Questions and Answers_Attachment 3_USARC DEERS Support Services_04JUN26.docx

DOCX document 1003 KB Posted

Attached to
USARC DEERS Support Services
Solicitation number
W9124726RA010
Issued by

About this file

This is a Questions and Answers document addressing clarifications to Solicitation W91247-26-R-A010 for USARC DEERS Support Services. The Q&A provides 67 responses to offeror inquiries submitted through May 22, 2026, and clarifies requirements contained in the Performance Work Statement, Technical Exhibits, and pricing schedules without modifying the solicitation's terms and conditions.

Key clarifications include: the solicitation deadline was extended to June 12, 2026, at 10:00 AM EST; the requirement covers 33 locations (not 32) with administrative oversight at Fort Bragg, NC and USARC Army Project Office at Fort Knox, KY; all personnel must certify as Site Security Managers and Verifying Officials unless otherwise specified; the Project Manager may be dual-hatted as SSM for Fort Bragg with Government provision of 1-2 additional SSMs; replacement timelines for terminated personnel will be applied reasonably when delays result from Government-dependent actions such as CAC issuance or background investigations; travel is authorized only for PM/Regional Manager site visits at a not-to-exceed amount of $25,000 per contract period; the base contract period runs from August 6, 2026, through July 5, 2027, with two one-year option periods preceded by a 30-day phase-in; offerors must propose appropriate labor categories and hours per FTE necessary to meet 90% or higher on-site utilization requirements; past performance documentation must demonstrate a minimum of three years of relevant work experience; subcontractor past performance may be submitted and evaluated; and the incumbent contractor is Rapier Solutions Inc. under Contract W91247-25-C-A017. The document confirms that Government will provide all equipment, RAPIDS/DEERS system access, facility security, and printer access for customer handouts, while the contractor bears responsibility for proposing compliant staffing solutions and labor rates consistent with Service Contract Act wage determinations.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers (Q&A): The following questions and responses are provided for clarification of Solicitation W91247-26-R-A010. Questions were accepted through 22 May 2026 at 4:00 PM EST. This Q&A does not modify the terms and conditions of the solicitation. Any changes to the solicitation will be issued by formal amendment via the Government Point of Entry (GPE).

#
Questions
Answers
1.
Will the government consider extending the due date of the solicitation to June 12th ( a week extension) to allow to offerors to conduct the necessary analysis and prepare a competitive proposal?
Solicitation will be extended until 12 JUN 2026 10:00am EST.
2.
For the current contract in performance, can the Government provide the current incumbent name, contract number, period of performance and awarded price?
Rapier Solutions Inc, W91247-25-C-A017, Period of performance 06 May 2026-05 August 2026.
3.
Are the requirements for this solicitation the same as the current contract? If not, how do the requirements differ?
The Government does not provide a comparison between the current contract and this solicitation. Offerors should base their proposals solely on the requirements, performance standards, and staffing expectations contained in the current solicitation and its associated exhibits.

Any changes from prior requirements are fully reflected in the solicitation as issued. Offerors are responsible for reviewing the Performance Work Statement, Technical Exhibits, and all attachments to determine the requirements for this acquisition

4.
CLIN 0002 describes an eleven (11) month Base Period from 06 August 2026 to 05 August 2027, while CLINs 1001 and 2001 are from July to July.

Please confirm and correct that CLIN 0002 PoP should be 06 August 2026 to 05 July 2027 The CLIN structure in the solicitation is correct. CLIN 0001 covers the 30 day phase in period, and CLIN 0002 covers the 11 month base period.

