Direct Labor-Sample
| Propsective Federal Contractor |
| Cost and Pricing Proposal Submitted in Response to |
| Solicitation: RFP PFCXXX-12234 |
| Element of Price and Costs: Labor Costs | |
| Sample description of the labor hours, labor mix, labor loading and the proposed workers are consistent with page 45 the technical proposal and previous payroll records. Current labor rates are the rates currently paid to workers, and can be traced to current payroll records. Additionally, the same rates paid to laborers through Period of Performance 31 Oct - 30 Sep with increases as shown. |
| Hourly Labor Rate | ||
| Month 20X6 | Proposed Level of Laborer |
Watley, Franklin K Mr CIV USA: Watley, Franklin K Mr CIV USA:
The Level/Senior/Junior will identify Hourlly Pay Rate. Position Current Increase During Performance Hours Labor Cost
Summary by Labor Category
| Level III | Program Manager | 248 | $11,647.52 |
| Senior | Scientist | 585 | $23,129.82 |
| Senior | Engineer | 775 | $26,233.68 |
| Junior | Scientist | 3,236 | $92,099.80 |
| Junior | Engineer | 3,619 | $103,062.71 |
| Level II | Statistician | 2,401 | $47,126.27 |
| Level IV | Management Analyst | 860 | $15,225.44 |
| Level VI | Laboratory Technician | 319 | $5,149.20 |
Labor Cost 12,043 $323,674.44
Time Phased Labor Loading
| February | Level III | Program Manager | $45.71 | 0.00% | $45.71 | 26 | $1,188.46 |
| March | Level III | Program Manager | $45.71 | 0.00% | $45.71 | 31 | $1,417.01 |
| April | Level III | Program Manager | $45.71 | 0.00% | $45.71 | 43 | $1,965.53 |
| May | Level III | Program Manager | $45.71 | 0.00% | $45.71 | 12 | $548.52 |
| June | Level III | Program Manager | $45.71 | 5.01% | $48.00 | 13 | $624.00 |
| July | Level III | Program Manager | $45.71 | 5.01% | $48.00 | 15 | $720.00 |
| August | Level III | Program Manager | $45.71 | 5.01% | $48.00 | 26 | $1,248.00 |
| September | Level III | Program Manager | $45.71 | 5.01% | $48.00 | 41 | $1,968.00 |
| October | Level III | Program Manager | $45.71 | 5.01% | $48.00 | 29 | $1,392.00 |
| November | Level III | Program Manager | $45.71 | 5.01% | $48.00 | 12 | $576.00 |
| February | Senior | Senior Scientist | $38.86 | 0.00% | $38.86 | 67 | $2,603.62 |
| March | Senior | Senior Scientist | $38.86 | 0.00% | $38.86 | 43 | $1,670.98 |
| April | Senior | Senior Scientist | $38.86 | 0.00% | $38.86 | 40 | $1,554.40 |
| May | Senior | Senior Scientist | $38.86 | 0.00% | $38.86 | 87 | $3,380.82 |
| June | Senior | Senior Scientist | $38.86 | 2.93% | $40.00 | 83 | $3,320.00 |
| July | Senior | Senior Scientist | $38.86 | 2.93% | $40.00 | 80 | $3,200.00 |
| August | Senior | Senior Scientist | $38.86 | 2.93% | $40.00 | 51 | $2,040.00 |
| September | Senior | Senior Scientist | $38.86 | 2.93% | $40.00 | 53 | $2,120.00 |
| October | Senior | Senior Scientist | $38.86 | 2.93% | $40.00 | 40 | $1,600.00 |
| November | Senior | Senior Scientist | $38.86 | 2.93% | $40.00 | 41 | $1,640.00 |
| February | Senior | Senior Engineer | $32.88 | 0.00% | $32.88 | 79 | $2,597.52 |
| March | Senior | Senior Engineer | $32.88 | 0.00% | $32.88 | 76 | $2,498.88 |
| April | Senior | Senior Engineer | $32.88 | 0.00% | $32.88 | 77 | $2,531.76 |
| May | Senior | Senior Engineer | $32.88 | 0.00% | $32.88 | 79 | $2,597.52 |
| June | Senior | Senior Engineer | $32.88 | 4.93% | $34.50 | 76 | $2,622.00 |
| July | Senior | Senior Engineer | $32.88 | 4.93% | $34.50 | 77 | $2,656.50 |
| August | Senior | Senior Engineer | $32.88 | 4.93% | $34.50 | 79 | $2,725.50 |
| September | Senior | Senior Engineer | $32.88 | 4.93% | $34.50 | 76 | $2,622.00 |
| October | Senior | Senior Engineer | $32.88 | 4.93% | $34.50 | 77 | $2,656.50 |
| November | Senior | Senior Engineer | $32.88 | 4.93% | $34.50 | 79 | $2,725.50 |
| February | Junior | Junior Scientist | $27.65 | 0.00% | $27.65 | 322 | $8,903.30 |
| March | Junior | Junior Scientist | $27.65 | 0.00% | $27.65 | 323 | $8,930.95 |
| April | Junior | Junior Scientist | $27.65 | 0.00% | $27.65 | 325 | $8,986.25 |
| May | Junior | Junior Scientist | $27.65 | 0.00% | $27.65 | 322 | $8,903.30 |
| June | Junior | Junior Scientist | $27.65 | 4.88% | $29.00 | 323 | $9,367.00 |
| July | Junior | Junior Scientist | $27.65 | 4.88% | $29.00 | 325 | $9,425.00 |
| August | Junior | Junior Scientist | $27.65 | 4.88% | $29.00 | 324 | $9,396.00 |
| September | Junior | Junior Scientist | $27.65 | 4.88% | $29.00 | 323 | $9,367.00 |
| October | Junior | Junior Scientist | $27.65 | 4.88% | $29.00 | 325 | $9,425.00 |
| November | Junior | Junior Scientist | $27.65 | 4.88% | $29.00 | 324 | $9,396.00 |
| February | Junior | Junior Engineer | $27.65 | 0.00% | $27.65 | 361 | $9,981.65 |
| March | Junior | Junior Engineer | $27.65 | 0.00% | $27.65 | 363 | $10,036.95 |
| April | Junior | Junior Engineer | $27.65 | 0.00% | $27.65 | 362 | $10,009.30 |
| May | Junior | Junior Engineer | $27.65 | 0.00% | $27.65 | 361 | $9,981.65 |
| June | Junior | Junior Engineer | $27.65 | 4.99% | $29.03 | 363 | $10,537.89 |
| July | Junior | Junior Engineer | $27.65 | 4.99% | $29.03 | 362 | $10,508.86 |
| August | Junior | Junior Engineer | $27.65 | 4.99% | $29.03 | 361 | $10,479.83 |
| September | Junior | Junior Engineer | $27.65 | 4.99% | $29.03 | 363 | $10,537.89 |
| October | Junior | Junior Engineer | $27.65 | 4.99% | $29.03 | 362 | $10,508.86 |
| November | Junior | Junior Engineer | $27.65 | 4.99% | $29.03 | 361 | $10,479.83 |
| February | Level II | Statistician | $19.07 | 0.00% | $19.07 | 241 | $4,595.87 |
| March | Level II | Statistician | $19.07 | 0.00% | $19.07 | 240 | $4,576.80 |
| April | Level II | Statistician | $19.07 | 0.00% | $19.07 | 239 | $4,557.73 |
| May | Level II | Statistician | $19.07 | 0.00% | $19.07 | 241 | $4,595.87 |
| June | Level II | Statistician | $19.07 | 4.88% | $20.00 | 240 | $4,800.00 |
| July | Level II | Statistician | $19.07 | 4.88% | $20.00 | 239 | $4,780.00 |
| August | Level II | Statistician | $19.07 | 4.88% | $20.00 | 241 | $4,820.00 |
| September | Level II | Statistician | $19.07 | 4.88% | $20.00 | 240 | $4,800.00 |
| October | Level II | Statistician | $19.07 | 4.88% | $20.00 | 239 | $4,780.00 |
| November | Level II | Statistician | $19.07 | 4.88% | $20.00 | 241 | $4,820.00 |
| February | Level IV | Management Analyst | $17.26 | 0.00% | $17.26 | 86 | $1,484.36 |
| March | Level IV | Management Analyst | $17.26 | 0.00% | $17.26 | 85 | $1,467.10 |
| April | Level IV | Management Analyst | $17.26 | 0.00% | $17.26 | 87 | $1,501.62 |
| May | Level IV | Management Analyst | $17.26 | 0.00% | $17.26 | 86 | $1,484.36 |
| June | Level IV | Management Analyst | $17.26 | 4.29% | $18.00 | 85 | $1,530.00 |
