07_ES1-01_-_ELECTRICAL_SITE_PLAN_-_MEDICAL_CLINIC_BUILDING_1465.pdf

PDF 686 KB Posted

Attached to
Tyndall AFB Temporary Modular Medical Facility
Solicitation number
W9127S19Q6039
Issued by

About this file

Part of Attachment B1 - Additional Utility Plans

View the file

Other files

File Type Posted
49_22__TLV2.0_Combined_Clinic_TPF_Low_Voltage_Systems_Notes_&_Details.pdf PDF
55_TQ3.11A_-_FFE_PLAN_-_TPF_PHASE_1,_AREA_A.pdf PDF
49_21__TFP1.0_Combined_Clinic_TPF_Life_Safety_Narrative.pdf PDF
49_25__TPFV5.0_STANDARD_CANOPY_DETAILS_STAMPED.pdf PDF
49_25__TPFV3.0_STANDARD_RAMP_AND_STAIR_DETAILS_STAMPED.pdf PDF
49_24__TPF2.1-P2_Full_Building_Plan_Phase_2.pdf PDF
1-V1.03_SURVEY_PLAN.pdf PDF
49_21__TFP2.0_Combined_Clinic_TPF_Life_Safety_Plan.pdf PDF
1-V1.01_SURVEY_PLAN.pdf PDF
49_23__TCP1.4_Combined_Clinic_TPF_RCP.pdf PDF
1-V1.04_SURVEY_PLAN.pdf PDF
55_TQ3.11B_-_FFE_PLAN_-_TPF_PHASE_1,_AREA_B.pdf PDF
49_21__TFP3.3_Combined_Clinic_TPF_Fire_Suppression_Notes_and_Details.pdf PDF
49_23__TCP1.0_Combined_Clinic_TPF_RCP.pdf PDF
49_24__TPF3.0_Full_Luminary_Plan.pdf PDF
56_SGT.02_TEMP_SIGNAGE_TPF_PHASE_1.pdf PDF
49_22__TLV1.0_Combined_Clinic_TPF_LV_Systems_Notes_&_Details.pdf PDF
55_TQ3.01_-_FFE_JSN_LEGEND.pdf PDF
49_25__TPFV6.0_CANOPY_FOOTING_DETAILS_STAMPED.pdf PDF
49_24__TPF4.0_Overall_Supply_Plumbing_Schematic.pdf PDF
1-V1.08_SURVEY_PLAN.pdf PDF
55_TQ3.11C_-_FFE_PLAN_-_TPF_PHASE_1,_AREA_C.pdf PDF
49_24__TPF2.0-PI_Full_Building_Plan-Phase_1.pdf PDF
49_25__TPFV2.0_STANDARD_RAMP_AND_STAIR_DETAILS_STAMPED.pdf PDF
49_23__TCP1.3_Combined_Clinic_TPF_RCP.pdf PDF
55_TQ4.11D_-_FFE_PLAN_-_TPF_PHASE_2,_AREA_D.pdf PDF
1-V1.05_SURVEY_PLAN.pdf PDF
49_23__TCP1.5_Combined_Clinic_TPF_RCP.pdf PDF
55_TQ4.11C_-_FFE_PLAN_-_TPF_PHASE_2,_AREA_C.pdf PDF
49_23__TCP1.2_Combined_Clinic_TPF_RCP.pdf PDF
55_TQ3.11_-_FFE_PLAN_-_TPF_PHASE_1.pdf PDF
49_21__TFP4.3_Combined_Clinic_TPF_Fire_Alarm_Details_and_Notes.pdf PDF
55_TQ4.01_-_FFE_JSN_LEGEND.pdf PDF
49_21__TFP3.2_Combined_Clinic_TPF_Fire_Suppression_Plan_Phase_2.pdf PDF
49_23__TCP1.4-PI_Combined_Clinic_TPF_RCP-PHASE_1.pdf PDF
49_21__TFP4.2_Combined_Clinic_TPF_Fire_Alarm_Plan_Phase_2.pdf PDF
49_24__TPF5.0_Overall_DWV_&_Waste_Schematic.pdf PDF
56_SGT.03_TEMP_SIGNAGE_TPF_PHASE_2.pdf PDF
49_25__TPFV4.0_STANDARD_RAMP_AND_STAIR_DETAILS_STAMPED.pdf PDF
49_21__TFP4.1_Combined_Clinic_TPF_Fire_Alarm_Plan_Phase_1.pdf PDF
49_25__TPFV7.0_RAMP_STEP_AND_PLATFORM_CONNECTION_DETAILS_STAMPED.pdf PDF
55_TQ3.02_-_FFE_JSN_LEGEND.pdf PDF
49_24__TPF1.0_Full_Building_Elevations.pdf PDF
49_24__TPF7.0_Overall_Plumbing_Plan_-_D.W.V.pdf PDF
55_TQ3.11D_-_FFE_PLAN_-_TPF_PHASE_1,_AREA_D.pdf PDF
49_23__TCP1.4-PII_Combined_Clinic_TPF_RCP-PHASE_II.PDF PDF
1-V1.06_SURVEY_PLAN.pdf PDF
49_23__TCP1.1_Combined_Clinic_TPF_RCP.pdf PDF
49_25__TPFV8.0_CANOPY_ASSEMBLY_AND_FOOTING_DETAILS_STAMPED.pdf PDF
49_21__TFP3.1_Combined_Clinic_TPF_Fire_Suppression_Plan_Phase_1.pdf PDF
Show 40 more

