This regulation establishes an energy and water conservation policy for Fort Rucker. It requires appointing building energy monitors for all facilities and developing standard operating procedures to maximize efficiency of heating, air conditioning, lighting and other systems. Specific requirements include installing programmable thermostats, motion sensors and timers for lighting control, prohibiting portable space heaters and window air conditioners, establishing seasonal HVAC changeover dates and temperature set points, installing low-flow fixtures, and reporting all water leaks and equipment issues. The policy aims to eliminate waste, reduce fossil fuel dependence and improve security by consuming energy and water in the most cost-effective and environmentally responsible manner.

This solicitation seeks proposals for operation, maintenance and repair services for the Fort Rucker gunnery range and training complex. The work includes range operations and maintenance, equipment repair, and other services over a five-year period. Interested offerors should review the attached request for proposal documents including the technical exhibits, performance requirements summary, pricing workbook and service contract act wage determination for full details. Proposals are due by the specified closing date. The soliciting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.

View the file

Other files

File Type Posted
Gunnery Fort Rucker RFP QA 2020 Set 3.xlsx XLSX spreadsheet
W9124G21R0001 Gunnery Range RFP Amendment 8.pdf PDF
Attachment 3 Pricing Workbook Labor Categories with OYs Updated 29 Dec 20.xlsx XLSX spreadsheet
W9124G21R0001 Gunnery Range RFP Amendment 7.pdf PDF
Attachment 5 Past Performance Questionnaire (PPQ) and Cover Letter dated 30 Dec 20.pdf PDF
Gunnery Fort Rucker RFP QA 2020 Set 2.xlsx XLSX spreadsheet
W9124G21R0001 Gunnery Range RFP Amendment 6 Conform (12-23-20).pdf PDF
Attachment 17 USAACE Reg 25-1 POLICY AND PROCEDURES FOR OBTAININGUSING.pdf PDF
Attachment 11 Fort Rucker Reg 385-1 Ranges and TAs (11 Feb 2020).pdf PDF
Attachment 8 Fort Rucker Reg 190-5 Fort Rucker Motor Vehicle Regulation (11 Jul 2019).pdf PDF
Attachment 10 Fort Rucker Reg 380-1 Security Procedures (23 December 2016).pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 6 (12-23-20).pdf PDF
Attachment 13 Fort Rucker Reg 420-5 Fire Prevention Program (16 Dec 2011).pdf PDF
Attachment 15 TE 14 Workload (updated 17 Dec 20).pdf PDF
Attachment 14 O M Contract Overview 16 Nov 20.pptx PPTX presentation
Attachment 18 USAACE Reg 600-1 Prohibited and Regulated Conduct (26 Jul 2010).pdf PDF
Attachment 3 Pricing Workbook Labor Categories with OYs Updated 23 Dec 20.xlsx XLSX spreadsheet
Gunnery Fort Rucker RFP QA 2020.xlsx XLSX spreadsheet
Attachment 6 Technical Exhibit 1 Data Item 6 updated 16 Nov 20.pdf PDF
Amendment 6 List of Changes.docx DOCX document
Attachment 7 DPTMS Range Branch SOP (15 Apr 18)(Signed).pdf PDF
Attachment 9 Fort Rucker Reg 215-1 Hunting Fishing Water Safety and Trapping (20 May 2019).pdf PDF
Attachment 19 Amount Billed for Fuel FY10 - FY16.xlsx XLSX spreadsheet
Attachment 20 TE 15 Stock Levels and Materials CLIN Items (11 Dec 20).pdf PDF
Attachment 16 USAACE Reg 1-2 Staff Administrative Procedures and Correspondence Guide (11 Sep 2017).pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 5.pdf PDF
Attachment 5 Past Performance Questionnaire (PPQ) and Cover Letter dated 16 Dec 20.pdf PDF
Attachment 5 Past Performance Questionnaire (PPQ) and Cover Letter dated 8 Dec 20.pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 4.pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 3.pdf PDF
Attachment 5 Past Performance Questionnaire (PPQ) and Cover Letter.pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 2.pdf PDF
W9124G21R0001 Gunnery Range RFP Amendment 1.pdf PDF
Attachment 4 Service Contract Act WD 2015-4631 May 03 2020.docx DOCX document
Attachment 1 Technical Exhibits (TE).pdf PDF
W9124G21R0001 Gunnery Range RFP.pdf PDF
Attachment 3 Pricing Workbook.xlsx XLSX spreadsheet
Attachment 2 Performance Requirements Summary (PRS).pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Rucker Reg 420-2 • 29 August 2018

Fort Rucker Reg 420-2

DEPARTMENT OF THE ARMY

U.S ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS U.S. ARMY GARRISON

2218 6TH AVENUE

FORT RUCKER AL 36362-5105

Fort Rucker Regulation 29 August 2018 No. 420-2

Facilities Engineering

INSTALLATION ENERGY AND WATER CONSERVATION

1. PURPOSE. To set forth installation policy and understanding concerning the commitment to consuming energy and water in the most cost effective and environmentally responsible manner possible.

2. SCOPE. This publication establishes responsibility and provides guidance for all Fort Rucker personnel to eliminate waste, reduce dependence on fossil fuels, and improve energy and water security.

3. RESPONSIBILITIES.

a. Commander/Supervisors:

(1) Ensure that a building energy monitor (BEM) has been appointed and trained for each building the unit or organization occupies. Ensure that all BEMs in their organization utilize energy checklists provided by the Directorate of Public Works (DPW). Report the name, phone number, email, and the building number(s) of BEM(s) to the DPW Energy Engineer, 334-255-1368.

(2) Ensure energy conservation responsibilities are included in performance objectives of staff, where appropriate.

(3) Ensure that contract clauses cover the guidelines of this energy policy.

Contractors may also suggest energy conservation opportunities.

(4) Encourage, recognize, share, and reward worthwhile ideas on energy and water conservation.

(5) Lease/procure only fuel efficient vehicles. Reduce petroleum use by 2% per year.

*This regulation supersedes Fort Rucker Reg 420-2, 13 June 2016

(6) Notify DPW of facility occupancy change.

(7) Submit service or work order(s) to DPW for failed systems or energy waste as identified by facility occupants or BEM.

b. Directorate of Public Works:

(1) Ensure ALL Sustainment, Restoration, and Modernization; military construction projects; and “in house” designs comply with any prescriptive measures and the goals specified in Energy Policy Act of 2005, 8 August 2005; Energy Independence and Security Act of 2007, 19 December 2007; Executive Order 13834, Efficient Federal Operations, 17 May 2018; and the Army Sustainable Design and Development Policy, 17 January 2017.

(2) Support energy conservation at Fort Rucker by implementing service orders and work requests identified by BEM inspections and energy audits that have positive savings to investment ratios and reasonable payback durations.

(3) Train and provide expertise to all BEMs and others assigned energy and water conservation responsibilities.

(4) Maintain and update all garrison plans, best management practices, and standard operating procedures pertaining to energy and water conservation.

(5) Ensure operation and maintenance contractor develops and implements standard operating procedures to maximize energy efficiency of central heating and air conditioning systems.

(6) Conduct quality energy audits for 25% of square footage on base each year.

(7) Act as the proponent for energy and water conservation projects on the installation.

(8) Monitor consumption of energy and water.

(9) Act as the proponent for energy awards for the community.

(10) Conduct public outreach activities to raise awareness of energy and water conservation throughout the community.

(11) Complete yearly and upward reporting for energy and water savings and usage.

4. PROCEDURES.

a. Office Equipment Policy.

(1) Computers and monitors: Turn computers and monitors off at conclusion of the business day, unless the computer is a server or directed to leave on by the Network Enterprise Center. Turn any peripheral devices (e.g., scanners, speakers, chargers, etc.) off at close of business or when not in use.

(2) Classrooms and conference rooms: Ensure all equipment (e.g., smart boards, televisions, LCD projectors, etc.) is turned off when not in use.

(3) Per Army Regulation (AR) 420-1, Army Facilities Management, 12 February 2008, Rapid Action Revision, 24 August 2012, refrigerators in work areas and offices intended for only one person’s use are prohibited. Use one cubic foot per person as an average to determine size and quantity of refrigerators that are appropriate.