| July | Level IV | Management Analyst | $17.26 | 4.29% | $18.00 | 87 | $1,566.00 |
| August | Level IV | Management Analyst | $17.26 | 4.29% | $18.00 | 86 | $1,548.00 |
| September | Level IV | Management Analyst | $17.26 | 4.29% | $18.00 | 85 | $1,530.00 |
| October | Level IV | Management Analyst | $17.26 | 4.29% | $18.00 | 87 | $1,566.00 |
| November | Level IV | Management Analyst | $17.26 | 4.29% | $18.00 | 86 | $1,548.00 |
| February | Level VI | Laboratory Technician | $15.60 | 0.00% | $15.60 | 31 | $483.60 |
| March | Level VI | Laboratory Technician | $15.60 | 0.00% | $15.60 | 33 | $514.80 |
| April | Level VI | Laboratory Technician | $15.60 | 0.00% | $15.60 | 32 | $499.20 |
| May | Level VI | Laboratory Technician | $15.60 | 0.00% | $15.60 | 31 | $483.60 |
| June | Level VI | Laboratory Technician | $15.60 | 5.77% | $16.50 | 33 | $544.50 |
| July | Level VI | Laboratory Technician | $15.60 | 5.77% | $16.50 | 32 | $528.00 |
| August | Level VI | Laboratory Technician | $15.60 | 5.77% | $16.50 | 31 | $511.50 |
| September | Level VI | Laboratory Technician | $15.60 | 5.77% | $16.50 | 33 | $544.50 |
| October | Level VI | Laboratory Technician | $15.60 | 5.77% | $16.50 | 32 | $528.00 |
| November | Level VI | Laboratory Technician | $15.60 | 5.77% | $16.50 | 31 | $511.50 |
Labor Cost 12,043 $323,674.44
Mat & Subcontract Costs-Sample
| Propsective Federal Contractor |
| Cost and Pricing Proposal Submitted in Response to |
| Solicitation: RFP PFCXXX-12234 |
| Element of Price and Costs: Material & Subcontract Costs |
| Item 1 |
| Widget Case and Structure Assembly - Part Number 210-XXXX |
| Bill of Material |
| Original 0001 Dated 15 January 20X4 |
| Revision 0002 Dated 15 February 20X5 |
| Revision 0005 Dated 30 September 20X6 |
| Required | Gross | ||||||||
| Total | To Fill | Scrap or Shrinkage | Required | Basis | |||||
| Part | Required | Order | (Note below) | To Fill | Unit | (Note | |||
| Number | Description | One Unit | 1000 | Factor | Quantity | Order | Price | below) | Extension |
| 192119 | Roller, Shaft | 4 | 4000 | 5.00% | 200 | 4200 | $100.000 | 2 | $420,000.000 | |
| 350437 | Screw, 25mm x 50mm | 87 | 87000 | 5.00% | 4350 | 91350 | $1.050 | 4 | $95,917.500 | |
| 187889 | C | Gear Case Cover Casting | 1 | 1000 | 2.00% | 20 | 1020 | $80.000 | 2 | $81,600.000 |
| 118930 | Shaft, Clutch | 2 | 2000 | 2.50% | 50 | 2050 | $28.495 | 2 | $58,414.750 | |
| 360841 | Pulley | 1 | 1000 | 2.80% | 28 | 1028 | $51.230 | 2 | $52,664.440 | |
| 182949 | C | Drive Pulley Casting | 1 | 1000 | 1.50% | 15 | 1015 | $28.650 | 1 | $29,079.750 |
| 118642 | Cam, Agitator and Pump | 1 | 1000 | 6.00% | 60 | 1060 | $10.890 | 2 | $11,543.400 | |
| 116033 | Bearing | 2 | 2000 | 6.00% | 120 | 2120 | $4.000 | 3 | $8,480.000 | |
| 119438 | Bearing, Thrust | 1 | 1000 | 3.50% | 35 | 1035 | $3.000 | 3 | $3,105.000 | |
| 152446 | Spring, Control rod | 1 | 1000 | 2.50% | 25 | 1025 | $2.500 | 1 | $2,562.500 | |
| 152097 | Spring, Retainer | 1 | 1000 | 2.50% | 25 | 1025 | $2.480 | 1 | $2,542.000 | |
| 196853 | Bearing, 1mm O.D. | 2 | 2000 | 5.00% | 100 | 2100 | $1.000 | 4 | $2,100.000 | |
| 116039 | Lining, Brake | 1 | 1000 | 2.50% | 25 | 1025 | $1.940 | 4 | $1,988.500 | |
| 116135 | Screw, Taper End | 2 | 2000 | 2.50% | 50 | 2050 | $0.785 | 3 | $1,609.250 | |
