W9128A-19-B-0002_Am-0003_Specifications.pdf

PDF 2 MB Posted

Attached to
Repair Building 3004, Schofield Barracks, Hawaii Federal contract opportunity
Solicitation number
W9128A19B0002
Issued by
Department of the Army Corps of Engineers Engineering District Honolulu

About this file

Am-0003 Specifications

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RENOVATION OF BUILDING 3004, SCHOFIELD BARRACKS, OAHU, HAWAII BLDG3004

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 00 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 RMS3 - CONTRACTOR MODE (RMS3/CM)

01 45 04 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 62 35 RECYCLED / RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 90 00 MISCELLANEOUS PROVISIONS

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 01 30.71 CONCRETE REHABILITATION

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 37 13 SHOTCRETE

03 39 00.00 10 CONCRETE CURING

03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 14 00 FLUID-APPLIED WATERPROOFING

PROJECT TABLE OF CONTENTS Page 1

(Am-0003)

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 62 10 COPPER SHEET METAL FLASHING

07 62 13 COPPER SHEET METAL FLASHING AND TRIM

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 34 59 VAULT DOORS AND DAY GATES

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 39 FOLDING PANEL PARTITIONS

10 26 00 WALL PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

PROJECT TABLE OF CONTENTS Page 2

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 19.10 10 INSULATED WIRE AND CABLE

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

31 31 16.19 TERMITE CONTROL BARRIERS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS

32 11 23 AGGREGATE BASE COURSES

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

PROJECT TABLE OF CONTENTS Page 3

32 17 24.00 10 PAVEMENT MARKINGS

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 67 PAGES

RENOVATION OF BUILDING 3004, SCHOFIELD BARRACKS, OAHU, HAWAII

01 32 00 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

SD-06 Test Reports 3.5.2Narrative Report 3.5.3Schedule Reports 3.6.2Periodic Schedule Updates

01 33 00 SD-01 Preconstruction Submittals

3.1 GSubmittal Register

3.5.1Monthly Updates

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.5Crane Operators

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8 GActivity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

01 45 04 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 67 PAGES

01 45 35 SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1Certified Plant 2.1Certificate of Compliance 1.5Special Inspector

SD-11 Closeout Submittals 3.1.2Interim Final Report

3.1.2 GComprehensive Final Report

01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey

1.7 GEnvironmental Protection Plan

3.2.1.2Inspection Reports

SD-11 Closeout Submittals 3.2.1.3Stormwater Pollution Prevention

Plan Compliance Notebook 3.2.1.4Stormwater Notice of Termination

01 74 19 SD-01 Preconstruction Submittals 1.4Material dismantling sequence plan 1.4Schedule of removal 1.4Estimated quantity of recyclable materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 67 PAGES

01 74 19 SD-09 Manufacturer’s Field Reports

1.1Solid Waste Disposal and Diversion

01 78 00 SD-03 Product Data 1.5.1Warranty Management Plan 1.5.5Warranty Tags 1.2.5.1Spare Parts Data

SD-08 Manufacturer’s Instructions 1.3Preventative Maintenance 1.3Condition Monitoring (Predictive

Testing) 1.3Inspection 1.5.1Instructions

SD-10 Operation and Maintenance Data

1.7.1Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.2.1Record Drawings 1.4Certification of EPA Designated

Items 01 78 23 SD-10 Operation and Maintenance

Data 1.3O&M Database 3.1.1Training Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 67 PAGES

01 78 23 3.1.3Training Outline 3.1.2Training Content

SD-11 Closeout Submittals 3.1.4Training Video Recording 3.1.6Validation of Training Completion

01 90 00 SD-01 Preconstruction Submittals 1.12.4.1Electrical Outage Permit 1.12.4.2Water Outage Permit 1.12.2.1Request for Temporary Water

