W9127821R0056 GDACS and Controls Installation MATOC Specification 12-2-21.pdf

PDF 682 KB Posted

Attached to
MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for the U. S. Army Corps of Engineers, South Atlantic Division
Solicitation number
W9127821R0056
Issued by

View the file

Other files

File Type Posted
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 07.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 07.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 06.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 06.pdf PDF
W9127821R0056 RFP Amendment 05.pdf PDF
W9127821R0056 DD3150 C19 Vaccination Attestation Contractor and Visitor.pdf PDF
W9127821R0056 RFP Amendment 04.pdf PDF
W9127821R0056 WFG Drawings Amended 12-2-21.pdf PDF
W9127821R0056 RFP Amendment 03.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 02.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 02.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 02.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 01.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 01.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 01.xlsx XLSX spreadsheet
W9127821R0056 RFP for Control System Installation.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 1 Company Data Sheet.docx DOCX document
W9127821R0056 RFP Reference_Drawings.pdf PDF
W9127821R0056 RFP Attachment 3 Past Performance Data Sheet.docx DOCX document
W9127821R0056 RFP Attachment 4 Past Performance Questionnaire_fillable.pdf PDF
W9127821R0056 RFP WFG Generator Install Drawings Final.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 6 SubContactingPlanTemplate.docx DOCX document
W9127821R0056 RFP Attachment 2 Notice of Exceptions.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAD GDACS & Controls Upgrades - Installation MATOC 19MU10M1WFG

SECTION 01 10 00.00 25

CONTRACT ADMINISTRATION DATA

2021/ 12/2

PART 1 GENERAL

1.1 CONTRACT ADMINISTRATION

This Contract will be administered by the Office or Person(s) listed in SECTION 00800, Contract Clause 52.000-4006, CONTRACT ADMINISTRATOR.

1.2 CONTRACTING OFFICER

The Contracting Officer who signed this contract is the primary Contracting Officer for the contract. Nevertheless, any Contracting Officer assigned to the Mobile District and acting within his/her authority may take formal action on this contract when a contract action needs to be taken and the primary Contracting Officer is unavailable.

1.3 SERIAL LETTER CORRESPONDENCE

1.3.1 General

The original and three copies of all correspondence pertaining to this contract shall be sent to the Contracting Officer's Representative (COR), U.S. Army, Corps of Engineers, Mobile District, 109 Saint Joseph St, Mobile, AL 36602. Letters shall be signed by the Project Manager or by assistants designated to act for the Project Manager. A list of personnel so designated shall be furnished.

1.3.2 Numbering

All letter correspondence shall be independently numbered serially with no numbers missing or duplicated, and in sequence, commencing with number one (1). Each letter shall show the contract number, description, and subject matter. Only one subject should be covered in the same letter.

1.3.3 Subcontractors

Subcontractors shall not correspond with Government Personnel; the prime Contractor shall handle all correspondence.

1.3.4 Transmittals

Transmittals of signed pay estimates, payrolls, submittals, and other similar correspondence will not require a Serial Letter; use of a commercial transmittal form or speed letter is encouraged.

1.3.5 PROJECT-SPECIFIC MANAGEMENT PLAN

Particular Submittals identified as SD-01, Pre- Work Submittals (SECTION 01 33 00.00 25 ), shall be submitted via the Project-Specific Management Plan. The Project-Specific Management Plan shall be submitted as a single document and address job-specific accident prevention program, w environmental protection plan, work quality control program, and project

SECTION 01 10 00.00 25 Page 1 work plan. Acceptance of the Project-Specific Management Plan is required prior to commencement of site work.

It shall be organized as follows:

a. Section I - Accident Prevention Program.

(1) Accident prevention plan (EM 385-1-1 and SECTION 01 35 26 )

(2) Drug-free workplace policy.

(3) Hazard communication program

(4) Activity hazard analysis (EM 385-1-1).

(5) Equipment certification.

b. Section II - Environmental Protection Plan. (SECTION 01 57 20.00 25

c. Section III - Work Quality Management Program.(SECTION 01 45 04.00 25 )

(1) Contractor's quality control (CQC) plan.

(2) CQC Daily Report form.

d. Project Work Plan. (The following are examples:)

(1) Roadway Access Agreement

(2) Temporary electrical systems

(3) Welder qualifications

(4) Welding procedures

(5) Bolt pre-tensioning procedure

e. Schedule of Work

f. Submittal Register

1.4 LETTERS OF AUTHORITY

To authenticate actions required under terms of this contract, a letter of authority shall be furnished to the COR that indicates the names of individual or individuals who will be authorized to perform the following functions on behalf of the company:

a. Sign progress payment estimates.

b. Accept Government furnished property (if applicable).

c. Sign contract modifications, supplemental agreements and consent of surety.

d. Monitor and report on the environmental protection plan, management plan, quality control plan, and safety plan.

e. Supervise the field activities

This letter of authority shall bear the typewritten names and the handwritten signatures of each individual and be signed by the person

SECTION 01 10 00.00 25 Page 2 whose signature appears on the final contract.