| 117261 | Spring | 1 | 1000 | 3.50% | 35 | 1035 | $1.500 | 1 | $1,552.500 | |
| 116049 | Ring, Snap | 1 | 1000 | 2.50% | 25 | 1025 | $1.500 | 4 | $1,537.500 | |
| 195405 | Belt, "V" | 1 | 1000 | 5.00% | 50 | 1050 | $0.970 | 4 | $1,018.500 | |
| 191939 | Seal, Oil | 1 | 1000 | 5.00% | 50 | 1050 | $0.945 | 3 | $992.250 | |
| 353320 | Washer, Thrust | 1 | 1000 | 5.00% | 50 | 1050 | $0.667 | 4 | $700.350 | |
| 152073 | Washer | 1 | 1000 | 2.50% | 25 | 1025 | $0.033 | 3 | $33.825 |
Material Costs for 1000 Units $777,442.015
210-XXX A Widget Assembly 1 1000 0 1000 $308.273 1 $308,273.000
Subcontract Costs for 1000 Units $308,273.000
| Basis for Overall Requirements and Outsourcing of Widget Assembly |
| All component requirements can be traced to the most current bill of material (30 Sep 20X6) above. The current bill of material reflects PFC's recent "make or buy decision," to outsource the Widget Assembly, based on competitive negotiation with three potential suppliers. PFC plans to award a subcontract to XXX Company, whose competitive proposal is best value. |
| Basis for Unit Price above |
| 1 = Adequate price competition plus the results of negotiation. |
| 2 = Cost and price analysis of cost and price breakdown received from subcontractors. |
| 3 = Market price (established from sources other than the vendor). |
| 4 = Historical price for same or similar item, adjusted (via appropriate Index) to current price level. |
| Basis for Scrap Factor above |
| Experience from past production orders. |
Item 2 Related XXX-Data Package
Based on current vendor quotation from Technical Data, Inc. $28,000.00
PCF received responses to a best value solicitation. XXX-Data, Inc. (XXX-D) provided the best value proposal. there price was $3,000 higher than the "runner up" in the competitive range. Bangor management decided that XXX-D's proposal was the best value and warranted the incremental expenditure of $3,000. A copy of the negotiation memorandum may is available for inspection if necessary.
Subcontract-Sample
| Propsective Federal Contractor |
| Cost and Pricing Proposal Submitted in Response to |
| Solicitation: RFP PFCXXX-12234 |
Element of Price and Costs: Subcontract Costs
| Vendor: | |||
| ABCD Inc. | |||
| 1234 Easy Street | |||
| San Antonio, TX 78236 | Planned Subcontract Amount | $150,000.36 | |
| ABCD, Inc. will provide data analysis and computer support during the contract performance period. ABCD' s effort is also described in our technical proposal. 3-Firms responded to our solicitation for this service. All of them provided priced offers that were within 4 % of our internal price estimate. Although ABCD's offer was the highest of the three received, we plan to award the subcontract to ABCD since theirs is the best value technical proposal, is within 4 % of our internal proposal, and not significantly higher than the other two offer within the competitive range. |
ODC-Sample
| Propsective Federal Contractor |
| Cost and Pricing Proposal Submitted in Response to |
| Solicitation: RFP FPFCXXX-12234 |
Element of Price and Costs: Other Direct Costs
| Other Direct Costs (ODC) - Travel | |
| Escalation |
Watley, Franklin K Mr CIV USA: Watley, Franklin K Mr CIV USA:
This may or may not be a Factor in your proposed Travel Costs depending on the Costs and Rates posted on GSA Website.
