A2

A2

A2

A2

EM

A2

A2

A2

A2

A2

EM

A2

A2

A2

A2

A1

EM

A1

A1

EM

H-EM

A1

A1

EMA1 A1

A1

EM

A1 A1

OS5

G G

G-EMG

A1 A1 A1

EM

A1 A1 A1

EM

A1

EM

A1

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

SW1

LFMC

LFMC

LFMC LFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMCLFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

C

C

LFMC

LFMC

C

OS5

LFMC LFMC

C C

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

OS5 OS5

OS5

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

SW1

SW1

STAIR

S202

OS5

OS5

OS2 OS2 OS2

OS2

2,2*

DOWN TO

FIRST FLOOR

UP TO THIRD

FLOOR

LV

LV

LV

LVLV

OS2 OS2

2,2* 2,2*

2,2*2,2*

G-EM

OS2

OS8 OS8

6 *6 * 6 *

6 * 6 *

6 * 6 * 6 * 6 *

6,6*

6,6*

-4B 6 6 *

4 *

4 * 4 *

4 *

4 *4 * 4 * 4 *

4 *

4 * 4 *

4 * 4 *

4 * 4 *

4 *

4 *4 *

4 * 4 * 4 *

4 *4 *

OS8

OS8 OS8

OS8

OS8

-4B 4

44 4

4,4*4,4*

4,4*

4,4*

4,4*4,4*

4,4*

OS8

1 * 1 * 1 * 1 * 1 *

1 *

1 * 1 *

1 *

1 *

1 *1 *1 *1 *

1,1* 1,1*

1,1*

1,1*

1,1*

1,1*

1,1* 1

OS2

OS2

OS2

1,1*

1 * 1 *

2,2*

2,2*

2 *

2 *

2 * 2 *

2 *

2 * 2 *

-4B 2

2 * 2 *

2 *

1 *1 * 1 *

2,2*

2,2*

2 * 2,2*

2,2* f f f f f f f f

RC-4

RC-4

g g g g g g g g g e e e ee bb bb aa aa

RC-4

LV

Pc-1Pc-1Pc-1

LV

LV

bb bb aa aa

RC-4

b

RC-4

LV

a a a a a a b b b b b b b b b bRC-4 b b b b

LV

Pc-1a a a a

INDICATES CONTROLLED BY LIGHT SWITCH AND/OR OCCUPANCY

SENSOR LOCATED IN THE SAME ROOM OR HALLWAY. SEE LIGHTING

CONTROL DEVICE SCHEDULE AND LIGHTING CONTROL WIRING

DIAGRAM ON SHEET E-603.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EL105

P A

R T

IA

L

S E

C O

N D

F

LO

O R

L

IG

H T

IN

G

P

LA

N

P

LA

N

E A

S T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL SECOND FLOOR LIGHTING PLAN 1 - PLAN EAST