1.5 LABOR STANDARDS

1.5.1 General

The Contractor and all subcontractors are required to comply with the following labor standards, statutes, and regulations; Davis-Bacon Act;

Contract Work Hours and Safety Standards Act; Secretary of Labor's regulations (Parts 3 and 5, Subtitle A, Title 29, Code of Federal Regulations).

1.5.2 Coverage

The contract provisions relating to wages, overtime, payroll deductions, and other labor standards requirements cover foremen, laborers, and mechanics, including owner-operators of other than hauling equipment and other individual enterprises performing the duties of a laborer or mechanic. Bona fide owner-operators of hauling equipment, such as trucks, who are independent contractors are not covered, and the certified payrolls, including the names of such owner-operators, need not show hours worked nor rates paid, but only the notation "owner-operator."

1.5.3 Wages

Wages shall be paid at least once a week and shall be computed at hourly rates not less than those set forth in the contract wage schedule, as set by the Davis-Bacon Act wage determinations, for the particular classifications of work performed. (Instructions regarding wage determination obligations are available on request.)

1.5.4 Overtime

Overtime for work in excess of 40 hours in any workweek shall be paid at not less than 1 1/2 times the basic rate of pay. Rates paid for fringe benefits are excluded in the computations of overtime.

1.5.5 Deductions

Deductions from wages earned may be only those that are permitted by the Copeland Act (Anti-Kickback) regulations. An instruction sheet entitled "Payroll Deductions" is available upon request.

1.5.6 Apprentices

Apprentices shall be individually registered in a program of a State apprenticeship and training agency approved and recognized by the U.S.

Bureau of Apprenticeship and Training. Written evidence of such registration shall accompany the first payroll on which apprentices appear.

1.5.7 Equal Opportunity

Affirmative action shall be taken to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, creed, color, religion, sex, or national origin. SECTION 00700, Clause 52.222-26, EQUAL OPPORTUNITY, requires the posting of notices and sending of a notice to each labor union or representative of workers with which you have an agreement. Posting of the notice available from the COR's office satisfies both requirements.

SECTION 01 10 00.00 25 Page 3

1.5.8 Subcontracts

Subcontracts (first tier or otherwise) shall physically contain the labor standards provisions of the prime contract. Subcontracts of any tier in excess of $10,000 must also contain the "Equal Opportunity" clause.

1.5.9 Payrolls

Correct Weekly Payrolls, including those of subcontractors, shall be prepared and submitted. An instruction sheet is available upon request.

Incorrect and delinquent payrolls will delay processing of partial payment estimates.

1.5.10 Records

Payroll and Employment Records shall be maintained during the course of work and for three years thereafter. They are subject to inspection by authorized representative of the Contracting Officer and the U.S.

Department of Labor.

1.5.11 Job Interviews

A Government representative will interview Contractor and Subcontractor employees from time to time during working hours on the job.

1.5.12 Work Stoppage

Work stoppages resulting, or, likely to result from actual or potential labor disputes, shall be promptly reported, with all relevant information, to the Government Quality Assurance Representative (GQAR).

1.5.13 Not Used

1.5.14 Other

The Contractor's attention is called to the following clauses in SECTION 00600, Clause 52.219-1, SMALL BUSINESS PROGRAM REPRESENTATIONS, Clause 52.219-22, SMALL DISADVANTAGED BUSINESS STATUS; and Clause 52.204-5, WOMEN-OWNED BUSINESS (OTHER THAN SMALL BUSINESS). The Contractor assumes affirmative obligations with respect to subcontracting with such enterprises. The prime Contractor shall send a copy of the clauses to each subcontractor.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section --

SECTION 01 10 00.00 25 Page 4

SECTION 01 10 10.00 25

CONTRACTOR'S OPERATIONS AND REQUIREMENTS

2021/04/21

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK

The U.S. Army Corps of Engineers (USACE), South Atlantic Division (SAD) has identified a requirement for the upgrade of its facility control systems. This contract and effort extents to 13 hydropower projects in the SAD region (Virginia, South Carolina, Georgia, Alabama, and Florida).

