AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X
X 9B. DATED (SEE ITEM 11)
07-Sep-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
W9127821R0056
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X is not extended.
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment 06 is to include clause for bonds required at the task order level, an updated bid schedule and post the sign-in sheet for the 2nd site visit. See next page.
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY CODE
ENDIST MOBILE CONTRACTING DIVISION
109 ST JOSEPH ST
MOBILE AL 36602
W91278 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
3.EFFECTIVE DATE
19-Jan-2022
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
X
W9127821R0056
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
RESPONSE DATE:
The required proposal response date/time remains January 24, 2022 10:00 AM Central Standard Time.
SITE VISIT SIGN-IN: See the attached sign-in sheet for the 2nd site visit held December 6, 2021.
ATTACHMENT UPDATE: A revised Seed Project bid schedule is attached to include task order Performance and Payment Bonds reimbursement.
CLAUSES UPDATE: The following clause is included in the solicitation:
52.228-16 Performance and Payment Bonds-Other Than Construction (Nov 2006)
(a) Definitions. As used in this clause-
"Original contract price" means the award price of the contract or, for requirements contracts, the price payable for the estimated quantity;
or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) The Contractor shall furnish a performance bond (Standard Form 1418) for the protection of the Government in an amount equal to 100 percent of the original contract price and a payment bond Standard Form 1416) in an amount equal to 100 percent of the original contract price.
(c) The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within 10 days, but in any event, before starting work.
(d) The Government may require additional performance and payment bond protection if the contract price is increased. The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bonds or to obtain additional bonds.
(e) The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States.
Treasury Circular 570 is published in the Federal Register, or may be obtained from the:
U.S. Department of the Treasury, Or via the internet at http://www.fms.treas.gov/c570/.
Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6 F01
Hyattsville, MD 20782.
(End of clause)
(End of Summary of Changes) k5ct9lrk Cross-Out
Bid Schedule Seed Project Attachment 5.2
Bid Item
Description QTY Unit Unit Price
Base Bid Amount
BASE BID ITEMS
0001 Unit 1 - Demolition & Disposal 1 JOB
0002 Unit 1 - Installation 1 JOB
0003 Unit 2 - Demolition & Disposal 1 JOB
0004 Unit 2 - Installation 1 JOB
0005 Unit 3 - Demolition & Disposal 1 JOB
0006 Unit 3 - Installation 1 JOB
0007 Unit 4 - Demolition & Disposal 1 JOB
0008 Unit 4 - Installation 1 JOB
0009 Recorder Board - Demolition & Disposal 1 JOB
Main Duplex Switchboard - Demolition & Disposal
1 JOB
0011 24VDC System - Demolition & Disposal 1 JOB
As-Built Drawings - Contract & Contractor- Prepared
1 JOB
REIMBURSEMENT FOR ACTUAL
PERFORMANCE/PAYMENT BOND PREMIUMS
1 JOB
NOTE: All mobilization, demobilization, and materials supply costs shall be included in the appropriate bid items
Bid Item
OPTIONAL BID ITEMS
0013 Provide OEM-Certified Exciter Specialist HOUR
Provide OEM-Certified Turbine Controller Specialist
HOUR
Total Base and OptionalBid
Items:
Total Options:
Total Base Bid Items: