View the file

Other files

File Type Posted
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 07.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 07.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 06.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 06.pdf PDF
W9127821R0056 RFP Amendment 05.pdf PDF
W9127821R0056 DD3150 C19 Vaccination Attestation Contractor and Visitor.pdf PDF
W9127821R0056 WFG Drawings Amended 12-2-21.pdf PDF
W9127821R0056 GDACS and Controls Installation MATOC Specification 12-2-21.pdf PDF
W9127821R0056 RFP Amendment 03.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 02.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 02.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 02.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 01.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 01.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 01.xlsx XLSX spreadsheet
W9127821R0056 RFP for Control System Installation.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 1 Company Data Sheet.docx DOCX document
W9127821R0056 RFP Reference_Drawings.pdf PDF
W9127821R0056 RFP Attachment 3 Past Performance Data Sheet.docx DOCX document
W9127821R0056 RFP Attachment 4 Past Performance Questionnaire_fillable.pdf PDF
W9127821R0056 RFP WFG Generator Install Drawings Final.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 6 SubContactingPlanTemplate.docx DOCX document
W9127821R0056 RFP Attachment 2 Notice of Exceptions.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X

X 9B. DATED (SEE ITEM 11)

07-Sep-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

W9127821R0056

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X is not extended.The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of amendment 04 is to update site visit requirements and include updated scope sections. See next page.

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY CODE

ENDIST MOBILE CONTRACTING DIVISION

109 ST JOSEPH ST

MOBILE AL 36602

W91278 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

3.EFFECTIVE DATE

2-DEC-2021

X

W9127821R0056

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SITE VISIT INFORMATION AND REQUIREMENTS:

Monday, December 6, 2021 at 9:00am Eastern Standard Time.

Location: Walter F. George Powerhouse Powerhouse Access Road Shorterville, AL 36373

Requirements for Entry per DoD COVID-19 Safety Protocols:

a. Visitors will complete the DD Form 3150, "Contractor and Visitor Certification of Vaccination"; and present to authorized DoD personnel upon entry of the DOD Facility. Failure to complete the DD Form 3150 will result in denial of visitor's access to the DoD facility.

b. Visitors who are not fully vaccinated against COVID-19, or who decline to volunteer their COVID-19 vaccination status, must show an electronic or paper copy of negative COVID-19 test results from an FDA-authorized or approved COVID-l9 test administered no earlier than 72 hours prior to their visit. If a not fully vaccinated visitor is unable to show a negative COVID-19 test result, the visitor will be denied access to the DoD facility.

SPECIFICATION UPDATES:

1.) Removed 01 35 29.00 25 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS This was a duplicate deprecated safety section.

2.) Removed 02 82 14.00 10 ASBESTOS ABATEMENT ACTIVITIES 3.) Revised Technical specifications in response to ProjNet comments.

4.) Added 13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT

The GDACS & Controls Installation MATOC Specifications were revised in response to RFI ProjNet questions and comments. The specification packet is replaced in it's entirety, see file W9127821R0056 GDACS & Controls Installation MATOC Specification 12-2-21.

DRAWING UPDATES:

The Walter F. George (WFG) drawings were revised in response to RFI ProjNet questions and comments. The WFG drawing packet is replaced in it's entirety, see file W9127821R0056 WFG Drawings Amended 12-2-21.

(End of Summary of Changes)

W9127821R0056 WFG Unit 3 Cooling Water Piping Photos.pdf
Unit 3 Cooling Water Piping Photos 1
Unit 3 Cooling Water Piping Photos 2
Unit 3 Cooling Water Piping Photos 3
Unit 3 Cooling Water Piping Photos 4
Unit 3 Cooling Water Piping Photos 5
Unit 3 Cooling Water Piping Photos 6
Unit 3 Cooling Water Piping Photos 7
W9127821R0056 RFP Amendment 02 corrected page.pdf
W9127821R0056 WFG Unit 3 Cooling Water Piping Photos.pdf
Unit 3 Cooling Water Piping Photos 1
Unit 3 Cooling Water Piping Photos 2
Unit 3 Cooling Water Piping Photos 3
Unit 3 Cooling Water Piping Photos 4
Unit 3 Cooling Water Piping Photos 5
Unit 3 Cooling Water Piping Photos 6
Unit 3 Cooling Water Piping Photos 7

File details come from the government source that posted it. Updated .