This effort is critical to the Southeastern Power Administration (SEPA) mission to support the power needs of customers across the Southeastern United States and operate the electrical grid reliably. The award will result in a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC). The MATOC will have a performance period of five (5) years or until capacity is exhausted.

Capacity will be $20 million. This contract will not be subject to Cost Accounting Standard, nor will certified cost or pricing information be required. Contractor tasks and required submittals will be specified under each Task Order executed under this contract. This contract will provide immediate response capacity for installation of government-furnished control cabinets in addition to contractor-supplied instrumentation and wiring specified herein.

These control cabinets will be used as Remote Terminal Units (RTU) for facility SCADA systems. The contractor will be responsible for moving RTUs to their final installation location and installing the wiring to the field devices. It may be necessary for the contractor to install courtesy pads, conduit and cable tray to reach the instrumentation devices. The contractor will provide all cabling and labor necessary. The contractor will also procure and install new Level, Pressure, and Flow transducers throughout the project. The contractor may be required to make changes to governor and exciter programable logic controls. When logic changes are needed an OEM-certified technician will be required. Equipment programming and configuration shall be performed by the Government. Task Orders will be issued on an as-required basis.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

CODE OF FEDERAL REGULATIONS (CFR))

29 CFR 1910.94 Ventilation

29 CFR 1910.95 Occupational Noise Exposure

29 CFR 1910.1000 Air Contaminants

29 CFR 1926.52 Occupational Noise Exposure

29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists

SECTION 01 10 10.00 25 Page 1

29 CFR 1926.57 Ventilation

29 CFR 1926.101 Hearing Protection

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code

NFPA 70E (2015) Standard for Electrical Safety in the Workplace

1.3 SUBMITTALS

Government review and approval is required for submittals listed below for this SECTION and shall be furnished in accordance with SECTIONS 01 33 00.00 25 and 01 35 29.00 25

SD-01 Preconstruction Submittals

Schedule for Work; G

Access Agreements and Work Areas ; G

Project Security Procedures ; G

Contractor's Work Supervisor(s) Qualifications ; G

Gas, Vapor, Fume, Dust and Mist Control Program ; G

Disposal Plan ; G

Contractor's Planned Equipment Methods ; G

Loading plan for cranes and heavy equipment ; G

Plant and Equipment List ; G

Loading Diagram for Heavy Vehicles ; G

Scaffolding ; G

Temporary Electrical Service Plan ; G

Qualified Crane Operators ; G

Qualified Riggers ; G

1.4 SCHEDULE FOR WORK

The Contractor shall submit a detailed schedule for accomplishing the work

SECTION 01 10 10.00 25 Page 2 in this contract. The schedule will not be used by the Government to select a Contractor; rather it will be used to ensure that the Contractor is capable of accomplishing the necessary work in the allotted time periods. It is the Governments intent to return the units to service in a timely manner. As such, the desired schedule would limit unit outages to no more than 90 consecutive days per unit. Only one unit outage per plant shall be permitted at a time unless otherwise stated. A unit is considered returned to service upon the successful completion of installation and commissioning procedures.

1.5 COORDINATION MEETINGS

Weekly coordination meetings will be held between the Contractor and the Government. This meeting will be used to discuss the Contractor's proposed schedule, actual progress in the last week and work planned in the upcoming two weeks. The Contractor shall make particular note of any work requiring Project support or potential impacts to Project operations or maintenance. A meeting time and place shall be mutually agreed upon for the same time each week. The Contractor shall distribute the coordination meeting notes with changes to the Government no later than the close of business the workday following the weekly meeting.

1. 6 CONTRACTOR EMPLOYEES

1.6 General

The Contractor shall ensure that all employees are capable of demonstrating adequate knowledge of tools, supplies, equipment and techniques necessary to competently perform the work. The Contractor's Work Supervisor(s) Qualifications , experience, and a verifying contact, name and phone number, shall be submitted for at least two such facilities. The Government may require the Contractor to discontinue using any employee in the performance of the work specified in this contract determined by the Government to be unsatisfactory. Contractor employees will not be permitted to bring guests, family members or non-employees to the job site at any time.

1.6.1 Background Checks

The Contractor shall complete a background check for all employees performing work at the site, including sub-contractors.

1.6.3 Training

1.6.3.1 General

The Contractor shall ensure that all employees are provided any additional training required to perform their assigned duties as indicated by OSHA and the referenced EM 385-1-1 .

1.6.3.2 Arc Flash

The Contractor shall provide all personnel training on Arc Flash Hazards as defined by NFPA 70E as they pertain to the work being performed. At a minimum this training shall include the definition of an arc flash, identification of potential arc flash hazards, methods of mitigation, and selection of appropriate personal protective equipment when mitigation is not possible. The training shall be as specific to the work and environment in which it is being performed as is possible.