Latest 50 of 129 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gate.

Porta Potties

5 9

CONC.

BUILDING 1468

M E

D

IC

A L

C

LI

N

IC

MEDICAL CLINIC

MAGNOLIA CIRCLE

M E

D

IC

A L

C

LI

N

IC

BUILDING 1467

B U

IL

D

IN

G

BLDG 1465

SIGN

T R

A F

F

IC

M

IR

R O

R

16.5"

OAK

CONC.

C O

V E

R E

D W

O O

D P

A T

IO

M

ABA

ABA

AB

A

A B A

A B

A

A B

A

A B

A

A B

A A

B A

A B

A A

B A

A B

A A

B A

A B

A A

B A

J

1 7

A B

A A

B A

A B

A A

B A

A B

A A

B A

A B

A

A B

A

A B

A

A B A

AB

A

ABA

ABA

A B

A A

B A

CO CO CO CO

MAGNOLIA CIRCLE

EXISTING PARKING LOT LIGHTING

NOT AFFECTED BY THIS WORK

1 1 1

OUT BUILDING -F112

MDP-1 BY TPF VENDOR

MDP-2 BY TPF VENDOR

T E

M M

P O

R A

R Y

P A

R K

IN

G

T E

M M

P O

R A

R Y

P A

R K

IN

G

T E

M P

O R

A R

Y P

A R

K

IN

G

EXISTING PARKING LOT LIGHTING

NOT AFFECTED BY THIS WORK

BUILDING 1465

MILCON ADDITION

NEW DROP-OFF

CANOPY

CUP

BUILDING

BUILDING 1467

NORTH

TPF

GALLO

JED

G O

V E

R N

M E

N T

M A

R A

T H

O N

1 1

1 1

COMMAND

TPF

MDP-3 BY TPF VENDOR

PDU1 PDU2

SOUTH

TPF

TEMPORARY FENCE.

RE:ARCH

1. EXISTING SITE LIGHTING FIXTURE TO

REMAIN. FIXTURE MAINTAINED BY GCEC.

2. NEW PARKING SPACES ADDED ALONG THIS

SIDE ARE ILLUMINATED BY NEW SITE

LIGHTS, AS PART OF ATFP UPGRADE.

3. EXISTING PARALLEL GENERATORS, FUEL

TANK AND ASSOCIATED APPURTENANCES

TO BE REMOVED AT THE END OF PHASE-2

WHEN ALL EMERGENCY LOADS IN THE

RENOVATED FACILITY ARE SUPPLIED BY

NEW GENERATOR.

4. EXISTING, PARALLEL TRANSFORMERS TO

BE REMOVED BY GCEC AT THE END OF

PHASE-2 WHEN ALL NEW AND EXISTING

LOADS IN THE CLINIC ARE SUPPLIED BY

NEW SERVICE IN G-102.