5.
Can the Government confirm that offerors add every location and position under each CLIN?
The labor CLINs in the solicitation are CLIN 0001 (Phase‑In), CLIN 0002 (Base Year Labor), CLIN 1001 (Option Year 1 Labor), and CLIN 2001 (Option Year 2 Labor). Offerors should propose all required labor across all locations and positions under these labor CLINs.
6.
Can the Government distinguish what it’s looking for in the Position and Labor Category? Would it be correct to state the Position is VO and the Labor Category is Personnel Assistant (Employment) II?
The Verifying Official (VO) and Site Security Manager (SSM) are the position titles identified in the PWS. Historically, these positions have aligned to the Personnel Assistant II labor category. The Offeror shall propose the appropriate labor categories that align with their staffing solution.
7.
Can the Government confirm in the Salary Rate column it is looking for the direct labor rate?
Yes, the Salary Rate column is for the unburdened rate. The roll-up section on Attachment 2 is provided as an example. Offerors may use the roll-up tab or their own format to present their effective loaded labor rates and any associated escalation.
8.
All of the indirect cost calculated formulas point to Row 2 percentage, some of the columns don’t match offeror accounting systems and methods. Can the Government validate that offerors can change the calculations to meet the CLIN requirements as well as their accounting system and practices?
Yes, the Offeror may change calculations or provide their own format for detailing their effective loaded labor rates and any associated escalation.
9.
The PWS states that USARC operates thirty-two (32) ICOs and requires staffing at thirty-two (32) locations; however, Technical Exhibits 3 and 4 appear to list thirty-three (33) site entries, including Site 33, USARC DEERS Army Project Office (APO), Fort Knox, KY, and the Mission Capability evaluation references management and oversight at 33 locations.

Please confirm the correct number of required performance locations and whether Site 33/Fort Knox is included in the required staffing, management, and pricing approach Government Confirms there are 33 locations for this requirement. Reference revised PWS for changes.

10.
The PWS requires at least one Site Security Manager (SSM) at each location, states that all personnel are Verifying Officials (VOs), and states that the PM/APM can be dual-hatted as SSMs.

Please confirm whether the Fort Bragg PM and/or APM may count toward the SSM requirement for the Fort Bragg ICO.

Please confirm whether each site, including part-time/0.5 FTE locations, must have a separate designated SSM in Security Online?

Please confirm whether on the PM and APM can be an SSM or at sites with one personnel 0.5 or 1 FTE) do they too serve in all cases as the SSM and VO?

Please refer to the updated PWS for recent changes. The Alternate Project Manager (APM) position has been replaced with the Regional Manager (RM), which functions as a Verifying Official (VO) position.

Yes, the Project Manager (PM) may be dual‑hatted as the SSM for the Fort Bragg ICO. In addition, the Government will provide 1–2 personnel to fulfill the SSM requirement at that location.

Regarding part‑time or 0.5 FTE sites: For locations staffed with part‑time personnel (0.5 FTE) or a single full‑time individual.The PM/RM can be dual hatted as SSM only for their location. All full time and part time locations will certify as SSMs for their designated site locations. If staff are available, the government may be able to provide personnel to certify as SSM for support.

Each site must have an SSM designated in Security Online. All VOs are considered SSMs unless otherwise specified in the PWS.

11.
During a local or national emergency, administrative closure, pandemic, utility outage, or similar event, will the Government designate alternate Government-controlled facilities for continued ICO operations when the primary site is unavailable? If yes, please clarify whether offerors should assume RAPIDS/DEERS equipment, network access, card stock control, physical security, and SSM/VO permissions will be made available at those alternate facilities by the Government
If available, the Government may provide alternate facilities for continued ICO operations when the primary site is unavailable.

If operations are temporarily relocated to an alternate facility, the Government will ensure that SSMs and VOs have access to the required RAPIDS/DEERS equipment, network connectivity, card stock control, physical security measures, and all necessary SSM/VO permissions at that location.

12.
PWS 1.13 states that the Contractor is not permitted to telework/work from home, while the Mission-Essential Contractor Services Plan requirement asks offerors to address personnel capable of relocating to alternate facilities or performing work from home during an extended event.