KEY PLAN

PLAN 1 -

PLAN EAST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

J

RCRC

J

OS

OS

OS

S

J

OS

S

S

S

J

OS

OS

OS

J

RCRC

J

OS

S

S

S

S

S

S S

J

J

J

JJ

J

OSOS

OS

RC J

S

S

S J J

J

OS

JJ

OS

OS

OS

J

J

RC

J

V V

V

V

V

V

V

V

DS

A

B

C

4 5

MEN

WOMEN

MATCHLINE,

SEE SHEET A1 EL104

OS5

C C

EM

C

C C

G

C

EM

C

C

C

C

C

EMC

EM

C

C

EM C C

G

G-EM

LFMC

LFMC

SW1

SW1

OS4

OS4LV

OS4

OS4

1 *

1,1*

3 * 3 *

3 * 3 *

3 * 3,3* 3,3*

3 3 * 3 *

3,3*

3 *

3 *

3 * 3 *

3 *

LV

RC-2

RC-2

LV

LV

A

B

C

12 13

WOMEN

MEN

MATCHLINE,

SEE SHEET A1 EL105

OS5

G

G-EM

LFMC

LFMC

C

C

C

EM

C

C

C

EM C

C

EM

CC

G

C C

C

C

EM

C C

EM

SW1

SW1

2,2*

OS4

OS4

OS4

2,2*

OS4

1 *

1,1*

2 * 2 *

2 * 2 *

2 *

2 * 2 *

2 *

2 *

2 * 2

2 *

2 *

2,2*

2,2*

2,2*

RC-2

RC-2

C

D

E

F

G

13 14 15 16

S-3 CONF RM

S-3 OPEN OFFICE

S-6 STOR

S-6 OPEN OFFICE

S-2 STOR

S-3 STOR

S-3 OIC

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E L1

S-6 OIC

S-2 OIC

A3 A3

EM

A3 A3

OS5

OS5

OS5

OS5

A3A3

G G

G G

A2

EM

A2

EM

A2

A2 A2

A2 A2 A2 A2

A2

A2

EM

A2

A2

EM

A3

A3

G

G

A2 A2

EM

A2 A2

EM

A2 A2 A2

B B B

A2

EM

A2A2A2A2B

EM

A2

A2A2A2

A2

EM

A2A2

EM

B

B A2

A2

OS5

LFMCLFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

OS5

OS5

OS5

LFMC

LFMC

LFMC LFMC

LFMCLFMC

LFMCLFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMCLFMC

LFMC

SW1

SW1

LFMC

LV

LV

LV

LV

LV

LFMCLV

LV

8 * 8 *

8 *

8 *

8 *

8 * 8,8*

8 *

8 *

8 *

8,8*

OS8

8 *

8 * 8 *

8 *

8 *

8 *

8 *

8 *

8 *

8 *

8,8*

OS8 OS8OS8

8,8*

8,8*

8 *

8 * 8,8* 8 * 8,8*

8 *

8 *

-4B 8

6 * 6 *

6 * 6 * 6 * 6 * 6 *

6 *

6 *6 *6 *6 *

6 * 6 * 6 * 6 * 6 * 6 * 6 *

6,6*6,6*

6,6*

6,6*

OS8

OS8

OS8

RC-4

b b

RC-4

b b b b a a b b bb a aaaa Pc-1

LV

INDICATES CONTROLLED BY LIGHT SWITCH AND/OR OCCUPANCY

SENSOR LOCATED IN THE SAME ROOM OR HALLWAY. SEE LIGHTING

CONTROL DEVICE SCHEDULE AND LIGHTING CONTROL WIRING

DIAGRAM ON SHEET E-603.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EL106

P A

R T

IA

L

S E

C O

N D

F

LO

O R

L

IG

H T

IN

G

P

LA

N

A N

D

P

L A N

E A

S T

A N

D W

E S

T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"D1 PARTIAL SECOND FLOOR LIGHTING PLAN 2 - PLAN WEST

3/16" = 1'-0"A1 PARTIAL SECOND FLOOR LIGHTING PLAN 3 - PLAN EAST

3/16" = 1'-0"B6 PARTIAL SECOND FLOOR LIGHTING PLAN 2 - PLAN EAST

KEY PLAN

PLAN 2 -

PLAN

EAST

PLAN 3 -

PLAN EAST

PLAN 2 -

PLAN WEST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

SSSS

S

S

S

S

S

S

S

S

S

S

S S

S

SSSSS

S

S

S

S

S S S

J

J

J J

J

J RC

S

J J

J J

J

J

OS

OS

OS

J J

J

OS

OS

J

RC

J J

J

J

JJJ

J

OS

OS

OS

J

RC

OS

RC

J J

OS OS

RC

RC

OS

OSRC

J OS

OS

OS

J

J

J J

J

J RC OS

V

V

V

V

V

V V

V V V

V V

V

V V V V

V

V

V

V

V

V V

V

V

RC

OS

C

D

E

F

G

1 2 3 4 5 6 7 8

S-4 OIC

S-4 PBO

S-4 MAINT

S-4 FOOD SVC

S-4 FINANCE

S-4 OPEN OFFICE

CMD RESTROOM

BDE DCO

BDE CSM

CMD OPEN

OFFICE

BDE CMDR

BDE XO

CMD STOR

FRSA

ID NCOIC

RETENTION NCO

ASST CHAPLAIN

CHAPLAIN

MECHANICAL

S-4 STOR

BREAK RM

ELECTRICAL RM

EO

SHARP

S-1 STOR

S-1 HR TECH

S-1 NCOIC

S-1 OIC

CORRIDOR

300F

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E L1

MATCHLINE,

SEE SHEET D1 EL109

CMD CONF RM

H-EM

A3

A3

A3

A2 A2 A3 A2 A2

A3

A3

A2 A2 B

A2

EM

A2

A2 A2 B

A2

EM A2

A2

EM

A2

A2

A1 A1

EM

A1

EM

A1

EM

G-EM

A2

EM

A2 A2

A2 A2

EM

A2 A2

EM

A2 A2

A2 A2

EM

A2

A2

A2

EM

A2

A1

A1

EM

A1

EM

A1

A1 A1

EM

A1 A1

EM

A1 A1 A1

EM

A1

A1

EM

A1

A1

EM

A1

EM

A1 A1 A1

EM

G

G

G

G

G-EM

G

G

G

G-EM

H-EM

A3

B

G G

A2 A2 A2

A2 A2

A2

EM

A2 A2 A2

A2

EM

A2 A2

A1

A3

A2

A3 A3 A3

OS5OS5OS5OS5

OS5

A2 A2

A2

EM

A2

OS5

OS5

A3

EM

OS5

A3

EMOS5

OS5

S-1 OPEN OFFICE

A2

EM

A2 A2 A2

A2

A2

EM

A2

A2

A2 A2 A2

A2

EM

A2 A2

EM

A2

OS5

A3 A3

OS5

A3

OS5

OS5 OS5 OS5 OS5

G

OS5

A3

OS5

OS5

OS5

A3

OS5

A3

OS5

OS5

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC LFMCLFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

