Attachment 6 Technical Exhibit 1 Data Item 6 updated 16 Nov 20.pdf

PDF 79 KB Posted

Attached to
FORT RUCKER GUNNERY RANGE AND TRAINING COMPLEX OPERATIONS, MAINTENANCE, AND REPAIR SERVICES
Solicitation number
W9124G21R0001
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) for a management plan related to a contract for Gunnery Range Operations, Maintenance, and Repair Services. The contractor must submit a draft management plan with their proposal and then submit a final version incorporating any government feedback. After contract award, the contractor is required to submit any proposed changes to the management plan to the government for review and acceptance prior to implementation. Changes must be clearly marked. The contractor shall submit one electronic copy to the Contracting Officer's Representative and one to the Contracting Officer. The solicitation was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis for gunnery range and training complex services.

View the file

Other files

File Type Posted
Gunnery Fort Rucker RFP QA 2020 Set 3.xlsx XLSX spreadsheet
W9124G21R0001 Gunnery Range RFP Amendment 8.pdf PDF
Attachment 3 Pricing Workbook Labor Categories with OYs Updated 29 Dec 20.xlsx XLSX spreadsheet
W9124G21R0001 Gunnery Range RFP Amendment 7.pdf PDF
Attachment 5 Past Performance Questionnaire (PPQ) and Cover Letter dated 30 Dec 20.pdf PDF
Gunnery Fort Rucker RFP QA 2020 Set 2.xlsx XLSX spreadsheet
W9124G21R0001 Gunnery Range RFP Amendment 6 Conform (12-23-20).pdf PDF
Attachment 17 USAACE Reg 25-1 POLICY AND PROCEDURES FOR OBTAININGUSING.pdf PDF
Attachment 11 Fort Rucker Reg 385-1 Ranges and TAs (11 Feb 2020).pdf PDF
Attachment 8 Fort Rucker Reg 190-5 Fort Rucker Motor Vehicle Regulation (11 Jul 2019).pdf PDF
Attachment 10 Fort Rucker Reg 380-1 Security Procedures (23 December 2016).pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 6 (12-23-20).pdf PDF
Attachment 12 Fort Rucker Reg 420-2 Installation Energy And Water Conservation (29 Aug 2018).pdf PDF
Attachment 13 Fort Rucker Reg 420-5 Fire Prevention Program (16 Dec 2011).pdf PDF
Attachment 15 TE 14 Workload (updated 17 Dec 20).pdf PDF
Attachment 14 O M Contract Overview 16 Nov 20.pptx PPTX presentation
Attachment 18 USAACE Reg 600-1 Prohibited and Regulated Conduct (26 Jul 2010).pdf PDF
Attachment 3 Pricing Workbook Labor Categories with OYs Updated 23 Dec 20.xlsx XLSX spreadsheet
Gunnery Fort Rucker RFP QA 2020.xlsx XLSX spreadsheet
Amendment 6 List of Changes.docx DOCX document
Attachment 7 DPTMS Range Branch SOP (15 Apr 18)(Signed).pdf PDF
Attachment 9 Fort Rucker Reg 215-1 Hunting Fishing Water Safety and Trapping (20 May 2019).pdf PDF
Attachment 19 Amount Billed for Fuel FY10 - FY16.xlsx XLSX spreadsheet
Attachment 20 TE 15 Stock Levels and Materials CLIN Items (11 Dec 20).pdf PDF
Attachment 16 USAACE Reg 1-2 Staff Administrative Procedures and Correspondence Guide (11 Sep 2017).pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 5.pdf PDF
Attachment 5 Past Performance Questionnaire (PPQ) and Cover Letter dated 16 Dec 20.pdf PDF
Attachment 5 Past Performance Questionnaire (PPQ) and Cover Letter dated 8 Dec 20.pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 4.pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 3.pdf PDF
Attachment 5 Past Performance Questionnaire (PPQ) and Cover Letter.pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 2.pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 1.pdf PDF
Attachment 4 Service Contract Act WD 2015-4631 May 03 2020.docx DOCX document
Attachment 1 Technical Exhibits (TE).pdf PDF
W9124G21R0001 Gunnery Range RFP.pdf PDF
Attachment 3 Pricing Workbook.xlsx XLSX spreadsheet
Attachment 2 Performance Requirements Summary (PRS).pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

W9124G21R0001

DD FORM 1423-1, FEB 2001 Previous editions may be used.

TE 1, page 7 of 39

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TE-1 TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Gunnery Range OM&R

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

6 Management Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

5.1.1 KO

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

OTS With proposal b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

See block 16 Reg Repro

16. REMARKS:

Page limitations, format requirements, and number of copies are outlined in Section L of the Request For Proposal. These requirements do not apply to changes made after contract award.

The contractor shall submit changed pages as outlined in Section L.

After contract award, the contractor shall submit proposed changes to the Government for review and acceptance prior to implementation.

Changes shall be readily identifiable. Submit one copy to the COR and one copy to the KO.

Electronic submission is satisfactory.

See block 16

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

M. Buxton 16 Nov 20

File details come from the government source that posted it. Updated .