SECTION 01 10 10.00 25 Page 3

1.6.3.3 Crane Operators and Riggers

Crane operators and riggers must meet the minimum training requirements defined in the referenced EM 385-1-1 . The Contractor shall provide a list and evidence of completed training in qualified crane operators and qualified riggers for crane operators and riggers respectively, to the COR no less than 30 days prior to mobilization on site if Contractor personnel will be performing crane or rigging operations.

1.7 PROJECT SAFE CLEARANCE PROCEDURE

A safe clearance system is required by South Atlantic Division Regulation SADR PDO-6 "Hazardous Energy Control Program" and used by Project Personnel to insure continuity of service and safety to personnel and equipment. Any work, service or delivery performed which requires taking project operating equipment out of service will be done only after a formal clearance is obtained through the Site Responsible Official.Contractor personnel are required to successfully complete the training and examination required as well as execute all work in conformance with this policy. Safe Clearances shall not be violated by Contractor personnel. Any serious violation of the South Atlantic Division's Safe Clearance Procedure will be grounds for the immediate removal of the offender(s) from the Project.

1.8 Arc Flash

The Contractor shall comply with all requirements of NFPA 70E pertaining to the performance of work on electrical equipment. The Contractor shall use mitigation (i.e. electrical isolation of the equipment by way of the projects safe clearance procedure) as the primary means of addressing the arc flash hazard. Using PPE within the arc flash boundary of energized equipment shall be permitted only when no other method of performing the work exists. When equipment is encountered which has no labels indicating the Arc Flash Category, available energy, and arc flash protection boundary the Contractor shall consult with the COR and Power Plant Manager to determine the applicable PPE and flash protection boundary

1.9 ACCESS AGREEMENTS AND WORK AREAS

1.9.1 Access Agreements

Access Roads to and from the work site shall be submitted after the Contractor, the Contract Officer's Representative and the Project's Representative have coordinated and determined the most advantageous access to, and staging of, the Contractor's assets deployed to the work site. The existing access roadway and any associated access roads on the project, shall not be closed as a result of construction or delivery activities associated with this contract unless previously coordinated and approved by the Government. Traffic delays will only be permitted in accordance with the provisions of this section. In accordance with the referenced EM 385-1-1, when necessary for equipment to operate on or to cross access roads, arterial roads or highways, flaggers, signs, lights, and/or other necessary safeguards shall be furnished to safely control and direct the flow of traffic. When necessary to operate on or to cross existing highways or roads, all necessary permits shall be obtained from the appropriate private or public authority. Spillage on the project roads and state or county roads will not be permitted, and the spillage shall be immediately cleaned up at the expense of the Contractor. No cleated or crawler-type equipment shall be operated on paved surfaces. Damage to all

SECTION 01 10 10.00 25 Page 4 roads caused by the Contractor's operations shall be repaired to preexisting conditions at the expense of the Contractor. The right-of-way for the work (or delivery site) and access thereto will be furnished as stated in this paragraph subject to mutual agreement between the Contractor and the Government concerning the specific route the Contractor is to use. Such mutual agreement must be reached prior to initiation, construction or delivery.

1.9.2 Work Areas

Drawings showing the layout of the area proposed for use shall be submitted for review and approval. The drawing(s) shall show the location of the principal components: offices, access roads, parking, storage facilities and disposal areas, which the Contractor proposes to construct within the designated limits. Only Contractor and subcontractor parts trailers and lunch trailers may be allowed in the Contractor work areas and these shall be subject to COR approval. All contractor and subcontractor trailers shall be required to be adequately physically anchored to prevent overturning due to high winds. Should additional working space or lands within the Government right-of-way be required for material yards, job offices, or other purposes they can be obtained through agreement with the Government approved in writing. When directed at any time during the progress of the work when space is needed within the right-of-way for other purposes, any part of the grounds that have been in use shall be promptly vacated and cleaned up. However, it is not the intent to require the Contractor's plant or material to be removed from an area while such plant, material, or area is still being actively used. The project staff will brief the Contractor on security procedures.

Any such procedures will not be the basis for claims for additional money or time. The project areas off limits to Contractor personnel will also be designated. Salespersons or personnel seeking employment will not be permitted inside the project security fences without prior Government approval.

1.9.3 Employee Access and Parking

The Contractor's employee private vehicle parking areas shall be restricted to the area(s) agreed upon before site operations begin. The Contractor shall keep the parking areas free of litter and debris. An adequate number and size of trash receptacles shall be placed in the parking areas and emptied, as necessary to avoid overflowing. Trash receptacles shall be adequately secured to provide protection from the wind and animals. Access to the Contractor's work areas will be available during normal project operating hours at each facility .