5. EXISTING MV SWITCH TO BE MAINTAINED

DURING PHASE-1 & 2. GEAR TO BE

REMOVED BY GCEC PRIOR TO

SUBSTANTIAL COMPLETION.

6. NEW AUTOMATIC MV SWITCH &

TRANSFORMER BY GCEC. COORDINATE

FOR NEW SERVICE TO BE IN PLACE IN

EARLY PHASE-1. FINAL LOCATION TO BE

FIELD VERIFIED IN RELATION TO EXISTING

UNDERGROUND TANKS/UTILITIES.

7. NEW 600 KW DIESEL GENERATOR TO BE

INSTALLED IN EARLY PHASE-1. FINAL

LOCATION TO BE FIELD VERIFIED IN

RELATION TO EXISTING UNDERGROUND

TANKS/UTILITIES.

8. REMOVE ALL DISTRIBUTION EQUIPMENT IN

THIS OUT BUILDING DURING PHASE-2

AFTER ALL CONNECTED LOADS ARE

REMOVED.

9. ATFP UPGRADE: NEW LED SITE LIGHTING

MOUNTED ON 30'-0" POLE BY GCEC.

MINIMUM LUMENS SHALL BE 36,000. TYPE

IV, FORWARD THROW DISTRIBUTION.

CIRCUITING AND CONTROLS BY GCEC.

10. NEW LED SITE LIGHTING MOUNTED ON

30'-0" POLE BY GCEC. MINIMUM LUMENS

SHALL BE 36,000. TYPE III, ROADWAY

DISTRIBUTION. CIRCUITING AND CONTROLS

BY GCEC.

11. CONSTRUCTION TRAILER. RE: TRAILER ONE

LINE DIAGRAM FOR TEMPORARY

CONNECTION. DERIVE POWER FROM

EXISTING 200A, EXTERIOR DISCONNECT.

FINAL LOCATION OF DISCONNECTS ,PDUS

AND RACEWAYS TO BE COORDINATED WITH

TRAILER ORIENTATIONS AND SHALL BE

LOCATED TO PREVENT ANY PHYSICAL

DAMAGE. UPON COMPLETION, EXISTING

200A DISCONNECT SWITCH SHALL REMAIN

WITH ALL LOAD SIDE FEEDERS REMOVED.

12. COORDINATE WITH GCEC FOR RE-

LOCATION OF EXISTING SITE LIGHTING

FIXTURES.

13. NEW TEMPORARY SITE LIGHTING BY GCEC.

MINIMUM LUMENS SHALL BE 36,000, TYPE

lll ROADWAY DISTRIBUTION. CIRCUITING, CONTROLS AND TYPE OF POLE SHALL BE

AS SELECTED BY GCEC.

14. ROUTE FEEDER UNDERGROUND UPTO TPF.

FEEDER UNDER TPF MAY BE ABOVE

GROUND.

15. FOR ACTIVE VEHICLE BARRIER. PROVIDE 3

# 10 AWG IN 3/4" CONDUIT TO MAIN

ELECTRICAL ROOM. PROVIDE WARNING

TAPE WITH TRACER 6" ABOVE CONDUIT.

16. REFERENCE INTERIOR LIGHTING PLANS

FOR NEW CANOPY LIGHTING.

17. LOCATE UFER GROUNDING WITHIN THE

YARD AREA. RE: E5.01 & E6.01 FOR

GOUNDING REQUIREMENTS.

18. 500 KVA TRANSFORMER BY GCEC FOR TPF.

TRANSFORMER SHALL BE REMOVED BY

GCEC AFTER DEMOLITION OF TPF.

19. GCEC TO CONNECT TO NEAREST EXISTING

SITE LIGHT. CONDUCTOR SELECTION

SHALL LIMIT VOLTAGE DROP TO 3%. MIN. #

10 AWG RECOMMENDED.

20. EXISTING SITE LIGHTING FIXTURE TO BE

RELOCATED IN PHASE-2 BY GCEC.

21. SITE LIGHTING FIXTURE TO BE REMOVED

FOR TPF PLACEMENT AND REINSTALLED

AFTER TPF IS REMOVED BY GCEC.

