Q A_V.3_RAM_Blast.pdf
PDF 48 KB Posted
- Attached to
- RAM Blast Project Federal contract opportunity
- Solicitation number
- W9127P-13-R-0003
About this file
Questions Answers V.3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_30_Amendment_0001.pdf | ||
| QA_V.4_RAM_Blast_answered.pdf | ||
| QA_V.5_RAM_Blast_Answered.pdf | ||
| Q A_V.6_RAM_Blast.pdf | ||
| EXHIBIT_C_DB_April_2013.doc | DOC document | |
| RAM_Blast_Pre-Bid_sign_in.pdf | ||
| Q A_V.2_RAM_Blast.pdf | ||
| RAM_BLAST_DRAWINGS.pdf | ||
| RAM_BLAST_BUILDING_SOW.pdf | ||
| Q A_V.1_RAM_Blast.pdf | ||
| EXHIBIT_B_April_2013.pdf | ||
| EXHIBIT_C_DB_April_2013.pdf | ||
| 1442_Solicitation_RAM_Blast.pdf | ||
| EXHIBIT_A_DB_April_2013.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9127P-13-R-003 – RAM Blast
Q&A V.3
28 AUG 2013
1. What is the distance of the proposed Sewer Line form the Ram Blast building to the existing manhole?
a. Sewer line is approximately 240'
2. What is the size of the Sewer Line Pipe?
a. Sewer pipe is to be sized to accommodate plumbing fixtures in the latrine.
3. What is the distance of the high voltage line from the Ram Blast building to the power pole?
a. 275' from the transformer pole to the building.
4. What is the length & width of the Ramp at the roll-up Door at the Ram Blast Building?
a. Width is 18" wider than the door, length will be sufficient to transition from the final slab height to ground level with no more than 15% slope.
5. Scope of Work indicates that the building is to have a steel roll-up door that is 32 feet wide x
18 feet high. We would like to confirm that this door size is correct.
a. Yes door sizing is to be as is indicated 32' wide by 18' high.
6. Also, please confirm if the door is required to have the same wind force load design as the building (150mph).
a. Yes door is to be required to meet the same wind force load design as the building. (150mph)