1.9.4 Public Access

The public shall not have access to the work area.

1.10 SALVAGE

Some items will remain the property of the Government during the contract and after completion. Salvage shall include removal of the material, equipment, etc., from its present location and transporting, bundling, protecting, cleaning, and storing it on-site as directed. Salvage items will be those specified. Adequate property control records shall be maintained for all materials or equipment specified to be salvaged. These records may be in accordance with the Contractor's system of property control. The Contractor shall be responsible for the adequate storage and

SECTION 01 10 10.00 25 Page 5 protection of all salvaged materials and equipment and shall replace all salvage materials and equipment which are stolen, broken, or damaged during the salvage operations as the result of the Contractor's negligence, or while in the Contractor's care.

1.11 1.1 1 Delivery of Major Equipment

During times when the Contractor is not on site, the Project will receive equipment and stage it in the Powerhouse. Once the Contractor returns to the site, it shall be the Contractor's responsibility to uncrate the equipment and to dispose of all shipping crates and packing materials.

Government personnel will not be responsible for inspection of equipment at time of delivery and will accept no responsibility for the condition or correctness of the equipment being delivered. Furthermore, Government personnel will not provide additional functions beyond offloading;

signatures of Government employees provided will indicate only that items were received but will not attest to the condition, completeness, or correctness of the delivery. Any deliveries attempted outside of normal business hours will not be permitted and at Contractor expense.

1.12 PROJECT SECURITY

1.12.1 Project Security Procedures

Departure from the powerhouse will be accomplished in a similar manner.

Contractor personnel will not be permitted to arrive or depart from through the gates individually other than in an emergency or when agreed upon with project personnel in advance. Arrangement and scheduling of working hours and crews shall be coordinated with the Project Staff. The Contractor shall submit the intended working hours of his staff on site and identify any employees working for him in any capacity.The security of the Contractor's property and items furnished under this contract, until the Government accepts items, are the Contractor's responsibility whether stored inside or outside. All Contractor personnel, subcontractor personnel, suppliers, etc. shall comply with the project security policies. Salespersons or personnel seeking employment will not be permitted inside the Project. Signs may be erected outside the project containing instructions for personnel seeking the Contractor. The content and location of the signs shall be approved by the COR prior to erection.

Posts or other means of support, if required, shall be furnished by the Contractor and removed when the contract is completed. Any open post holes shall be suitably backfilled prior to the end of the shift that posts are removed and any other damage shall be repaired to preconstruction conditions.

1.12.2 Contractor's General Personnel

The Contractor shall prepare, and revise whenever organizational changes occur, a project organizational chart. The Contractor shall maintain a complete organizational chart of all positions that will be working on the project. All personnel employed by the Contractor shall be fully qualified in their respective fields to render the services necessary.

1.12.3 Identification of Employees

Contractor personnel shall be readily identifiable by means of the contractor's logo and the employees name affixed to their hard hat and/or uniform.. The Contractor shall submit a complete listing of all personnel and their titles who will be working on the project. This listing shall

SECTION 01 10 10.00 25 Page 6 be revised and resubmitted when personnel changes occur. The Contractor may be issued an access key card at the discretion of the Power Plant Manager to more easily facilitate entrance and exit from the project. This discretion is limited to only one of the Contractor's personnel and must be a manager or foreman assigned for the duration of the contract. Failure to return any access key(s) will result in a $100 charge to the Contractor for each key. These fees will be deducted from the Contractor's payment. The Contractor must furnish a written request for government furnished access cards containing the following minimum information to the COR at least one week in advance of receiving the actual key card:

Name of Contractor Name of Employee

Birth date Recent Identification with Photo Place of Birth Other information as needed based on security level

1.12.4 Foreign Born Employees

The Contractor shall submit scanned images in .pdf or .jpg format of both the Worker's Visa and Green Card or else both the Visa and a U.S. Driver's License to the COR of all Contractor employees who are foreign born and have non-citizen status. These files shall be submitted at least one month in advance of the start of work by the employees. This allows the Corps District Security Office sufficient time to run a security check on these affected personnel. Contractor personnel who fit the above description of non-citizenship shall not be permitted to work at the Project until they pass this security check in addition to the other normal requirements.

1.12.5 Identification of Contractor Vehicles

All Contractor vehicles used for prosecuting the work shall have a Contractor sign or other permanent identification and must carry the required insurance. Private vehicles not owned by the Prime Contractor or Subcontractors shall not be used for prosecuting the work.

