Chapter 10A - ASTs - Jan 08.pdf

PDF 182 KB Posted

Attached to
Fort Greely Base Operations Support
Solicitation number
W9126009R0001
Issued by

About this file

Appendix 4 to PWS- Bidder's Library - Chapter 10A - ASTs - Jan 08

View the file

Other files

File Type Posted
Amendment 0006.zip ZIP file
W91260-09-R-0001 0005.doc DOC document
Solicitation QA 18JUNE09 —
Solicitation W91260-09-R-0001 Amendment 0004.zip ZIP file
W91260-09-R-0001 0003.doc DOC document
Attachment 1_FGA_PWS_06122009Rev 1.doc DOC document
Solicitation QA 12JUNE09.docm DOCM document
W91260-09-R-0001 0002.doc DOC document
Publicity Book for BASOPS Site Visit.pdf PDF
W91260-09-R-0001 0001.doc DOC document
Final Itinerary BASEOPS Industry Dayrev4.docx DOCX document
Solicitation QA 08JUNE09.doc DOC document
Attachment 1 MOD P00026.doc DOC document
AR 200-1.pdf PDF
Bidders Library Items Outline - FY 10 as of 3-26-09.xls XLS spreadsheet
AR 190-14.pdf PDF
Fort Greely —
2007-2012 FGA INRMP.pdf PDF
IPM 37 - Recycling.pdf PDF
A001 -- Contingency Plan CDRL.pdf PDF
Attach 2_SCA_WD2005-2017R10.pdf PDF
Installation Policy 16.pdf PDF
Appendix 8 - Government Equipment.doc DOC document
Construction and Demolition Debris Disposal Memo.pdf PDF
Final RFP 26 May 09.rtf RTF text file
AR 190-11 —
Atch 6_Past Performance Questionnaire.doc DOC document
SSP...Provide Basic Cleaning Services.pdf PDF
A009 -- Monthly Solid Waste Data CDRL.pdf PDF
Atch 10 - Calculation of 50 percent for small business concern.doc DOC document
Attachment 11 Rate Request Information.doc DOC document
Installation Policy 15.pdf PDF
DOD INSTRUCTION 4150.07.pdf PDF
Chapter 10 - Attachment N.pdf PDF
A005 -- Monthly Lodging Report CDRL.pdf PDF
Statement of Work.pdf PDF
Chapter 4 Wastewater - Jan 2009.pdf PDF
Attachment 4 - Pesticide Use Proposal form.xls XLS spreadsheet
Attachment A —
Attachment 1_FGA_PWS_05222009.doc DOC document
Chap 2 - Haz Mat Waste - Jan 2008.pdf PDF
Chapter 9 - Integrated Pest Management Plan - March 2008.pdf PDF
Pesticide Reports 2006-2008.pdf PDF
A008 -- Monthly Pesticide Application Record CDRL.pdf PDF
AR 608-10.pdf PDF
Attachment 2 - OSG-AK Facilities Frequency.xls XLS spreadsheet
Appendix 5 - GSA Vehicle Assignments.xlsx XLSX spreadsheet
AAAF Frequency Schedule.xls XLS spreadsheet
Appendix 3 - Definitions.doc DOC document
Chapter 24 - Ozone-Depleting Chemical Elimination Plan.pdf PDF
Show 40 more

Latest 50 of 231 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chapter 10A: Aboveground Storage Tank Management Procedure

1. Purpose

This procedure establishes the requirements for the management of aboveground storage tank (AST) systems at Fort Greely Alaska (FGA). Tanks are used to store petroleum, oil, lubricants and hazardous materials. This procedure assures that tank storage will be conducted in compliance with federal, state and U.S. Army requirements.

2. Scope

This procedure applies to all aboveground storage tanks at FGA to include inspections, maintenance, leak detection, spill and overfill prevention, corrosion protection, and construction and modification of tanks. The requirements of this procedure apply to aboveground tanks and containers ≥55 gallons (including mobile fueling sources) and to associated piping, secondary containment, and ancillary equipment. Fifty-five gallon drums have been added to this procedure to make it consistent with the U.S. EPA’s Spill Prevention, Control, and Countermeasure regulations which defines bulk storage containers (tanks) as containers ≥ 55 gallons. This procedure does not apply to the operational use of fluids (hydraulic systems, lubricating systems, gear boxes, machining coolant systems, heat transfer systems, transformers, circuit breakers, electrical switches, other systems containing oil solely to enable the operation of the device) and vehicle fuel tanks.

3. Responsibilities

a. Garrison Commander The Garrison Commander is the responsible official for environmental compliance at Fort Greely and provides overall policy and guidance associated with environmental compliance.

