W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 02.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for the U. S. Army Corps of Engineers, South Atlantic Division
Solicitation number
W9127821R0056
Issued by

View the file

Other files

File Type Posted
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 07.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 07.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 06.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 06.pdf PDF
W9127821R0056 RFP Amendment 05.pdf PDF
W9127821R0056 DD3150 C19 Vaccination Attestation Contractor and Visitor.pdf PDF
W9127821R0056 RFP Amendment 04.pdf PDF
W9127821R0056 WFG Drawings Amended 12-2-21.pdf PDF
W9127821R0056 GDACS and Controls Installation MATOC Specification 12-2-21.pdf PDF
W9127821R0056 RFP Amendment 03.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 02.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 02.pdf PDF
W9127821R0056 RFP Amendment 01.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 01.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 01.xlsx XLSX spreadsheet
W9127821R0056 RFP for Control System Installation.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 1 Company Data Sheet.docx DOCX document
W9127821R0056 RFP Reference_Drawings.pdf PDF
W9127821R0056 RFP Attachment 3 Past Performance Data Sheet.docx DOCX document
W9127821R0056 RFP Attachment 4 Past Performance Questionnaire_fillable.pdf PDF
W9127821R0056 RFP WFG Generator Install Drawings Final.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 6 SubContactingPlanTemplate.docx DOCX document
W9127821R0056 RFP Attachment 2 Notice of Exceptions.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

5 Year Ordering Period Labor Rates
No.MATOC Labor CategoriesOrdering Year 1Ordering Year 2Ordering Year 3Ordering Year 4Ordering Year 5FAR 52.217.8 - Option to Extend Services (Max of 6 months)
1Program Manager
2Project Manager
3Site Superintendent/Supervisor
4Safety & Health Manager
5Site & Safety Health Officer
6Sr. Contract Manager
7Quality Control Manager
8Sr. Engineer
9Mid. Engineer
10Jr. Engineer
11Engineering Technician
12CAD Specialist
13Data Entry Operator
14Estimator
15Fiber Optic Technician
16Technical Instructor
17Construction Foreman
18Electrician Maintenance
19Electrician Technician I
20Electrician Technician II
21Electrician Technician III
22Electronics Technician I
23Electronics Technician II
24Electronics Technician III
25Instrument Mechanic
26Field Technician
27Project Controls/Scheduler
28Laborer
29Plumber Maintenance
30Pipefitter Maintenance
31Painter Maintenance
32Machinist Maintenance
33Millwright
34Rigger
35Administrative Assistant
36Accounting Clerk
37Document Preparation Clerk
38General Clerk
39Order Clerk I
40Order Clerk II
41Travel Clerk
42Rental Clerk
NOTES:
1. Hourly Labor Rates shall include overhead(s), general and administrative (G&A) expenses, labor burden fringes, any other applicable costs.
2. Profit will be negotiated with each task order - DO NOT include profit in the hourly labor rate.
3. The Hourly Labor Rates listed above shall be the maximum rates that can be proposed in response to Requests for Proposal (RFPs) issued during the Base Period of the contract; the Hourly Labor Rates listed above shall be the maximum rates that can be incorporated into task orders awarded during the Option Period of this contract. Lower rates may be proposed during the RFP process and incorporated into awarded task orders.
4. Modifications to task orders will reflect the applicable Hourly Labor Rates at the time the task order was awarded.
No.RateOrdering Year 1Ordering Year 2Ordering Year 3Ordering Year 4Ordering Year 5FAR 52.217.8 - Option to Extend Services (Max of 6 months)
43Overhead
44G&A
NOTES:
1. The rates in the table above will be applied to Other Direct Costs (ODCs) as negotiated per task order. ODCs may include but are not limited to reproduction, travel, subcontracting effort and specialized equipment.
2. Profit on ODCs will be negotiated per task order.
3. Modifications to task orders will reflect the applicable Overhead and G&A Rates at the time the task order was awarded.

MATOC Bid Schedule Attachment 5.1

File details come from the government source that posted it. Updated .