1.12.6 Use of Private Vehicles

Private vehicles of the Contractor and his employees shall enter and leave the project as directed. Parking shall be restricted to approved areas.

1.13 ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS

1.13.1 AT Level 1 Training

All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:

http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the

SECTION 01 10 10.00 25 Page 7

RA ATO in presentation form which will be documented via memorandum.

1.13.2 Access and General Protection/Security Policy and Procedures.

All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). If necessary, the contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

1.13.3 Contractors requiring Common Access Card (CAC)

The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

1.13.4 Contractors who do not require CAC, but require access to a DoD facility or installation

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.13.5 AT Awareness Training for Contractor Personnel Traveling Overseas

All US based contractor employees and associated sub-contractor employees traveling overseas will receive the government provided AOR specific AT awareness training. The documentation of training completion must be provided to the COR prior to departure.

1.13.6 Suspicious Activity Reporting Training

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to

SECTION 01 10 10.00 25 Page 8 report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

1.13.7 Contractor Employees Who Require Access to Government Information Systems

All contractor employees with access to a government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter in accordance with personnel security standards listed in AR 25-2 (Information Assurance), an appropriate background investigation will be conducted prior to accessing the government information systems.

1.13.8 Requirement for OPSEC Standing Operating Procedure/Plan

The Contractor shall develop an OPSEC SOP/Plan within 90 days of contract award. The OPSEC SOP/Plan must be reviewed and approved by the RA OPSEC Officer. The SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator.

1.13.9 Requirement for OPSEC Training

All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.

1.13.10 Information Assurance (IA)/Information Technology (IT) Training

All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.

1.13.11 Information Assurance (IA)/Information Technology (IT) Certification

All contractor employees supporting IA/IT functions shall be appropriately certified upon contract IAW DoD 8570.01-M, DFARS 252.239-7001 and AR 25-2.

The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

SECTION 01 10 10.00 25 Page 9

1.13.12 Contractors Authorized to Accompany the Force

All contractor employees shall ensure the following AT/OPSEC requirements are met prior to deploying personnel authorized to accompany U.S. Armed Forces outside the United States; to include compliance with laws, regulations, pre-deployment requirements, and required training in accordance with combatant command guidance.

1.13.13 Contracts Requiring Performance or Delivery in a Foreign Country

All non-local contracting personnel will comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task force commander policies and directives.

1.13.14 Handling or Access to Classified Information

Contractor shall comply with AR 380-67 (Personnel Security Program) and Homeland Security Presidential Directive 12 (Policy for a Common Identification Standard for Federal Employees and Contractors) as well as FAR 52.204-2, Security Requirements. Additionally, Contractors must comply with - (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor. For classified contracts, the DD Form 254 will be attached with the contract.

1.13.15 Exposure to Classified and/or Sensitive Materials

All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

1.13.16 Facility Clearance and Individual Clearances

If access to classified information is necessary, then the Prime Contractor Company must have (or will have) a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22-M and AR 380-49) prior to the start of the contract awarded period of performance. Contractor personnel performing work under this contract must have the required security clearance, per AR 380-67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD Form 254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL.

1.13.17 Pre-screen Candidates Using E - Verify Program

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the

SECTION 01 10 10.00 25 Page 10 designated Government representative.

This Form will be provided to the Contracting Officer and shall become part of the official contract file.

1.13.18 Contracts Requiring Armed Security Guards

All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility policies and procedures on storing weapons and ammunition IAW AR 190-11 (provided by government representative).

1.13.19 Threat Awareness Reporting Program

All new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized web-based TARP training for CAC card holders is available at the following website: https://www.us.army.mil/suite/page/655474.

1.14 DECK ACCESS RESTRICTIONS

Operational areas of the deck gantry crane shall not be blocked at any time. With prior coordination and approval, the deck gantry crane may be blocked for a period no longer than 4 hours.

1.15 NOISE CONTROL

1.15.1 General

Noise control and noise levels shall conform to requirements set forth in the appropriate regulations, including EM 385-1-1, Section 05.C, 29 CFR 1910.95 , 29 CFR 1926.52 and 29 CFR 1926.101 . The most conservative requirement shall govern.

1.15.2 Nighttime Noise Limitations

During work , the noise levels, as measured from the nearest occupied housing unit, shall not exceed 50 decibels during the hours from 2200 hours to 0700 hours.

1.16 UTILITIES

1.16.1 Sanitary Facilities

Use of the project restroom by Contractor personnel will not be permitted. Sanitary facilities furnished by the Contractor shall be provided in accordance with EM 385-1-1 and shall be located in areas at locations coordinated and approved by the COR. The Contractor shall provide freeze protection as needed to prevent any spillage.

