W9128A-19-B-0002_Am-0003_Specifications.pdf
PDF 2 MB Posted
- Attached to
- Repair Building 3004, Schofield Barracks, Hawaii Federal contract opportunity
- Solicitation number
- W9128A19B0002
About this file
Am-0003 Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19b2-BidAbstract.pdf | ||
| sf30-19b2-am4.pdf | ||
| W9128A-19-B-0002_Am-0003_Drawings_Part2.pdf | ||
| W9128A-19-B-0002_Am-0003_Drawings_Part1.pdf | ||
| sf30-19b2-am3.pdf | ||
| W9128A-19-B-0002_Am-0002.pdf | ||
| W9128A-19-B-0002_Am-0001.pdf | ||
| W9128A-19-B-0002_Specifications_(Part_1_of_4).pdf | ||
| W9128A-19-B-0002_Specifications_(Part_3_of_4).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_2_of_6).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_3_of_6).pdf | ||
| W9128A-19-B-0002_Specifications_(Part_4_of_4).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_1_of_6).pdf | ||
| W9128A-19-B-0002_Specifications_(Part_2_of_4).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_6_of_6).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_5_of_6).pdf | ||
| W9128A-19-B-0002_Drawings_(Part_4_of_6).pdf | ||
| W9128A-19-B-0002_Invitation_for_Bid.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RENOVATION OF BUILDING 3004, SCHOFIELD BARRACKS, OAHU, HAWAII BLDG3004
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 00 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 RMS3 - CONTRACTOR MODE (RMS3/CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 90 00 MISCELLANEOUS PROVISIONS
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 83 13.00 20 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 01 30.71 CONCRETE REHABILITATION
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 37 13 SHOTCRETE
03 39 00.00 10 CONCRETE CURING
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 14 00 FLUID-APPLIED WATERPROOFING
PROJECT TABLE OF CONTENTS Page 1
(Am-0003)
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 62 10 COPPER SHEET METAL FLASHING
07 62 13 COPPER SHEET METAL FLASHING AND TRIM
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
PROJECT TABLE OF CONTENTS Page 2
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 19.10 10 INSULATED WIRE AND CABLE
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
31 31 16.19 TERMITE CONTROL BARRIERS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
PROJECT TABLE OF CONTENTS Page 3
32 17 24.00 10 PAVEMENT MARKINGS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 67 PAGES
RENOVATION OF BUILDING 3004, SCHOFIELD BARRACKS, OAHU, HAWAII
01 32 00 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
SD-06 Test Reports 3.5.2Narrative Report 3.5.3Schedule Reports 3.6.2Periodic Schedule Updates
01 33 00 SD-01 Preconstruction Submittals
3.1 GSubmittal Register
3.5.1Monthly Updates
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.5Crane Operators
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.8 GActivity Hazard Analysis (AHA)
1.12.4Certificate of Compliance
01 45 04 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 67 PAGES
01 45 35 SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1Certified Plant 2.1Certificate of Compliance 1.5Special Inspector
SD-11 Closeout Submittals 3.1.2Interim Final Report
3.1.2 GComprehensive Final Report
01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey
1.7 GEnvironmental Protection Plan
3.2.1.2Inspection Reports
SD-11 Closeout Submittals 3.2.1.3Stormwater Pollution Prevention
Plan Compliance Notebook 3.2.1.4Stormwater Notice of Termination
01 74 19 SD-01 Preconstruction Submittals 1.4Material dismantling sequence plan 1.4Schedule of removal 1.4Estimated quantity of recyclable materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 67 PAGES
01 74 19 SD-09 Manufacturer’s Field Reports
1.1Solid Waste Disposal and Diversion
01 78 00 SD-03 Product Data 1.5.1Warranty Management Plan 1.5.5Warranty Tags 1.2.5.1Spare Parts Data
SD-08 Manufacturer’s Instructions 1.3Preventative Maintenance 1.3Condition Monitoring (Predictive
Testing) 1.3Inspection 1.5.1Instructions
SD-10 Operation and Maintenance Data
1.7.1Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.2.1Record Drawings 1.4Certification of EPA Designated
Items 01 78 23 SD-10 Operation and Maintenance
Data 1.3O&M Database 3.1.1Training Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 67 PAGES
01 78 23 3.1.3Training Outline 3.1.2Training Content
SD-11 Closeout Submittals 3.1.4Training Video Recording 3.1.6Validation of Training Completion
01 90 00 SD-01 Preconstruction Submittals 1.12.4.1Electrical Outage Permit 1.12.4.2Water Outage Permit 1.12.2.1Request for Temporary Water
Service 1.12.4.4Excavation and Traffic Control
Permit
1.12.4.3 GRoad Closure
1.13 GAlteration of the Original
Contractor's Operations or Storage Area
1.13Contractor's Operations or Storage Area
SD-06 Test Reports 1.7Inspection 1.8Dust Control
SD-07 Certificates 1.5Products Containing Recovered
Materials 01 91 00.15 SD-01 Preconstruction Submittals
1.7 GCommissioning Firm
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 67 PAGES
01 91 00.15 1.7.1 GLead Commissioning Specialist
1.7.2 GTechnical Commissioning
Specialists
1.7 GCommissioning Firm's Contract
SD-06 Test Reports
3.1.3 GDesign Review Report
3.1.2.1 GInterim Construction Phase
Commissioning Plan
3.1.2.2 GFinal Construction Phase
Commissioning Plan
3.1.2.1.2 GTemplate Building Envelope
Inspection Checklists
3.1.5.2 GBuilding Envelope Inspection
Checklists
3.1.5.3 GPre-Functional Checklists
1.8Issues Log
3.2 GCommissioning Report
SD-07 Certificates
1.9 GCertificate of Readiness
SD-10 Operation and Maintenance Data
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
3.1.7 GSystems Manual
3.1.8 G DOMaintenance and Service Life
Plans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 67 PAGES
01 91 00.15 SD-11 Closeout Submittals
3.1.2.1 S DOConstruction Phase
Commissioning Plan
3.2 S DOFinal Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates 1.6Notification
SD-11 Closeout Submittals 3.3.4Receipts
02 83 13.00 20 SD-01 Preconstruction Submittals
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.2 GLead Compliance Plan
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.8 GLead Waste Management Plan
3.5.2.1 GWritten Evidence
1.5.2.4 GMedical Examinations
SD-06 Test Reports
1.5.2.3 GSampling Results
1.5.2.3 GOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.3 GTesting Laboratory
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 67 PAGES
02 83 13.00 20 3.1.1.1 GOccupant Notification
1.5.1.4 GThird Party Consultant
Qualifications
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 Ghazardous waste manifest
3.5.2.1 Gturn-in documents or weight
