Attachment A_Price Schedule_amend1 7.24.26.xlsx
XLSX spreadsheet 79 KB Posted
- Attached to
- Yaquina Overhaul FY27
- Solicitation number
- W9127N26BA029_
About this file
This is a Price Schedule attachment for a firm fixed price Job Order under a Master Ship and Repair Agreement (MSRA) for overhaul, maintenance, and repair services to the Dredge YAQUINA for the U.S. Army Corps of Engineers (USACE), Portland District.
The schedule is organized into two work categories plus an over and above section. Category A contains 38 line items covering support services and routine maintenance, including transportation, crane services, drydocking, wet berth services, machinery maintenance (slops tanks, pump room, engine room bilge cleaning, emergency generator service, dock and sea trials, and CRPP control service inspection), hull work (sliding piece fit-up, sluice valve replacement, pressure wash), hopper inspection and services, bow thruster maintenance, deck services (rescue boat davit maintenance, chain locker cleaning, launch davit maintenance, lift raft service, navigation and communication maintenance), and house systems (galley exhaust, fire suppression, bridge window replacement, paint renewal, watertight door replacement, and other upgrades). Category B contains 13 line items including tug services, main propulsion repairs, hull coating and anode renewal, suction inlet replacement, and hopper door components and maintenance. The Over and Above Work section provides pricing for a ship repair labor rate of 13,000 fully burdened hours at $0.00 per hour plus $500,000.00 for materials and subcontractor costs, along with daily extension rates for dry-docking (10 days) and pier side work (14 days), all currently priced at zero with a total Over and Above Work amount of $500,000.00. All unit prices and individual line item amounts are currently blank, indicating this is a template awaiting contractor pricing submissions.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Transportation | 5.1.1 | 4 | Each | $ - 0 | |
| Crane Services | 5.1.3 | 75 | Hour | $ - 0 | |
| Connection / Disconnection of Services | 5.1.4 | 1 | Job | $ - 0 | |
| Field Office | 5.1.5 | 1 | Job | $ - 0 | |
| Parking | 5.1.6 | 1 | Job | $ - 0 | |
| Drydocking (Lift Day) | 5.2.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day Services | 5.2.2 | 60 | Day | $ - 0 | |
| Wet Berth | 5.2.3 | 15 | Day | $ - 0 | |
| Electricity | 5.2.4 | 1 | Job | $ - 0 | |
| Steam / Chilled Water | 5.2.5 | 75 | Day | $ - 0 | |
| Marine Chemists Certifications | 5.2.6 | 1 | Job | $ - 0 | |
| Main Propulsion - Shafting & Rudder Clearances | 5.3.2 | 1 | Job | $ - 0 | |
| Machinery - Slops Tanks Annual Maintenance | 5.4.1 | 1 | Job | $ - 0 | |
| Machinery - Pump Room Bilge Cleaning | 5.4.2 | 1 | Job | $ - 0 | |
| Machinery - Engine Room Bilge Cleaning | 5.4.3 | 1 | Job | $ - 0 | |
| Machinery - Emergency Generator Service | 5.4.4 | 1 | Job | $ - 0 | |
| Machinery - Dock and Sea Trials | 5.4.5 | 1 | Job | $ - 0 | |
| Machinery - CRPP Control Service Inspection | 5.4.6 | 1 | Job | $ - 0 | |
| Hull - Sliding Piece Fit-Up | 5.5.3 | 1 | Job | $ - 0 | |
| Hull - Sluice Valve Replacement | 5.5.4 | 1 | Job | $ - 0 | |
| Hull – Pressure Wash Exterior Hull | 5.5.6 | 1 | Job | $ - 0 | |
| Hopper - Hopper Inspection Staging | 5.6.6 | 1 | Job | $ - 0 | |
| Bow Thruster - Inspection Setup | 5.7.1 | 1 | Job | $ - 0 | |
