Attachment 2 Performance Requirements Summary (PRS).pdf
PDF 166 KB Posted
- Attached to
- FORT RUCKER GUNNERY RANGE AND TRAINING COMPLEX OPERATIONS, MAINTENANCE, AND REPAIR SERVICES
- Solicitation number
- W9124G21R0001
About this file
This performance requirements summary outlines the key tasks and performance metrics for operating and maintaining a military gunnery range and training complex. Services include fabricating, maintaining, and operating range equipment and targets; providing preventative maintenance and repair; managing the range operations center; conducting vegetation control and real property maintenance; operating the aviation obstacle and vertical hazard database; and submitting required reports. Performance is evaluated monthly on core tasks such as range and target operations, maintenance, electronic systems support, and operational functions based on metrics including on-time completion, accuracy, and safety incident rates, with incentive fees or deductions applied based on performance ratings.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TE 16
Performance Requirements Summary
PWS Paragraph Performance Objective Performance Standard Acceptable Quality Level (AQL) Monitoring Method Incentive / Deduction
1.4.1
Fabricate, requisition, store, maintain, and operate equipment and targets for operation of the Aviation Gunnery Range (AGR).
AGR Equipment and Targets will be ready for use during all scheduled periods of aviation gunnery training events.
100% of all AGR equipment and targets will be inspected on schedule. 95% of all active targets will be available for use. Deficiencies will be logged in the maintenance database and scheduled for repair within 24 hours of noted deficiency.
Random inspection.
Randomly verify on-site processes.
Increase or decrease in surveillance.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
1.4.2
Requisition, store, maintain, and operate equipment and targetry for operation of the other ranges and facilities listed within this PWS.
Range and training area targetry will be ready for use during all scheduled periods of training.
100% of all Range and Training Area equipment and targets will be inspected on schedule. Deficiencies will be logged in the maintenance database and scheduled for repair within 24 hours of noted deficiency.100% of all small arms automated targets will be functional for using units.
Review of maintenance logs.
Random inspection.
Increase or decrease in surveillance.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
1.4.3
Perform organizational direct support/general support (DSGS), preventive maintenance, and repair on range materials, computer-controlled hard-wired target devices, radio-controlled solar-powered target devices, and moving targets.
Maintenance and repair will be conducted without impact to range or training area scheduling. Long term repairs will be scheduled around using unit training requirements.
95% of all maintenance and repairs will be completed in projected timelines. COR will be kept updated on maintenance/repair schedules with adjustment requests approved by the COR.
Random inspection.
Randomly verify on-site processes.
Review maintenance logs.
Routine inspection of automated range operability.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
Performance Evaluation Criteria
TE 16, page 1 of 8
PWS Paragraph Performance Objective Performance Standard Acceptable Quality Level (AQL) Monitoring Method Incentive / Deduction
1.4.4 Operate moving and stationary targets as required by the using units.
Scheduled ranges and training areas requiring RCS operators will be supported by the contractor. The contractor will provide qualified RCS operators knowledgeable with the training requirements of the range.
100% of all scheduled automated ranges will be supported by RCS operators. Gaps in coverage by RCS operators will be supplemented by Firing Desk personnel.
Random inspection.
Randomly verify on-site processes.
Routine inspection of RCS operator functionality. Random review of RCS training program.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
1.4.5
Inspect, maintain, and repair the range/training complex/related real property and appurtenances including, but not limited to, target berms, service roads, permanent foxholes and bunkers, drainage pipes and systems, sediment control structures, terraces, fences, gates, parking lots, vegetation control, electrical power, and data lines from the entrance of administrative areas to all targets and buildings.
Range complex maintenance activities will be performed efficently and successfully without impact to training units or safety of using unit training requirements. Deficiencies will be logged in maintenance database and scheduled for repair as required.
95% of all maintenance and repairs will be completed. Delays in repair will be scheduled for completion within 90 days of noted deficiency.