1.16.2 General

The Contractor shall furnish utilities required for the performance of work under this contract, except Government-furnished electrical power, water, and compressed air as described below.

SECTION 01 10 10.00 25 Page 11

1.16.3 Electrical Power

1.16.3.1 General

The Contractor shall be allowed to use existing 120V and 480V electrical outlets. Contractor shall take special care not to overload receptacle circuits. Contractor shall be responsible for all accessories, such as extension cords, adapters, and raceways for road crossings. Extension cords shall not be allowed to cross crane rails.

1.16.3.2 Temporary Electrical Service

The Contractor shall submit a temporary electrical service plan for temporary electrical wiring.The powerhouse emergency generator may be used to provide temporary electrical service when it is to support essential powerhouse loads for short periods of planned interruption of service.

The powerhouse emergency generator shall not be used to provide service in any other circumstance. When modifications of the existing electrical configuration are required to maintain service a detailed plan as well as wiring and connection diagrams shall be provided to the Government for approval. When temporary service is required it shall comply with the EM 385-1-1 andNFPA 70 . Particular attention should be paid to Article 590, Temporary Installations. The contractor shall be responsible for providing temporary electrical service for any situation where the existing 120V or 480V electrical outlets cannot be used.

1.16.3.2.1 Generators

When temporary electrical service is to be supplied within the powerhouse for short durations the emergency diesel generator may be used, however only to provide essential plant loads. When a generator is to be used to supply additional non-essential loads or for long durations the powerhouse emergency generator may not be used. In this situation the Contract shall provide a generator sized sufficiently to support all normal plant loads in accordance with NFPA 70 . The Contractor shall perform all required temporary installations and wiring in accordance with NFPA 70 . Particular attention should be paid to Article 445. A detailed plan as well as wiring and connection diagrams shall be provided to the Government for approval.

1.16.3.2.2 Commercial

When electrical service is only available through commercial electrical service provide by the local electric utility it shall be provided as temporary. The service shall be provided in the name of the Contractor.

Establishment and coordination of this service shall be the responsibility of the Contractor. Location of equipment such as transformers, panels, meters, poles, and cable shall be identified on a drawing and submitted for Government approval. No service shall be ordered by the Contractor unless prior Government approval has been provided. The Contractor shall be responsible for termination of the service, removal of temporary equipment, and restoration of the site to pre-construction conditions when it is no longer required. All equipment procured by the Contractor to establish the temporary service shall be transferred to the Government when the service is terminated.

SECTION 01 10 10.00 25 Page 12

1.16.3.3 Temporary Electrical Wiring

The Contractor shall include all temporary wiring in the temporary electrical service plan All temporary electrical wiring shall be installed in accordance with the EM 385-1-1 andNFPA 70 and as approved. All temporary electrical wiring shall be removed prior to completion of the contract. The following requirements for temporary electrical wiring supplement that required in the references:

a. Single conductor wires such as Types WP, R, RH, T, and TW shall not be installed unprotected along the ground or walkways or within reach of persons on ground or walkways. These wires shall either be protected by conduit (except Type WP) or be supported by insulators beyond the reach of persons. These wire types are not acceptable for festoon lighting and shall not be used with insulation piercing sockets. For festoon lighting the use of 2 conductor No. 12 neoprene brewery cord is acceptable provided that where the cord is suspended, the use of wedge type strain clamps, such as "Reliable" Type PR is used to take the strain.

b. Type S, SO, or ST ("Tirex") shall be used where cords are subject to extreme conditions such as rocky ground, vehicle traffic, frequent moves along the ground, and frequent exposure to moisture.

Nonmetallic-sheathed cable and service entrance cable shall not be used as portable cord run along the ground or suspended in the air.

When exposed they shall be run against and fastened to continuous protective surfaces.

c. Only nonmetallic supports shall be used for installation of temporary electrical wiring; the use of baling wire and other like materials is prohibited.

d. Type NM (indoor) nonmetallic-sheathed cable shall not be exposed to moisture. For outdoor installation Type NMC or service cable shall be used and boxes used therewith shall be made of insulating material. Cabinets or cutout boxes installed where exposed to moisture shall either be rain tight or shall be protected from moisture.

e. Boxes and cabinets shall not have wires and cables passing through sharp edged holes. Individual wires shall enter boxes in conduit or through holes bushed with insulation material. Cables shall enter boxes through bushings or box connectors.