Please confirm that any work-from-home planning should be limited to Government-authorized administrative, management, coordination, reporting, and employee accountability activities, and that DEERS/RAPIDS production work, CAC/USID issuance, card stock handling, and PII-sensitive processing must occur only at authorized Government facilities/systems unless otherwise directed by the Government.

Reference PWS para 1.13. Place of Performance and response to question #11.

13.
PWS 1.15.1 states that security requirements are stated in “Technical Exhibit 67.” The solicitation attachment list identifies Technical Exhibit 7 as the DD Form 254/Contract Security Classification Specification.

Please confirm whether the intended reference is Technical Exhibit 7, or another exhibit, so offerors can align the security approach and compliance matrix to the correct attachment DD254 is included at Technical Exhibit 7.

14.
The PWS requires CAC registration documentation within three business days of hire/replacement, CAC prior to full performance, and replacement of terminated/released personnel within ten (10) workdays.

Please confirm how the Government will treat replacement timelines when Government-dependent actions such as CAC issuance, favorable background processing, RAPIDS access, Security Online role assignment, training availability, or Government certification approval extend beyond the contractor’s control The Government acknowledges that certain onboarding and replacement activities, such as CAC issuance, background investigations, RAPIDS access, Security Online role assignments, training availability, and Government certification approvals are Government‑dependent actions. When delays occur due to factors outside the contractor’s control, the Contracting Officer Representative (COR) will coordinate with the contractor to address the situation. Replacement timelines will be applied reasonably, consistent with the circumstances and the contractor’s demonstrated efforts to comply.

15.
The solicitation includes travel CLINs/NTE amounts and PWS 1.21 allows PM/APM site visits, including in-person or virtual visits, but travel is not authorized during phase-in.

Please confirm the anticipated post-phase-in travel purposes under the travel CLINs, including whether travel may be used for PM/APM site visits, emergency backfill, training/certification support, or mission-essential continuity support.

Travel is only authorized for PM/RM site visits.

Travel is not authorized for emergency backfill, training/certification support, or mission-essential continuity support.

16.
The PWS states “.. the contractor is responsible for providing services at all thirty- two (32) ICOs during the Hours of Operation as detailed in Technical Exhibit 3, Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.”

With all sites having to be operational as specified in TE 3, does the Government allow the contractor to have fully qualified replacement personnel through CAC and training as back up personnel or can times be made up if a site had to be closed?

While a replacement is being hired, if no backup is immediately available, the PM may coordinate with the COR to approve a temporary site closure. Alternatively, the PM may approve utilizing personnel from a site with 2 FTEs as temporary backup coverage.

17.
The proposal instructions require offerors to describe how personnel will possess and maintain RAPIDS certifications required by Technical Exhibit 6, while the evaluation language references RAPIDS certifications required by Technical Exhibit 5.

Please confirm that Technical Exhibit 6 is the controlling exhibit for RAPIDS certification/training requirements and whether the evaluation reference to Technical Exhibit 5 should be corrected.

The RAPIDS Training Certification is provided at Technical Exhibit 6. See solicitation for changes.

18.
For the Mission-Essential Contractor Services Plan, should offerors assume continuity of operations at full site hours and full FTE levels for up to 30 days, or may offerors propose a prioritized/tiered continuity approach based on Government site status, customer demand, public health restrictions, RAPIDS/DEERS system availability, and Government direction during the crisis?
Offerors Mission Essential Services Plan shall be IAW DFARS 252.237-7023.
19.
Volume III requires documentation for relevant past performance but does not expressly state whether subcontractor/team member past performance may be submitted.

Please confirm whether offerors may submit relevant past performance from proposed subcontractors/team members, and whether those references will be evaluated as part of the offeror/team’s past performance Yes, any subcontractors that will perform major or critical aspects of the requirement when it is relevant to the instant acquisition will be considered.

20.
TE 5 column E lists all positions as Exempt. TE 3 column lists all but the PM and APM as Personnel Assistant (Employment) II, which is a Wage Determination Title. TE 8 provides a listing of all of the location Wage Determinations. The Personnel Assistant (Employment) II positions cannot be Exempt and on the Wage Determination.

Can the Government confirm that except for the PM and APM that all other positions are Wage Determined and Non-Exempt Historically, the PM/APM have been exempt positions. The Offeror shall make the determination of exempt or non-exempt based on their staffing solution.

21.
Technical Exhibit 6 lists RAPIDS certification courses for desktop and deployable workstations and notes that workstation-specific courses are based on the user’s assignment in Security Online.

Please confirm whether every VO/CAC Operator must complete both desktop and deployable workstation training/certification, or only the certification path tied to the workstation/site type to which the user is assigned.

The VO/CAC Operator must only complete the certification path tied to the workstation/site type to which the user is assigned (desktop or deployable workstation training/certification).

22.
Can you please provide a list of current incumbents with longevity subject to SCA for pricing considerations. This is necessary to assess applicable fringe entitlements (e.g. PTO)

A list of employees will be provided to the awardee after award to determine employee eligibility for vacation or other fringe benefits based upon length of service IAW FAR 52.222-41(n).

23.
PWS, p.13 states “Key Personnel shall be onboard during the entire 30 day phase in period”. And, 1.20.3 states that the PM/APM are required to be “present during the entirety of phase in”. Please confirm that this applies to the current incumbent PM/APM, billable on the incumbent Task Order, and other biddors are proposing their KPs accordingly for the awarded period of performance (POP)
All Offerors shall propose all key personnel on board for the full 30 day phase-in.
24.
Technical_Exhibit_1: In accordance with PRS #10, the Government's expectation is for full coverage of every site with a 90% or higher utilization (on-site) requirement. To achieve this, offerors will need to propose at least 2,000 billable hours (2,080 hours - 80 PTO hours offsite) per FTE as opposed to 1,920 hours. Can the Government please consider revising the pricing spreadsheet to show 2,000 hrs to be consistent with this requirement to ensure all expected hours are priced?, otherwise bids with LOE stated below the coverage requirement would be anticipated
Offerors are responsible for proposing the appropriate level of effort to meet the performance requirements identified in the PWS. Offerors should propose the number of hours per FTE necessary to satisfy these requirements, consistent with their staffing approach and any applicable leave or PTO assumptions.
25
Technical_Exhibit_1: Page 4 provides a definition of when a vacancy is considered filled. The last sentence states "Onboarding is completed once a Contractor is eligible for a CAC issuance." However, that process and timeline are out of the contractor's control. Can the Government please revise this definition to remove the last sentence?

Reference Technical Exhibit 1 Performance Requirements Summary for changes.

26
Technical Exhibit 3-5: Exhibit 5, column C states "Exempt" for all positions. However, the Verifying Officials have an SCA WD title listed in column F. Please confirm column C for the Verifying Officials should state SCA (Non-Exempt
Reference response to question #20.
27
Solicitation 6.3: Past Performance requirements states "...must provide documentation for a minimum of three (3) years relevant work experience...". This requirement appears to be overly restrictive and advantageous to the incumbent contractor. Offerors providing the same or similar work for a period of 1-2 years would be unable to reference this relevant work in light of this restrictive requirement.
The requirement in in the solicitation for Past Performance for offerors to provide documentation demonstrating a minimum of three (3) years of relevant work experience is intentional and not considered unduly restrictive. The Government may establish recency and relevance thresholds to ensure offerors have demonstrated experience performing work of similar size, scope and complexity.
28
Attachment 1_PWS: Paragraph 1.4 states "the contractor to have at least one (1) individual that is considered the SSM at each of the thirty-two (32) locations..." The following sentence states "all personnel under this contract shall be considered as VOs." Can the Government further clarify the expectation
All personnel are VOs and certify to become SSMs, unless specified otherwise, to meet the SSM requirement.

For 1 FTE, part-time/0.5 FTE locations.

