j17 Storm Water Runoff Permit Terminaiton Request.pdf

PDF 83 KB Posted

Attached to
Competitive 8(a) SATOC JOC Federal contract opportunity
Solicitation number
W9124P-19-R-A029
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This document contains details of a competitive 8(a) Single Award Task Order Contract solicitation. The solicitation is for a five-year firm fixed price IDIQ contract to perform unspecified minor military construction, lab revitalization, and sustainment, restoration, and modernization projects for the US Army Garrison - Redstone Department of Public Works. All questions regarding the solicitation must be submitted via email to the identified contracting personnel by February 22, 2019. The anticipated award date is December 16, 2019. The solicitation will be set aside for 8(a) small businesses and the contracting agency is the Department of the Army Materiel Command Contracting Command Redstone Arsenal.

j17 Storm Water Runoff Permit Terminaiton Request

View the file

Other files for this federal contract opportunity

Other files attached to Competitive 8(a) SATOC JOC, newest first.
File Type Posted
Amendment_0002_.pdf PDF
Amendment_0001_.pdf PDF
C2_CORRECTED.PDF PDF
j19 Past Perfomance Record.doc DOC document
j24 Background Checks for Installation Access.xlsx XLSX spreadsheet
Section_J_-_Attachments_.zip ZIP file
j8 Quality Control Report.xls XLS spreadsheet
j28 Trial Proposal Site Visit Memo Attachment.pdf PDF
j15 ADEM Form 24- NOI.pdf PDF
j15 ADEM Form 24- NOI.pdf PDF
j14 septic.pdf PDF
j9 Site Visit Memo.doc DOC document
j16 ADEM Form 23 BMP Inspection Report.pdf PDF
j20 Past Performance Survey.docx DOCX document
j5 Manifest of Material Delivered to SWMA.xls XLS spreadsheet
j7 Manifest of Material Delivered to the City Incenerator.doc DOC document
j25 CDRLs.docx DOCX document
j4 Equipment Data Sheet.xls XLS spreadsheet
j18 Spill Plan.pdf PDF
j11 Equipment Warranty List.doc DOC document
j23 Company Specialized Experience.docx DOCX document
j6 Manifest of Material Delivered to the City Landfill.doc DOC document
j10 Progress Chart.xls XLS spreadsheet
j21 Key Personnel Resume.docx DOCX document
j12 JOC Evaluation Form.xls XLS spreadsheet
j24 Background Checks for Installation Access.xlsx XLSX spreadsheet
j25 CDRLs.docx DOCX document
j22 Letter of Commitment.docx DOCX document
Construction_Task_Catalog_-_April_2019.pdf PDF
j14 septic.pdf PDF
j6 Manifest of Material Delivered to the City Landfill.doc DOC document
J1 DD Form 1348-1 Turn-in Slip.xls XLS spreadsheet
Technical_Specifications_-_April_2019.pdf PDF
j3 Environmental Laws.doc DOC document
j3 Environmental Laws.doc DOC document
j19 Past Perfomance Record.doc DOC document
j26 Trial Proposal Drawing Set.pdf PDF
j28 Trial Proposal Site Visit Memo Attachment.pdf PDF
j8 Quality Control Report.xls XLS spreadsheet
j23 Company Specialized Experience.docx DOCX document
j2 RSA 200-6 Hazmat Management Plan.pdf PDF
j10 Progress Chart.xls XLS spreadsheet
j13 cc order form.xlsx XLSX spreadsheet
j16 ADEM Form 23 BMP Inspection Report.pdf PDF
j12 JOC Evaluation Form.xls XLS spreadsheet
j17 Storm Water Runoff Permit Terminaiton Request.pdf PDF
j27 Seed Project.pdf PDF
BLDG_3434_Photo_Studio_Equipmnt_Listing.xlsx XLSX spreadsheet
W9124P-19-R-A029_QUESTIONS_AND_RESPONSES.pdf PDF
DRAFT_RFP_W9124P-19-R-A029.pdf PDF
Show all 50

Competitive 8(a) SATOC JOC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TERMINATION REQUEST – GENERAL PERMIT NUMBER ALR100000

NPDES PERMIT NUMBER ALR100000 IS A GENERAL PERMIT AUTHORIZING DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES THAT RESULT IN A TOTAL LAND DISTURBANCE OF ONE ACRE OR GREATER AND SITES LESS THAN ONE ACRE BUT ARE PART OF A LARGER COMMON PLAN OR DEVELOPMENT OR SALE

Mail to: Alabama Department of Environmental Management Water Division Post Office Box 301463 Montgomery, Alabama 36130-1463

PLEASE COMPLETE ALL QUESTIONS. RESPOND WITH “N/A” AS APPROPRIATE. INCOMPLETE OR INCORRECT ANSWERS, OR MISSING SIGNATURES WILL DELAY PROCESSING. IF SPACE IS INSUFFICIENT, CONTINUE ON AN ATTACHED SHEET(S) AS NECESSARY. ATTACH CBMPP AND OTHER INFORMATION AS NEEDED. PLEASE TYPE OR

PRINT LEGIBLY IN INK.

Item I.

Permittee Name

Facility/Site Name

NPDES Permit Number

ALR10

Facility Street Address or Location Description

County(s)

City, State, and Zip Code

Item II.

1. Yes No Has all regulated activity authorized by this Permit at this facility been completed? (i.e.

construction/industrial effects removed; solid waste/debris properly disposed; all disturbed areas have been fully reclaimed, permanently stabilized, or perennial vegetative cover established; and stormwater discharges do not represent an adverse impact to water quality.)

2. Yes No Has the Permittee lost operational control of the facility/site?

3. Yes No Has the Permittee lost legal responsibility for the facility/site?

If “Yes” to any or all of questions 2 or 3, in order for this termination request to be granted, the Name, Phone Number, and Address of the succeeding responsible permittee/operator(s) must be listed and the succeeding responsible operator must obtain coverage:

“I understand that discharging pollutants in storm water associated with regulated activity to waters of the State that is not authorized by NPDES permit coverage is a violation of State law. I also understand that the submittal of this request for termination does not release the operator from liability for any violations of this permit, ADEM Administrative Code Chapter 335-6-6, or other ADEM rules until a complete and correct request for termination of the permit is received by the Department. I understand that the permittee, operator, owner, developer, contractors, home builder(s), property owners association, etc., separately or collectively, must retain permit coverage for subdivision developments or other phased developments until all disturbance activity, including individual home construction, is substantially complete. I understand that should an inspection or complaint reveal significant noncompliance with ADEM rules, an environmental problem related to the discharge of stormwater from the site or that incorrect information has inadvertently been provided, implementation of remedial measures may be required, to include resubmittal of the NOI in order to correct any deficiencies, comply with federal stormwater permitting requirements, and provide for the protection of water quality. “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I certify that this form has not been altered, and if copied or reproduced, is consistent in format and identical in content to the ADEM approved form. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.”

Name & Designation of QCP

Signature Date

Name & Title of Responsible Official

Signature Date

ADEM Form 21 5/14 m1 Page 1 of 1

Water Division

Permittee Name:
Facility/Site Name:
NPDES Permit Number ALR10:
Facility Street Address or Location Description:
County(s):
City, State, and Zip Code:
3:
the succeeding responsible permittee/operator(s) must be listed and the succeeding responsible operator must obtain coverage:
Name & Designation of QCP:
Date:
Name & Title of Responsible Official:
Date: