W9123822R0015 AMENDMENT 0002.pdf
PDF 156 KB Posted
- Attached to
- Flight Test Apron Hill Air Force Base Federal contract opportunity
- Solicitation number
- W9123822R0015
About this file
This amendment modifies a solicitation for flight test apron reconstruction services at Hill Air Force Base. The contractor will replace Portland cement concrete slabs and reconstruct base materials in sections of the airfield apron, demolishing existing slabs and drainage features. Anchored aircraft tie-downs, underdrain piping, stormwater structures, grounding points and pavement markings will also be installed. The amendment extends the period of performance for option items to 18 months, increases the quantity of unsuitable soil replacement, and changes the response deadline to March 10, 2022. The Department of the Army Corps of Engineers Engineering District Sacramento issued the solicitation for the design-bid-build project adhering to DoD and Air Force facility criteria.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Cut Sheet 2381 AM0002 2022-03-07.pdf | ||
| Cut Sheet 180-25-0982C-121-C-121.pdf | ||
| Cut Sheet 180-25-0982C-122-C-122.pdf | ||
| Revised Attachment 3 Supplemental Contract Requirements 4 March 2022 .pdf | ||
| Revised Attachment 4 UT20220091 Feb 25 2022.pdf | ||
| W9123822R0015 AMENDMENT 0001.pdf | ||
| B07 W9123822R0015 Sign In Roster Site Walk.pdf | ||
| W9123822R0015 Flight Apron Repairs v2.pdf | ||
| Attachment 6 Flight Apron Site Walk.pdf | ||
| Attachment 2 Test Apron Drawings.pdf | ||
| Attachment 1 Specifications.pdf | ||
| Attachment 8 Project Information Form.pdf | ||
| Attachment 5 Pre Award Survey.pdf | ||
| Attachment 7_Utah Resident Office Map.pdf | ||
| Attachment 9 Past Performance Questionnaire.pdf | ||
| Attachment 4 DBW Rates.pdf | ||
| Attachment 3 Supplemental Contract Requirements.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment 0002 is to 1.Add cut sheet 2381 AM0002 dated 7 March 2022. This cut sheet updated the follow ing:
a) Section 01 33 00, Paragraph 1.10.4 language updated.
b) Section 32 13 14.13, Paragraphs 1.4.6.1 & 2.2.1 language updated.
2. Add/incorporate draw ing cut sheets 180-25-0982C-121-C-121 and 180-25-0982C-122 C-122.
3.Update CLIN 1001 Un-suitable Soil from 432 CY to 1543 CY 4.Update verbiage in option CLIN extended description from 365 days to 18 months
5. Change the proposal submission date from 09 March 2022 to 10 March 2022 **Information contained in cut sheets supersedes the previously submitted versions.**
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Mar-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123822R0015
X 9B. DATED (SEE ITEM 11)
03-Feb-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Mar-2022
CODE
US ARMY CORPS OF ENGINEERS, SACRAMENTO
CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123822R0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 09-Mar-2022 01:00 PM to 10-Mar-2022 01:00 PM.
CLIN 1001
The CLIN extended description has changed from:
Unsuitable Soil Replacement*To be exercised within 365 days of NTP*
To:
Unsuitable Soil Replacement*To be exercised within 18 Months of NTP* The pricing detail quantity has increased by 1,111.00 from 432.00 to 1,543.00.
CLIN 1002
Aircraft Towing Temporary Work estimated 12,511ft*To be exercised within 365 days of NTP*
Aircraft Towing Temporary Work estimated 12,511ft*To be exercised within 18 Months of NTP*
CLIN 1003
Asbestos/LBP removal shall be accomplished by a certified asbestos/LBP removal contractor. Offerors should assume that asbestos pipe that would be removed has 12 inch diameter.*To be exercised within 365 days of NTP*
Asbestos/LBP removal shall be accomplished by a certified asbestos/LBP removal contractor. Offerors should assume that asbestos pipe that would be removed has 12 inch diameter.*To be exercised within 18 Months of NTP*
The following Delivery Schedule item for CLIN 1001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
W9123822R0015
18 mths. ANP 432 UTAH RESIDENT OFFICE
DOUGLAS WESEMANN, P.E.
7227 6TH STREET BUILDING 366
HILL AFB UT 84056-5214
(801) 586-3296 FOB: Destination
W91238
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
18 mths. ANP 1,543 UTAH RESIDENT OFFICE
DOUGLAS WESEMANN, P.E.
7227 6TH STREET BUILDING 366
HILL AFB UT 84056-5214
(801) 586-3296 FOB: Destination
W91238
(End of Summary of Changes)
File details come from the government source that posted it. Updated .