f. All metal which encloses live electrical conductors shall be grounded with the exception of isolated fixed boxes in dry locations and so placed that persons cannot touch the box and simultaneously touch or be standing on the ground, concrete or a grounded metal surface. The term "enclosure" includes safety switch and motor started boxes, panel board enclosures, switch and outlet boxes, and the frames of portable power tools. Metal stands for portable floodlights also shall be grounded. Water pipe or existing cable grounds shall be used whenever possible. All "made" grounds such as rods or pipes driven into the ground will provide a maximum ground resistance of 25 ohms or less. Ground wires connections shall utilize clamps or lugs so as to provide a mechanically sound, low resistance connection. Ground wires shall be of the size specified by the National Electric Code (NEC) and shall be run or protected to avoid injury. If subject to flexing or vibration, the ground wire shall be

SECTION 01 10 10.00 25 Page 13 stranded.

g. Grounding of portable electrical equipment including floodlight stands shall be accomplished by means of an extra conductor within the cord and an additional contact on the receptacle plug so arranged that the circuit and ground conductors cannot be interchanged. The neutral conductor shall not be used as the ground conductor. Mechanical protection and stranding of the ground conductor shall be equal to that of the circuit conductors. If a Contractor's portable equipment has plug caps that will not match receptacles equipped with a grounding connection, he shall replace the cord and plug to the proper type and permanently connect ground wire to equipment case.

h. Ground wires in portable cords shall always be identified by a green color and neutral conductors shall be white or gray. Special care shall be exercised in making up portable cords to be sure that the circuit and ground conductors are not interchanged.

i. The frames of all portable engine generator plants shall be grounded. This will usually entail a driven ground adjacent to the machine. The neutral wire of plants having an output voltage of 115/230 volts three wire also shall be grounded. All ungrounded conductors shall be protected by fuses of circuit breakers of no higher ampere ratings than allowed by the NEC.

j. The Contractor shall provide and maintain on the site a suitable ground testing device in use and authorized quality control personnel shall perform tests initially and subsequently whenever temporary wiring is altered to assure the adequacy of "man made grounds."

k. Welding machine leads shall be kept free of bare spots and splices shall be made using standard insulating splicing devices made for the purpose.

l. Every motor shall have a disconnecting means in sight of the controller location or arranged to be locked in the open position.

m. Only qualified journeymen electricians shall perform work on all temporary electrical wiring.

n. All concrete sawing and coring equipment shall be suitably grounded.

o. The Contractor shall use GFCI protected receptacles for providing power for his workers. This requirement shall only be waived where electrical equipment can not be operated with the GFCI receptacle and only after COR authorization. The COR shall provide this authorization for temporary use of non-GFCI receptacles only after he determines that no personnel shall be endangered by this temporary waiver.

1.16.4 Telephone

Telephone will not be available for Contractor use.

1.16.5 Water

All reasonable amounts of water for domestic use (not for concrete curing or construction purposes) will be made available from existing outlets and

SECTION 01 10 10.00 25 Page 14 supplies. No charge will be made for the water.

1.17 GAS, VAPOR, FUME, DUST, AND MIST CONTROL IN POWERHOUSE

1.17.1 General

Necessary measures shall be taken to effect maximum control of gases, vapors, fumes, dusts, and mists created by Contractor operations under this contract. To the maximum extent possible, dust and dirt shall be removed by vacuum cleaning, unless otherwise approved. Prior to commencement of such operations, a written plan of the proposed Gas, Vapor, Fume, Dust and Mist Control Program shall be submitted to the COR for approval. The required Control Program shall include the following:

a. Provision of exhaust ducts which shall discharge outside the powerhouse structure where mechanical ventilation is used. Ventilation systems shall comply with requirements of 29 CFR 1910.94 and

29 CFR 1926.57 .

b. Controlled operation of power-driven tools.

c. Furnishing and removing of approved dust preventatives in areas which cannot be properly rendered free from excessive dusting by vacuum cleaning or other methods.

d. Vacuum cleaning (or other acceptable method) of spaces within the powerhouse where dust accumulates.

e. Only air, electrical, propane, or battery-driven equipment may be used inside the powerhouse.

f. The powerhouse is pressurized to prevent dust infiltration from the outside. All doors shall be kept closed when not being used.

g. Methods to prevent exposure of employees to inhalation, ingestion, skin absorption, or contact with any material or substance at concentrations above those specified in 29 CFR 1910.1000 and

29 CFR 1926.55 .

1.17.2 Additional Provisions

Ventilation systems shall not interfere with traffic inside or outside the Powerhouse. Depending upon the Contractor's plant and equipment and methods of operation, additional provisions for satisfactory gas, vapor, fumes, dust, and mist control will be required and shall be included in the proposed Gas, Vapor, Fume, Dust, and Mist Control Program.