For 2 FTE locations, the VOs certify to become SSMs.

The PM/RM can be dual hatted as SSM for FT Bragg/FT Knox

29
Can the Exhibit 3 be updated to identify SSM versus VO positions to ensure clarity and consistent proposals amongst all Offerors
Reference Technical Exhibit 5.
30
Attachment 1_PWS: Paragraph 1.5 states a Base plus four Option Years. However, Attachment 2_Pricing Schedule is for a Base plus two Options Years. Can the Government please clarify?

This requirement is for a base plus two (2) option years. See Attachment 1_Performance Work Statement (PWS) for changes.

31
Technical_Exhibit_2-Deliverables: CACMAT Assessment Reports are listed as a required deliverable with a reference to PWS 5.5.3. However, there is no 5.5.3 in the PWS nor does the PWS reference any CACMAT inspection requirements. Can the Government please clarify this deliverable
See Attachment 1_Performance Work Statement (PWS) for changes.
32
1.11.3 of PWS it states that the Regional Manager needs Site Security Manager experience and knowledge of the CACMAT position this person needs to be SSM trained. In TE5 it lists this position as a Verifying Official only, not an SSM.

5.3 It lists Customer service handouts that the contractor shall develop.

1. Who is responsible for the cost of these handouts?

1. Is there a standard format for these handouts.

1. Is there a minimum number of handouts to be made for each locations?

The RM will certify as an SSM. See Attachment 1_Performance Work Statement (PWS) for changes.

The PM will provide handout comment cards, other info/signs for personnel to print. The Government will provide access to printers to print handouts.

No minimum number of handouts required. It will vary at each site. As long as the handouts are available and stocked for the customers.

33
What is the purpose of these handouts as each location is already provided on the RAPIDS online locator provided by DMDC along with all of this information,

The purpose is to inform customers of required documents customers need to have with them in order to obtain a CAC. Not all customers read all requirements from the RAPIDS online site. The handouts/sign shall also include hours of operation, directions and the phone number to the facility. Most locations are secured and customers may have to call the CAC office for access.

34
Can the Government please clarify if a single cover sheet is required for the overall submission package (as a standalone document/file), or is a cover sheet required for each volume (I, II, and III) individually?

A single cover sheet will suffice.

35
Can the Government confirm that the parenthetical reference to “italic and bold” indicates that these variations are permissible formatting options (e.g., for emphasis or headers), rather than a requirement that the entire proposal be submitted in bold and/or italic font throughout?

Correct italic and bold are permissible throughout, however should not be used for the entirety of the proposal submission. The submission should be ariel 12 font.

36
Can the Government please confirm whether the correct PWS reference in Section 6.1.3(a) should be PWS paragraph 1.26.1 (Phase-In/Phase-Out Periods) rather than PWS Part 1.21.1 (Contractor Travel Requirements)?

The numbering has been corrected. See Attachment 1_Performance Work Statement (PWS) for changes.

37
Reference: Solicitation W9124726RA010, Page 55/64, Section 6.2.1. “The price submission should be clearly marked "Volume II, Price, W91247-26-R-A010…”

Can the Government please confirm whether this file naming convention is applicable to all volumes/what naming convention is required?

Yes, it is applicable to all volumes.

38
Is there an incumbent currently performing this work? If so, please provide the name of the contractor and the contract number.

Reference response to question #2.

39
What is the estimated period of performance start date?

The Period of Performance (POP) is anticipated to begin phase-in on 06 July 2026. Reference solicitation for complete POP dates.

40
Will the government be providing all equipment necessary, to include computers, workstations, etc. for contractor personnel to accomplish these tasks?

Yes.

41
Can the government please provide all updates in red or a highlighted font within the amended solicitation to clearly demonstrate the exact changes made?

All changes will be clearly identified.

