Q A_V.3_RAM_Blast.pdf

PDF 48 KB Posted

Attached to
RAM Blast Project Federal contract opportunity
Solicitation number
W9127P-13-R-0003
Issued by
Department of the Army Virgin Islands Army National Guard

About this file

Questions Answers V.3

View the file

Other files for this federal contract opportunity

Other files attached to RAM Blast Project, newest first.
File Type Posted
SF_30_Amendment_0001.pdf PDF
QA_V.4_RAM_Blast_answered.pdf PDF
QA_V.5_RAM_Blast_Answered.pdf PDF
Q A_V.6_RAM_Blast.pdf PDF
EXHIBIT_C_DB_April_2013.doc DOC document
RAM_Blast_Pre-Bid_sign_in.pdf PDF
Q A_V.2_RAM_Blast.pdf PDF
RAM_BLAST_DRAWINGS.pdf PDF
RAM_BLAST_BUILDING_SOW.pdf PDF
Q A_V.1_RAM_Blast.pdf PDF
EXHIBIT_B_April_2013.pdf PDF
EXHIBIT_C_DB_April_2013.pdf PDF
1442_Solicitation_RAM_Blast.pdf PDF
EXHIBIT_A_DB_April_2013.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9127P-13-R-003 – RAM Blast

Q&A V.3

28 AUG 2013

1. What is the distance of the proposed Sewer Line form the Ram Blast building to the existing manhole?

a. Sewer line is approximately 240'

2. What is the size of the Sewer Line Pipe?

a. Sewer pipe is to be sized to accommodate plumbing fixtures in the latrine.

3. What is the distance of the high voltage line from the Ram Blast building to the power pole?

a. 275' from the transformer pole to the building.

4. What is the length & width of the Ramp at the roll-up Door at the Ram Blast Building?

a. Width is 18" wider than the door, length will be sufficient to transition from the final slab height to ground level with no more than 15% slope.

5. Scope of Work indicates that the building is to have a steel roll-up door that is 32 feet wide x

18 feet high. We would like to confirm that this door size is correct.

a. Yes door sizing is to be as is indicated 32' wide by 18' high.

6. Also, please confirm if the door is required to have the same wind force load design as the building (150mph).

a. Yes door is to be required to meet the same wind force load design as the building. (150mph)