Service 1.12.4.4Excavation and Traffic Control

Permit

1.12.4.3 GRoad Closure

1.13 GAlteration of the Original

Contractor's Operations or Storage Area

1.13Contractor's Operations or Storage Area

SD-06 Test Reports 1.7Inspection 1.8Dust Control

SD-07 Certificates 1.5Products Containing Recovered

Materials 01 91 00.15 SD-01 Preconstruction Submittals

1.7 GCommissioning Firm

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 67 PAGES

01 91 00.15 1.7.1 GLead Commissioning Specialist

1.7.2 GTechnical Commissioning

Specialists

1.7 GCommissioning Firm's Contract

SD-06 Test Reports

3.1.3 GDesign Review Report

3.1.2.1 GInterim Construction Phase

Commissioning Plan

3.1.2.2 GFinal Construction Phase

Commissioning Plan

3.1.2.1.2 GTemplate Building Envelope

Inspection Checklists

3.1.5.2 GBuilding Envelope Inspection

Checklists

3.1.5.3 GPre-Functional Checklists

1.8Issues Log

3.2 GCommissioning Report

SD-07 Certificates

1.9 GCertificate of Readiness

SD-10 Operation and Maintenance Data

3.1.6 G ROTraining Plan

3.1.6 G ROTraining Attendance Rosters

3.1.7 GSystems Manual

3.1.8 G DOMaintenance and Service Life

Plans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 67 PAGES

01 91 00.15 SD-11 Closeout Submittals

3.1.2.1 S DOConstruction Phase

Commissioning Plan

3.2 S DOFinal Commissioning Report

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates 1.6Notification

SD-11 Closeout Submittals 3.3.4Receipts

02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.2 GLead Compliance Plan

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.8 GLead Waste Management Plan

3.5.2.1 GWritten Evidence

1.5.2.4 GMedical Examinations

SD-06 Test Reports

1.5.2.3 GSampling Results

1.5.2.3 GOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.3 GTesting Laboratory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 67 PAGES

02 83 13.00 20 3.1.1.1 GOccupant Notification

1.5.1.4 GThird Party Consultant

Qualifications

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 Ghazardous waste manifest

3.5.2.1 Gturn-in documents or weight

tickets 02 84 16 SD-07 Certificates

1.8.1 GQualifications of CIH

1.8.1 GTraining Certification

1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter certification

3.2.4Certification of Decontamination 3.5.2.1Certificate of Disposal and/or recycling 03 01 30.71 SD-07 Certificates

2.1.1.1Epoxy Resin Binder SD-08 Manufacturer’s Instructions

2.1.1Epoxy 03 11 13.00 10 SD-02 Shop Drawings

2.2.1Formwork 3.1.1Formwork

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 67 PAGES

03 11 13.00 10 2.2.1Form Removal Schedule SD-03 Product Data

2.2Form Materials SD-05 Design Data

2.1Calculations SD-06 Test Reports

3.2Inspection 03 15 00.00 10 SD-03 Product Data

2.2Preformed Expansion Joint Filler 2.3Sealant

SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.3Sealant

03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement

SD-03 Product Data 2.1Reinforcing Steel

SD-07 Certificates 2.1Reinforcing Steel

03 30 00.00 10 SD-01 Preconstruction Submittals 1.5.2Quality Control Plan 1.5.1Laboratory Accreditation

3.8.5.4 GSampling Plan

SD-03 Product Data 2.2Cementitious Materials 2.8Vapor Barrier

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 67 PAGES

03 30 00.00 10 2.1.5Floor Finish 2.4Chemical Admixtures

SD-05 Design Data 2.1.1Mixture Proportions

SD-06 Test Reports 2.1.1Mixture Proportions 3.8Testing and Inspection for CQC 2.2.4Fly Ash 2.3Aggregates 3.8.5.1Slump 3.8.5.4Compressive Strength 2.5Water

SD-07 Certificates 1.5Contractor Quality Control personnel 3.2.1Ready-Mix Plant

03 37 13 SD-06 Test Reports

1.6 GTesting During Construction

2.1.3Aggregate 2.1.4Water 2.3Mixture Proportions

1.6.5 GRepair Of Shotcrete

3.9 GRepair Of Shotcrete

SD-07 Certificates

1.5 GQualifications

2.1.1Cement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 67 PAGES

03 37 13 2.1.2Supplementary Cementitious Materials

2.1.5 GAdmixtures

2.1.6Reinforcement 2.1.7Curing Materials

03 39 00.00 10 SD-03 Product Data 2.1Curing Materials

SD-06 Test Reports 3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions 2.1Curing Compound

03 42 13.00 10 SD-01 Preconstruction Submittals 1.3.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 GStandard Precast Units

2.1.2 GCustom-Made Precast Units

SD-03 Product Data 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.4Accessories