| Bow Thruster – Inspection, Oil and Seal Change | 5.7.2 | 1 | Job | ||
| Bow Thruster - Sleeve Replacement | 5.7.4 | 1 | Job | $ - 0 | |
| Deck - Annual Rescue Boat Davit Maintenance | 5.8.3 | 1 | Job | $ - 0 | |
| Deck - Chain Locker Cleaning | 5.8.4 | 1 | Job | $ - 0 | |
| Deck - Launch Davit Annual Maintenance | 5.8.5 | 1 | Job | ||
| Deck - Lift Raft Annual Service | 5.8.6 | 1 | Job | $ - 0 | |
| Deck - Navigation, Communication, and GMDSS Maintenance | 5.8.7 | 1 | Job | $ - 0 | |
| House - Clean and Inspect Galley Exhaust Ducting | 5.9.1 | 1 | Job | $ - 0 | |
| House - Fire Suppression Services | 5.9.2 | 1 | Job | $ - 0 | |
| Inspection - ABS Inspection Services | 5.10.1 | 1 | Job | $ - 0 | |
| Inspection - Audio Gauging Services | 5.10.2 | 1 | Job | $ - 0 | |
| Machinery - Engine Removal and Reinstallation | 5.11.1 | 1 | Job | ||
| Machinery Reduction Gear Overhaul | 5.11.2 | 1 | Job | ||
| Machinery - Keel Cooler Gasket Change Out | 5.11.3 | 1 | Job | ||
| Hull - Engine room Double Bottom Paint | 5.11.4 | 1 | Job | ||
| Hopper - New Hopper Door Seal Hinges | 5.11.5 | 1 | Job | ||
| Hopper - Hopper Door Seal Upgrade | 5.11.6 | 1 | Job | ||
| Deck - Paint Forward Doghouses | 5.11.7 | 1 | Job | ||
| House - Bridge Window Replacement | 5.11.8 | 1 | Job | ||
| House - Jackstaff Varnish Renewal | 5.11.9 | 1 | Job | ||
| House - Bridge Paint Renewal | 5.11.10 | 1 | Job | ||
| House - Laundry Room Cabinet Removal | 5.11.11 | 1 | Job | ||
| Hull - AMR Double Bottom Paint | 5.11.12 | 1 | Job | ||
| Bridge - Auto Pilot installation | 5.11.13 | 1 | Job | ||
| Deck - Capstan Repair | 5.11.14 | 1 | Job | ||
| Deck - Crane Inspection | 5.11.15 | 1 | Job | ||
| House - Watertight Door Replacement | 5.11.16 | 1 | Job | ||
| Hopper - Irathane Coating Renewal | 5.11.17 | 1 | Job | ||
| House - Stateroom Window Gasket Renewal | 5.11.18 | 1 | Job | ||
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Services | 5.1.2 | 1 | each | $ - 0 | |
| Main Propulsion - Propeller Blade Repairs | 5.3.1 | 1 | Job | ||
| Hull - Coating of Hull Below Waterline | 5.5.1 | 3000 | SqFt | $ - 0 | |
| Hull - Hull Anode Renewal | 5.5.2 | 1 | Job | $ - 0 | |
| Hull - Suction Inlet Hull Rings and Pipe Liners Replacement | 5.5.5 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Bearing Support Channel Overhaul | 5.6.1 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Hinge Bushing Renewal | 5.6.2 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Operating Rod Replacement | 5.6.3 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Retaining Bar Repair | 5.6.4 | 1 | Job | $ - 0 | |
| Hopper - Hopper I Beam Inspection | 5.6.5 | 1 | Job | $ - 0 | |
| Bow Thruster – Inspection, Oil and Seal Change | 5.7.2 | 1 | Job | ||
| Bow Thruster - Pod Preservation | 5.7.3 | 1 | Job | $ - 0 | |
| Deck - 20-inch Pipe Replacement | 5.8.1 | 1 | Job | $ - 0 | |
| Deck - Anchor and Anchor Chain Reconditioning | 5.8.2 | 1 | Job | $ - 0 | |
| Total Category B Work Items | $ - 0 |
Over & Above Work Over & Above Work tc={EABF1FC3-EC0E-4093-A392-6EB2AC67D34C}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Where do I get these numbers from?
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 13,000 | $0.00 | ||
| Materials & Subcontractor | 6.1 | $ 500,000.00 | $ 500,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $500,000.00 |
Where do I get these numbers from?
File details come from the government source that posted it. Updated .