tickets 02 84 16 SD-07 Certificates
1.8.1 GQualifications of CIH
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter certification
3.2.4Certification of Decontamination 3.5.2.1Certificate of Disposal and/or recycling 03 01 30.71 SD-07 Certificates
2.1.1.1Epoxy Resin Binder SD-08 Manufacturer’s Instructions
2.1.1Epoxy 03 11 13.00 10 SD-02 Shop Drawings
2.2.1Formwork 3.1.1Formwork
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 67 PAGES
03 11 13.00 10 2.2.1Form Removal Schedule SD-03 Product Data
2.2Form Materials SD-05 Design Data
2.1Calculations SD-06 Test Reports
3.2Inspection 03 15 00.00 10 SD-03 Product Data
2.2Preformed Expansion Joint Filler 2.3Sealant
SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.3Sealant
03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement
SD-03 Product Data 2.1Reinforcing Steel
SD-07 Certificates 2.1Reinforcing Steel
03 30 00.00 10 SD-01 Preconstruction Submittals 1.5.2Quality Control Plan 1.5.1Laboratory Accreditation
3.8.5.4 GSampling Plan
SD-03 Product Data 2.2Cementitious Materials 2.8Vapor Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 67 PAGES
03 30 00.00 10 2.1.5Floor Finish 2.4Chemical Admixtures
SD-05 Design Data 2.1.1Mixture Proportions
SD-06 Test Reports 2.1.1Mixture Proportions 3.8Testing and Inspection for CQC 2.2.4Fly Ash 2.3Aggregates 3.8.5.1Slump 3.8.5.4Compressive Strength 2.5Water
SD-07 Certificates 1.5Contractor Quality Control personnel 3.2.1Ready-Mix Plant
03 37 13 SD-06 Test Reports
1.6 GTesting During Construction
2.1.3Aggregate 2.1.4Water 2.3Mixture Proportions
1.6.5 GRepair Of Shotcrete
3.9 GRepair Of Shotcrete
SD-07 Certificates
1.5 GQualifications
2.1.1Cement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 67 PAGES
03 37 13 2.1.2Supplementary Cementitious Materials
2.1.5 GAdmixtures
2.1.6Reinforcement 2.1.7Curing Materials
03 39 00.00 10 SD-03 Product Data 2.1Curing Materials
SD-06 Test Reports 3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions 2.1Curing Compound
03 42 13.00 10 SD-01 Preconstruction Submittals 1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 GStandard Precast Units
2.1.2 GCustom-Made Precast Units
SD-03 Product Data 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.4Accessories
SD-05 Design Data 2.1.2Design Calculations 2.1.5.1Concrete Mix Proportions
SD-06 Test Reports 1.3.2.4Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 67 PAGES
03 42 13.00 10 SD-07 Certificates 1.3.2.2Quality Control Procedures
05 12 00 SD-02 Shop Drawings 1.3.2Fabrication Drawings
SD-03 Product Data 2.4.1Welding Electrodes and Rods 2.4.2Non-Shrink Grout
SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3.3.1Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods
05 30 00 SD-02 Shop Drawings 1.3.3Fabrication Drawings
SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.4Galvanizing Repair Paint 2.1.4Touch-Up Paint 1.3.2Welding Equipment 1.3.2Welding Rods and Accessories
SD-07 Certificates 1.3.2Welder Qualifications 1.3.2Welding Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 67 PAGES
05 30 00 1.3.1Manufacturer's Certificate 05 50 13 SD-02 Shop Drawings
2.3Expansion Joint Covers 2.6Angles and Plates 2.8Roof Hatches
SD-03 Product Data 2.3Expansion Joint Covers 2.8Roof Hatches
SD-04 Samples 2.3Expansion Joint Covers
05 51 00 SD-02 Shop Drawings 2.2.1Metal Stair System
SD-03 Product Data 2.3.2Masonry Anchorage Devices 2.2.2Steel Pan Stairs 2.3.1Steel Stairs
SD-07 Certificates 1.3.1Welder Qualification
SD-08 Manufacturer’s Instructions 2.3.2Masonry Anchorage Devices
05 51 33 SD-02 Shop Drawings 2.3Ladders
SD-03 Product Data 2.3Ladders
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 67 PAGES
05 51 33 1.3Fabricator Certification for Ladder Assembly
05 52 00 SD-02 Shop Drawings 1.2.1Fabrication Drawings
SD-03 Product Data 2.2.7Masonry Anchorage Devices 2.2.9Steel Railings and Handrails 1.2.1Anchorage and Fastening
Systems SD-07 Certificates
1.4.1Welder Qualification SD-08 Manufacturer’s Instructions
3.2Installation Instructions 06 10 00 SD-06 Test Reports
1.4.2Preservative-treated SD-07 Certificates
1.7Preservative Treatment 06 20 00 SD-02 Shop Drawings
1.3Detail Drawings Indicating All Wood Assemblies
2.3.2Termite Treatment Plan SD-03 Product Data
2.3.2Termiticide MSDS SD-07 Certificates
1.5.1.1Certificates of Grade 2.3.2licensed pesticide applicator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 67 PAGES
06 41 16.00 10 SD-02 Shop Drawings 1.4.2Shop Drawings 2.8Shop Drawings 3.1Installation
SD-03 Product Data 2.1Wood Materials
SD-04 Samples 2.3Plastic Laminates 2.5Cabinet Hardware
SD-07 Certificates 1.4Quality Assurance 3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings 1.4.2Detail Drawings 3.1Installation
SD-03 Product Data 2.1Solid Polymer Material 1.4.1Qualifications 2.3Fabrications
SD-04 Samples 2.1Material
SD-06 Test Reports 2.1Solid Polymer Material
SD-07 Certificates 2.3Fabrications 1.4.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 67 PAGES
06 61 16 SD-10 Operation and Maintenance Data
3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2Thermal Imaging Camera SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.7 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 14 00 SD-03 Product Data 2.1Fluid-Applied Membrane 2.2Membrane Primer 2.8Elastomeric Sheet 2.10Flexible Foam-Backed
Elastomeric Sheet 3.3Solvent
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 67 PAGES
07 14 00 3.4.1Moisture Meter 2.11Protection Board 2.7Bond Breaker
SD-11 Closeout Submittals 1.6Warranty 3.6Information Card 3.5Instructions To Government
Personnel 07 21 16 SD-03 Product Data
2.2Blanket Insulation SD-08 Manufacturer’s Instructions
3.2.1Insulation 07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3Verification of Existing Conditions
SD-03 Product Data 2.1Insulation 1.4Cover Board 2.4Adhesives
SD-07 Certificates 1.7Volatile Organic Compounds
(VOC) Content 1.6Installer Qualifications
SD-08 Manufacturer’s Instructions 2.1Insulation
07 27 10.00 10 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 67 PAGES
07 27 10.00 10 1.8Design Review Report 3.1.2Testing and Inspection
SD-07 Certificates 1.7Air Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals 1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer
SD-02 Shop Drawings 1.4Fluid-Applied Membrane Air
Barrier SD-03 Product Data
1.4Fluid-Applied Membrane Air Barrier
2.2Primers, Adhesives, and Mastics 2.5Reinforcement 1.4.2Safety Data Sheets
SD-04 Samples 1.4.3Mockup
SD-06 Test Reports 1.6Capillary Moisture Test 1.4.4Field Peel Adhesion Test 1.4.4Flame Propagation of Wall
Assemblies 1.4.4Flame Spread and Smoke
Developed Index Ratings 3.4.1Site Inspections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 67 PAGES
07 27 26 SD-07 Certificates 1.4Fluid-Applied Membrane Air
Barrier 1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer
SD-08 Manufacturer’s Instructions 1.4Fluid-Applied Membrane Air
Barrier 2.2Primers, Adhesives, and Mastics
07 52 00 SD-02 Shop Drawings 1.4.6Roof plan
SD-03 Product Data 2.1Modified Bitumen Sheets 2.4Primer 2.5Modified Bitumen Roof Cement 2.7Fasteners And Plates 1.9Warranty
SD-05 Design Data 1.4.5Wind Uplift Calculations
SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator 1.4.3Qualification of Engineer of
Record 1.4.5Wind Uplift Resistance 1.4.4Fire Resistance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 67 PAGES
07 52 00 SD-08 Manufacturer’s Instructions 3.3.4Modified Bitumen Membrane
Application 3.3.5Flashing 3.2.2.1Torches 2.4Primer 2.7.1Fasteners
SD-11 Closeout Submittals 1.9Warranty 3.8Information Card 3.7Instructions To
GovernmentPersonnel 07 62 10 SD-02 Shop Drawings
2.1.3Sheet Metal 07 62 13 SD-02 Shop Drawings
2.1.3Sheet Metal 07 84 00 SD-03 Product Data
2.1Firestopping Materials SD-06 Test Reports
3.3Inspection SD-07 Certificates
2.1Firestopping Materials 1.5.1Installer Qualifications
07 92 00 SD-03 Product Data 2.2Sealants 2.3Primers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 67 PAGES
07 92 00 2.4Bond Breakers 2.5Backstops
08 11 13 SD-02 Shop Drawings 2.1Doors 2.1Doors 2.6Frames 2.6Frames 2.4Accessories
SD-03 Product Data 2.1Doors 2.6Frames 2.4Accessories
08 11 16 SD-02 Shop Drawings
1.5.1 GDoor and Frame Assembly
SD-03 Product Data
1.5.1 GDoor and Frame Assembly
SD-04 Samples
1.5.2 GFinish Samples
SD-05 Design Data 1.5.3Design Analysis 1.2.1Calculations
SD-06 Test Reports 1.2.3Air Infiltration 1.2.4Water Penetration 1.2.1.1Standard Airblast
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 67 PAGES
08 11 16 1.5.1Door and Frame Assembly 1.5.4Adjustments, Cleaning, and
Maintenance 08 14 00 SD-02 Shop Drawings
2.1Doors SD-03 Product Data
2.1Doors 2.2Accessories 2.3.7Water-resistant Sealer 1.4Warranty 2.1.2Sound Transmission Class
Rating 2.1.3Fire Resistance Rating
SD-06 Test Reports 2.4Cycle-Slam 2.4Hinge Loading Resistance
SD-11 Closeout Submittals 1.4Warranty
08 34 59 SD-02 Shop Drawings 2.1Vault Door Unit 2.3Day Gate
SD-03 Product Data 2.2Vault Door and Frame
SD-07 Certificates 2.2Vault Door and Frame
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 67 PAGES
08 34 59 3.1Installation 08 34 73 SD-02 Shop Drawings
2.1Wood Sound Retardant Doors 2.1Door Frames
SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds
SD-06 Test Reports 2.4.4Acoustical Tests
SD-07 Certificates 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.9Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.2.7.1Hardware 2.2.3Fasteners 2.3Mullions 2.2.9Screens 2.2.2Weatherstripping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 67 PAGES
08 51 13 2.2.7Accessories 2.2.4Adhesives
SD-04 Samples 1.4.2.1Finish Sample
SD-05 Design Data 2.1Structural Calculations for
Deflection 1.4.3Design Analysis
SD-06 Test Reports 1.4.4Resistance to Forced Entry 1.10.2.3Standard Airblast Test
SD-07 Certificates 1.10.3Exterior Windows
SD-10 Operation and Maintenance Data
2.1Windows 08 71 00 SD-02 Shop Drawings
1.4Hardware Schedule 2.3.6Keying System
