Text version

Direct Labor-Sample

Propsective Federal Contractor
Cost and Pricing Proposal Submitted in Response to
Solicitation: RFP PFCXXX-12234
Element of Price and Costs: Labor Costs
Sample description of the labor hours, labor mix, labor loading and the proposed workers are consistent with page 45 the technical proposal and previous payroll records. Current labor rates are the rates currently paid to workers, and can be traced to current payroll records. Additionally, the same rates paid to laborers through Period of Performance 31 Oct - 30 Sep with increases as shown.
Hourly Labor Rate
Month 20X6Proposed Level of Laborer

Watley, Franklin K Mr CIV USA: Watley, Franklin K Mr CIV USA:

The Level/Senior/Junior will identify Hourlly Pay Rate. Position Current Increase During Performance Hours Labor Cost

Summary by Labor Category

Level IIIProgram Manager248$11,647.52
SeniorScientist585$23,129.82
SeniorEngineer775$26,233.68
JuniorScientist3,236$92,099.80
JuniorEngineer3,619$103,062.71
Level IIStatistician2,401$47,126.27
Level IVManagement Analyst860$15,225.44
Level VILaboratory Technician319$5,149.20

Labor Cost 12,043 $323,674.44

Time Phased Labor Loading

FebruaryLevel IIIProgram Manager$45.710.00%$45.7126$1,188.46
MarchLevel IIIProgram Manager$45.710.00%$45.7131$1,417.01
AprilLevel IIIProgram Manager$45.710.00%$45.7143$1,965.53
MayLevel IIIProgram Manager$45.710.00%$45.7112$548.52
JuneLevel IIIProgram Manager$45.715.01%$48.0013$624.00
JulyLevel IIIProgram Manager$45.715.01%$48.0015$720.00
AugustLevel IIIProgram Manager$45.715.01%$48.0026$1,248.00
SeptemberLevel IIIProgram Manager$45.715.01%$48.0041$1,968.00
OctoberLevel IIIProgram Manager$45.715.01%$48.0029$1,392.00
NovemberLevel IIIProgram Manager$45.715.01%$48.0012$576.00
FebruarySeniorSenior Scientist$38.860.00%$38.8667$2,603.62
MarchSeniorSenior Scientist$38.860.00%$38.8643$1,670.98
AprilSeniorSenior Scientist$38.860.00%$38.8640$1,554.40
MaySeniorSenior Scientist$38.860.00%$38.8687$3,380.82
JuneSeniorSenior Scientist$38.862.93%$40.0083$3,320.00
JulySeniorSenior Scientist$38.862.93%$40.0080$3,200.00
AugustSeniorSenior Scientist$38.862.93%$40.0051$2,040.00
SeptemberSeniorSenior Scientist$38.862.93%$40.0053$2,120.00
OctoberSeniorSenior Scientist$38.862.93%$40.0040$1,600.00
NovemberSeniorSenior Scientist$38.862.93%$40.0041$1,640.00
FebruarySeniorSenior Engineer$32.880.00%$32.8879$2,597.52
MarchSeniorSenior Engineer$32.880.00%$32.8876$2,498.88
AprilSeniorSenior Engineer$32.880.00%$32.8877$2,531.76
MaySeniorSenior Engineer$32.880.00%$32.8879$2,597.52
JuneSeniorSenior Engineer$32.884.93%$34.5076$2,622.00
JulySeniorSenior Engineer$32.884.93%$34.5077$2,656.50
AugustSeniorSenior Engineer$32.884.93%$34.5079$2,725.50
SeptemberSeniorSenior Engineer$32.884.93%$34.5076$2,622.00
OctoberSeniorSenior Engineer$32.884.93%$34.5077$2,656.50
NovemberSeniorSenior Engineer$32.884.93%$34.5079$2,725.50
FebruaryJuniorJunior Scientist$27.650.00%$27.65322$8,903.30
MarchJuniorJunior Scientist$27.650.00%$27.65323$8,930.95
AprilJuniorJunior Scientist$27.650.00%$27.65325$8,986.25
MayJuniorJunior Scientist$27.650.00%$27.65322$8,903.30
JuneJuniorJunior Scientist$27.654.88%$29.00323$9,367.00
JulyJuniorJunior Scientist$27.654.88%$29.00325$9,425.00
AugustJuniorJunior Scientist$27.654.88%$29.00324$9,396.00
SeptemberJuniorJunior Scientist$27.654.88%$29.00323$9,367.00
OctoberJuniorJunior Scientist$27.654.88%$29.00325$9,425.00
NovemberJuniorJunior Scientist$27.654.88%$29.00324$9,396.00
FebruaryJuniorJunior Engineer$27.650.00%$27.65361$9,981.65
MarchJuniorJunior Engineer$27.650.00%$27.65363$10,036.95
AprilJuniorJunior Engineer$27.650.00%$27.65362$10,009.30
MayJuniorJunior Engineer$27.650.00%$27.65361$9,981.65
JuneJuniorJunior Engineer$27.654.99%$29.03363$10,537.89
JulyJuniorJunior Engineer$27.654.99%$29.03362$10,508.86
AugustJuniorJunior Engineer$27.654.99%$29.03361$10,479.83
SeptemberJuniorJunior Engineer$27.654.99%$29.03363$10,537.89
OctoberJuniorJunior Engineer$27.654.99%$29.03362$10,508.86
NovemberJuniorJunior Engineer$27.654.99%$29.03361$10,479.83
FebruaryLevel IIStatistician$19.070.00%$19.07241$4,595.87
MarchLevel IIStatistician$19.070.00%$19.07240$4,576.80
AprilLevel IIStatistician$19.070.00%$19.07239$4,557.73
MayLevel IIStatistician$19.070.00%$19.07241$4,595.87
JuneLevel IIStatistician$19.074.88%$20.00240$4,800.00
JulyLevel IIStatistician$19.074.88%$20.00239$4,780.00
AugustLevel IIStatistician$19.074.88%$20.00241$4,820.00
SeptemberLevel IIStatistician$19.074.88%$20.00240$4,800.00
OctoberLevel IIStatistician$19.074.88%$20.00239$4,780.00
NovemberLevel IIStatistician$19.074.88%$20.00241$4,820.00
FebruaryLevel IVManagement Analyst$17.260.00%$17.2686$1,484.36
MarchLevel IVManagement Analyst$17.260.00%$17.2685$1,467.10
AprilLevel IVManagement Analyst$17.260.00%$17.2687$1,501.62
MayLevel IVManagement Analyst$17.260.00%$17.2686$1,484.36
JuneLevel IVManagement Analyst$17.264.29%$18.0085$1,530.00
JulyLevel IVManagement Analyst$17.264.29%$18.0087$1,566.00
AugustLevel IVManagement Analyst$17.264.29%$18.0086$1,548.00
SeptemberLevel IVManagement Analyst$17.264.29%$18.0085$1,530.00
OctoberLevel IVManagement Analyst$17.264.29%$18.0087$1,566.00
NovemberLevel IVManagement Analyst$17.264.29%$18.0086$1,548.00
FebruaryLevel VILaboratory Technician$15.600.00%$15.6031$483.60
MarchLevel VILaboratory Technician$15.600.00%$15.6033$514.80
AprilLevel VILaboratory Technician$15.600.00%$15.6032$499.20
MayLevel VILaboratory Technician$15.600.00%$15.6031$483.60
JuneLevel VILaboratory Technician$15.605.77%$16.5033$544.50
JulyLevel VILaboratory Technician$15.605.77%$16.5032$528.00
AugustLevel VILaboratory Technician$15.605.77%$16.5031$511.50
SeptemberLevel VILaboratory Technician$15.605.77%$16.5033$544.50
OctoberLevel VILaboratory Technician$15.605.77%$16.5032$528.00
NovemberLevel VILaboratory Technician$15.605.77%$16.5031$511.50

