MDC 353-E507-2012-01 Revision A Dredge Pipe Arrangement.pdf
PDF 299 KB Posted
- Attached to
- Yaquina Overhaul FY27
- Solicitation number
- W9127N26BA029_
About this file
This is a technical drawing for dredge pipe arrangement as part of the Dredging Phase 4 Residential Repower project at the CENVP Bridge Yaquina location. The drawing depicts plan and elevation views of pipe configurations, including multiple pipe segments (PFK-01 through PFK-05), casting locations, support structures, and connection details for dredge operations.
The drawing specifies four casting types: Dredge Elbow Casting, Dredge T-Pipe Casting, Dredge Y-Pipe Casting, and Dredge Tee Casing Foundation, each with associated drawing numbers in the 353-E507-2012 series. The bill of materials identifies required materials including steel pipes of various sizes and fittings, rubber and neoprene gaskets, valve kits, and miscellaneous fasteners. General notes provide construction specifications for pipe installation, welding requirements, support installation at waterstops, and clearance specifications. The drawing is dated July 28, 2011 with revision index D and drawing number 2507 353-E507-2012-01, indicating this is a design document for a marine infrastructure improvement project managed by the Marine Design Center.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text Up
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UPLAN VIEW 5-A
AutoCAD SHX Text
SEACHEST
AutoCAD SHX Text
SEACHEST
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DEPARTMENT OF THE ARMY
AutoCAD SHX Text
MARINE DESIGN CENTER
AutoCAD SHX Text
CORPS OF ENGINEERS
AutoCAD SHX Text
MDC PROJECT
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
REV.
AutoCAD SHX Text 353-E507-2012-01
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
100 PENN SQUARE EAST ROOM 630 SOUTH PHILADELPHIA, PA 19107 215 656-6850
AutoCAD SHX Text
JBF
AutoCAD SHX Text
JULY 06, 2011
AutoCAD SHX Text
DREDGE PIPE ARRANGEMENT
AutoCAD SHX Text
AutoCAD SHX Text
CENWP DREDGE YAQUINA
AutoCAD SHX Text
SEQUENTIAL REPOWERING PHASE 4
AutoCAD SHX Text %%uGENERAL NOTES
AutoCAD SHX Text
NO
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
QTY
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
MATL
AutoCAD SHX Text
SPEC
AutoCAD SHX Text V-1
AutoCAD SHX Text
AutoCAD SHX Text VALVE, GATE, 500mm IHC
AutoCAD SHX Text F-1
AutoCAD SHX Text ELBOW, 90 DEGREE, 500mm.
AutoCAD SHX Text F-3
AutoCAD SHX Text WYE, 500mm X 500mm X 24"
AutoCAD SHX Text P-1
AutoCAD SHX Text PIPE, 500mm TRIBRAZE 6 @ 10'-0"
AutoCAD SHX Text P-2
AutoCAD SHX Text
PIPE, SEAMLESS, 3" SCH 120
AutoCAD SHX Text
BILL OF MATERIALS
AutoCAD SHX Text
AutoCAD SHX Text
DREDGE ELBOW CASTING
AutoCAD SHX Text 353-E507-2012-02
AutoCAD SHX Text 1, STANDARDIZED PIPE LENGTHS. STANDARDIZED PIPE LENGTHS. 2, NAMED PIPE SECTION. NAMED PIPE SECTION. 3. CHANGED THE LENGTH OF THE FLEX PIECES FROM 18" TO 16". CHANGED THE LENGTH OF THE FLEX PIECES FROM 18" TO 16". 4. ADDED GENERAL NOTES 17, 18, 19 & 20. ADDED GENERAL NOTES 17, 18, 19 & 20. 5. ADDED SUPPORT NOTES. ADDED SUPPORT NOTES. 6. MODIFIED QUANTITIES IN BOM.MODIFIED QUANTITIES IN BOM.
