07_ES1-01_-_ELECTRICAL_SITE_PLAN_-_MEDICAL_CLINIC_BUILDING_1465.pdf
PDF 686 KB Posted
- Attached to
- Tyndall AFB Temporary Modular Medical Facility
- Solicitation number
- W9127S19Q6039
About this file
Part of Attachment B1 - Additional Utility Plans
View the file
Other files
Show 40 more
Latest 50 of 129 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gate.
Porta Potties
5 9
CONC.
BUILDING 1468
M E
D
IC
A L
C
LI
N
IC
MEDICAL CLINIC
MAGNOLIA CIRCLE
M E
D
IC
A L
C
LI
N
IC
BUILDING 1467
B U
IL
D
IN
G
BLDG 1465
SIGN
T R
A F
F
IC
M
IR
R O
R
16.5"
OAK
CONC.
C O
V E
R E
D W
O O
D P
A T
IO
M
ABA
ABA
AB
A
A B A
A B
A
A B
A
A B
A
A B
A A
B A
A B
A A
B A
A B
A A
B A
A B
A A
B A
J
1 7
A B
A A
B A
A B
A A
B A
A B
A A
B A
A B
A
A B
A
A B
A
A B A
AB
A
ABA
ABA
A B
A A
B A
CO CO CO CO
MAGNOLIA CIRCLE
EXISTING PARKING LOT LIGHTING
NOT AFFECTED BY THIS WORK
1 1 1
OUT BUILDING -F112
MDP-1 BY TPF VENDOR
MDP-2 BY TPF VENDOR
T E
M M
P O
R A
R Y
P A
R K
IN
G
T E
M M
P O
R A
R Y
P A
R K
IN
G
T E
M P
O R
A R
Y P
A R
K
IN
G
EXISTING PARKING LOT LIGHTING
NOT AFFECTED BY THIS WORK
BUILDING 1465
MILCON ADDITION
NEW DROP-OFF
CANOPY
CUP
BUILDING
BUILDING 1467
NORTH
TPF
GALLO
JED
G O
V E
R N
M E
N T
M A
R A
T H
O N
1 1
1 1
COMMAND
TPF
MDP-3 BY TPF VENDOR
PDU1 PDU2
SOUTH
TPF
TEMPORARY FENCE.
RE:ARCH
1. EXISTING SITE LIGHTING FIXTURE TO
REMAIN. FIXTURE MAINTAINED BY GCEC.
2. NEW PARKING SPACES ADDED ALONG THIS
SIDE ARE ILLUMINATED BY NEW SITE
LIGHTS, AS PART OF ATFP UPGRADE.
3. EXISTING PARALLEL GENERATORS, FUEL
TANK AND ASSOCIATED APPURTENANCES
TO BE REMOVED AT THE END OF PHASE-2
WHEN ALL EMERGENCY LOADS IN THE
RENOVATED FACILITY ARE SUPPLIED BY
NEW GENERATOR.
4. EXISTING, PARALLEL TRANSFORMERS TO
BE REMOVED BY GCEC AT THE END OF
PHASE-2 WHEN ALL NEW AND EXISTING
LOADS IN THE CLINIC ARE SUPPLIED BY
NEW SERVICE IN G-102.
5. EXISTING MV SWITCH TO BE MAINTAINED
DURING PHASE-1 & 2. GEAR TO BE
REMOVED BY GCEC PRIOR TO
SUBSTANTIAL COMPLETION.
6. NEW AUTOMATIC MV SWITCH &
TRANSFORMER BY GCEC. COORDINATE
FOR NEW SERVICE TO BE IN PLACE IN
EARLY PHASE-1. FINAL LOCATION TO BE
FIELD VERIFIED IN RELATION TO EXISTING
UNDERGROUND TANKS/UTILITIES.
7. NEW 600 KW DIESEL GENERATOR TO BE
INSTALLED IN EARLY PHASE-1. FINAL
LOCATION TO BE FIELD VERIFIED IN
RELATION TO EXISTING UNDERGROUND
TANKS/UTILITIES.