22. TEMPORARY POLE, WIRE GUTTER AND

DISCONNECTS. RE: D4/ES1.01.

23. EXISTING TO REMAIN, UNDERGROUND FUEL

TANK. LOCATION IS FROM 1965 RECORD

DRAWINGS. FIELD VERIFY EXACT

LOCATION.

24. EXISTING TO REMAIN, UNDERGROUND

BLOW-OFF TANK. LOCATION IS FROM 1965

RECORD DRAWINGS. FIELD VERIFY EXACT

LOCATION.

25. DUCT BANK SHALL BE FIELD COORDINATED

WITH EXISTING UNDERGROUND UTILITIES.

ABANDONED FUEL OIL PIPING MAY BE

REMOVED AS REQUIRED.

26. RE: ARCHITECTURAL DETAIL FOR WALL

PENETRATION AT THIS LOCATION.

STRUCTURE SHALL BE X-RAYED PRIOR TO

DRILLING HOLES TO AVOID ANY REBARS.

KEY NOTES (THIS SHEET)X

1. REFER TO SHEET E0.02 FOR LEGEND AND

ADDITIONAL GENERAL NOTES.

2. COORDINATE INSTALLATION OF DEVICES

WITH ALL OTHER TRADES.

3. REFER TO CIVIL DRAWINGS FOR EQUIPMENT

PAD DETAILS.

4. REFER TO CIVIL DRAWINGS FOR PHASING

AND SEQUENCING OF WORK.

5. REFERENCE SPECIAL INSPECTIONS AND

SOIL REMEDIATION SPEC FOR ADDITIONAL

REQUIREMENTS.

6. THE ELECTRIC UTILITY SERVING THIS BASE

IS GULF COAST ELECTRIC COOPERATIVE,

ABBREVIATED AS GCEC THROUGHOUT THIS

PACKAGE.

7. STRIPING SHOWN ON GRAVEL LOTS ARE

FOR PARKING COUNTS ONLY. GRAVEL WILL

NOT RECEIVE PAINTING STRIPES.

GENERAL NOTES (THIS SHEET)

MDP-1

1000A

MCB

120/208V 3P-4W

BY TPF

VENDOR

M

500 kVA

TRANSFORMER

BY GCEC

UTILITY

METER

BY GCEC

MDP-2

1000A

MCB

120/208V 3P-4W

BY TPF

VENDOR

(3) SETS OF 4 #400 KCMIL IN 3"C.

ESTIMATED VOLTAGE DROP - 1.3%

TRANSFORMER

PRIMARY

BY GCEC

(3) SETS OF 4 #400 KCMIL IN 3"C.

ESTIMATED VOLTAGE DROP - 0.4%

MDP-3

800A

MCB

120/208V 3P-4W

BY TPF

VENDOR

(2) SETS OF 4 #600 KCMIL IN 4"C.

ESTIMATED VOLTAGE DROP - 1.2%

GRADE

26.09

03.05

03.0503.05

MAGNOLIA CIRCLE

1 1

1 1

F112

EXISTING PARKING LOT LIGHTING

NOT AFFECTED BY THIS WORK

EXISTING PARKING LOT LIGHTING

NOT AFFECTED BY THIS WORK

BUILDING 1465

MILCON ADDITION

NEW DROP-OFF

CANOPY

CUP

BUILDING

BUILDING 1467

1EQL1C

CONNECTED LOAD FROM MDP SCHEDULE FOR NORTH

TPF (PUBLIC HEALTH) 292.1 kVA

CONNECTED LOAD FROM MDP SCHEDULE FOR SOUTH

TPF (AMBULANCE SERVICES) 290.9 kVA

CONNECTED LOAD FOR COMMAND TPF 242.8 kVA

TOTAL CONNECTED 825.8 kVA

DEMAND FOR CLINIC (UFC 3-501-01) 45-50%

ANTICIPATED DEMAND @ 50% 412.9 kVA

NEAREST SERVICE TRANSFORMER SIZE 500 kVA

AVAILABLE FULL LOAD CURRENT AT 120/208V: 1389 A

ELECTRICAL LOAD SUMMARY FOR TPF

ENCLOSED

NEMA

3R F-100 100A

MCB

600V

PDU1 PDU2

12" X 12" X 36" 3R GUTTER

TO TRAILERS

(E) EXT.