SD-05 Design Data 2.1.2Design Calculations 2.1.5.1Concrete Mix Proportions

SD-06 Test Reports 1.3.2.4Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 67 PAGES

03 42 13.00 10 SD-07 Certificates 1.3.2.2Quality Control Procedures

05 12 00 SD-02 Shop Drawings 1.3.2Fabrication Drawings

SD-03 Product Data 2.4.1Welding Electrodes and Rods 2.4.2Non-Shrink Grout

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3.3.1Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods

05 30 00 SD-02 Shop Drawings 1.3.3Fabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.4Galvanizing Repair Paint 2.1.4Touch-Up Paint 1.3.2Welding Equipment 1.3.2Welding Rods and Accessories

SD-07 Certificates 1.3.2Welder Qualifications 1.3.2Welding Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 67 PAGES

05 30 00 1.3.1Manufacturer's Certificate 05 50 13 SD-02 Shop Drawings

2.3Expansion Joint Covers 2.6Angles and Plates 2.8Roof Hatches

SD-03 Product Data 2.3Expansion Joint Covers 2.8Roof Hatches

SD-04 Samples 2.3Expansion Joint Covers

05 51 00 SD-02 Shop Drawings 2.2.1Metal Stair System

SD-03 Product Data 2.3.2Masonry Anchorage Devices 2.2.2Steel Pan Stairs 2.3.1Steel Stairs

SD-07 Certificates 1.3.1Welder Qualification

SD-08 Manufacturer’s Instructions 2.3.2Masonry Anchorage Devices

05 51 33 SD-02 Shop Drawings 2.3Ladders

SD-03 Product Data 2.3Ladders

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 67 PAGES

05 51 33 1.3Fabricator Certification for Ladder Assembly

05 52 00 SD-02 Shop Drawings 1.2.1Fabrication Drawings

SD-03 Product Data 2.2.7Masonry Anchorage Devices 2.2.9Steel Railings and Handrails 1.2.1Anchorage and Fastening

Systems SD-07 Certificates

1.4.1Welder Qualification SD-08 Manufacturer’s Instructions

3.2Installation Instructions 06 10 00 SD-06 Test Reports

1.4.2Preservative-treated SD-07 Certificates

1.7Preservative Treatment 06 20 00 SD-02 Shop Drawings

1.3Detail Drawings Indicating All Wood Assemblies

2.3.2Termite Treatment Plan SD-03 Product Data

2.3.2Termiticide MSDS SD-07 Certificates

1.5.1.1Certificates of Grade 2.3.2licensed pesticide applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 67 PAGES

06 41 16.00 10 SD-02 Shop Drawings 1.4.2Shop Drawings 2.8Shop Drawings 3.1Installation

SD-03 Product Data 2.1Wood Materials

SD-04 Samples 2.3Plastic Laminates 2.5Cabinet Hardware

SD-07 Certificates 1.4Quality Assurance 3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings 1.4.2Detail Drawings 3.1Installation

SD-03 Product Data 2.1Solid Polymer Material 1.4.1Qualifications 2.3Fabrications

SD-04 Samples 2.1Material

SD-06 Test Reports 2.1Solid Polymer Material

SD-07 Certificates 2.3Fabrications 1.4.1Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 67 PAGES

06 61 16 SD-10 Operation and Maintenance Data

3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2Thermal Imaging Camera SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

3.5.7 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

07 14 00 SD-03 Product Data 2.1Fluid-Applied Membrane 2.2Membrane Primer 2.8Elastomeric Sheet 2.10Flexible Foam-Backed

Elastomeric Sheet 3.3Solvent

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 67 PAGES

07 14 00 3.4.1Moisture Meter 2.11Protection Board 2.7Bond Breaker

SD-11 Closeout Submittals 1.6Warranty 3.6Information Card 3.5Instructions To Government

Personnel 07 21 16 SD-03 Product Data

2.2Blanket Insulation SD-08 Manufacturer’s Instructions

3.2.1Insulation 07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3Verification of Existing Conditions

SD-03 Product Data 2.1Insulation 1.4Cover Board 2.4Adhesives

SD-07 Certificates 1.7Volatile Organic Compounds

(VOC) Content 1.6Installer Qualifications

SD-08 Manufacturer’s Instructions 2.1Insulation

07 27 10.00 10 SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 67 PAGES

07 27 10.00 10 1.8Design Review Report 3.1.2Testing and Inspection

SD-07 Certificates 1.7Air Barrier Inspector

07 27 26 SD-01 Preconstruction Submittals 1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer

SD-02 Shop Drawings 1.4Fluid-Applied Membrane Air

Barrier SD-03 Product Data

1.4Fluid-Applied Membrane Air Barrier

2.2Primers, Adhesives, and Mastics 2.5Reinforcement 1.4.2Safety Data Sheets

SD-04 Samples 1.4.3Mockup

SD-06 Test Reports 1.6Capillary Moisture Test 1.4.4Field Peel Adhesion Test 1.4.4Flame Propagation of Wall

Assemblies 1.4.4Flame Spread and Smoke

Developed Index Ratings 3.4.1Site Inspections

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 67 PAGES

07 27 26 SD-07 Certificates 1.4Fluid-Applied Membrane Air

Barrier 1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer

SD-08 Manufacturer’s Instructions 1.4Fluid-Applied Membrane Air

Barrier 2.2Primers, Adhesives, and Mastics

07 52 00 SD-02 Shop Drawings 1.4.6Roof plan

SD-03 Product Data 2.1Modified Bitumen Sheets 2.4Primer 2.5Modified Bitumen Roof Cement 2.7Fasteners And Plates 1.9Warranty

SD-05 Design Data 1.4.5Wind Uplift Calculations

SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator 1.4.3Qualification of Engineer of

Record 1.4.5Wind Uplift Resistance 1.4.4Fire Resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 67 PAGES

07 52 00 SD-08 Manufacturer’s Instructions 3.3.4Modified Bitumen Membrane

Application 3.3.5Flashing 3.2.2.1Torches 2.4Primer 2.7.1Fasteners

SD-11 Closeout Submittals 1.9Warranty 3.8Information Card 3.7Instructions To

GovernmentPersonnel 07 62 10 SD-02 Shop Drawings

2.1.3Sheet Metal 07 62 13 SD-02 Shop Drawings

2.1.3Sheet Metal 07 84 00 SD-03 Product Data

2.1Firestopping Materials SD-06 Test Reports

3.3Inspection SD-07 Certificates

2.1Firestopping Materials 1.5.1Installer Qualifications

07 92 00 SD-03 Product Data 2.2Sealants 2.3Primers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 67 PAGES

07 92 00 2.4Bond Breakers 2.5Backstops

08 11 13 SD-02 Shop Drawings 2.1Doors 2.1Doors 2.6Frames 2.6Frames 2.4Accessories

SD-03 Product Data 2.1Doors 2.6Frames 2.4Accessories

08 11 16 SD-02 Shop Drawings

1.5.1 GDoor and Frame Assembly

SD-03 Product Data

1.5.1 GDoor and Frame Assembly

SD-04 Samples

1.5.2 GFinish Samples

SD-05 Design Data 1.5.3Design Analysis 1.2.1Calculations

SD-06 Test Reports 1.2.3Air Infiltration 1.2.4Water Penetration 1.2.1.1Standard Airblast

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 67 PAGES

08 11 16 1.5.1Door and Frame Assembly 1.5.4Adjustments, Cleaning, and

Maintenance 08 14 00 SD-02 Shop Drawings

2.1Doors SD-03 Product Data

2.1Doors 2.2Accessories 2.3.7Water-resistant Sealer 1.4Warranty 2.1.2Sound Transmission Class

Rating 2.1.3Fire Resistance Rating

SD-06 Test Reports 2.4Cycle-Slam 2.4Hinge Loading Resistance

SD-11 Closeout Submittals 1.4Warranty

08 34 59 SD-02 Shop Drawings 2.1Vault Door Unit 2.3Day Gate

SD-03 Product Data 2.2Vault Door and Frame

SD-07 Certificates 2.2Vault Door and Frame

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 67 PAGES

08 34 59 3.1Installation 08 34 73 SD-02 Shop Drawings

2.1Wood Sound Retardant Doors 2.1Door Frames

SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds

SD-06 Test Reports 2.4.4Acoustical Tests

SD-07 Certificates 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.9Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.2.7.1Hardware 2.2.3Fasteners 2.3Mullions 2.2.9Screens 2.2.2Weatherstripping