(4) Procure and use only ENERGY STARTM rated office equipment and appliances.

Ensure that sleep mode is active (i.e., scanners, copy machines, faxes, printer, computers, and monitors).

b. Lighting Policy.

(1) Eliminate off-hour interior and exterior lighting, unless necessary for safety and security in accordance with (IAW) AR 190-11, Physical Security of Arms, Ammunition, and Explosives, 5 September 2013, via institution of appropriate procedures to turn off lights and equipment until photocells, occupancy/motion sensors, and/or timers are installed. Any exterior lighting with automatic switches on during the day shall be reported to the BEM.

(2) Incandescent bulbs are prohibited. Replace with T-8, LED, or compact fluorescent lamps.

(3) Ornamental lighting is prohibited.

(4) Lighting levels and control will be maintained IAW United Facilities Criteria 3-530-01, Interior and Exterior Lighting Systems and Controls, 01 April 2015, Change 3, 01 June 2016.

c. Heating Venting Air Conditioning (HVAC) Policy.

(1) Portable space heaters are not authorized for use. Waivers may be approved through written requests by supervisors, including medical justification. All waiver requests will be routed through the DPW and fire department. If HVAC system is not adequate, initiate service orders and/or work requests, as appropriate.

(2) Window air conditioners are not authorized when a central HVAC system is available for the same area.

(3) Many facilities are served by a central heating and cooling plant. The targeted seasonal transition dates for central heating and cooling are as follows:

(a) Cooling season: March 15 through November 15, unless unusual adverse weather dictates.

(b) Heating season: November 15 through March 15, unless unusual adverse weather dictates.

(4) Unoccupied warehouses will not be heated if freezing or condensation is not a problem. Heating will not be permitted if the space is classified as non-heated storage.

(5) Maintenance bays and warehouses will not be cooled unless specifically required for preservation of stored items. In the event cooling is authorized, unoccupied temperature settings will be permitted.

(6) Use programmable thermostats with night setback and weekend temperature settings for all heating and air conditioning equipment. For equipment without programmable thermostats, establish procedures for manual adjustment of heating and cooling equipment at the end of every work day and on weekends. Required setback temperatures are found in AR 420-1, chapter 22, as follows:

Administrative Facilities

Occupied Settings Unoccupied Settings

Maximum Heating at 70 55 oF +/- 5 oF degrees Fahrenheit (oF)

Minimum Cooling at 74 oF 85 oF +/- 5 oF

Warehouse and Maintenance Facilities

Occupied Settings Unoccupied Settings

Heating at 60 oF +/- 5 oF 45 oF +/- 5 oF

Cooling 85 oF +/- 5 oF

(7) Problems associated with inadequate controls, temperature imbalances, etc., will be reported to the BEM.

d. Water Conservation Policy.

(1) Utilize spray type faucets with flow restrictors.

(2) Report all water leaks and running commodes.

(3) Ensure all faucets are off when not in use.

(4) All faucets, showers, lavatories, and dishwashing equipment will be classified low flow IAW ANSI/ASHRAE/IES/USGBC Standard 189.1-2014, Standard for the Design of High- Performance Green Buildings Except Low-Rise Residential Buildings.

e. Best Management Practices.

(1) Doors and windows between conditioned spaces and non-conditioned spaces are not to be propped or left open. Actively manage doors and windows.

(2) Periodically check weather stripping and caulking. If it is old and cracked or peeling, notify the BEM.

(3) Maintain a 110 oF maximum for hot water in administrative and other facilities.

(4) As motors fail, replace with only premium efficiency type motors where cost effective.

(5) Operate all pumps and motors in automatic mode rather than manual mode, unless specific systems require operation 24 hours a day, 7 days a week.

FOR THE GARRISON COMMANDER:

LYNN R. LOTT

Director, Human Resources

The proponent agency of this regulation is the Directorate of Public Works. Users are invited to send comments and suggested improvements to the U.S. Army Garrison Command, ATTN: IMRC-PWF, Fort Rucker, AL 36362-5105.