Solicitation QA 08JUNE09.doc

DOC document 31 KB Posted

Attached to
Fort Greely Base Operations Support
Solicitation number
W9126009R0001
Issued by

About this file

Attachment 12 -- Final Solicitation Questions and Answers

View the file

Other files

File Type Posted
Amendment 0006.zip ZIP file
W91260-09-R-0001 0005.doc DOC document
Solicitation QA 18JUNE09 —
Solicitation W91260-09-R-0001 Amendment 0004.zip ZIP file
W91260-09-R-0001 0003.doc DOC document
Attachment 1_FGA_PWS_06122009Rev 1.doc DOC document
Solicitation QA 12JUNE09.docm DOCM document
W91260-09-R-0001 0002.doc DOC document
Publicity Book for BASOPS Site Visit.pdf PDF
W91260-09-R-0001 0001.doc DOC document
Final Itinerary BASEOPS Industry Dayrev4.docx DOCX document
Attachment 1 MOD P00026.doc DOC document
AR 200-1.pdf PDF
Bidders Library Items Outline - FY 10 as of 3-26-09.xls XLS spreadsheet
AR 190-14.pdf PDF
Fort Greely —
2007-2012 FGA INRMP.pdf PDF
IPM 37 - Recycling.pdf PDF
A001 -- Contingency Plan CDRL.pdf PDF
Attach 2_SCA_WD2005-2017R10.pdf PDF
Installation Policy 16.pdf PDF
Appendix 8 - Government Equipment.doc DOC document
Construction and Demolition Debris Disposal Memo.pdf PDF
Final RFP 26 May 09.rtf RTF text file
AR 190-11 —
Atch 6_Past Performance Questionnaire.doc DOC document
SSP...Provide Basic Cleaning Services.pdf PDF
A009 -- Monthly Solid Waste Data CDRL.pdf PDF
Atch 10 - Calculation of 50 percent for small business concern.doc DOC document
Attachment 11 Rate Request Information.doc DOC document
Installation Policy 15.pdf PDF
DOD INSTRUCTION 4150.07.pdf PDF
Chapter 10 - Attachment N.pdf PDF
A005 -- Monthly Lodging Report CDRL.pdf PDF
Statement of Work.pdf PDF
Chapter 4 Wastewater - Jan 2009.pdf PDF
Attachment 4 - Pesticide Use Proposal form.xls XLS spreadsheet
Attachment A —
Attachment 1_FGA_PWS_05222009.doc DOC document
Chap 2 - Haz Mat Waste - Jan 2008.pdf PDF
Chapter 9 - Integrated Pest Management Plan - March 2008.pdf PDF
Pesticide Reports 2006-2008.pdf PDF
A008 -- Monthly Pesticide Application Record CDRL.pdf PDF
AR 608-10.pdf PDF
Attachment 2 - OSG-AK Facilities Frequency.xls XLS spreadsheet
Appendix 5 - GSA Vehicle Assignments.xlsx XLSX spreadsheet
AAAF Frequency Schedule.xls XLS spreadsheet
Appendix 3 - Definitions.doc DOC document
Chapter 24 - Ozone-Depleting Chemical Elimination Plan.pdf PDF
AR 190-13.pdf PDF
Show 40 more

Latest 50 of 231 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Greely AK Base Operations Support Solicitation

Questions and Answers

W91260-09-R-0001

Q1 Reference: RFP Section L, 4.3.1 Specific Content

Issue: This Section L paragraph presents a submission requirement for “Specific Content” that appears to be separate from the requirements outlined in paragraph 4.3. Our assumption is that the requirement in 4.3.1 should be provided independently of the Attachment 7 requirements.

Questions/ Discussion: Is our assumption correct?

· If so, does the Government intend to apply a page limitation for the “Specific Content” requirements presented in paragraph 4.3.1?

· If not, does the Government intend for offerors to provide the “Specific Content” requirement presented in paragraph 4.3.1 within each Attachment 7?

A1 Government Response: Your assumption is not correct. Section L, para 4.3 has sub paras 4.3.1 and 4.3.2 that pertain to para 4.3. These are instructions for what Volume III shall contain. Per Table 1.2, the Volume III limitation is 4 pages per contract.

Attachment 7 is merely a form that is to be filled out for Volume III, so it is two pages of the four page limit.

Q2 Reference: RFP Section L, 4.3.2 Organizational Structure Change History Issue: This Section L paragraph presents a submission requirement that appears to be separate from the requirement outlined in paragraph 4.3. Our assumption is that the requirement in 4.3.2 should be provided independently of the Attachment 7 requirements.

Questions/ Discussion: Is our assumption correct?

If so, does the Government intend to apply a page limitation to the requirement presented in paragraph 4.3.2?

A2 Government Response : See Answer 1 above. Para 4.3.2 is part of the Volume III submission. This is part of the four-page limitation.

File details come from the government source that posted it. Updated .