View the file

Other files

File Type Posted
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 07.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 07.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 06.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 06.pdf PDF
W9127821R0056 RFP Amendment 05.pdf PDF
W9127821R0056 DD3150 C19 Vaccination Attestation Contractor and Visitor.pdf PDF
W9127821R0056 RFP Amendment 04.pdf PDF
W9127821R0056 WFG Drawings Amended 12-2-21.pdf PDF
W9127821R0056 GDACS and Controls Installation MATOC Specification 12-2-21.pdf PDF
W9127821R0056 RFP Amendment 03.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 02.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 02.xlsx XLSX spreadsheet
W9127821R0056 RFP Amendment 01.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 01.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 01.xlsx XLSX spreadsheet
W9127821R0056 RFP for Control System Installation.pdf PDF
W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 1 Company Data Sheet.docx DOCX document
W9127821R0056 RFP Reference_Drawings.pdf PDF
W9127821R0056 RFP Attachment 3 Past Performance Data Sheet.docx DOCX document
W9127821R0056 RFP Attachment 4 Past Performance Questionnaire_fillable.pdf PDF
W9127821R0056 RFP WFG Generator Install Drawings Final.pdf PDF
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule.xlsx XLSX spreadsheet
W9127821R0056 RFP Attachment 6 SubContactingPlanTemplate.docx DOCX document
W9127821R0056 RFP Attachment 2 Notice of Exceptions.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of amendment 02 is to include informational attachments, revised the bid schedules, and extend the proposal due date.

This amendment includes revised bid schedules:

W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 02 to remove Asbestos Abatement Option Pricing W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 02 to remove Asbestos Abatement Option Pricing

This amendment includes the follow ing informational attachments:

W9127821R0056 WFG Asbestos Survey W9127821R0056 WFG Unit 3 Cooling Water Piping Photos W9127821R0056 WFG Ultrasonic Flow Meter Information

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Nov-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127821R0069

X 9B. DATED (SEE ITEM 11)

07-Sep-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Nov-2021

CODE

ENDIST MOBILE CONTRACTING DIVISION

109 ST JOSEPH ST

MOBILE AL 36602

W91278 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127821R0069

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 08-Nov-2021 10:00 AM to 15-Nov-2021 10:00 AM.

(End of Summary of Changes)

MATOC Bid Schedule Attachment 5.1

No. MATOC Labor Categories Ordering

Year 1 Ordering

Year 2 Ordering

Year 3 Ordering

Year 4 Ordering

Year 5

FAR 52.217.8 -

Option to Extend

Services (Max of 6 months)

1 Program Manager

2 Project Manager

3 Site Superintendent/Supervisor

4 Safety & Health Manager

5 Site & Safety Health Officer

6 Sr. Contract Manager

7 Quality Control Manager

8 Sr. Engineer

9 Mid. Engineer

10 Jr. Engineer

11 Engineering Technician

12 CAD Specialist

13 Data Entry Operator

14 Estimator

15 Fiber Optic Technician

16 Technical Instructor

17 Construction Foreman

18 Electrician Maintenance

19 Electrician Technician I

20 Electrician Technician II

21 Electrician Technician III

22 Electronics Technician I

23 Electronics Technician II

24 Electronics Technician III

25 Instrument Mechanic

26 Field Technician

27 Project Controls/Scheduler

28 Laborer

29 Plumber Maintenance

30 Pipefitter Maintenance

31 Painter Maintenance

32 Machinist Maintenance

33 Millwright

34 Rigger

35 Administrative Assistant

36 Accounting Clerk

37 Document Preparation Clerk

38 General Clerk

39 Order Clerk I

40 Order Clerk II

41 Travel Clerk

42 Rental Clerk

No. Rate Ordering

Year 1 Ordering

Year 2 Ordering

Year 3 Ordering

Year 4 Ordering

Year 5

FAR 52.217.8 -

Option to Extend

Services (Max of 6 months)

43 Overhead

44 G&A

ACM Removal per cubic foot iaw Specification Section 02 82 14.00 10

5 Year Ordering Period Labor Rates

3. The Hourly Labor Rates listed above shall be the maximum rates that can be proposed in response to Requests for Proposal (RFPs) issued during the Base Period of the contract; the Hourly Labor Rates listed above shall be the maximum rates that can be incorporated into task orders awarded during the Option Period of this contract. Lower rates may be proposed during the RFP process and incorporated into awarded task orders.

2. Profit will be negotiated with each task order - DO NOT include profit in the hourly labor rate.

1. Hourly Labor Rates shall include overhead(s), general and administrative (G&A) expenses, labor burden fringes, any other applicable costs.

NOTES:

3. Modifications to task orders will reflect the applicable Overhead and G&A Rates at the time the task order was awarded.

2. Profit on ODCs will be negotiated per task order.

1. The rates in the table above will be applied to Other Direct Costs (ODCs) as negotiated per task order. ODCs may include but are not limited to reproduction, travel, subcontracting effort and specialized equipment.

NOTES:

4. Modifications to task orders will reflect the applicable Hourly Labor Rates at the time the task order was awarded.

Bid Schedule Seed Project Attachment 5.2

Bid Item

Description QTY Unit Unit Price

Base Bid Amount

BASE BID ITEMS

0001 Unit 1 - Demolition & Disposal 1 JOB 0002 Unit 1 - Installation 1 JOB 0003 Unit 2 - Demolition & Disposal 1 JOB 0004 Unit 2 - Installation 1 JOB 0005 Unit 3 - Demolition & Disposal 1 JOB 0006 Unit 3 - Installation 1 JOB 0007 Unit 4 - Demolition & Disposal 1 JOB 0008 Unit 4 - Installation 1 JOB 0009 Recorder Board - Demolition & Disposal 1 JOB

Main Duplex Switchboard - Demolition & Disposal

1 JOB

0011 24VDC System - Demolition & Disposal 1 JOB

As-Built Drawings - Contract & Contractor- Prepared

1 JOB

NOTE: All mobilization, demobilization, and materials supply costs shall be included in the appropriate bid items

Bid Item

OPTIONAL BID ITEMS

0013 Provide OEM-Certified Exciter Specialist HOUR

Provide OEM-Certified Turbine Controller Specialist

HOUR

ACM Removal per cubic foot iaw Specification Section 02 82 14.00 10

Cu Ft

Total Base and OptionalBid

Items:

Total Options:

Total Base Bid Items:

WFG Ultrasonic Flow Meter Information

WFG Unit 3 Cooling Water Piping

W9127821R0056 WFG Unit 3 Cooling Water Piping Photos.pdf
Unit 3 Cooling Water Piping Photos 1
Unit 3 Cooling Water Piping Photos 2
Unit 3 Cooling Water Piping Photos 3
Unit 3 Cooling Water Piping Photos 4
Unit 3 Cooling Water Piping Photos 5
Unit 3 Cooling Water Piping Photos 6
Unit 3 Cooling Water Piping Photos 7