DISC.

200A

FUSED

AT150A

4/0 TRIPLEX

AL

3#3/0, 1#4G IN 2"

CONDUIT 3#1, 1#6G IN 1-1/4"

PVC CONDUIT

3#1,1#6G IN 1-1/4" PVC CONDUIT

TO EACH TRAILER MODULE

ENCLOSED

NEMA

3R F-100 100A

MCB

600V

OVERHEAD

LINE,

MAINTAIN

MIN. 18'-0"

FROM

GRADE.

WEATHER HEAD

POWER

DISTRIBUTION

UNITS, PART

OF TRAILERS

GRADE

TEMPORARY

POLE

BUILDING

EXISTING

BUILDING

MOUNTED

SWITCH

MOUNT WIRE GUTTER AND

BOTH SAFETY SWITCHES

ON UNISTRUT RACK

TEMPORARY TRAILER FENCE

TEMPORARY TRAILER FENCE

L

IT

T L

E R

O C

K D

IV

IS

IO

N

L

IT

T L

E R

O C

K

A R

K A

N S

A S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A

54321

B

C

D

E

54321

B A

S E

C

IV

IL

E

N G

IN

E

E R

/D E

P U

T Y

C H

IE

F

E N

G

IN

E E

R

IN

G F

L

IG

H T

C

E P

C H

IE

F

C O

N T

R A

C T

S S

E C

T

IO

N

C E

P M

R E

C O

M M

E N

D E

D

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

R E

V D

A T

E E

N G

IN

E

E R

\D E

S

IG

N E

R

D R

A W

N B

Y

S C

A L

E

S O

L

IC

IT

A

T

IO

N N

U M

B E

R

C O

N T

R A

C T

N U

M B

E R

D E

S

IG

N T

E A

M

U S

IN

G

A G

E N

C Y

C H

E C

K E

D B

Y

H O

E F

E R

W Y

S O

C K

I

A R

C H

IT

E

C T

S

/3

/2

S U

B M

IT

T

A L

C

O R

R E

C T

E D

F

IN

A L

JE DUNN + HWA

NATIONAL HEALTHCARE DEISGN-BUILD TEAM

M .E

G

R O

U P

JE

D

U N

N

U S

A F

/2

/2

:4 :0

P

M

A s in di ca te d

C U s e rs

\c a n d y ta

.w ilf o rd

\D o c u m e n ts

\M E

G T y n d a ll_

A F

B M

E P

C a n d y .W ilf o rd

.r v t

E L E

C T

R

IC

A L S

IT

E

P L A

N

M E

D

IC

A L C

L

IN

IC

B

U

IL

D

IN

G

T Y

N D

A

LL

A F

B V

E T

C

LI

N

IC

ES1.01

M A

G N

O

LI

A C

IR

C

LE

T Y

N D

A

LL

A F

B , F

L

A P

JT

V

W

5-

-R

-6

W

5-

-D

-6

High Performance Building Consultants

Job #:

R m e UPG

601.042

1" = 50'-0"E5 SITE PLAN - PHASE 1 0 15' 30' 60'

N.T.S.E4 TPF ONE LINE DIAGRAM

1" = 50'-0"A5 SITE PLAN - PHASE 2 0 15' 30' 60'

N.T.S.D4 TEMPORARY TRAILER ONE LINE DIAGRAM

S y m b o l

D es cr ip ti o n

T ra ck in g N o

A ct io n

D at e

A

S I

-1

-2

A

M E

N D

M E

N T

-2

-2

Sheets
ES1.01 - ELECTRICAL SITE PLAN - MEDICAL CLINIC BUILDING 1465
MD1.12 - FIRST FLOOR DEMO HVAC PLAN - AREA 2
MD2.01 - TUNNEL LEVEL DEMO HYDRONIC PLAN - AREA 1
MD2.02 - TUNNEL LEVEL DEMO HYDRONIC PLAN - AREA 2
MEPD1.01 - BLDG. 1473 MEP DEMO PLANS
MEPD1.02 - MEP TUNNEL DEMO PLAN

File details come from the government source that posted it.