Random sampling of maintained areas.
Routine inspection.
On site visits to review processes.
Increase or decrease in surveillance.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
1.4.6 Perform range supply, maintenance, administrative, and operational functions as listed within this PWS.
Operational fuctions are completed to standard in accordance with specific tasks within this PWS
Supply, maintenance, administrative, and operational tasks are completed and submitted or processed with 95% accuracy. Suspenses are met 95% in accordance with directed suspense dates.
Random document review.
Review of records and reports for accuracy. Conduct of weekly meetings.
Increase or decrease in surveillance.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
Technical Exhibit 16 Performance Requirement Summary (PRS)
TE 16, page 2 of 8
PWS Paragraph Performance Objective Performance Standard Acceptable Quality Level (AQL) Monitoring Method Incentive / Deduction
1.4.7 Provide operational support of the
Range Operations Center.
Range Operations Center provides functionally accurate information and products that facilitate the support of using units, directorates, and installation activities.
95% of all operational support tasks are completed on time and accurately. 100% of all safety-related incidents and events are evaluated, disseminated, and actioned without gaps or delays in support of the event.
Random inspection. Random on site review. Routine document review.
Increase or decrease in surveillance.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
1.4.8 Perform mowing and vegetation control of LOS areas, road rights-of-way, and range areas.
Mowing and vegetation control does not present an impact to ranges or access points for target maintenance.
95% of all LOS, road rights-of-way, and range areas are maintained annually.
Random sampling and inspection of maintenance areas.
On site review of processes.
Review work plans.
Increase or decrease in surveillance.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
1.4.9
Provide operational AVOID support for Fort Rucker by managing, operating, providing technical support, deploying, and sustaining the AVOID database.
AVOID database is maintained.
Vertical hazards are identified and surveyed in accordance with SOP and installation regulatory requirements.
AVOID database is maintained with 95% accuracy. 100% of reported vertical hazards are surveyed, identified, and disseminated to reporting agencies.
Random review of AVOID databse.
Routine monitoring of hazard notifications. Random on site review of database management.
Increase or decrease in surveillance.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
1.4.10 Prepare and submit reports .
Reports are accurately submitted in accordance with directed suspsenses and frequency.
95% of reports submitted on time. 100% of reports submitted.
Regular review of recurring reports for timeliness and accuracy.
CPAR ratings reflecting good or poor performance could affect decisions to exercise options or to make future contract awards.
Technical Exhibit 16 Performance Requirement Summary (PRS)
TE 16, page 3 of 8
100%
Core Task Weighted Value
3%
PWS Paragraph Weighted Value 25% 5% 2%
5% 2%
1.4.1
3% 25% 5%
25%
1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.4.7 1.4.8 1.4.9
1.4.10
TE 16, page 4 of 8
Month / Year: December-19 Core Task and Title Items Inspected Deficiencies Eval Percentage Rating
1.4.1 Aviation Gunnery Targetry
41 14 65.85%
104 1 99.04% 70 1 98.57%
Core Task Summary Rating 215 16 87.82% SATISFACTORY
1.4.2 Range Targetry
47 1 97.87% 36 100.00% 24 100.00% 37 100.00%