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 67 PAGES

08 51 13 2.2.7Accessories 2.2.4Adhesives

SD-04 Samples 1.4.2.1Finish Sample

SD-05 Design Data 2.1Structural Calculations for

Deflection 1.4.3Design Analysis

SD-06 Test Reports 1.4.4Resistance to Forced Entry 1.10.2.3Standard Airblast Test

SD-07 Certificates 1.10.3Exterior Windows

SD-10 Operation and Maintenance Data

2.1Windows 08 71 00 SD-02 Shop Drawings

1.4Hardware Schedule 2.3.6Keying System

SD-03 Product Data 2.3Hardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.4Hardware Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 67 PAGES

08 71 00 SD-11 Closeout Submittals 1.5.1Key Bitting

08 81 00 SD-03 Product Data 1.6.1Insulating Glass 1.3Glazing Accessories

SD-04 Samples 1.6.1Insulating Glass 2.3.3Tape 2.3.1.1Sealant

SD-07 Certificates 1.6.1Insulating Glass

SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

SD-04 Samples 1.4Wall louvers 1.5Wall louvers

09 22 00 SD-02 Shop Drawings 2.1Metal support systems

09 29 00 SD-03 Product Data 2.1.5Cementitious Backer Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 67 PAGES

09 29 00 2.1.3Glass Mat Water-Resistant Gypsum Tile Backing Board

2.1.2Water-Resistant Gypsum Backing Board

2.1.4Abuse Resistant Gypsum Board 2.1.8Accessories 2.1.1Gypsum Board

SD-07 Certificates 2.1Asbestos Free Materials

09 30 10 SD-03 Product Data 2.1.1Mosaic Tile 2.1.2Glass Tile 2.1.3Glazed Wall Tile 2.2Setting-Bed 2.4Mortar, Grout

SD-04 Samples 2.1Tile 2.1Accessories 2.1Transition Strips 2.5Transition Strips 2.4.2Grout

09 51 00 SD-03 Product Data 2.2Acoustical Units

SD-04 Samples 2.2Acoustical Units

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 67 PAGES

09 51 00 2.1.1Ceiling Attenuation Class and Test

09 62 38 SD-03 Product Data 2.1Static-Control Resilient Flooring 2.3Accessories 2.2Adhesives 1.8Warranty

SD-04 Samples 2.1Static-Control Resilient Flooring 2.3Accessories

SD-06 Test Reports 3.2Moisture, Alkalinity and Bond 3.6Testing

SD-07 Certificates 1.5Qualifications of Applicator

SD-08 Manufacturer’s Instructions 2.1Static-Control Resilient Flooring 2.3Accessories

SD-10 Operation and Maintenance Data

2.1Static-Control Resilient Flooring 2.3Accessories

09 65 00 SD-03 Product Data 2.7Resilient Flooring and

Accessories 2.4Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 67 PAGES

09 65 00 SD-04 Samples

2.7 GResilient Flooring and

Accessories SD-06 Test Reports

3.3Moisture, Alkalinity and Bond Tests

SD-08 Manufacturer’s Instructions 3.2Surface Preparation 3.1Installation

SD-10 Operation and Maintenance Data

2.7Resilient Flooring and Accessories

09 68 00 SD-02 Shop Drawings 3.4Installation Drawings 2.4Moldings

SD-03 Product Data 2.1Carpet 2.4Moldings

SD-04 Samples 2.1Carpet 2.4Moldings

SD-06 Test Reports 3.2Moisture and Alkalinity Tests

SD-08 Manufacturer’s Instructions 3.1Surface Preparation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 67 PAGES

09 68 00 3.4Installation SD-10 Operation and Maintenance Data

2.1Carpet 3.5Cleaning and Protection

SD-11 Closeout Submittals 1.5Warranty

09 90 00 SD-03 Product Data 2.1Coatings 2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.9 GColor

SD-07 Certificates

1.3Applicator's qualifications 1.4.1.2Qualification Testing

SD-08 Manufacturer’s Instructions 3.2.1Application instructions 3.6.2Mixing 1.7.2Manufacturer's Safety Data