42
Can the government please ensure that all questions provided to the government are responded to? We understand that some may appear to be duplicates between vendors, however this ensures all questions are accounted for.
The Government will review and respond to all submitted questions. While some questions may be similar or duplicative across offerors, each submission will be accounted for, and responses will be consolidated where appropriate to ensure consistency and fairness. All answers will be released to all offerors through the same public posting to maintain equal access to information.
43
Can the government please confirm that all settings within the government's PDF Reader will not automatically create links from URLs? Adobe Acrobat and Reader are programmed with default settings with “Preferences” to convert non-hyperlinked text, such as emails and links, into hyperlinks. As this is a setting for each individual's Adobe account, offerors should not be liable for automatic URL creations.
Offerors will not be held liable for hyperlinks automatically generated by a viewer’s local software settings.
44
In order to best reference in our proposal response, can the government please confirm the official contract title for this procurement.
USARC DEERS Support Services
45
Block 8 of the SF 1449 and the proposal instructions both state that proposals are due by 4:00 PM EST on 05 June 2026. However, the SAM.gov posting for this solicitation lists the response deadline as 3:00 PM. Can the Contracting Officer please confirm the correct offer due date and time?
Reference response to question #1.
46
How many RAPIDS workstations is the contractor required to man/operate at each facility?

Each contractor operates one (1) workstation, but they have all access to all stations assigned to USARC at their site. Although, most sites are run by one contractor/one workstation, some sites may have two contractors/2 workstations and or one workstation for 2 contractors.

47
If the contractor is required to operate more than one (1), is the contractor required to operate all the workstations for the full duration of the hours of operation?

Each contractor operates one (1) workstation at a time and is required to operate at their workstations for the full duration of the hours of operation.

48
What type of ID card policy(s) are Verifying Officers (VO) tested on?

Verifying Officers (VO) complete two (2) hours of online training on basic ID card policies, followed by a multiple-choice test. This online training educates operators on how to correctly navigate the Defense Enrollment Eligibility Reporting System (DEERS) and issue Uniformed Services Identification (USID) cards and Common Access Cards (CAC) in accordance with DoD regulations, such as DoDI 1000.13 and other policies and regulations.

49
Does the government provide at least one (1) Site Security Manager (SSM) for each location? If not, does the government expect the contractor to provide two (2) SSMs
Yes. ideally, the Government will provide 1–2 SSMs. However, due to high turnover, there may be times when gaps occur and no Government personnel are available to fill these roles. For sites with two contractors, both individuals serve as SSMs to ensure continuous coverage (note that the FTEs specified in Technical Exhibit (TE) 3 represent the minimum FTES allowed per site). (required staffing level for every single site)
50
Does the government allow lunch breaks? If “yes,” for how long? Does the Government expect operations to continue uninterrupted during the entire period of “HOURS OF OPERATION?”
Yes, contractor personnel are required to take lunch breaks IAW standard labor practices.
51
Do Verifying Officers (VO) work independently
Yes, but contractor personnel are supervised by the PM located at USARC HQs, FT Bragg, NC. Additionally, each site has a Government Facility Manager, and contractors must adhere to local building policies and regulations. A local Government point of contact will also be available at each site to assist with local support and/or equipment/supplies.
52
Under Hours of Operation, the government utilizes “T” can the government confirm T is for Tuesday and not Thursday?

T represents Tuesday and TH represents Thursday.

53
The Government provides Site IDs, but does not indicate how many RAPIDS workstations are to be manned by contractor personnel at each site?

Each site has at least one RAPIDS workstation, with some locations having two. Some sites with one workstation may be shared by a full-time and a part-time contractor. Contractors must man the workstations assigned to their site.

Amended TE 3 will be updated to specify the number of workstations at each site.

54
How many RAPIDS workstations are to be manned by contractor personnel at each site?

Reference response to question #53.

55
Does the Government classify Defense Enrollment and Eligibility Reporting System (DEERS) as a personnel record system?

Yes, DEERS is the database that determines eligibility for military benefits and personnel data.

