j8 Quality Control Report.xls
XLS spreadsheet 45 KB Posted
- Attached to
- Competitive 8(a) SATOC JOC Federal contract opportunity
- Solicitation number
- W9124P-19-R-A029
About this file
This document contains a quality control report template and details of a federal contract opportunity. The quality control report template outlines requirements for daily reporting on weather conditions, work performed, inspections, test results, instructions received, remarks, safety issues, and contractor certification.
The federal contract opportunity is a five-year, firm-fixed-price Indefinite Delivery Indefinite Quantity single award task order contract to perform unspecified minor military construction projects, lab revitalization, and sustainment, restoration, and modernization projects for the US Army Garrison - Redstone Department of Public Works. Questions regarding the opportunity must be submitted by email no later than February 22, 2019 to the identified contracting specialist and contracting officer. The final RFP will be released at a later date. The contracting agency is the Department of the Army Materiel Command Contracting Command Redstone Arsenal.
Not Listed
View the file
Other files for this federal contract opportunity
Show all 50
Competitive 8(a) SATOC JOC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QCR (1)
| CONTRACTOR'S QUALITY CONTROL REPORT (QCR) | DATE: | REPORT NO: | ||
| CONTRACT NUMBER AND NAME OF CONTRACTOR: | DESCRIPTION AND LOCATION OF THE WORK: | |||
| WEATHER CLASSIFICATION: | CLASSIFICATION: | |||
| CLASS A | No interruptions of any kind from weather conditions occurring on this or previous | |||
| shifts. | ||||
| CLASS B | Weather occurred during this shift that caused a complete stoppage of all work. | CLASS _______________ | ||
| CLASS C | Weather occurred during this shift that caused a partial stoppage of work. | TEMPERATURE: | ||
| CLASS D | Weather overhead excellent or suitable during shift. Work completely stopped | |||
| due to results of previous adverse weather. | ||||
| CLASS E | Weather overhead excellent or suitable during shift but work partially stopped | MAX ______ MIN ______ | ||
| due to previous adverse manner. | PRECIPITATION: | |||
| OTHER | Explain | |||
| INCHES _____________ | ||||
| CONTRACTOR/SUBCONTRACTORS AND AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY: (Attach list of | ||||
| items of equipment either idle or working as appropriate.) | ||||
| a. | ||||
| b. | ||||
| c. | ||||
| d. | ||||
| e. | ||||
| f. | ||||
| g. | ||||
| 1. WORK PERFORMED TODAY: (Indicate location and description of work performed. Refer to work performed by prime | ||||
| and/or subcontractors by letter in Table above. Indicate any delays in work.) | ||||
| 2. TYPE AND RESULTS OF INSPECTION: (Indicate whether: P - Preparatory, I - Initial, or F - Follow-up and include | ||||
| satisfactory work completed or deficiencies with action to be taken.) | ||||
| 3. TESTS REQUIRED BY PLANS AND/OR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS: |
&CATTACHMENT J8
Page &P
QCR (2)
| 4. VERBAL INSTRUCTIONS RECEIVED: (List any instructions given by Government personnel on construction deficiencies | |||
| retesting required, etc., with action to be taken. List the names of the Government personnel who gave verbal | |||
| instruction) | |||
| 5. REMARKS: (Cover any conflicts in plans, specifications or instructions: acceptability of incoming materials; offsite | |||
| surveillance activities; progress of work, delays, causes and extent thereof; days of no work with reasons for same.) | |||
| Include any telephone conversations/instructions with the Contracting Officer, COR or other representative. | |||
| Indication of delays to be in accordance with para 2 of Part B of FAR 52.249-10. | |||
| 6. SAFETY: (Include any infractions of approved safety plan, safety manual or instructions from Government personnel. | |||
| Specify corrective action taken.) | |||
| INSPECTOR | |||
| CONTRACTOR'S CERTIFICATION: I certify that the above report is complete and correct and that all material | |||
| and equipment used, work performed and tests conducted during this reporting period were in strict compliance | |||
| with the contract plans and specifications except as noted above. | |||
| CONTRACTOR'S APPROVED AUTHORIZED REPRESENTATIVE | |||
| SAM FORM 696, 1 SEP 79 |