Revised PWS Intercom_PA_Cameras.pdf
PDF 3 MB Posted
- Solicitation number
- W9124C26RA005
About this file
This is a Performance Work Statement (PWS) for the installation of an intercom, public announcement, and video surveillance system at the Clothing Initial Issue Point (CIIP) facility located at Building 1776 Washington Road, Fort Jackson, South Carolina 29207. The contract is a non-personal services, firm fixed-price contract with a performance period of April 1, 2026 through April 30, 2026 during standard operating hours of 0800-1630, Monday through Friday.
The contractor must deliver, install, configure, test, and provide initial training for an integrated system comprising: an AXIS C7050 Mk III Audio Manager Pro intercom with public announcement capability; a video surveillance system with 64 axis camera licenses supporting 80 video channels at 4M/30FPS resolution for up to 192 doors; two AXIS Camera S9302 client workstations with Windows 11 IoT Enterprise; cameras including 8 fixed IR dome units, 14 panoramic indoor fisheye units, and 5 outdoor four-sensor panoramic dome units; network paging consoles, horn speakers, and ceiling speakers; and installation of all required cabling, conduit, network racking, and hardware. The contractor is responsible for all labor, materials, configuration, testing, training, and debris removal. Key deliverables include a Quality Control Plan within 30 days of award, a Work Plan within 10 days, Installation Pass Logs, Anti-Terrorism Level I training certificates, and System Capabilities documentation. All hardware includes a 5-year manufacturer warranty with contractor providing a 1-year installation and materials warranty. The contract requires compliance with OSHA safety requirements, Installation Access Control procedures, physical security protocols, and reporting of labor hours to www.sam.gov with performance thresholds set at 100% compliance for all major system components.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5.2.5. Installation. The Contractor shall provide complete installation services of all hardware and software for all items listed in part 5 (Specific tasks) of this contract. This includes running all required conduit, cabling, labeling, speakers, intercom devices, public announcement (PA) devices, power if not available to support the installation, configuring software and systems, testing, and providing end user training.
5.2.5.1. Pull Boxes. Pull boxes shall beplaced in conduit runs where a continuous conduit length exceeds 100 feet, or where thee are more than two 90 degree bends. Pull boxes shall be placed in straight, alighned runs of conduit and not be used in lieu of a bend. Pull boxes shall be directly accessible.
5.2.5.2. Conduits. Conduits in finished areas shall be concealed in ceilings and or walls.
Conduits are already installed.
5.2.5.3. Outlet boxes. Mount boxes so that none occur back to back in walls. Access control boxes shall be mounted on the secure side of the doors in the secure space.
5.2.5.4. Restrictions. None of the cabling or special equipment under this contract shall be located in or routed through the NIPR TR's nor use of the NIPR cable trays or conduits as a pathway.
5.2.5.5. Penetrations. Seal penetrations through floors or fire walls to maintain the integrity of the fire and acoustic ratings of the walls and floors.
5.2.5.6. Expansion or seismic joints. Raceways crossing structural expansion joints or seismic joints shall be provided with suitable expansion fittings or other suitable means to compensate for the building expansion and contraction and to provide for continuity for grounding.
5.2.5.7. Clearances around equipment cabinets. A minimum of 36 inches of space shall be provided infront of the equipment cabinets and any installed equipment. A minimum side clearance of 24 inches shall be provided on the side of the cabinets.
5.2.6. Training. The contractor shall provide on site training on the operation of all the the installed systems. This training shall be coordinated with the government representative identified in this contract and shall be not less two 8 hour classes. The contractor shall provide a proposed training plan for review as part of this contract. The contractor shall also provide access to online training that can be accessed after the on site training to enable expanded learning of the installed systems in part 5 (Specific tasks) of this contract.
5.2.7. Warranty: All Hardware 5 Yr Manufactureers warranty. Contractor 1 Year installation and materials warranty from date of contract completion.
5.3 Service Contract Reporting: N/A
AUG22