Core Task Summary Rating 144 1 99.47% EXCEPTIONAL
1.4.3 Electronic Maintenance
1 100.00% 1 100.00% 3 100.00%
15 100.00% 7 100.00% 1 100.00% 1 100.00%
Core Task Summary Rating 29 0 100.00% EXCEPTIONAL
1.4.4 Range Computer Systems
6 100.00% Core Task Summary Rating 6 0 100.00% EXCEPTIONAL
1.4.5 Range Complex Maintenance
75 1 98.67% 65 2 96.92% 16 100.00%
Core Task Summary Rating 156 3 98.53%
1.4.6 Operational Support
66 4 93.94% Core Task Summary Rating 66 4 93.94% VERY GOOD
MPMG Range CPQC Range MRF Range
Power Center Inspections Firing Pad Inspections
AGRC Target Inspections
Inspection Description
Evaluation Metric Summary (Example)
RCS Inspection
Record UOS Training Develop Range Scenarios
Repair Circuit Cards Replace Faulty Electronic Component
Maintain RCS Computers Prepare Electronic BOM
Draft Design Plans
ARF Range
Work Sections Inspection
Erosion Checklist Training Facilities Inspection
Small Arms Range Inspections
TE 16, page 5 of 8
Month / Year: December-19 Core Task and Title Items Inspected Deficiencies Eval Percentage Rating
1.4.7 Range Operations
15 100.00% 90 9 90.00% 90 2 97.78%
Core Task Summary Rating 195 11 95.93% VERY GOOD
1.4.8 LOS and Roadway Maintenance
60 100.00% Core Task Summary Report 60 0 100.00% EXCEPTIONAL
1.4.9 AVOID Management
8 100.00% Core Task Summary Report 8 0 100.00% EXCEPTIONAL
1.4.10 Reports
12 100.00% 60 100.00%
Core Task Summary Report 72 0 100.00% EXCEPTIONAL 2 10.00% Deduction
0.00% Deduction 0.00% Deduction
Monthly Evaluation Rating 85.24% SATISFACTORY
Score Rating
0.00% UNSATISFACTORY
75.00% SATISFACTORY
90.00% VERY GOOD
96.00% EXCEPTIONAL
Minor Safety Violation (5%)
Daily Brief Inspection Staff Journal Log Accuracy
Incident Reporting
Inspection Description
Evaluation Metric Summary (Example)
LRC Reports Submitted CDRLs Submitted
Hazards Reported / Verified
Acres Scheduled / Maintained
Moderate Safety Violation (15%) Major Safety Violation (25%)
TE 16, page 6 of 8
Month / Year: December-19 Item # Location
1 C01L 2 C04L 3 C10L 4 C01M 5 D01L 6 D04L 7 D05L 8 D11L 9 F04L
10 F06L 11 F07L 12 K01L 13 K03L 14 K04L
15 K1FP
16 K2FP
17 Matteson
18 FAFP 22
19 TA-6 BEE Course
20 MRF
21 K1PC
22 Minor Safety Violation 23 Minor Safety Vioation 24 Daily Journal 25 Daily Brief
Evaluation Metric Summary (Example) Description Minor Erosion Damage on Berm Erosion Damage on Berm Minor Erosion Behind Right Timber Wall
Repair Erosion Damage as Needed Repair Erosion Damage as Needed Re-stencil Numbers, Repair Erosion Damage as Needed Minor Water Erosion on Left Side of Berm Washboarding on Access Trail
Water Erosion at end of Timber Wall Erosion Damage on Berm Erosion Damage on Berm Erosion Damage on Berm Repair Rocket Strikes on Access Trail as Needed
Lights Left on, Rotting Floor Near Stair Well Lane 3, 300m Target Will Not Expose, in the Red Minor Water Erosion on Back Side of Berm Damage Involving GFE Trailer and Backing Up Damage to Back Hoe Due to Improper Use of Equipment
Washboarding on Access Trail Police Brass as Needed SFLOA Sign Needs Painting CFL Sign Needs Repair T-post on Northern Survey Marker Needs to be Reset into Ground
Nine errors found in journal, corrections annotated Two errors found in brief, corrections annotated
TE 16, page 7 of 8
Month / Year: December-19
Areas of Concern:
Consistency with 1594 Journal Entries (systemic).
Turnover at Firing Desk.
Damage involving GFE trailer and Back Hoe.
Close calls during exodus involving personnel down range when POW is open to the public.
Evaluation Metric Summary (Example) Narrative:
All contractually obligated tasks have been performed to standard.
TE 16, page 8 of 8