A3

OS5

LFMC

LFMC LFMC

LFMCLFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

C

LFMCLFMC

LFMC

LFMC

LFMC

LFMC

SW1

SW1

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMCLFMC LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

OS8

OS8

OS8

LV

LV

OS8

OS8

LV

LV

SW1

SW1

SW1

OS8

OS8

LV

LV

OS2

OS2

OS2

OS2

OS2

OS2

OS2 OS2

STAIR

S301

5 * 5 * 5 *

5 * 5 * 5 * 5 *

5 * 5 *

5 *

5 *

5 *

5 *

5 *

5 *

3 *

3 *

3 *

3,3*

3 *

3,3*

3 *

3 *

3,3*3 *

3 * 3 *

3 *

3,3* 3,3*

3 *

3 *

3 *

3 *

3 *

3 *

5 *

5 * 5 *

5 * 5 *

-4C 5

5,5*

5 * 5 * 5 *

5 *5 *

5,5*

C 5 *

5 *

5,5*5,5*

5 *5 *

5 * 5 * 5 * 5 *

5,5*

5 * 5 *

5 *

5 *

5 *

7 * 7 * 7 *

7 *

7 *7 *7 *

7 *

7 *

7 *

7 *

7 *

7 * 7 * 7 *

7,7*

A2

7 *

7 *

7,7*

7,7*

7,7*

7 *

7 * 7 *

-4C 7

7 * 7 * 7,7*

1 *

1,1* 1 1

1,1*

LV

1 *

1,1*

1,1*

1 *

1,1*

1 *1 *

1 *

1 *1 1,1*

1,1*1 -4C 1

1,1* 1 *1 * 1,1*

1,1*

1 *

1,1*

1 *

1 * 1,1*

LV

LV

OS2

LV

3 *

3 * 3 *

3 *

OS4

-4C 3

3,3*

LV

3,3* 3,3*

DOWN TO

SECOND

FLOOR

LFMC

LFMC

LFMC LFMC

3 * a a a

LV

LV

RC-4

a a a a

LV

RC-4

b b b

LV

RC-2

LV SW1

b

RC-4

c c

RC-4

c c d d d d d

RC-4

e e e e

RC-4

5,5*

7,7*

7,7*

7,7*

RC-4OS8

INDICATES CONTROLLED BY LIGHT SWITCH AND/OR OCCUPANCY

SENSOR LOCATED IN THE SAME ROOM OR HALLWAY. SEE LIGHTING

CONTROL DEVICE SCHEDULE AND LIGHTING CONTROL WIRING

DIAGRAM ON SHEET E-603.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EL107

P A

R T

IA

L

T H

IR

D

F

LO

O R

L

IG

H T

IN

G

P

LA

N

P

LA

N

W E

S T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL THIRD FLOOR LIGHTING PLAN 1 - PLAN WEST

KEY PLAN

PLAN 1 -

PLAN WEST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

S S

S S

S

S S

SS

S

J

J

OS

S J

RC

OS

JJ

OS

OS

OS

RC

JJ

J J JOSOS

RC

J J J J

OS

RC

OS

OS

J J J

OS OS

OS

OS

RC

J

J

J

OS

RC

J

S

OS

J

OS

J

J

J

J

V

VV

V

V V

V

DS

DS

C

D

E

F

G

8 9 10 11 12 13

TELECOMM RM

MECHANICAL

S-6 OPEN OFFICE

S-6 OIC

S-2 SEC STOR

S-2 OIC

LEGAL SJA

LEGAL STOR

S-2 OPEN OFFICE

S-3 STOR

S-6 STOR

S-2 STOR

RECYCLE

FUTURE SIPR

LEGAL OPEN

OFFICE

CORRIDOR

300F

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E L1

M

A T

C H

LI

N

E

S E

E S

H E

E T

B

E L1

MATCHLINE,

SEE SHEET A1 EL109

H-EM

A3

A2

EM

A2

A3

EM

A1 A1 A1

EM

A1 A1

A3

A1

EM

A1 A1 A1

EM

A1 A1 A1

EM

A1 A1

EM

G G

G-EM G

G

GGG

G-EM

G

G

G-EM

G H-EM

A1

A1

EM

A1

A1 A1

A1

EM

A1

A1

EM

A1

OS5 OS5

OS5 OS5 OS5 OS5

OS5

OS5

A2 A2

A2 A2

A2 A2

EM

A2 A2

B

EM

A3

G

OS5

OS5OS5

A2 A2

EM A2 A2

A2 A2 A2

A2

EM

A2

A2

A2

EM

A2

EM

A2 A2 A2

A2 A2

A2

A2

EM

A2A2

A2

EM

A2A2

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

OS5

LFMC

LFMC

LFMC

LFMC

LFMCLFMC LFMC LFMC

LFMCLFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC LFMC LFMC LFMC LFMC LFMC LFMC

LFMCLFMC LFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMC

OS5

LFMC

LFMC

LFMC

LFMC

LFMC

OS8

OS8

LV

LV

SW1

SW1

OS8

OS8

OS8

LV

LV

OS8

OS8

OS2

OS2

OS2

OS2

OS2

OS2

OS2

OS2

OS2

OS2

OS2

STAIR

S302

6 *

-4C 6

6 * 6 * 6 * 6 *6,6*

LV

LV

6 * 6 * 6 * 6 *

4 *4 *

4 *

4 * 4 *

4 *

4 *

4,4*

LV

-4C 4 LFMC

LFMC 4

4 *4 *4 *

4 *

4 *4 *4 *

4,4*

4,4*

4 *4 *

4 *

4 *

4,4*

4,4*

4 *4 *4 *

4,4*

C 1 *

1 * 1 *

1,1*

LV LV

1 * 1 *

1,1*

1 *

LV

LV

1 *

1,1*

1,1*LV1 * 1 * 1

LV

1 *

1,1*

LV

1 *

1 *

1 *

1,1*

1 *

1 *

1,1* 1,1*1 *

2 * 2 *

2 *

-4C 2

2 *

2 *

G

2 *

2 *

G

2 *

G

2 *

G

2 *

2 *

G

2 * 2 *

2 * 2 *

2,2*

DOWN TO

SECOND

FLOOR

2,2* 2,2* f

RC-4

f f f f f f f

LVLV

g g g

RC-4

g ggg g g

RC-4

g ee e e e

RC-4

b b b b b a a a a

RC-4

LV

Pc-1

Pc-1

LV

SW2

RC-4

b b b b b a a a a a

SW2

4,4*

4,4*

2,2*

2,2*

INDICATES CONTROLLED BY LIGHT SWITCH AND/OR OCCUPANCY

SENSOR LOCATED IN THE SAME ROOM OR HALLWAY. SEE LIGHTING

CONTROL DEVICE SCHEDULE AND LIGHTING CONTROL WIRING

DIAGRAM ON SHEET E-603.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EL108