The Commander will consult regularly with FGA-ENV to ensure the installation’s environmental policies and procedures are consistent with federal, state and Army requirements and are properly implemented. The Commander will consult regularly with all installation tenant organizations and departments and facilitate resolution of conflicts regarding environmental matters that cannot be resolved at lower levels.

Aboveground Storage Tank Management Procedure January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

b. FGA Environmental Office (FGA ENV) The FGA Environmental Office, part of the Fort Greely Directorate of Public Works, is responsible for establishing environmental procedures that apply to all activities conducted at FGA. The FGA ENV:

(1) Oversees tank management operations for environmental compliance.

(2) Submits all required reports and documents to regulatory agencies and serves as

FGA’s primary point of contact on environmental compliance.

(3) Advises the garrison, tenants and contractors of environmental requirements and provides assistance achieving compliance.

(4) Provides annual tank management training.

(5) Maintains this procedure, the Spill Prevention Response Plan, and the FGA tank inventory (Attachment 1).

(6) Coordinates the internal and external tank, pipeline and cathodic protection system inspections and testing. (The DESC will schedule inspections and testing for tank systems within the FGA Bulk Fuel Farm)

c. Installation Management Command (IMCOM) – Pacific The IMCOM - Pacific oversees environmental management and compliance activities at FGA and provides resources for environmental program implementation. The IMCOM - Pacific ensures Fort Greely’s environmental program conforms to DoD and Army requirements and provides policy and programmatic guidance to FGA-ENV.

d. FGA Directorates, Tenants and Contractors FGA directorates, tenants and contractors will designate aboveground tank operators that are responsible for meeting the requirements of this procedure for all aboveground tank systems that are under their control. A listing of responsible directorates, tenants and contractors for each aboveground tank system is provided in Attachment 1. Directorates, tenants and contractors are responsible to provide adequate funding to operate and maintain aboveground fuel storage tank equipment in accordance with this procedure.

4. Spill Notification and Response

If a spill from a tank is discovered or suspected, the operator will immediately provide verbal notification to the FGA Fire Department at (907) 873-3473 (911 for on-base lines) and conduct response activities according to Chapter 5 of the FGA Environmental Procedures Manual.

Aboveground Storage Tank Management Procedure January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

5. Inspection and Testing

(1) Tank operators must conduct weekly tank inspections of all tanks ≥ 100 gallons using the inspection form in Attachment 2 (an inspection is not required for a tank that is permanently out of service). Copies of completed inspection forms should be regularly sent to the FGA Environmental Office.

(2) Small bulk oil storage containers (55 gallons to 100 gallons) must be inspected monthly using the inspection form in Attachment 3. Copies of the completed inspection forms should be regularly sent to the FGA Environmental Office.

(3) FGA ENV will ensure that external inspections, internal integrity testing and piping inspections are conducted by an Alaska Department of Environmental Conservation (ADEC) certified inspector according to the schedule in Attachment 1.

(4) For tanks in direct contact with the ground that have impressed current cathodic protection system, rectifier readings must be recorded monthly by the operator and tested annually by an ADEC certified tester.

6. Operations, Maintenance and Repair

(1) Operators must ensure that the drain valves permitting direct outward flow of the container's contents have adequate security measures (locks, controlled access) so that they remain in the closed position when not in use.

(2) Operators will label tanks with contents and place "No Smoking", "Authorized Personnel Only" and the ADEC-approved spill reporting sign (Attachment 4) on or near the aboveground tank system and replace faded or illegible signs.

(3) Tank operators must coordinate all tank system repairs, beyond preventative maintenance, with the FGA ENV to ensure the repairs will take precautions to prevent a release and retrofits will meet regulatory and Army requirements.

(4) Metal pipe sections and fittings that have leaked as a result of corrosion or other damage must be replaced.

7. Filling or Off-loading

(1) Operators will ensure tank level is tested before filling to make certain adequate capacity exists.

(2) The operator or refueler must check all fittings before filling or off-loading tanks.

Aboveground Storage Tank Management Procedure January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

Vents must be checked for icing that would prevent proper ventilation.

(3) The operator or designated refueler will monitor transfer operations to ensure that:

(a) A release due to spilling or overfilling does not occur;

(b) The volume available in the tank is greater than the volume of petroleum to be transferred to the tank before the transfer is made;

(c) The transfer operation is constantly monitored to prevent overfilling or spilling; and

(d) Any spill or overfill is reported immediately.

(4) To prevent spilling and overfilling during transfer operations, the operator will use the following spill and overfill prevention equipment:

(a) Spill prevention equipment, such as a spill catchment basin, that will prevent release of the petroleum to the environment when the transfer hose is detached from the fill pipe; and

(b) Overfill prevention equipment that will automatically shut off flow into the tank when the tank is no more than 95 percent full; or alert the transfer operator when the tank is no more than 90 percent full by restricting the flow into the tank or by triggering a high-level alarm.

(5) After filling or off-loading fuel, the fueler or operator will cap all truck manifolds.

(6) Refuelers that are stored at Ft. Greely with fuel must be parked in a containment area.

(7) Loading/unloading stands must be constructed with a volume of containment greater than or equal to the largest tanker fuel compartment.

8. Tank Construction, Modification, Change in Service and Closure

(1) All tank construction, modification and closure must be preapproved by the FGA

ENV. Also, if a tank is taken out of service for more than three months, the FGA ENV must be notified.

(2) New tanks installed at Ft. Greely that are <10k gallons must meet the following requirements:

(a) New tanks will be aboveground, unless conditions exist that make aboveground construction impractical or cost prohibitive.

(b) Tanks must be constructed to prevent a release caused by corrosion or structural failure for the operational life of the system.

(c) Tanks must have a means of secondary containment. (To the extent economically and technically feasible, new tanks should be of double walled

Aboveground Storage Tank Management Procedure January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office] construction.)

(d) Cathodic protection must be installed to protect tank bottom if installed on the soil.

(e) Each tank must be constructed with at least one of the following devices to avoid discharges: high level alarm, high level pump cutoff device, direct audible communication between the container gauger and the pumper, and/or a fast response system for determining the liquid level.

(f) Facility lighting is necessary if needed to discover discharges occurring during hours of darkness.

(g) Piping should be aboveground to the extent possible to allow visual leak detection. If buried piping is necessary, it must be off all welded construction and protected from corrosion by a cathodic protection system.

(h) Piping supports must be designed to be seismically stable and composed of materials to minimize corrosion and prevent chafing and allow for expansion and contraction.

(i) Aboveground piping must be protected from damage by vehicles.

(3) In addition to the requirements above, new tanks installed at Ft. Greely that are

≥10k gallons must additionally meet the following requirements:

(a) Each tank must have a leak detection system that an observer from outside the tank can use to detect leaks in the bottom of the tank.

(b) Each tank must have an overfill prevention system which can be a high level alarm to signal personnel conducting a transfer or a high level automatic pump shutoff device to stop flow at a predetermined tank content level or both.

(c) Fuel spills from overfilling must be directed to the tank’s interstitial space or secondary containment structure.

(d) Fuel can not be added to the tank until the tank has been added to the Ft.

Greely Spill Prevention and Response Plan and approved by the ADEC.

(e) Field built tanks must be constructed and installed using:

(1) the American Petroleum Institute's Welded Steel Tanks for Oil Storage, Eighth Edition, 1988 (API 650), Specification for Field Welded Tanks for Storage of Production Liquids, Ninth Edition, 1989 (API Spec l2D), adopted by reference; Specification for Shop Welded Tanks for Storage of Production Liquids, 10th Edition, 1989 (API Spec 12F), adopted by reference; or

(2) Specification for Fiberglass Reinforced Tanks, First Edition, 1986 (API Spec 12P), adopted by reference; or

Aboveground Storage Tank Management Procedure January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

(f) Shop built tanks, piping, and related equipment must be properly designed and constructed using one of the following standards:

(1) Underwriters Laboratories' Steel Aboveground Tanks for Flammable and Combustible Liquids, Eighth Edition, dated July 11, 2002 (UL 142), adopted by reference;

(2) Appendix J of the American Petroleum Institute's Welded Steel Tanks for Oil Storage, 10th Edition, November 1998, Addendum 1, January 2000, Addendum 2, November 2001, and Addendum 3, September 2003 (API 650), adopted by reference;

(3) American Petroleum Institute's Specification for Shop Welded Tanks for Storage of Production Liquids, 11th Edition, November 1994 (API Spec 12F), adopted by reference;

(4) Steel Tank Institute's Standard for Aboveground Tanks with Integral Secondary Containment, revised as of October 21, 2004 (STI F921-03), adopted by reference;

(5) Underwriters Laboratories' Protected Aboveground Tanks for Flammable and Combustible Liquids, Second Edition, revised as of December 1, 1999 (UL 2085), adopted by reference.

(4) Installation will not occur within 100 feet of a potable drinking water well.

(5) Operators must notify the FGA ENV when new oil drum storage locations are established.