SD-03 Product Data 2.3Hardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.4Hardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 67 PAGES
08 71 00 SD-11 Closeout Submittals 1.5.1Key Bitting
08 81 00 SD-03 Product Data 1.6.1Insulating Glass 1.3Glazing Accessories
SD-04 Samples 1.6.1Insulating Glass 2.3.3Tape 2.3.1.1Sealant
SD-07 Certificates 1.6.1Insulating Glass
SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
SD-04 Samples 1.4Wall louvers 1.5Wall louvers
09 22 00 SD-02 Shop Drawings 2.1Metal support systems
09 29 00 SD-03 Product Data 2.1.5Cementitious Backer Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 67 PAGES
09 29 00 2.1.3Glass Mat Water-Resistant Gypsum Tile Backing Board
2.1.2Water-Resistant Gypsum Backing Board
2.1.4Abuse Resistant Gypsum Board 2.1.8Accessories 2.1.1Gypsum Board
SD-07 Certificates 2.1Asbestos Free Materials
09 30 10 SD-03 Product Data 2.1.1Mosaic Tile 2.1.2Glass Tile 2.1.3Glazed Wall Tile 2.2Setting-Bed 2.4Mortar, Grout
SD-04 Samples 2.1Tile 2.1Accessories 2.1Transition Strips 2.5Transition Strips 2.4.2Grout
09 51 00 SD-03 Product Data 2.2Acoustical Units
SD-04 Samples 2.2Acoustical Units
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 67 PAGES
09 51 00 2.1.1Ceiling Attenuation Class and Test
09 62 38 SD-03 Product Data 2.1Static-Control Resilient Flooring 2.3Accessories 2.2Adhesives 1.8Warranty
SD-04 Samples 2.1Static-Control Resilient Flooring 2.3Accessories
SD-06 Test Reports 3.2Moisture, Alkalinity and Bond 3.6Testing
SD-07 Certificates 1.5Qualifications of Applicator
SD-08 Manufacturer’s Instructions 2.1Static-Control Resilient Flooring 2.3Accessories
SD-10 Operation and Maintenance Data
2.1Static-Control Resilient Flooring 2.3Accessories
09 65 00 SD-03 Product Data 2.7Resilient Flooring and
Accessories 2.4Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 67 PAGES
09 65 00 SD-04 Samples
2.7 GResilient Flooring and
Accessories SD-06 Test Reports
3.3Moisture, Alkalinity and Bond Tests
SD-08 Manufacturer’s Instructions 3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data
2.7Resilient Flooring and Accessories
09 68 00 SD-02 Shop Drawings 3.4Installation Drawings 2.4Moldings
SD-03 Product Data 2.1Carpet 2.4Moldings
SD-04 Samples 2.1Carpet 2.4Moldings
SD-06 Test Reports 3.2Moisture and Alkalinity Tests
SD-08 Manufacturer’s Instructions 3.1Surface Preparation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 67 PAGES
09 68 00 3.4Installation SD-10 Operation and Maintenance Data
2.1Carpet 3.5Cleaning and Protection
SD-11 Closeout Submittals 1.5Warranty
09 90 00 SD-03 Product Data 2.1Coatings 2.1Manufacturer's Technical Data
Sheets SD-04 Samples
1.9 GColor
SD-07 Certificates
1.3Applicator's qualifications 1.4.1.2Qualification Testing
SD-08 Manufacturer’s Instructions 3.2.1Application instructions 3.6.2Mixing 1.7.2Manufacturer's Safety Data
Sheets 10 11 00 SD-03 Product Data
1.2Visual Display Board 2.4Projection Screen
SD-04 Samples 2.1.3Aluminum
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 67 PAGES
10 11 00 2.1.1Porcelain Enamel 2.1Materials
10 14 00.10 SD-02 Shop Drawings
3.1 GApproved Detail Drawings
SD-03 Product Data 3.1Installation
1.2 GExterior Signage
SD-04 Samples
1.2 GExterior Signage
SD-10 Operation and Maintenance Data
3.1.2Protection and Cleaning 10 14 00.20 SD-02 Shop Drawings
1.3.2Detail Drawings SD-03 Product Data
3.1Installation 1.5Warranty
SD-04 Samples 1.3.1Interior Signage
SD-10 Operation and Maintenance Data
3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings 3.2Installation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 67 PAGES
10 21 13 2.1Cleaning and Maintenance Instructions
2.7Colors And Finishes 2.2.1Anchoring Devices and
Fasteners 2.2.3Hardware and Fittings 2.2.2Brackets 2.2.4Door Hardware 2.5Pilaster Shoes 2.2.3.2Finishes 2.3.1Toilet Enclosures 2.3.2Urinal Screens
SD-04 Samples 2.7Colors and Finishes 2.2.3Hardware and Fittings 2.2.1Anchoring Devices and
Fasteners SD-07 Certificates
1.5Warranty 10 22 39 SD-01 Preconstruction Submittals
2.1Manufacturer's Qualifications 2.1Manufacturer's Sample Warranty 2.1Statement of Code Compliance 2.1Statement of Standards
Conformity
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 67 PAGES
10 22 39 2.1Verification of Field Measurements
SD-02 Shop Drawings 3.1Installation 3.1.1Layouts 2.1Fabrication Drawings
SD-03 Product Data 2.3Folding Panel Partitions 2.1Installation Instructions
SD-04 Samples 2.3Folding Panel Partitions
SD-06 Test Reports 2.1.2.1Flame and Smoke Development
Tests SD-07 Certificates
2.2Materials 2.3Folding Panel Partitions
SD-10 Operation and Maintenance Data
2.3Folding Panel Partitions 10 26 00 SD-02 Shop Drawings
2.2Corner Guards SD-03 Product Data
2.2Corner Guards SD-04 Samples
2.4Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 67 PAGES
10 26 00 SD-06 Test Reports 2.2Corner Guards
SD-07 Certificates 2.2Corner Guards
10 28 13 SD-03 Product Data 2.1.2Finishes 2.2Accessory Items
SD-04 Samples 2.1.2Finishes 2.2Accessory Items
SD-07 Certificates 2.2Accessory Items
10 44 16 SD-02 Shop Drawings 2.2.1Wall Brackets
SD-03 Product Data 2.1.2Fire Extinguishers 2.2.1Wall Brackets 3.2.1Replacement Parts List
SD-04 Samples 1.2.1Wall Bracket
SD-07 Certificates 2.1.2Fire Extinguishers
10 51 13 SD-02 Shop Drawings 2.1Types 1.4Location 3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 67 PAGES
10 51 13 3.2Numbering system SD-03 Product Data
2.2Material 2.3.1Locking Devices 2.3.1Lock Control Chart 2.3.3Handles 2.2.3Finish 2.3components 3.1Assembly
SD-04 Samples 1.5.1Color chips
12 21 00 SD-02 Shop Drawings 3.3Installation
SD-03 Product Data 2.1Window Blinds 3.3.1Window Blinds 3.3Installation
SD-04 Samples 2.1Window Blinds 3.3.1Window Blinds
SD-08 Manufacturer’s Instructions 2.1Window Blinds 3.3.1Window Blinds
SD-10 Operation and Maintenance Data
2.1Window Blinds
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 67 PAGES
12 21 00 3.3.1Window Blinds 14 24 23 SD-02 Shop Drawings
2.1Elevator 1.2.1Elevator Components 1.2.2Elevator Components 1.2.1Machine and Elevator Controller 1.3.4Wiring Diagrams
SD-03 Product Data 2.1Elevator 1.2.1Elevator Components 1.2.2Elevator Components 1.2.2Data Sheets 2.5.2Elevator Microprocessor
Controller SD-05 Design Data
1.2.3.3Emergency Power Systems 1.2.3.2Heat Loads 1.2.3.1Reaction Loads
SD-07 Certificates 1.4Warranty 1.3.1.1Endorsement Letter 1.2.4Welders' Qualifications 2.5.2.3Elevator Controller Certification
SD-10 Operation and Maintenance Data
2.1Elevator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 67 PAGES
14 24 23 1.2.5Maintenance Control Program
(MCP)
2.5.2.2Software and Documentation 21 13 13.00 10 SD-02 Shop Drawings
1.4.3 GShop Drawings