8. REMOVE ALL DISTRIBUTION EQUIPMENT IN
THIS OUT BUILDING DURING PHASE-2
AFTER ALL CONNECTED LOADS ARE
REMOVED.
9. ATFP UPGRADE: NEW LED SITE LIGHTING
MOUNTED ON 30'-0" POLE BY GCEC.
MINIMUM LUMENS SHALL BE 36,000. TYPE
IV, FORWARD THROW DISTRIBUTION.
CIRCUITING AND CONTROLS BY GCEC.
10. NEW LED SITE LIGHTING MOUNTED ON
30'-0" POLE BY GCEC. MINIMUM LUMENS
SHALL BE 36,000. TYPE III, ROADWAY
DISTRIBUTION. CIRCUITING AND CONTROLS
BY GCEC.
11. CONSTRUCTION TRAILER. RE: TRAILER ONE
LINE DIAGRAM FOR TEMPORARY
CONNECTION. DERIVE POWER FROM
EXISTING 200A, EXTERIOR DISCONNECT.
FINAL LOCATION OF DISCONNECTS ,PDUS
AND RACEWAYS TO BE COORDINATED WITH
TRAILER ORIENTATIONS AND SHALL BE
LOCATED TO PREVENT ANY PHYSICAL
DAMAGE. UPON COMPLETION, EXISTING
200A DISCONNECT SWITCH SHALL REMAIN
WITH ALL LOAD SIDE FEEDERS REMOVED.
12. COORDINATE WITH GCEC FOR RE-
LOCATION OF EXISTING SITE LIGHTING
FIXTURES.
13. NEW TEMPORARY SITE LIGHTING BY GCEC.
MINIMUM LUMENS SHALL BE 36,000, TYPE
lll ROADWAY DISTRIBUTION. CIRCUITING, CONTROLS AND TYPE OF POLE SHALL BE
AS SELECTED BY GCEC.
14. ROUTE FEEDER UNDERGROUND UPTO TPF.
FEEDER UNDER TPF MAY BE ABOVE
GROUND.
15. FOR ACTIVE VEHICLE BARRIER. PROVIDE 3
# 10 AWG IN 3/4" CONDUIT TO MAIN
ELECTRICAL ROOM. PROVIDE WARNING
TAPE WITH TRACER 6" ABOVE CONDUIT.
16. REFERENCE INTERIOR LIGHTING PLANS
FOR NEW CANOPY LIGHTING.
17. LOCATE UFER GROUNDING WITHIN THE
YARD AREA. RE: E5.01 & E6.01 FOR
GOUNDING REQUIREMENTS.
18. 500 KVA TRANSFORMER BY GCEC FOR TPF.
TRANSFORMER SHALL BE REMOVED BY
GCEC AFTER DEMOLITION OF TPF.
19. GCEC TO CONNECT TO NEAREST EXISTING
SITE LIGHT. CONDUCTOR SELECTION
SHALL LIMIT VOLTAGE DROP TO 3%. MIN. #
10 AWG RECOMMENDED.
20. EXISTING SITE LIGHTING FIXTURE TO BE
RELOCATED IN PHASE-2 BY GCEC.
21. SITE LIGHTING FIXTURE TO BE REMOVED
FOR TPF PLACEMENT AND REINSTALLED
AFTER TPF IS REMOVED BY GCEC.
22. TEMPORARY POLE, WIRE GUTTER AND
DISCONNECTS. RE: D4/ES1.01.
23. EXISTING TO REMAIN, UNDERGROUND FUEL
TANK. LOCATION IS FROM 1965 RECORD
DRAWINGS. FIELD VERIFY EXACT
LOCATION.
24. EXISTING TO REMAIN, UNDERGROUND
BLOW-OFF TANK. LOCATION IS FROM 1965
RECORD DRAWINGS. FIELD VERIFY EXACT
LOCATION.