(6) If a tank is temporarily closed for three months or longer, FGA operators will leave vent lines open and functioning; and cap and secure all other lines, pumps, manways, and ancillary equipment. Piping must be emptied of liquid content either by draining or by inert gas pressure.

9. Record Keeping

Operators will keep detailed records on site for as long as the tank is used. If a tank is closed, the operator will transfer all records to the FGA ENV. Records include:

(1) Completed weekly inspection forms (monthly inspection forms for less than 100 gallon bulk storage containers).

(2) Documentation of operation of corrosion protection.

(3) Documentation of upgrades and repairs.

(4) Proof of compliance with applicable release detection.

(5) Leak detection manuals.

Aboveground Storage Tank Management Procedure January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

(6) Written documentation of calibration, maintenance, and repair of release detection equipment.

(7) Schedules of required calibration and maintenance provided by the release detection equipment manufacturer must be kept for at least five years.

(8) Records of operation of the cathodic protection system that are sufficient to demonstrate compliance, including the results of the last three inspections.

(9) Records of each repair made for the remaining operating life of the system.

FGA ENV will keep the following records for as long as the tank is used plus three years:

(1) Information about any suspected or confirmed release and corrective actions.

(2) Copies of ADEC spill reports.

(3) External and internal tank inspection results.

(4) Closure and corrective action reports.

10. Reporting

(1) Spill / Emergency Reporting – FGA ENV will notify ADEC of any release according to the requirements of the Ch 5 Spill Notification and Response Procedure and Spill Prevention and Response Plan.

(2) FGAENV will notify the ADEC before constructing or modifying any tank 10,000 or greater and revise the Spill Prevention and Response Plan prior to constructing or modifying any of these tanks.

11. Training

All tank operators and POL handlers must attend initial and annual refresher training on:

(1) The requirements of this procedure;

(2) The operation and maintenance of equipment to prevent discharges;

(3) Discharge procedure protocols;

(4) Applicable pollution control laws, rules, and regulations;

(5) General facility operations;

(6) The spill response and notification procedures provided in Chapter 5 of the FGA

Environmental Procedures;

(7) The contents of the facility Spill Prevention Response Plan; and

(8) Known discharges or failures, malfunctioning components, and any recently developed precautionary measures.

Aboveground Storage Tank Management Procedure January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

Aboveground Storage Tank Management Procedure January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

12. References

a. 18 AAC 75 Alaska Standards for ASTs

b. 40 CFR 112 Oil Pollution Prevention and Response (SPCC regulations)

c. AR 200-1 Army Environmental Protection and Enhancement

d. FGA Spill Prevention and Response Plan

Aboveground Storage Tank Management Procedure: Attachment 1 – Storage Tank Inventory January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

FT. GREELY STORAGE TANK INVENTORY

Aboveground Fuel Tank Inventory – Main Post

Building

No. ID Capacity (gallons)

Contents

Secondary Containment

Year Installed

External Inspect.

Internal Inspect. Comments

Main Post 101 150 Diesel N/A N/A

102 406A 2,500 Diesel Yes 2002 2008 2012

102 Day 500 Diesel

133 2040 500 Fuel Oil Yes 1996 N/A N/A

140 2039 500 Heating Oil Yes 1995 N/A N/A

319 2016 500 Heating Oil Yes 1995 N/A N/A

320 423 1,000 Heating Oil Yes 1989 N/A N/A

339 2037 1,000 Heating Oil Yes 1991 N/A N/A

340 2036 1,000 Heating Oil Yes 1995 N/A N/A

347 1,000 Heating Oil Yes 2001 N/A N/A

350 2014 1,000 Heating Oil Yes 1992 N/A N/A

361 2012 1,000 Heating Oil Yes 1995 N/A N/A

501 250 Diesel N/A N/A

507 507 500 Heating Oil Yes

512 2010 1,000 Heating Oil Yes 1992 N/A N/A

514 1,000 Diesel Yes 1994 N/A N/A

557 1,000 Heating Oil Yes 2004 N/A N/A

606 5 @ 250 ea Diesel N/A N/A

615 2005 600 Gasoline Yes 1995 N/A N/A

615 2006 600 Diesel Yes 1995 N/A N/A

618 420 630,000 Diesel Yes 1954 2012 2005

618 422 12,000 Diesel Yes 2004 2009 2014

618 421 12,000 Gasoline Yes 2004 2009 2014

636 1,000 Heating Oil Yes 2005 N/A N/A

640 1,000 Diesel Yes 2004 N/A N/A

643 643 500 Heating Oil Yes

649 2050 500 Diesel Yes 2000 N/A N/A

725 2004 500 Heating Oil Yes 1990 N/A N/A

DCO 1,000 Heating Oil Yes 2005 N/A N/A

Aboveground Storage Tank Management Procedure: Attachment 1 – Storage Tank Inventory January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