3.9As-Built Drawings
SD-03 Product Data 1.4.1Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.8 GPreliminary Tests
3.9 GFinal Acceptance Test
3.10 GOnsite Training
1.4.1 GFire Protection Specialist
1.4.2 GSprinkler System Installer
SD-05 Design Data
1.4.3 GSway Bracing
1.2.1.3 GHydraulic Calculations
SD-06 Test Reports
3.8 GPreliminary Test Report
3.9 GFinal Acceptance Test Report
SD-07 Certificates
3.3 GInspection by Fire Protection
Specialist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 67 PAGES
21 13 13.00 10 SD-10 Operation and Maintenance Data
3.10 GOperating and Maintenance
Manuals
22 00 00 SD-02 Shop Drawings
3.9.1 GPlumbing System
SD-03 Product Data 2.5Fixtures 2.5.2Flush Valve Water Closets 2.5.3Flush Valve Urinals 2.5.4Wall Hung Lavatories 2.5.5Kitchen Sinks 2.5.6Service Sinks 2.5.7Drinking-Water Coolers 2.8Shower Pan 2.10Water Heaters 2.11Pumps
3.9.1.1 GBackflow Prevention Assemblies
2.7.2Shower Faucets 1.5.1Welding
3.4 GVibration-Absorbing Features
3.9.1Plumbing System
SD-06 Test Reports 3.9Tests, Flushing and Disinfection
3.9.1.1 GTest of Backflow Prevention
Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 67 PAGES
22 00 00 SD-07 Certificates 1.3Materials and Equipment 2.2.1Bolts
SD-10 Operation and Maintenance Data
3.9.1 GPlumbing System
SD-11 Closeout Submittals
2.1.1Water-Efficient Products 2.1.2Energy-Efficient Water Heaters
23 00 00 SD-02 Shop Drawings 1.4.5Detail Drawings
SD-03 Product Data 2.10.1.1Metallic Flexible Duct 2.10.1.2Insulated Nonmetallic Flexible
Duct Runouts 2.10.1.2Duct Connectors 2.10.2Duct Access Doors 2.10.3Fire Dampers 2.10.4Manual Balancing Dampers 2.10.8.1Diffusers 2.10.8.2Registers and Grilles 2.10.9Louvers 2.10.10Air Vents, Penthouses, and
Goosenecks 2.11.1.1Centrifugal Fans 2.11.1.2In-Line Centrifugal Fans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 67 PAGES
23 00 00 2.12Air Handling Units 2.13.1Room Fan-Coil Units 2.13.2.1Variable Volume, Single Duct
Terminal Units 2.15Dehumidifier 2.14Energy Recovery Devices 1.4.6Test Procedures 1.2.1.2Diagrams
SD-06 Test Reports 3.13Performance Tests 3.11Damper Acceptance Test
SD-07 Certificates 1.4.3Ozone Depleting Substances
SD-08 Manufacturer’s Instructions 3.3Manufacturer's Installation
Instructions 3.15.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.15.1Operation and Maintenance Manuals
2.10.3Fire Dampers 2.10.4Manual Balancing Dampers 2.11.1.1Centrifugal Fans 2.11.1.2In-Line Centrifugal Fans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 67 PAGES
23 00 00 2.12Air Handling Units 2.13.1Room Fan-Coil Units 2.13.2.1Variable Volume, Single Duct
Terminal Units 2.15Dehumidifier 2.14Energy Recovery Devices
SD-11 Closeout Submittals 2.1.1Energy Efficient Equipment 2.1.2Reduce Volatile Organic
Compounds (VOC) 3.1Indoor Air Quality During
Construction 2.1.3Ozone Depleting Substances for
Refrigerants 23 05 93 SD-01 Preconstruction Submittals
1.3.3Records of Existing Conditions 1.5.3.1TAB Firm 1.2TAB Team Assistants 1.2TAB Team Engineer 1.5.3.2TAB Specialist 1.2TAB Team Field Leader
SD-02 Shop Drawings 1.3.3TAB Schematic Drawings and
Report Forms SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 67 PAGES
23 05 93 1.3Equipment and Performance Data
1.5.3.4TAB Related HVAC Submittals 1.5.2TAB Procedures…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.