P A

R T

IA

L

T H

IR

D

F

LO

O R

L

IG

H T

IN

G

P

LA

N

P

LA

N

E A

S T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"A1 PARTIAL THIRD FLOOR LIGHTING PLAN 1 - PLAN EAST

KEY PLAN

PLAN 1 -

PLAN EAST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

J

RC

RC

J

OS

OS

OS

S

J

OS

S

S

S

J

OS

OS

OS

J

RC

RC

J

OS

S

S

S

S

S

S

S

S

S

S

J J J

J J J

J J J

OS OS

RC

OSOS

J

J

J

J JOS

OS

RC J

J

RC

V

V V

V

V

V

V

V

V

V

V

DS

A

B

C

4 5

MEN

WOMEN

MATCHLINE,

SEE SHEET A1 EL107

OS5

C C

EM

C

C C

G

C

EM

C

C

C

C

C

EM

C

EM

C

C

EM C C

G

G-EM

LFMC

LFMC

OS4

LV

OS4

SW1

OS4OS4

SW1

1,1* 3 *

3 * 3 *

3 *

3,3*

3 *

3,3*

3 *3 *

3,3* 3,3*3 *

3 *

3 * 3 *

3 *

3,3*

1 *

LV

LV

LV

LV

RC-2

A

B

C

12 13

MEN

WOMEN

MATCHLINE,

SEE SHEET A1 EL108

OS5

G

G-EM

LFMC

LFMC

C

C

C

EM

C

C

C

EM

C

C

EM

CC

G

C C

C

C

EM

C

C

EM

OS4

OS4

OS4

SW1

SW1

OS4

LV

1,1*

2 * 2 *

2 * 2 *

2 * 2,2* 2,2*

2 * 2 *

2,2*

2,2*

2 *

2 *

2 * 2 *

2 *

1 *

RC-2

RC-2

C

D

E

F

G

13 14 15 16

S-3 OPEN OFFICE

S-3 OIC

S-3 OPS SGM

S-3 PLANS

S-3 CHOPS

S-3 CONF RM

SURGEON OPEN

OFFICE

SURGEON

M

A T

C H

LI

N

E

S E

E S

H E

E T

A

E L1

A2 A2

EM

A2 A2

A2

A2A2A2 A2

EM

A2

A2

EM

A2

A2

EMA2A2A2

A2

EM

A2A2A2A2

EM

A2A2

A2

EMA2

BA2A2

EM

A2

A3OS5

OS5

OS5

OS5

A3

A3

A3

A3

A2 A2

A2

EM

A2

A2 A2

A2

A2

A2

A2

EM

A2

A2

A2

A3

OS5

B

EM

A1

EM

OS5

OS5

B

LFMC

LFMC

LFMC

LFMC

LFMCLFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMCLFMCLFMC

LFMC

LFMC

LFMC

LFMC

LFMCLFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMC

LFMCLFMC

LFMC

LFMCLFMC

LFMC

LFMC

LFMC

LFMC LFMC

LFMC

LFMC

LFMC

LFMC

SW1

OS8

OS8

OS8

OS8OS8

OS8 LV

6 *

6 *

6 *

6 *

6 *

6,6*LFMC

LFMC

6 *

6,6*

6 *

6,6* 6 * 6 * 6 *

6 *6 *

6 * 6,6*

8,8*

8 * 8,8*

8 * 8,8* 8 *8 *

8 *

8 *8 *

8 *

8 *

S-3 TRAINING

8 *

8 *

8 *

8 *

S-3 OIC

-4C 8

8,8*

8 * 8 * 8 * 8,8* 8 *

8 *8 *8 *

8 * 8 *

8,8*

LV

8 *

8,8*

LV

LV

8,8* 8 *8 *

8 *

RC-4

RC-4

SW1

SW2

RC-4

b b b b b b aaaa

Pc-1

LV

INDICATES CONTROLLED BY LIGHT SWITCH AND/OR OCCUPANCY

SENSOR LOCATED IN THE SAME ROOM OR HALLWAY. SEE LIGHTING

CONTROL DEVICE SCHEDULE AND LIGHTING CONTROL WIRING

DIAGRAM ON SHEET E-603.

NOTES:

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 EL109

P A

R T

IA

L

T H

IR

D

F

LO

O R

L

IG

H T

IN

G

P

LA

N

A N

D

P

L A N

E A

S T

A N

D W

E S

T

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

3/16" = 1'-0"D1 PARTIAL THIRD FLOOR LIGHTING PLAN 2 - PLAN WEST

3/16" = 1'-0"A1 PARTIAL THIRD FLOOR LIGHTING PLAN 3 - PLAN EAST

3/16" = 1'-0"B6 PARTIAL THIRD FLOOR LIGHTING PLAN 2 - PLAN EAST

KEY PLAN

PLAN 2 -

PLAN

EAST

PLAN 3 -

PLAN EAST

PLAN 2 -

PLAN WEST

8'4' 16'0

SCALE: 3/16" = 1'-0"

8'4' 16'0

SCALE: 3/16" = 1'-0"

3P1200AF

3P1000AT

M

3P70A

3P100A3P100A

3P100A3P100A

3P100A3P100A

MAIN DISTRIBUTION SWITCHBOARD "4NDSB"

480Y/277V, 3 PH, 4W, 65 KAIC,

UL LISTED SERVICE ENTRANCE EQUIPMENT

PANEL "4C"

480/277V, 3 PH, 4W

3P100A MAIN CKT BKR,

14 KAIC (THIRD FLOOR)

PANEL "4B"

480/277V, 3 PH, 4W

3P100A MAIN CKT BKR,

14 KAIC (SECOND FLOOR)

PANEL "4A"

480/277V, 3 PH, 4W

3P100A MAIN CKT BKR,

14 KAIC (FIRST FLOOR)

1 1/2"C, 4#2, 1#8 GND

3P200A 3P200A E

3P200A 3P200A

E ACC - 1

55.6 TONS, 125.9 MCA, 460V, 3 PHFLEX

CONDUIT

3P100A 3P100A

E ELEVATOR CONTROLLER

48A FLA, 480V, 3 PHFLEX

CONDUIT

FLEX

CONDUIT

3P150A

PANEL "2IT"

208/120V, 3 PH, 3W

3P150A MAIN CKT BKR,

10 KAIC

3P60A

PANEL "2AIT"

208/120V, 3 PH, 4W,

10 KAIC

ERMS

DRY-TYPE TRANSFORMER "2IT"

480Δ - 208Y/120V, 3 PH, 4W,

45 KVA, 4.1 %Z

ST

AUX

1 1/2"C, 4#2, 1#8 GND

1 1/2"C, 4#2, 1#8 GND

3P20A 3P30A

E CHWP-1-1

5 HP, 460V, 3 PHFLEX

CONDUIT

3P20A 3P30A E

FLEX

CONDUIT

3P20A 3P30A E

FLEX

CONDUIT

SPD

GFP

1"C TO TELECOM

RM 128

3/4"C SPARE

N

G

1"C,1#3/0 GND,

GROUND PER NEC

3(4"C, 4-500 kcmil EA.)

1-4"C SPARE

750 KVA PAD MOUNTED

TRANSFORMER

7.2 / 12.47 KV - 480Y/277V, 3 PH 4W,

5.75%z, RADIAL FEED, (6) FULL

CAPACITY TAPS, 2 FCAN, 4 FCBN

FINLESS TYPE

3P450A

DRY-TYPE TRANSFORMER "2A"

480Δ - 208Y/120V, 3 PH, 4W,

300 KVA, 5.2 %Z

1 1/2"C, 3#4, 1#8 GND

2(2 1/2"C, 3-250 kcmil, 1#4 GND)

3P60A

3P60A

PANEL "2BIT"

208/120V, 3 PH, 4W,

10 KAIC

3P60A

3P60A

PANEL "2CIT"

208/120V, 3 PH, 4W,

10 KAIC

3P60A

1"C, 4#6, 1#10 GND

SEE SHEET A1/E-602

FOR CONTINUATION

1"C,1#3/0 GND,

GROUND PER NEC

3/4"C,1#6 GND,

GROUND PER NEC

2"C, 4#1/0, 1#6 GND

60E

1"C,1#3/0 GND,

GROUND PER

NEC

PARTIAL BUS, TYPICAL

PROVIDE TWO 3P30A SPARES AND

TWO 3P100A SPARE BREAKERS

1 1/2"C, 3#2, 1#8 GND

1 1/2"C, 3#2, 1#8 GND

2 1/2"C, 3#3/0, 1#4 GND

2 1/2"C, 3#3/0, 1#4 GND

3/4"C, 3#12, 1#12 GND

3/4"C, 3#12, 1#12 GND

3/4"C, 3#12, 1#12 GND

1"C, 3#12, 1#12 GND

3/4"C, 3#12, 1#12 GND

1"C, 3#12, 1#12 GND

1"C, TO FIRE SPRINKLER

PRE-ACTION PANEL

ACC - 2

55.6 TONS, 125.9 MCA, 460V, 3 PH2 1/2"C, 3#3/0,

1#4 GND

2 1/2"C, 3#3/0, 1#4 GND

SPD

SPD

SPD

SPD

CHWP-1-2

5 HP, 460V, 3 PH

CHWP-1-3

5 HP, 460V, 3 PH

PM 5563 SCHNEIDER

ELECTRIC METER

CONTRACTOR TO PROVIDE ARC FLASH

HAZARD ANALYSIS FOR THE ENTIRE BUILDING

ELECTRICAL DISTRIBUTION SYSTEM AND

PROVIDE ARC FLASH LABELS ACCORDINGLY.

PROVIDE ENERGY-REDUCING MAINTENANCE

SWITCH ON SWITCHBOARD ADJACENT TO

MAIN CIRCUIT BREAKER. SWITCH SHALL HAVE

A STATUS INDICATOR LIGHT AND PROVISIONS

FOR LOCK-OUT TAG-OUT.

NOTES:

1.

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 E-601

O N

E -L

IN

E

D

IA

G R

A M

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

NOT TO SCALEA1 ONE-LINE DIAGRAM 1

3P1200AF

3P1000AT

DISTRIBUTION SWITCHBOARD "2NDSB"

208Y/120V, 3 PH, 4W, 25 KAIC

3(4"C, 4-500 kcmil

EA., 1#3/0 GND)

1-4"C SPARE

3P125A

3P150A

ERMS

GFP

2"C, 4#1/0, 1#6 GND

PANEL "2MA"

208Y/120V, 3 PH, 4W,

14 KAIC

SPD

3P125A

SPARE

(TYPICAL FOR 2)

3P100A

SPARE

(TYPICAL FOR 2)

3P150A

PANEL "2A1"

208Y/120V, 3 PH, 4W,

14 KAIC3P125A2"C, 4#1,

1#6 GND

3P125A

PANEL "2A2"

208Y/120V, 3 PH, 4W,

14 KAIC3P125A2"C, 4#1,

1#6 GND

3P100A

PANEL "2A3"

208Y/120V, 3 PH, 4W,

14 KAIC3P100A1 1/2"C, 4#2,

1#8 GND

3P100A

PANEL "2MB"

208Y/120V, 3 PH, 4W,

14 KAIC3P100A1 1/2"C, 4#2,

1#8 GND

3P125A

PANEL "2B1"

208Y/120V, 3 PH, 4W,

14 KAIC3P125A2"C, 4#1,

1#6 GND

3P125A

PANEL "2B2"

208Y/120V, 3 PH, 4W,

14 KAIC3P125A2"C, 4#1,

1#6 GND

3P100A

PANEL "2B3"

208Y/120V, 3 PH, 4W,

10 KAIC3P100A1 1/2"C, 4#2,

1#8 GND

3P125A

PANEL "2C1"

208Y/120V, 3 PH, 4W,

10 KAIC3P125A2"C, 4#1,

1#6 GND

3P125A

PANEL "2C2"

208Y/120V, 3 PH, 4W,

10 KAIC3P125A2"C, 4#1,

1#6 GND

3P100A

PANEL "2C3"

208Y/120V, 3 PH, 4W,

10 KAIC3P100A2"C, 4#2,

1#8 GND

3P100A

PANEL "2MC"

208Y/120V, 3 PH, 4W,

10 KAIC3P100A1 1/2"C, 4#2,

1#8 GND

SEE SHEET A1/E-601

FOR CONTINUATION

CONTRACTOR TO PROVIDE ARC FLASH

HAZARD ANALYSIS FOR THE ENTIRE BUILDING

ELECTRICAL DISTRIBUTION SYSTEM AND

PROVIDE ARC FLASH LABELS ACCORDINGLY.