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text A
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
JULY 21, 2011
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
418/ 512 BHN
AutoCAD SHX Text F-2
AutoCAD SHX Text S-PIPE, 13 INCH OFFSET, 500mm
AutoCAD SHX Text H-1
AutoCAD SHX Text FLEX, 500mm", 16" LONG
AutoCAD SHX Text
AutoCAD SHX Text
CUSTOM FLANGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DREDGE S-PIPE CASTING
AutoCAD SHX Text 353-E507-2012-03
AutoCAD SHX Text
AutoCAD SHX Text
DREDGE WYE CASTING
AutoCAD SHX Text 353-E507-2012-04
AutoCAD SHX Text
AutoCAD SHX Text
DREDGE PUMP & ENGINE FOUNDATION
AutoCAD SHX Text 353-E330-2012-01
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
RUBBER
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
GOVERNMENT FURNISHED
AutoCAD SHX Text F-4
AutoCAD SHX Text CLEAN-OUT, 500mm
AutoCAD SHX Text
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
GOVERNMENT FURNISHED
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
GOVERNMENT FURNISHED
AutoCAD SHX Text
GOVERNMENT FURNISHED
AutoCAD SHX Text
GOVERNMENT FURNISHED
AutoCAD SHX Text
ASTM A106
AutoCAD SHX Text
1. THIS DRAWING HAS BEEN DEVELOPED TO PROVIDE INFORMATION FOR THE PURPOSE OF THIS DRAWING HAS BEEN DEVELOPED TO PROVIDE INFORMATION FOR THE PURPOSE OF BIDDING ON AND INSTALLING THE NEW DREDGE SYSTEM PIPING ON THE U.S. ARMY CORPS OF ENGINEERS DREDGE YAQUINA. 2. FRAME SPACING IS 2'-3" IN THE AREA CONCERNED. FRAME SPACING IS 2'-3" IN THE AREA CONCERNED. 3. THE 500mm PIPE SHALL BE FURNISHED BY THE GOVERNMENT IN STOCK LENGTHS. THE THE 500mm PIPE SHALL BE FURNISHED BY THE GOVERNMENT IN STOCK LENGTHS. THE CONTRACTOR SHALL CUT THE PIPE TO THE DIMENSIONS SHOWN OR AS DIRECTED BY THE GOVERNMENT DURING CONSTRUCTION. 4. THE CONTRACTOR SHALL INSTALL AND WELD ALL PIPE FLANGES. THE CONTRACTOR SHALL INSTALL AND WELD ALL PIPE FLANGES. 5. THERE SHALL BE WATERTIGHT COLLARS INSTALLED AND WELDED AT THE WATERTIGHT THERE SHALL BE WATERTIGHT COLLARS INSTALLED AND WELDED AT THE WATERTIGHT BOUNDARIES. 6. THE CONTRACTOR SHALL PROVIDE AND INSTALL " RED RUBBER GASKETS BETWEEN THE CONTRACTOR SHALL PROVIDE AND INSTALL " RED RUBBER GASKETS BETWEEN 18" RED RUBBER GASKETS BETWEEN THE FLANGES. . 7. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL BOLTS, NUTS AND WASHERS THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL BOLTS, NUTS AND WASHERS INCLUDING THE BOLTS REQUIRED FOR THE VALVES. ALL HARDWARE SHALL MEET THE REQUIREMENTS OF THE EQUIPMENT. WHERE THERE AR NO REQUIREMENTS THE HARDWARE SHALL BE GRADE 5. . 8. THE VERTICAL PIPE RUNS SHALL BE SUPPORTED USING THE EXISTING PIPE SUPPORT THE VERTICAL PIPE RUNS SHALL BE SUPPORTED USING THE EXISTING PIPE SUPPORT STRUCTURE WHICH SHALL BE MODIFIED TO MATCH THE NEW INSTALLATION. 9. ALL WELDING SHALL CONFORM TO THE CURRENT ABS & USCG RULES. ALL WELDING SHALL CONFORM TO THE CURRENT ABS & USCG RULES. RULES. ULES. 10. THIS DESIGN IS BASED ON THE EQUIPMENT INFORMATION PROVIDED BY PACIFIC POWER THIS DESIGN IS BASED ON THE EQUIPMENT INFORMATION PROVIDED BY PACIFIC POWER EQUIPMENT INFORMATION PROVIDED BY PACIFIC POWER INFORMATION PROVIDED BY PACIFIC POWER PRODUCTS. 11. A SHIPCHECK IS REQUIRED BY THE SHIPYARD TO VERIFY FINAL DIMENSIONS. A SHIPCHECK IS REQUIRED BY THE SHIPYARD TO VERIFY FINAL DIMENSIONS. 12. THE CONTRACTOR SHALL PURCHASE AND INSTALL THE MOUNTING HARDWARE AS REQUIRED THE CONTRACTOR SHALL PURCHASE AND INSTALL THE MOUNTING HARDWARE AS REQUIRED BUY THE EQUIPMENT MANUFACTURERS. 13. THE CONTRACTOR SHALL INSTALL COLLISION STOPS ON THE EQUIPMENT. THE CONTRACTOR SHALL INSTALL COLLISION STOPS ON THE EQUIPMENT. 14. THE CONTRACTOR SHALL PAINT ALL NEW WORK AS REQUIRED IN THE CONTRACT THE CONTRACTOR SHALL PAINT ALL NEW WORK AS REQUIRED IN THE CONTRACT SPECIFICATION, AND TOUCH-UP ALL AREAS DISTURBED BY THIS WORK. 15. ALL SHARP EDGES AND CORNERS SHALL BE REMOVED TO PROTECT EQUIPMENT AND ALL SHARP EDGES AND CORNERS SHALL BE REMOVED TO PROTECT EQUIPMENT AND PERSONNEL. 16. SOME FLANGES SHALL BE FIELD WELDED TO ASSURE PROPER ALIGNMENT. SOME FLANGES SHALL BE FIELD WELDED TO ASSURE PROPER ALIGNMENT. 17. THE CONTRACTOR SHALL MODIFY OR REPLACE THE EXISTING "S" PIPE FOUNDATIONS TO SUIT THE CONTRACTOR SHALL MODIFY OR REPLACE THE EXISTING "S" PIPE FOUNDATIONS TO SUIT THE NEW CASTINGS. 18. THE CONTRACTOR SHALL REMOVE THE EXISTING DISCHARGE PIPE SUPPORTS, MODIFY THEIR THE CONTRACTOR SHALL REMOVE THE EXISTING DISCHARGE PIPE SUPPORTS, MODIFY THEIR LENGTH AND REATTACH THEM SO THAT THE WEIGHT OF THE NEW PIPE IS SUPPORTED ON THE EXISTING FOUNDATION. 19. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR THE SUCTION ELBOWS OFF OF THE THE CONTRACTOR SHALL PROVIDE SUPPORT FOR THE SUCTION ELBOWS OFF OF THE BULKHEAD AT FRAME 32. 20. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR THE WYE.THE CONTRACTOR SHALL PROVIDE SUPPORT FOR THE WYE.
