Technical_Exhibit_1_-_Performance_Requirements_Summanry_(PRS).pdf

PDF 102 KB Posted

Attached to
DEERS CAC Card Support Services - W91247-19-R-9006 Federal contract opportunity
Solicitation number
W91247-19-R-9006
Issued by
Defense Contract Management Agency

About this file

Technical Exhibit 1 - Performance Requirements Summary (PRS)

View the file

Other files for this federal contract opportunity

Other files attached to DEERS CAC Card Support Services - W91247-19-R-9006, newest first.
File Type Posted
Attachment_1_-_PWS_(Amend_3)_DEERS_CAC_Services,_22May2019.pdf PDF
W91247-19-R-9006,_(Amedment_3)_DEERS_Support_Services,_22May2019.pdf PDF
W91247-19-R-9006_(Conformed_Copy,_Amend_3)_DEERS_Support_Services,_22May2019.pdf PDF
QA_(REV_3)_DEERS_Support_Services_10_May_2019.pdf PDF
Technical_Exhibit_2_(Amend_2)_Deliverables_Schedule.pdf PDF
Technical_Exhibit_1_(Amend_2)_Performance_Requirements_Summanry_(PRS).pdf PDF
Technical_Exhibit_3_(Amend_2)_CAC_Office_Locations_and_Hours.pdf PDF
Technical_Exhibit_8_(Amend_2)_RAPIDS_7_User_Guid.pdf PDF
W91247-19-R-9006,_(Amendment_2)_DEERS_Support_Services,_10May19.pdf PDF
Attachment_1_-_PWS_(Amend_2)_DEERS_CAC_Services,_10May2019.pdf PDF
W91247-19-R-9006_(Amend_2,_Conformed_Copy)_USARC_DEERS_Services,_10May2019.pdf PDF
Attachment_3,_Pricing_Schedule,_DEERS_Support_Services,_10May2019.xlsx XLSX spreadsheet
Technical_Exhibit_6_(Amend_2)_DD_254_Security_Classification.pdf PDF
Technical_Exhibit_9_(Amend_2)_AFI_36-3026_IP_2017.pdf PDF
Attachment_2__-_Wage_Determinations_(Amend_2)_30_Locations,_10May2019.docx DOCX document
Technical_Exhibit_4__(Amend_2)_RAPIDS_Training_Matrix.pdf PDF
W91247-19-R-9006,_USARC_DEERS_Support_Services,_29MAR2019.pdf PDF
Technical_Exhibit_7_-_Historical_Workload_Data.pdf PDF
Attachment_1_-_PWS,_DEERS_CAC_Services,_28Mar2019.pdf PDF
Attachment_2__-_Wage_Determinations,_30_Locations,_29Mar2019.pdf PDF
Technical_Exhibit_3_-_CAC_Office_Locations_and_Hours.pdf PDF
Technical_Exhibit_4_-_RAPIDS_Training_Matrix.pdf PDF
Technical_Exhibit_6_-_DD_254_Security_Classification.pdf PDF
Technical_Exhibit_5_-_Sample_Weekly_CAC_Report.pdf PDF
Technical_Exhibit_2_-_Deliverables_Schedule.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The standard should relate to timeliness, quality, or quantity (metrics) of service required by the Contractor is stated in the PWS verbiage. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Required Services

Performance Standard Acceptable Quality Level

(AQL)

Incentive (Positive and/or Negative)

ID and CAC administrative support services.

The Contractor shall provide services IAW

PWS 5.1.

Quality: No more than four

(4) customer complaints per month per location.

Timeliness: 85% completed within 15 minutes from time customer arrives at workstation.

Trends of less than acceptable performance and not re-performed by contractor could result in a negative CPARS rating.

Input & Maintain Records in DEERS/RAPIDS System.

The Contractor shall provide services IAW

PWS 5.2.

Quality: 95% Accepted without changes.

Timeliness: 100% completed before end of business day.

Trends of less than acceptable performance and not re-performed by contractor could result in a negative CPARS rating.

Develop Customer Service Handouts

The Contractor shall provide services IAW

PWS 5.3.

Quality: 95% Accepted without changes.

Timeliness: Updated Semiannually as needed

Trends of less than acceptable performance and not re-performed by contractor could result in a negative CPARS rating.

Provide Recommendation for Process Improvement

The Contractor shall provide services IAW

PWS 5.4.

Quality: Recommendation provides for a 95% Solution.

Timeliness: 30 work days after weakness is identified.

Trends of less than acceptable performance and not re-performed by contractor could result in a negative CPARS rating.

Develop Site Roster of Key POCs

The Contractor shall provide services IAW

PWS 5.5.

Timeliness: COR within five (5) working days of Contract Award and updated semi-annually as needed.

Trends of less than acceptable performance and not re-performed by contractor could result in a negative CPARS rating.

Provide Weekly Reports The Contractor shall provide services IAW

PWS 5.9.1.

Referenced in TE 5

Timeliness: On a weekly basis, every Friday COB

4:30 PM.

Trends of less than acceptable performance and not re-performed by contractor could result in a negative CPARS rating.

Maintain Site Management Manual

The Contractor shall provide services IAW

PWS 5.9.3.

Referenced in TE 2

Quality: 95% Accepted without changes.

Timeliness: After the first three (3) months of Contract performance and updated quarterly thereafter.

Trends of less than acceptable performance and not re-performed by contractor could result in a negative CPARS rating.

Conduct Quality Control

(QC).

The Contractor shall provide services IAW

PWS 5.11.

Quality: 100% Compliance

Timeliness: Perform a minimum of one site visit to each of the 30 locations annually.

Trends of less than acceptable performance and not re-performed by contractor could result in a negative CPARS rating.

Contractor Management Report (CMR)

The Contractor shall provide services IAW

PWS 5.12.

Quality: 100% Compliance

Timeliness: Reported by 31 October of each calendar year.

Trends of less than acceptable performance and not re-performed by contractor could result in a negative CPARS rating.

File details come from the government source that posted it.