25. DUCT BANK SHALL BE FIELD COORDINATED
WITH EXISTING UNDERGROUND UTILITIES.
ABANDONED FUEL OIL PIPING MAY BE
REMOVED AS REQUIRED.
26. RE: ARCHITECTURAL DETAIL FOR WALL
PENETRATION AT THIS LOCATION.
STRUCTURE SHALL BE X-RAYED PRIOR TO
DRILLING HOLES TO AVOID ANY REBARS.
KEY NOTES (THIS SHEET)X
1. REFER TO SHEET E0.02 FOR LEGEND AND
ADDITIONAL GENERAL NOTES.
2. COORDINATE INSTALLATION OF DEVICES
WITH ALL OTHER TRADES.
3. REFER TO CIVIL DRAWINGS FOR EQUIPMENT
PAD DETAILS.
4. REFER TO CIVIL DRAWINGS FOR PHASING
AND SEQUENCING OF WORK.
5. REFERENCE SPECIAL INSPECTIONS AND
SOIL REMEDIATION SPEC FOR ADDITIONAL
REQUIREMENTS.
6. THE ELECTRIC UTILITY SERVING THIS BASE
IS GULF COAST ELECTRIC COOPERATIVE,
ABBREVIATED AS GCEC THROUGHOUT THIS
PACKAGE.
7. STRIPING SHOWN ON GRAVEL LOTS ARE
FOR PARKING COUNTS ONLY. GRAVEL WILL
NOT RECEIVE PAINTING STRIPES.
GENERAL NOTES (THIS SHEET)
MDP-1
1000A
MCB
120/208V 3P-4W
BY TPF
VENDOR
M
500 kVA
TRANSFORMER
BY GCEC
UTILITY
METER
BY GCEC
MDP-2
1000A
MCB
120/208V 3P-4W
BY TPF
VENDOR
(3) SETS OF 4 #400 KCMIL IN 3"C.
ESTIMATED VOLTAGE DROP - 1.3%
TRANSFORMER
PRIMARY
BY GCEC
(3) SETS OF 4 #400 KCMIL IN 3"C.
ESTIMATED VOLTAGE DROP - 0.4%
MDP-3
800A
MCB
120/208V 3P-4W
BY TPF
VENDOR
(2) SETS OF 4 #600 KCMIL IN 4"C.
ESTIMATED VOLTAGE DROP - 1.2%
GRADE
26.09
03.05
03.0503.05
MAGNOLIA CIRCLE
1 1
1 1
F112
EXISTING PARKING LOT LIGHTING
NOT AFFECTED BY THIS WORK
EXISTING PARKING LOT LIGHTING
NOT AFFECTED BY THIS WORK
BUILDING 1465
MILCON ADDITION
NEW DROP-OFF
CANOPY
CUP
BUILDING
BUILDING 1467
1EQL1C
CONNECTED LOAD FROM MDP SCHEDULE FOR NORTH
TPF (PUBLIC HEALTH) 292.1 kVA
CONNECTED LOAD FROM MDP SCHEDULE FOR SOUTH
TPF (AMBULANCE SERVICES) 290.9 kVA
CONNECTED LOAD FOR COMMAND TPF 242.8 kVA
TOTAL CONNECTED 825.8 kVA
DEMAND FOR CLINIC (UFC 3-501-01) 45-50%
ANTICIPATED DEMAND @ 50% 412.9 kVA
NEAREST SERVICE TRANSFORMER SIZE 500 kVA
AVAILABLE FULL LOAD CURRENT AT 120/208V: 1389 A
ELECTRICAL LOAD SUMMARY FOR TPF
ENCLOSED
NEMA
3R F-100 100A
MCB
600V
PDU1 PDU2
12" X 12" X 36" 3R GUTTER
TO TRAILERS
(E) EXT.
DISC.