Sheets 10 11 00 SD-03 Product Data

1.2Visual Display Board 2.4Projection Screen

SD-04 Samples 2.1.3Aluminum

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 67 PAGES

10 11 00 2.1.1Porcelain Enamel 2.1Materials

10 14 00.10 SD-02 Shop Drawings

3.1 GApproved Detail Drawings

SD-03 Product Data 3.1Installation

1.2 GExterior Signage

SD-04 Samples

1.2 GExterior Signage

SD-10 Operation and Maintenance Data

3.1.2Protection and Cleaning 10 14 00.20 SD-02 Shop Drawings

1.3.2Detail Drawings SD-03 Product Data

3.1Installation 1.5Warranty

SD-04 Samples 1.3.1Interior Signage

SD-10 Operation and Maintenance Data

3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings

2.1Fabrication Drawings 3.2Installation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 67 PAGES

10 21 13 2.1Cleaning and Maintenance Instructions

2.7Colors And Finishes 2.2.1Anchoring Devices and

Fasteners 2.2.3Hardware and Fittings 2.2.2Brackets 2.2.4Door Hardware 2.5Pilaster Shoes 2.2.3.2Finishes 2.3.1Toilet Enclosures 2.3.2Urinal Screens

SD-04 Samples 2.7Colors and Finishes 2.2.3Hardware and Fittings 2.2.1Anchoring Devices and

Fasteners SD-07 Certificates

1.5Warranty 10 22 39 SD-01 Preconstruction Submittals

2.1Manufacturer's Qualifications 2.1Manufacturer's Sample Warranty 2.1Statement of Code Compliance 2.1Statement of Standards

Conformity

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 67 PAGES

10 22 39 2.1Verification of Field Measurements

SD-02 Shop Drawings 3.1Installation 3.1.1Layouts 2.1Fabrication Drawings

SD-03 Product Data 2.3Folding Panel Partitions 2.1Installation Instructions

SD-04 Samples 2.3Folding Panel Partitions

SD-06 Test Reports 2.1.2.1Flame and Smoke Development

Tests SD-07 Certificates

2.2Materials 2.3Folding Panel Partitions

SD-10 Operation and Maintenance Data

2.3Folding Panel Partitions 10 26 00 SD-02 Shop Drawings

2.2Corner Guards SD-03 Product Data

2.2Corner Guards SD-04 Samples

2.4Finish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 67 PAGES

10 26 00 SD-06 Test Reports 2.2Corner Guards

SD-07 Certificates 2.2Corner Guards

10 28 13 SD-03 Product Data 2.1.2Finishes 2.2Accessory Items

SD-04 Samples 2.1.2Finishes 2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

10 44 16 SD-02 Shop Drawings 2.2.1Wall Brackets

SD-03 Product Data 2.1.2Fire Extinguishers 2.2.1Wall Brackets 3.2.1Replacement Parts List

SD-04 Samples 1.2.1Wall Bracket

SD-07 Certificates 2.1.2Fire Extinguishers

10 51 13 SD-02 Shop Drawings 2.1Types 1.4Location 3.1Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 67 PAGES

10 51 13 3.2Numbering system SD-03 Product Data

2.2Material 2.3.1Locking Devices 2.3.1Lock Control Chart 2.3.3Handles 2.2.3Finish 2.3components 3.1Assembly

SD-04 Samples 1.5.1Color chips

12 21 00 SD-02 Shop Drawings 3.3Installation

SD-03 Product Data 2.1Window Blinds 3.3.1Window Blinds 3.3Installation

SD-04 Samples 2.1Window Blinds 3.3.1Window Blinds

SD-08 Manufacturer’s Instructions 2.1Window Blinds 3.3.1Window Blinds

SD-10 Operation and Maintenance Data

2.1Window Blinds

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 67 PAGES

12 21 00 3.3.1Window Blinds 14 24 23 SD-02 Shop Drawings

2.1Elevator 1.2.1Elevator Components 1.2.2Elevator Components 1.2.1Machine and Elevator Controller 1.3.4Wiring Diagrams

SD-03 Product Data 2.1Elevator 1.2.1Elevator Components 1.2.2Elevator Components 1.2.2Data Sheets 2.5.2Elevator Microprocessor

Controller SD-05 Design Data

1.2.3.3Emergency Power Systems 1.2.3.2Heat Loads 1.2.3.1Reaction Loads

SD-07 Certificates 1.4Warranty 1.3.1.1Endorsement Letter 1.2.4Welders' Qualifications 2.5.2.3Elevator Controller Certification