Aboveground Fuel Tank Inventory – Missile Defense Complex

Missile Defense Complex IPP IPP1 30,000 Diesel Yes 2004 2009 2014

IPP IPP2 30,000 Diesel Yes 2004 2009 2014

3001 1,000 Diesel Yes 2002 N/A N/A

3102 1,000 Diesel Yes 2002 N/A N/A

3102 3917 30,000 Diesel Yes 2003 2008 2013

3102 3918 30,000 Diesel Yes 2003 2008 2013

3102 3920 30,000 Diesel Yes 2005 2010 2015

3110 800 Diesel Yes 2002 N/A N/A

3201 800 Diesel Yes 2002 N/A N/A

3301 3301 10,000 Diesel Yes 2004 2009 2014

3301 1,000 Diesel Yes 2004 N/A N/A

3301 300 Diesel Yes 2005 N/A N/A Temporary

3401 150 Diesel Yes 2002 N/A N/A

3601 1,000 Diesel Yes 2002 N/A N/A

Bechtel Temp 1,000 Heating Oil Yes N/A N/A Temporary

Bulk Storage Containers

Building No.

Description

Volume (gallons)

Secondary Containment Comments

605 POL Dispensing Rack 8 x 60 Yes

605 Waste Accumulation Oil 1 x 55 Yes

605 Oil Rack Storage 6 x 55 Yes

618 Filling Stand Slop Drum 1 x 55 Yes

Haz Waste Storage (Bldg 636)

Waste Oil 10 x 55 Yes

615 Waste Oil 2 x 55 Yes

615 Oil Storage 2 x 55 Yes

615 POL Dispensing Rack 8 x 60 Yes

Bectel Construction

MDC

POL Dispensing 5 x 55 UNK

Aboveground Storage Tank Management Pr ocedure: Attachment 2 – Weekly Tank Inspection Form January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

FT. GREELY STORAGE TANK WEEKLY INSPECTION FORM MONTH ________ 20___

Tank No. __________ Week: 1 2 3 4 5 Condition Y/N/NA Y/N/NA Y/N/NA Y/N/NA Y/N/NA Comments

ALL STORAGE TANKS

Area around tank clean/free of debris Fire extinguishers available & charged No smoking signs posted No visible leaks, weeping or drips from tanks, valves, piping, or hoses

No corrosion > 0.1" (~as thick as a quarter’s edge) on tank or piping

Tank sign with contents visible Test leak detection equipment operation Vents clear Lights functioning Tank fill valve capped when not in use Piping supports in good condition Pipe wrapping or coating in good condition Test all tank devices (overfill alarm, high level shut off, liquid level sensing, etc.)

Spill response materials available Dispenser hoses & nozzles in good condition

Cathodic protection sacrificial metals sufficient

Cathodic protection system operating

ABOVEGROUND STORAGE TANKS WITH SECONDARY CONTAINMENT

Containment in good condition Containment area free of water & oil (Record here if water removed)

Valves used for emptying secondary containment secured

No weeds/debris in containment area

DOUBLED WALLED ABOVEGROUND STORAGE TANKS

Interstitial space free of liquid Interstitial monitor operating

UNDERGROUND STORAGE TANKS

Fill pipe catch basin free of liquid Sump monitor operating

OVER FLOW CONTAINMENT TANKS (SLOP) AND FILL STAND CONTAINMENT

Fill stand secondary containment clear Pump house secondary containment clear Valves in appropriate position Water and/or oil removed from tank or containment

INSPECTOR:

DATE:

Aboveground Storage Tank Management Procedure: Attachment 3 – Approved Spill Reporting Sign January 2008

[Printed Copies of this Document for Operational Use Only – Controlled Electronic Document Available from DPW Environmental Office]

REPORT ALL

Oil and Hazardous Material

Spills Immediately contact the Fort Greely Fire Department

873-FIRE (3473)

to report spills or discoveries of contamination

When reporting please provide as much information you can, including:

Your name

Time of spill or discovery Location of spill or discovery Nature of spill or discovery

Form approved by the Alaska Department of Environmental Conservation

1. Purpose
2. Scope
3. Responsibilities
a. Garrison Commander
c. Installation Management Command (IMCOM) – Pacific
d. FGA Directorates, Tenants and Contractors
4. Spill Notification and Response
5. Inspection and Testing
6. Operations, Maintenance and Repair
7. Filling or Off-loading
8. Tank Construction, Modification, Change in Service and Closure
9. Record Keeping
10. Reporting
11. Training
12. References