PROVIDE ENERGY-REDUCING MAINTENANCE

SWITCH ON SWITCHBOARD ADJACENT TO

MAIN CIRCUIT BREAKER. SWITCH SHALL HAVE

A STATUS INDICATOR LIGHT AND PROVISIONS

FOR LOCK-OUT TAG-OUT.

NOTES:

1.

PROFESSIONAL

LICENSED

No. 10569-E

ENGINEER

U. S. A.

I,IA

A

H

N E

I N

S

BA

OTI.

W

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L I C

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

EXPIRATION DATE OF THE LICENSE

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

4/30/20 E-602

O N

E -L

IN

E

D

IA

G R

A M

F Y

R

E P

A

IR

B L D

G

H O

N O

L U

LU

D

IS

T R

IC

T

F T

. S H

A F

T E

R , H

A W

A

II

8 -

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

LU

LU

E N

G

IN

E E

R D

IS

T

R

IC

T H

O N

O

LU

LU

, H

I

JS R

V

T

D T

M

A Y

RTA SUBMITTAL

S C

H O

F

IE

LD

B

A R

R A

C K

S , H

A W

A

II

2019.04.23

NOT TO SCALEA1 ONE-LINE DIAGRAM 2

TYPE DESCRIPTION

Os1 DIGITAL PASSIVE INFRARED CEILING MOUNT SENSOR, HIGH DENSITY LENS

LONG RANGE

Os2 DIGITAL PASSIVE INFRARED CEILING MOUNT SENSOR, HIGH DENSITY LENS

2-SIDED AISLE LENS

Os3 DIGITAL PASSIVE INFRARED CEILING MOUNT SENSOR, HIGH DENSITY LENS

1-SIDED AISLE LENS

Os4 DIGITAL ULTRA SONIC CEILING MOUNT SENSOR

Os5 DUAL TECHNOLOGY, WALL MOUNTED SWITCH/SENSOR

Os6 DUAL TECHNOLOGY, WALL MOUNTED SWITCH/SENSOR, DUAL RELAY

Os7 DUAL TECHNOLOGY, WALL MOUNTED SWITCH/SENSOR, 3-WAY

Os8 DIGITAL DUAL TECHNOLOGY CEILING MOUNT SENSOR

Sw1 DIGITAL WALL STATION, SINGLE BUTTON

Sw2 DIGITAL WALL STATION, TWO BUTTON

Sw5 DIGITAL WALL STATION, PRESET SCENE BUTTON, FIVE BUTTONS

Dm1 DIGITAL DIMMING WALL STATION

Pc1 DIGITAL MULTI-ZONE SWITCHING AND DIMMING PHOTOSENSOR

(EQ.C8.6)

RC -1 DIGITAL ON/OFF ROOM CONTROLLER, SINGLE RELAY.

RC -2 DIGITAL ON/OFF ROOM CONTROLLER, DUAL RELAY.

RC -3 DIGITAL ON/OFF/0-10 DIMMING ROOM CONTROLLER, SINGLE RELAY.

RC- 4 DIGITAL ON/OFF/0-10 DIMMING ROOM CONTROLLER, DUAL RELAY.

RC- 5 DIGITAL ZONE CONTROLLER

WIRELESS HANDHELD CONFIGURATION TOOL

LIGHTING RELAY PANEL "A" DIGITAL LIGHTING RELAY PANEL (24 ZONE)

GROUND FLOOR

LIGHTING CONTROL DEVICE SCHEDULE

TYPICAL FOR BUILDING EXTERIORS AND COVERED WALKWAY

CL LIGHT FIXTURES ON THIS CIRCUIT SHALL REMAIN ON FROM DUSK UNTIL MIDNIGHT.

NL LIGHT FIXTURES ON THIS CIRCUIT SHALL REMAIN ON FROM DUSK UNTIL DAWN.

SEQUENCE OF OPERATION

SEQUENCE OF OPERATION

TYPICAL FOR CORRIDORS AND COMMON AREAS

WHEN OCCUPIED LIGHTS ARE @ 100%

WHEN NOT OCCUPIED LIGHTS PARTIAL OFF GOING TO 25% LEVEL BUT NOT OFF

TYPICAL FOR CLASSROOMS

BUTTON

1 SCENE 1

GENERAL ILLUMINATION MODE

2 SCENE 2

A/V MODE ILLUMINATION MODE

3 SCENE 3

DAYLIGHT ZONE ONLY MODE

4 SCENE 4

n/a

SEQUENCE OF OPERATION

5 Raise/Lower

M

AY

CKT. USE: L-LTS,R-RECEP, S-SPARE WIRE WIRE USE: L-LTS,R-RECEP, S-SPARE CKT.

NO. CKT BKR, PFB-PROVISION FOR SIZE SIZE CKT BKR, PFB-PROVISION FOR NO.

FUTURE CKT BKR POLE AMPS POLE AMPS FUTURE CKT BKR

1 R - CMDR/XO/OPEN OFFICE 1 20 12 1.2 1.2 12 1 20 R - CLASSROOM 156 2

3 R - CMDR/XO/OPEN OFFICE 1 20 12 1.2 1.2 12 1 20 R - CLASSROOM 156 4

5 R - CMDR/XO/OPEN OFFICE 1 20 12 1.2 1.2 12 1 20 R - CLASSROOM 156 6

7 R - TRAINING 1/1SG 1/PLTN 1B & 1A 1 20 12 1.4 1.0 12 1 20 R - CLASSROOM 156 PROJECTOR 8

9 R - TRAINING 1/1SG 1/PLTN 1B & 1A 1 20 12 1.2 1.2 12 1 20 R - CLASSROOM 155 10

11 R - TRAINING 1/1SG 1/PLTN 1B & 1A 1 20 12 1.4 1.0 12 1 20 R - CLASSROOM 155 12

13 R - OPEN OFFICE/PLTN 1C & 1D 1 20 12 1.2 1.0 12 1 20 R - CLASSROOM 155 14

15 R - OPEN OFFICE/PLTN 1C & 1D 1 20 12 1.2 1.0 12 1 20 R - CLASSROOM 155 PROJECTOR 16 17 R - OPEN OFFICE/PLTN 1C & 1D 1 20 12 1.0 1.2 12 1 20 R - MULTIPURPOSE RM 153 18 19 R - SECURE STOR 1/CONF RM 122 1 20 12 1.2 1.6 12 1 20 R - MULTIPURPOSE RM 153 20 21 R - SECURE STOR 1/CONF RM 122 1 20 12 1.0 1.8 12 1 20 R - NBC STOR2/UNIT STOR2/COMM STOR2 22 23 R - SECURE STOR 1/CONF RM 122 1 20 12 1.0 1.6 12 1 20 R - NBC STOR2/UNIT STOR2/COMM STOR2 24 25 R - NBC STOR1/UNIT STOR1/COMM STOR1 1 20 12 1.4 1.4 12 1 20 R - SECURE STOR 2/CONF RM 150 26 27 R - NBC STOR1/UNIT STOR1/COMM STOR1 1 20 12 1.4 1.0 12 1 20 R - SECURE STOR 2/CONF RM 150 28 29 R - MECHANICAL ROOM 107/TP-3 1 20 12 1.2 1.2 12 1 20 R - SECURE STOR 2/CONF RM 150 30

31 R - BREAKROOM 126 1 20 12 1.4 1.2 12 1 20 R - OPEN OFFICE 2B/PLTN 2A & 2B 32

33 R - ELECTRICAL ROOM 127 1 20 12 1.2 1.2 12 1 20 R - OPEN OFFICE 2B/PLTN 2A & 2B 34 35 R - CONF RM 122 PROJECTOR & SCRN 1 20 12 1.0 1.2 12 1 20 R - OPEN OFFICE 2B/PLTN 2A & 2B 36 37 S 1 20 1 20 S 38 39 S 1 20 1 20 S 40

41 PFB PFB 42

CONNECTED LOAD PER PHASE 15.0 14.5 14.0

NOTES: 43.4

75% 32.6 90.5

PANEL "2A1" 3P125A MAIN CKT. BKR., 208Y/120V, 3 PHASE, 4 WIRE,

14,000 A.I.C. INDUSTRIAL-BOLTED TYPE, WITH DOOR AND TRIM, LOCKABLE,

SURFACE MOUNTED

BREAKER KVA ON BUSSES BREAKER

PHASE A PHASE B PHASE C

TOTAL CONNECTED LOAD (KVA)

DEMAND FACTOR

TOTAL DEMAND LOAD (KVA)

TOTAL DEMAND LOAD (AMPS)

CKT. USE: L-LTS,R-RECEP, S-SPARE WIRE WIRE USE: L-LTS,R-RECEP, S-SPARE CKT.

NO. CKT BKR, PFB-PROVISION FOR SIZE SIZE CKT BKR, PFB-PROVISION FOR NO.

FUTURE CKT BKR POLE AMPS POLE AMPS FUTURE CKT BKR

1 R - TRAINING 2/1SG 2/PLTN 2C & 2D 1 20 12 1.4 1.2 12 1 20 R - CORRIDOR WEST 2

3 R - TRAINING 2/1SG 2/PLTN 2C & 2D…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.