200A
FUSED
AT150A
4/0 TRIPLEX
AL
3#3/0, 1#4G IN 2"
CONDUIT 3#1, 1#6G IN 1-1/4"
PVC CONDUIT
3#1,1#6G IN 1-1/4" PVC CONDUIT
TO EACH TRAILER MODULE
ENCLOSED
NEMA
3R F-100 100A
MCB
600V
OVERHEAD
LINE,
MAINTAIN
MIN. 18'-0"
FROM
GRADE.
WEATHER HEAD
POWER
DISTRIBUTION
UNITS, PART
OF TRAILERS
GRADE
TEMPORARY
POLE
BUILDING
EXISTING
BUILDING
MOUNTED
SWITCH
MOUNT WIRE GUTTER AND
BOTH SAFETY SWITCHES
ON UNISTRUT RACK
TEMPORARY TRAILER FENCE
TEMPORARY TRAILER FENCE
L
IT
T L
E R
O C
K D
IV
IS
IO
N
L
IT
T L
E R
O C
K
A R
K A
N S
A S
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A
54321
B
C
D
E
54321
B A
S E
C
IV
IL
E
N G
IN
E
E R
/D E
P U
T Y
C H
IE
F
E N
G
IN
E E
R
IN
G F
L
IG
H T
C
E P
C H
IE
F
C O
N T
R A
C T
S S
E C
T
IO
N
C E
P M
R E
C O
M M
E N
D E
D
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
R E
V D
A T
E E
N G
IN
E
E R
\D E
S
IG
N E
R
D R
A W
N B
Y
S C
A L
E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
C O
N T
R A
C T
N U
M B
E R
D E
S
IG
N T
E A
M
U S
IN
G
A G
E N
C Y
C H
E C
K E
D B
Y
H O
E F
E R
W Y
S O
C K
I
A R
C H
IT
E
C T
S
/3
/2
S U
B M
IT
T
A L
C
O R
R E
C T
E D
F
IN
A L
JE DUNN + HWA
NATIONAL HEALTHCARE DEISGN-BUILD TEAM
M .E
G
R O
U P
JE
D
U N
N
U S
A F
/2
/2
:4 :0
P
M
A s in di ca te d
C U s e rs
\c a n d y ta
.w ilf o rd
\D o c u m e n ts
\M E
G T y n d a ll_
A F
B M
E P
C a n d y .W ilf o rd
.r v t
E L E
C T
R
IC
A L S
IT
E
P L A
N
M E
D
IC
A L C
L
IN
IC
B
U
IL
D
IN
G
T Y
N D
A
LL
A F
B V
E T
C
LI
N
IC
ES1.01
M A
G N
O
LI
A C
IR
C
LE
T Y
N D
A
LL
A F
B , F
L
A P
JT
V
W
5-
-R
-6
W
5-
-D
-6
High Performance Building Consultants
Job #:
R m e UPG
601.042
1" = 50'-0"E5 SITE PLAN - PHASE 1 0 15' 30' 60'
N.T.S.E4 TPF ONE LINE DIAGRAM
1" = 50'-0"A5 SITE PLAN - PHASE 2 0 15' 30' 60'
N.T.S.D4 TEMPORARY TRAILER ONE LINE DIAGRAM
S y m b o l
D es cr ip ti o n
T ra ck in g N o
A ct io n
D at e
A
S I
-1
-2
A
M E
N D
M E
N T
-2
-2
| Sheets |
| ES1.01 - ELECTRICAL SITE PLAN - MEDICAL CLINIC BUILDING 1465 |
| MD1.12 - FIRST FLOOR DEMO HVAC PLAN - AREA 2 |
| MD2.01 - TUNNEL LEVEL DEMO HYDRONIC PLAN - AREA 1 |
| MD2.02 - TUNNEL LEVEL DEMO HYDRONIC PLAN - AREA 2 |
| MEPD1.01 - BLDG. 1473 MEP DEMO PLANS |
| MEPD1.02 - MEP TUNNEL DEMO PLAN |
File details come from the government source that posted it.