| Factor (3 %) | ||||||||||
| Airline | for Probable | |||||||||
| Itinerary | Traveler | From | To | Fair | Per Diem | Lodging | Travel | Increase | Travel | |
| New York to Fort Knox and Return | Scientist | (date) | (date) | $585.00 | 5 days @ $50 = | $250.00 | $500.00 | $1,335.00 | $40.05 | $1,375.05 |
| New York to Fort Knox and Return | Engineer | (date) | (date) | $585.00 | 5 days @ $50 = | $250.00 | $500.00 | $1,335.00 | $40.05 | $1,375.05 |
| Travel - New York to San Antonio | Scientist | (date) | (date) | $1,047.00 | 5 days @ $60 = | $250.00 | $500.00 | $1,797.00 | $53.91 | $1,850.91 |
| Travel - New York to San Antonio | Engineer | (date) | (date) | $1,047.00 | 5 days @ $60 = | $250.00 | $500.00 | $1,797.00 | $53.91 | $1,850.91 |
| Other Direct Costs (ODC) - Travel | $6,451.92 | |||||||||
| Planned travel above is proposed and identified with the proposed contract effort. Accordingly it is treated as a direct cost. | ||||||||||
| Basis of estimates; Airlines fares and lodging estimates are based on IAW JTR. Per Diem rates are based on the current published GSA joint Travel Regulation rates for Fort Knox and San Antonio. The increase in travel costs are anticipated and PFC added a 3 % escalation factor. |
| Other Direct Costs (ODC) - Consultant(s) | ||
| Agreement with the Financial Management Institute (FMI) to provide all necessary financial management/contract administration support for the duration of this contract. Agreement with FMI provides that for this contract, FMI will prepare all required customer billings, financial reporting, liaison with auditors and other contract distraction officials. | $10,000.00 |
| Other Direct Costs (ODC) - Equipment Rental | ||
| XYZRentUm Company agreed to provide our equipment needs for the contract performance period for $14,000. 3-Firms were included in our market research. We considered lease vs. purchase options. Ultimately we decided to use XYZRentUm for our equipment rental needs, because of their available inventory of rental equipment. Further more, our market research shows that XYZRentUm's prices are very competitive. | $14,000.00 | |
| Other Direct Costs (ODC) - Royalties | ||
| Royalty costs of $12,000 represent payments required on license agreement with EFG Data Inc., 952 Easy Drive, Austin TX 78952, dated 30 Oct 20X6, for use of data base covered by patent no. 95002. A copy of this agreement and any additional information is available from our attorneys Johnson and Company 321 Giant Building, San Antonio TX 78652. | $12,000.00 |
Indirect Cost-Sample
| Propsective Federal Contractor |
| Cost and Pricing Proposal Submitted in Response to |
| Solicitation: RFP PFCXXX-12234 |
| Element of Price and Costs: Indirect Direct Costs | ||
| Indirect Cost Element | Basis of Allocation | Allocation Rate |
| Paid Absences Overhead | Labor | 14.39% |
| Payroll Taxes Expenses and Benefits | Labor Plus Paid Absences Overhead | 20.56% |
| Purchasing and Travel Management Overhead | Material, Subcontract, and Other Direct Costs | 24.46% |
| General and Administrative (G&A) Overhead | Cost Input | 107.62% |
| IR&D/B&P Overhead | Cost Input | 3.13% |
| The above indirect cost rates are: |
| Budgeted rates for the fiscal year to end 30 September 20X5. |
| Consistent with PFC's Indirect Cost Allocation Plan as described in its recently submitted CASB Disclosure Statement. |
| Supported by detail calculations which have been provided to the DCAA Audit field office identified in the proposal cover sheet. |
| Based on historic cost data from the two prior fiscal years, adjusted for anticipated cost growth, based on a rational anticipated sales volume; |
| The indirect cost pools identified above: |
| Includes only those costs which are allowable in accordance with the cost principles of the FAR and its supplements applicable to the contracts to which the final indirect cost rates will apply; |
| Do not include any costs which are expressly unallowable under applicable cost principles of the FAR or its supplements and |
| Are “net of applicable credits” (negative expenditure) pursuant to the definition of total costs in FAR Part 31. |
Accordingly, we believe these indirect cost rates are fair and reasonable and appropriate to use a basis for estimating anticipated indirect cost in future forward price proposals.