W9127821R0056 RFP Amendment 02.pdf
PDF 20 MB Posted
- Solicitation number
- W9127821R0056
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of amendment 02 is to include informational attachments, revised the bid schedules, and extend the proposal due date.
This amendment includes revised bid schedules:
W9127821R0056 RFP Attachment 5.1 MATOC Labor Rate Schedule Amd 02 to remove Asbestos Abatement Option Pricing W9127821R0056 RFP Attachment 5.2 Seed Project Bid Schedule Amd 02 to remove Asbestos Abatement Option Pricing
This amendment includes the follow ing informational attachments:
W9127821R0056 WFG Asbestos Survey W9127821R0056 WFG Unit 3 Cooling Water Piping Photos W9127821R0056 WFG Ultrasonic Flow Meter Information
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Nov-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127821R0069
X 9B. DATED (SEE ITEM 11)
07-Sep-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Nov-2021
CODE
ENDIST MOBILE CONTRACTING DIVISION
109 ST JOSEPH ST
MOBILE AL 36602
W91278 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127821R0069
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Nov-2021 10:00 AM to 15-Nov-2021 10:00 AM.
(End of Summary of Changes)
MATOC Bid Schedule Attachment 5.1
No. MATOC Labor Categories Ordering
Year 1 Ordering
Year 2 Ordering
Year 3 Ordering
Year 4 Ordering
Year 5
FAR 52.217.8 -
Option to Extend
Services (Max of 6 months)
1 Program Manager
2 Project Manager
3 Site Superintendent/Supervisor
4 Safety & Health Manager
5 Site & Safety Health Officer
6 Sr. Contract Manager
7 Quality Control Manager
8 Sr. Engineer
9 Mid. Engineer
10 Jr. Engineer
11 Engineering Technician
12 CAD Specialist
13 Data Entry Operator
14 Estimator
15 Fiber Optic Technician
16 Technical Instructor
17 Construction Foreman
18 Electrician Maintenance
19 Electrician Technician I
20 Electrician Technician II
21 Electrician Technician III
22 Electronics Technician I
23 Electronics Technician II
24 Electronics Technician III
25 Instrument Mechanic
26 Field Technician
27 Project Controls/Scheduler
28 Laborer
29 Plumber Maintenance
30 Pipefitter Maintenance
31 Painter Maintenance
32 Machinist Maintenance
33 Millwright
34 Rigger
35 Administrative Assistant
36 Accounting Clerk
37 Document Preparation Clerk
38 General Clerk
39 Order Clerk I
40 Order Clerk II
41 Travel Clerk
42 Rental Clerk
No. Rate Ordering
Year 1 Ordering
Year 2 Ordering
Year 3 Ordering
Year 4 Ordering
Year 5
FAR 52.217.8 -
Option to Extend
Services (Max of 6 months)
43 Overhead
44 G&A
ACM Removal per cubic foot iaw Specification Section 02 82 14.00 10
5 Year Ordering Period Labor Rates
3. The Hourly Labor Rates listed above shall be the maximum rates that can be proposed in response to Requests for Proposal (RFPs) issued during the Base Period of the contract; the Hourly Labor Rates listed above shall be the maximum rates that can be incorporated into task orders awarded during the Option Period of this contract. Lower rates may be proposed during the RFP process and incorporated into awarded task orders.
2. Profit will be negotiated with each task order - DO NOT include profit in the hourly labor rate.
1. Hourly Labor Rates shall include overhead(s), general and administrative (G&A) expenses, labor burden fringes, any other applicable costs.
NOTES:
3. Modifications to task orders will reflect the applicable Overhead and G&A Rates at the time the task order was awarded.
2. Profit on ODCs will be negotiated per task order.
1. The rates in the table above will be applied to Other Direct Costs (ODCs) as negotiated per task order. ODCs may include but are not limited to reproduction, travel, subcontracting effort and specialized equipment.
NOTES:
4. Modifications to task orders will reflect the applicable Hourly Labor Rates at the time the task order was awarded.
Bid Schedule Seed Project Attachment 5.2
Bid Item
Description QTY Unit Unit Price
Base Bid Amount
BASE BID ITEMS
0001 Unit 1 - Demolition & Disposal 1 JOB 0002 Unit 1 - Installation 1 JOB 0003 Unit 2 - Demolition & Disposal 1 JOB 0004 Unit 2 - Installation 1 JOB 0005 Unit 3 - Demolition & Disposal 1 JOB 0006 Unit 3 - Installation 1 JOB 0007 Unit 4 - Demolition & Disposal 1 JOB 0008 Unit 4 - Installation 1 JOB 0009 Recorder Board - Demolition & Disposal 1 JOB
Main Duplex Switchboard - Demolition & Disposal
1 JOB
0011 24VDC System - Demolition & Disposal 1 JOB
As-Built Drawings - Contract & Contractor- Prepared
1 JOB
NOTE: All mobilization, demobilization, and materials supply costs shall be included in the appropriate bid items
Bid Item
OPTIONAL BID ITEMS
0013 Provide OEM-Certified Exciter Specialist HOUR
Provide OEM-Certified Turbine Controller Specialist
HOUR
ACM Removal per cubic foot iaw Specification Section 02 82 14.00 10
Cu Ft
Total Base and OptionalBid
Items:
Total Options:
Total Base Bid Items:
WFG Ultrasonic Flow Meter Information
WFG Unit 3 Cooling Water Piping
| W9127821R0056 WFG Unit 3 Cooling Water Piping Photos.pdf |
| Unit 3 Cooling Water Piping Photos 1 |
| Unit 3 Cooling Water Piping Photos 2 |
| Unit 3 Cooling Water Piping Photos 3 |
| Unit 3 Cooling Water Piping Photos 4 |
| Unit 3 Cooling Water Piping Photos 5 |
| Unit 3 Cooling Water Piping Photos 6 |
| Unit 3 Cooling Water Piping Photos 7 |
File details come from the government source that posted it. Updated .