SD-10 Operation and Maintenance Data

2.1Elevator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 67 PAGES

14 24 23 1.2.5Maintenance Control Program

(MCP)

2.5.2.2Software and Documentation 21 13 13.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.9As-Built Drawings

SD-03 Product Data 1.4.1Fire Protection Related

Submittals

2.3 GMaterials and Equipment

1.6Spare Parts

3.8 GPreliminary Tests

3.9 GFinal Acceptance Test

3.10 GOnsite Training

1.4.1 GFire Protection Specialist

1.4.2 GSprinkler System Installer

SD-05 Design Data

1.4.3 GSway Bracing

1.2.1.3 GHydraulic Calculations

SD-06 Test Reports

3.8 GPreliminary Test Report

3.9 GFinal Acceptance Test Report

SD-07 Certificates

3.3 GInspection by Fire Protection

Specialist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 67 PAGES

21 13 13.00 10 SD-10 Operation and Maintenance Data

3.10 GOperating and Maintenance

Manuals

22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data 2.5Fixtures 2.5.2Flush Valve Water Closets 2.5.3Flush Valve Urinals 2.5.4Wall Hung Lavatories 2.5.5Kitchen Sinks 2.5.6Service Sinks 2.5.7Drinking-Water Coolers 2.8Shower Pan 2.10Water Heaters 2.11Pumps

3.9.1.1 GBackflow Prevention Assemblies

2.7.2Shower Faucets 1.5.1Welding

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports 3.9Tests, Flushing and Disinfection

3.9.1.1 GTest of Backflow Prevention

Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 67 PAGES

22 00 00 SD-07 Certificates 1.3Materials and Equipment 2.2.1Bolts

SD-10 Operation and Maintenance Data

3.9.1 GPlumbing System

SD-11 Closeout Submittals

2.1.1Water-Efficient Products 2.1.2Energy-Efficient Water Heaters

23 00 00 SD-02 Shop Drawings 1.4.5Detail Drawings

SD-03 Product Data 2.10.1.1Metallic Flexible Duct 2.10.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.10.1.2Duct Connectors 2.10.2Duct Access Doors 2.10.3Fire Dampers 2.10.4Manual Balancing Dampers 2.10.8.1Diffusers 2.10.8.2Registers and Grilles 2.10.9Louvers 2.10.10Air Vents, Penthouses, and

Goosenecks 2.11.1.1Centrifugal Fans 2.11.1.2In-Line Centrifugal Fans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 67 PAGES

23 00 00 2.12Air Handling Units 2.13.1Room Fan-Coil Units 2.13.2.1Variable Volume, Single Duct

Terminal Units 2.15Dehumidifier 2.14Energy Recovery Devices 1.4.6Test Procedures 1.2.1.2Diagrams

SD-06 Test Reports 3.13Performance Tests 3.11Damper Acceptance Test

SD-07 Certificates 1.4.3Ozone Depleting Substances

SD-08 Manufacturer’s Instructions 3.3Manufacturer's Installation

Instructions 3.15.2Operation and Maintenance

Training SD-10 Operation and Maintenance Data

3.15.1Operation and Maintenance Manuals

2.10.3Fire Dampers 2.10.4Manual Balancing Dampers 2.11.1.1Centrifugal Fans 2.11.1.2In-Line Centrifugal Fans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 67 PAGES

23 00 00 2.12Air Handling Units 2.13.1Room Fan-Coil Units 2.13.2.1Variable Volume, Single Duct

Terminal Units 2.15Dehumidifier 2.14Energy Recovery Devices

SD-11 Closeout Submittals 2.1.1Energy Efficient Equipment 2.1.2Reduce Volatile Organic

Compounds (VOC) 3.1Indoor Air Quality During

Construction 2.1.3Ozone Depleting Substances for

Refrigerants 23 05 93 SD-01 Preconstruction Submittals

1.3.3Records of Existing Conditions 1.5.3.1TAB Firm 1.2TAB Team Assistants 1.2TAB Team Engineer 1.5.3.2TAB Specialist 1.2TAB Team Field Leader

SD-02 Shop Drawings 1.3.3TAB Schematic Drawings and

Report Forms SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 67 PAGES

23 05 93 1.3Equipment and Performance Data

1.5.3.4TAB Related HVAC Submittals 1.5.2TAB Procedures…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.