Labor Cost 12,043 $323,674.44

Mat & Subcontract Costs-Sample

Propsective Federal Contractor
Cost and Pricing Proposal Submitted in Response to
Solicitation: RFP PFCXXX-12234
Element of Price and Costs: Material & Subcontract Costs
Item 1
Widget Case and Structure Assembly - Part Number 210-XXXX
Bill of Material
Original 0001 Dated 15 January 20X4
Revision 0002 Dated 15 February 20X5
Revision 0005 Dated 30 September 20X6
RequiredGross
TotalTo FillScrap or ShrinkageRequiredBasis
PartRequiredOrder(Note below)To FillUnit(Note
NumberDescriptionOne Unit1000FactorQuantityOrderPricebelow)Extension
192119Roller, Shaft440005.00%2004200$100.0002$420,000.000
350437Screw, 25mm x 50mm87870005.00%435091350$1.0504$95,917.500
187889CGear Case Cover Casting110002.00%201020$80.0002$81,600.000
118930Shaft, Clutch220002.50%502050$28.4952$58,414.750
360841Pulley110002.80%281028$51.2302$52,664.440
182949CDrive Pulley Casting110001.50%151015$28.6501$29,079.750
118642Cam, Agitator and Pump110006.00%601060$10.8902$11,543.400
116033Bearing220006.00%1202120$4.0003$8,480.000
119438Bearing, Thrust110003.50%351035$3.0003$3,105.000
152446Spring, Control rod110002.50%251025$2.5001$2,562.500
152097Spring, Retainer110002.50%251025$2.4801$2,542.000
196853Bearing, 1mm O.D.220005.00%1002100$1.0004$2,100.000
116039Lining, Brake110002.50%251025$1.9404$1,988.500
116135Screw, Taper End220002.50%502050$0.7853$1,609.250
117261Spring110003.50%351035$1.5001$1,552.500
116049Ring, Snap110002.50%251025$1.5004$1,537.500
195405Belt, "V"110005.00%501050$0.9704$1,018.500
191939Seal, Oil110005.00%501050$0.9453$992.250
353320Washer, Thrust110005.00%501050$0.6674$700.350
152073Washer110002.50%251025$0.0333$33.825

Material Costs for 1000 Units $777,442.015

210-XXX A Widget Assembly 1 1000 0 1000 $308.273 1 $308,273.000

Subcontract Costs for 1000 Units $308,273.000

Basis for Overall Requirements and Outsourcing of Widget Assembly
All component requirements can be traced to the most current bill of material (30 Sep 20X6) above. The current bill of material reflects PFC's recent "make or buy decision," to outsource the Widget Assembly, based on competitive negotiation with three potential suppliers. PFC plans to award a subcontract to XXX Company, whose competitive proposal is best value.
Basis for Unit Price above
1 = Adequate price competition plus the results of negotiation.
2 = Cost and price analysis of cost and price breakdown received from subcontractors.
3 = Market price (established from sources other than the vendor).
4 = Historical price for same or similar item, adjusted (via appropriate Index) to current price level.
Basis for Scrap Factor above
Experience from past production orders.

Item 2 Related XXX-Data Package

Based on current vendor quotation from Technical Data, Inc. $28,000.00

PCF received responses to a best value solicitation. XXX-Data, Inc. (XXX-D) provided the best value proposal. there price was $3,000 higher than the "runner up" in the competitive range. Bangor management decided that XXX-D's proposal was the best value and warranted the incremental expenditure of $3,000. A copy of the negotiation memorandum may is available for inspection if necessary.

Subcontract-Sample

Propsective Federal Contractor
Cost and Pricing Proposal Submitted in Response to
Solicitation: RFP PFCXXX-12234

Element of Price and Costs: Subcontract Costs

Vendor:
ABCD Inc.
1234 Easy Street
San Antonio, TX 78236Planned Subcontract Amount$150,000.36
ABCD, Inc. will provide data analysis and computer support during the contract performance period. ABCD' s effort is also described in our technical proposal. 3-Firms responded to our solicitation for this service. All of them provided priced offers that were within 4 % of our internal price estimate. Although ABCD's offer was the highest of the three received, we plan to award the subcontract to ABCD since theirs is the best value technical proposal, is within 4 % of our internal proposal, and not significantly higher than the other two offer within the competitive range.

ODC-Sample

Propsective Federal Contractor
Cost and Pricing Proposal Submitted in Response to
Solicitation: RFP FPFCXXX-12234

Element of Price and Costs: Other Direct Costs

Other Direct Costs (ODC) - Travel
Escalation

Watley, Franklin K Mr CIV USA: Watley, Franklin K Mr CIV USA:

This may or may not be a Factor in your proposed Travel Costs depending on the Costs and Rates posted on GSA Website.

Factor (3 %)
Airlinefor Probable
ItineraryTravelerFromToFairPer DiemLodgingTravelIncreaseTravel
New York to Fort Knox and ReturnScientist(date)(date)$585.005 days @ $50 =$250.00$500.00$1,335.00$40.05$1,375.05
New York to Fort Knox and ReturnEngineer(date)(date)$585.005 days @ $50 =$250.00$500.00$1,335.00$40.05$1,375.05
Travel - New York to San AntonioScientist(date)(date)$1,047.005 days @ $60 =$250.00$500.00$1,797.00$53.91$1,850.91
Travel - New York to San AntonioEngineer(date)(date)$1,047.005 days @ $60 =$250.00$500.00$1,797.00$53.91$1,850.91
Other Direct Costs (ODC) - Travel$6,451.92
Planned travel above is proposed and identified with the proposed contract effort. Accordingly it is treated as a direct cost.
Basis of estimates; Airlines fares and lodging estimates are based on IAW JTR. Per Diem rates are based on the current published GSA joint Travel Regulation rates for Fort Knox and San Antonio. The increase in travel costs are anticipated and PFC added a 3 % escalation factor.
Other Direct Costs (ODC) - Consultant(s)
Agreement with the Financial Management Institute (FMI) to provide all necessary financial management/contract administration support for the duration of this contract. Agreement with FMI provides that for this contract, FMI will prepare all required customer billings, financial reporting, liaison with auditors and other contract distraction officials.$10,000.00
Other Direct Costs (ODC) - Equipment Rental
XYZRentUm Company agreed to provide our equipment needs for the contract performance period for $14,000. 3-Firms were included in our market research. We considered lease vs. purchase options. Ultimately we decided to use XYZRentUm for our equipment rental needs, because of their available inventory of rental equipment. Further more, our market research shows that XYZRentUm's prices are very competitive.$14,000.00
Other Direct Costs (ODC) - Royalties
Royalty costs of $12,000 represent payments required on license agreement with EFG Data Inc., 952 Easy Drive, Austin TX 78952, dated 30 Oct 20X6, for use of data base covered by patent no. 95002. A copy of this agreement and any additional information is available from our attorneys Johnson and Company 321 Giant Building, San Antonio TX 78652.$12,000.00

Indirect Cost-Sample

Propsective Federal Contractor
Cost and Pricing Proposal Submitted in Response to
Solicitation: RFP PFCXXX-12234
Element of Price and Costs: Indirect Direct Costs
Indirect Cost ElementBasis of AllocationAllocation Rate
Paid Absences OverheadLabor14.39%
Payroll Taxes Expenses and BenefitsLabor Plus Paid Absences Overhead20.56%
Purchasing and Travel Management OverheadMaterial, Subcontract, and Other Direct Costs24.46%
General and Administrative (G&A) OverheadCost Input107.62%
IR&D/B&P OverheadCost Input3.13%
The above indirect cost rates are:
Budgeted rates for the fiscal year to end 30 September 20X5.
Consistent with PFC's Indirect Cost Allocation Plan as described in its recently submitted CASB Disclosure Statement.
Supported by detail calculations which have been provided to the DCAA Audit field office identified in the proposal cover sheet.
Based on historic cost data from the two prior fiscal years, adjusted for anticipated cost growth, based on a rational anticipated sales volume;
The indirect cost pools identified above:
Includes only those costs which are allowable in accordance with the cost principles of the FAR and its supplements applicable to the contracts to which the final indirect cost rates will apply;
Do not include any costs which are expressly unallowable under applicable cost principles of the FAR or its supplements and
Are “net of applicable credits” (negative expenditure) pursuant to the definition of total costs in FAR Part 31.

Accordingly, we believe these indirect cost rates are fair and reasonable and appropriate to use a basis for estimating anticipated indirect cost in future forward price proposals.