56
Does the Government expect contractor personnel (SSMs and VOs) to understand and make benefit eligibility decisions?

No. The Government does not expect contractor personnel to make benefit‑eligibility decisions. Their responsibilities are limited to verifying identity, processing transactions in accordance with RAPIDS/DEERS procedures, and following established documentation and system requirements. All benefit eligibility determinations remain the responsibility of authorized Government personnel or the appropriate Government systems.

57
Wage Determination Code - Personnel Assistant (Employment) II is listed for every category yet, the PWS lists SSM and VO labor categories. Is the PAII labor category accurate?
Reference response to question #6.
58
Personnel Assistant II and Personnel Assistant III labor categories are listed as historically used yet the Exhibit 5 only reflects PA II. Can the government further clarify this and where the PA III is used?
See Technical Exhibit 5 for changes.
59
Are these labor categories on the current active contract
Yes.
60
Is the government going to evaluate vendors’ labor categories selection?
The Offeror must show proposed labor categories in their staffing approach IAW solicitation Addendum to 52.212-2 Evaluation Commercial Items, 1.1(c).
61
In order to effectively respond to the solicitation, can the government please provide a one-week extension once the Q/As are posted?

Reference response to question #45.

62
Please confirm whether both the PM and APM must be physically located full-time at USARC Marshall Hall, Fort Bragg, NC, or whether one position may support remotely when the other is physically present onsite.
No remote work is authorized. The PM shall be located at Fort Bragg, NC and the RM shall be located at Fort Knox, KY IAW the PWS.
63
The solicitation includes Technical Exhibit 7, DD Form 254, and identifies a Secret facility clearance requirement with no safeguarding at the contractor facility. Please confirm whether offerors must possess an active Secret Facility Clearance at the time of proposal submission, at time of award, or prior to commencement of performance. If the apparent successful offeror does not currently possess the required FCL, will the Government sponsor the offeror for the required non-possessing Secret FCL after award.
The Offeror must possess the required FCL prior to commencement of performance. If the apparent successful offeror does not currently possess the required Facility Clearance (FCL), the Government may sponsor the contractor for the necessary clearance following award, in accordance with NISPOM requirements. Sponsorship may only occur after award and does not guarantee approval.
64
Please confirm that the $25,000 travel amount for each travel CLIN is a not-to-exceed amount for the applicable performance period and that virtual site visits may be used as part of the contractor’s quality control and oversight approach when appropriate, unless the COR approves or directs in-person travel.

Yes.

65
On lines 13 and 14, the WD number provided (2015-2017) is not found on SAMS.gov for Arlington Hts and Forest Park Homewood, IL. However WD 2015-5017 contains the counties of Du Page and Cook Counties for Arlington Hts and Forest Park Homewood, IL.

Would the Government update the WD number for Arlington Hts, IL and Forest Park Homewood, IL with WD 2015-5017.

The Wage Determination has been updated. See Technical Exhibit 8 for changes.

66
TE 3,4, and 8 List Moon Township, PA.

TE 5 lists Coraopolis, PA. TE 5 does not list Moon Township.

Are Moon Township, PA and Coraopolis, PA the same site location? Will the Government please clarify.

Moon Township, PA and Coraopolis, PA use the same address zip code. For GPS travel purposes utilize Moon Township for correct site bldg.

Reference TE 3: Site #-32, Site Name-McGarity Reserve Center, 99 Soldiers Lane ,Moon Township, PA, 101589

67.
TE 5 sets 1,920 net productive hours per full-time FTE. A standard SCA leave package of 88 holiday, 80 vacation, and 56 sick-leave hours totals 224 non-productive hours, yielding 1,856 net productive hours.

Please confirm whether Offerors shall plan on 1,920 or 1,856 net productive hours per FTE.

Reference response to question #24.

DEERS SUPPORT SERVICES

JACQUES SARAH K CIV USARMY ACC MICC (USA)

image1.png