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
PIPE (1)
AutoCAD SHX Text
PIPE (3)
AutoCAD SHX Text
PIPE (5)
AutoCAD SHX Text
PIPE (7)
AutoCAD SHX Text
PIPE (2)
AutoCAD SHX Text
PIPE (4)
AutoCAD SHX Text
PIPE (6)
AutoCAD SHX Text
PIPE (8)
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
CASTING
AutoCAD SHX Text
FLEX
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
CASTING
AutoCAD SHX Text G1
AutoCAD SHX Text G2
AutoCAD SHX Text G2
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G4
AutoCAD SHX Text
ELBOW
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
FLEX
AutoCAD SHX Text
ELBOW
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G4
AutoCAD SHX Text G1
AutoCAD SHX Text G2
AutoCAD SHX Text G2
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text
PROVIDE NEW ELBOW SUPPORT
JBF
A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Motor ENGINE
AutoCAD SHX Text Motor ENGINE
AutoCAD SHX Text
VELOCITY METER
AutoCAD SHX Text
DENSITY METER
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
MDC PROJECT
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
REV.
AutoCAD SHX Text 353-E507-2012-01
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
%%UELEVATION 11-A
AutoCAD SHX Text
%%UPLAN VIEW 11-C
AutoCAD SHX Text
SIZE & LOCATION TBD
AutoCAD SHX Text
PIPE (9)
AutoCAD SHX Text
PIPE (11)
AutoCAD SHX Text
FLEX
AutoCAD SHX Text
PIPE (13)
AutoCAD SHX Text
PIPE (10)
AutoCAD SHX Text
PIPE (12)
AutoCAD SHX Text
FLEX
AutoCAD SHX Text
PIPE (14)
AutoCAD SHX Text
PIPE (15)
AutoCAD SHX Text
CASTING
AutoCAD SHX Text
PIPE (17)
AutoCAD SHX Text
FLEX
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
PIPE (16)
AutoCAD SHX Text
CASTING
AutoCAD SHX Text
PIPE (18)
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
SIZE & LOCATION TBD
AutoCAD SHX Text F1
AutoCAD SHX Text F2
AutoCAD SHX Text F2
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F4
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F2
AutoCAD SHX Text F3
AutoCAD SHX Text F2
AutoCAD SHX Text F3
AutoCAD SHX Text F2
AutoCAD SHX Text F2
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text G1
AutoCAD SHX Text G2
AutoCAD SHX Text G2
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G4
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G2
AutoCAD SHX Text G2
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G2
AutoCAD SHX Text G2
AutoCAD SHX Text
LOOKING FORWARD
AutoCAD SHX Text F1
AutoCAD SHX Text F2
AutoCAD SHX Text F2
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text G1
AutoCAD SHX Text G2
AutoCAD SHX Text G2
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text F4
AutoCAD SHX Text F3
AutoCAD SHX Text F3
AutoCAD SHX Text G4
AutoCAD SHX Text G3
AutoCAD SHX Text G3
AutoCAD SHX Text
PROVIDE NEW WYE SUPPORT
AutoCAD SHX Text
MODIFY EXISTING PIPE SUPPORTS
AutoCAD SHX Text
MODIFY EXISTING PIPE SUPPORTS
REPLACE EXISTING PIPE SUPPORTS WITH NEW P&S
| Sheets and Views |
| 5.5.7 Sluice Valves - 353-E507-01REV-A DREDGE PIPE ARRANGMENT-Model |
| 5.5.7 353-E507-01REV-A DREDGE PIPE ARRANGMENT PG1.pdf |
| Sheets and Views |
| 5.5.7 Sluice Valves - 353-E507-01REV-A DREDGE PIPE ARRANGMENT-Model |
File details come from the government source that posted it. Updated .