Cut Sheet 180-25-0982C-122-C-122.pdf
PDF 381 KB Posted
- Attached to
- Flight Test Apron Hill Air Force Base Federal contract opportunity
- Solicitation number
- W9123822R0015
About this file
This document includes a solicitation and project description for a federal contract opportunity. The U.S. Army Corps of Engineers is seeking to replace sections of the existing Portland cement concrete apron and reconstruct structural base materials at Hill Air Force Base in Utah. The selected contractor will demolish existing concrete slabs and drainage swales, install a coarse aggregate base and drainage layer, provide new anchored tie-downs and pavement markings, and replace existing aircraft sunshade structures. The work must be designed and constructed in accordance with DoD and Air Force facility criteria. This will be a design-bid-build contract for the replacement and repair of flight test apron facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Cut Sheet 180-25-0982C-121-C-121.pdf | ||
| Cut Sheet 2381 AM0002 2022-03-07.pdf | ||
| W9123822R0015 AMENDMENT 0002.pdf | ||
| Revised Attachment 3 Supplemental Contract Requirements 4 March 2022 .pdf | ||
| Revised Attachment 4 UT20220091 Feb 25 2022.pdf | ||
| W9123822R0015 AMENDMENT 0001.pdf | ||
| B07 W9123822R0015 Sign In Roster Site Walk.pdf | ||
| Attachment 7_Utah Resident Office Map.pdf | ||
| Attachment 9 Past Performance Questionnaire.pdf | ||
| Attachment 4 DBW Rates.pdf | ||
| W9123822R0015 Flight Apron Repairs v2.pdf | ||
| Attachment 6 Flight Apron Site Walk.pdf | ||
| Attachment 2 Test Apron Drawings.pdf | ||
| Attachment 1 Specifications.pdf | ||
| Attachment 8 Project Information Form.pdf | ||
| Attachment 5 Pre Award Survey.pdf | ||
| Attachment 3 Supplemental Contract Requirements.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C-130J-30 HerculesC-130J-30 Hercules
C-130J-30 HerculesC-130J-30 Hercules
C-130J-30 Hercules C-130J-30 Hercules
C-130J-30 Hercules
C-130J-30 Hercules
PHASE 1 CONSTRUCTION AREA
HANGAR 204
HANGAR 206
HANGAR 233
HANGAR 220
BUILDING
PHASE 1
CONSTRUCTION
AREA
STAGING
AREA
BUILDING 1A
JET BLAST DEFLECTORS
HANGAR 10-206
STAGING AREA
10'
153'
77' 77'
77'
77'PHASE 1ACONSTRUCTION
AREA
NORTH
APRON
C-122
PH
AS
E
PH
AS
IN
G
P
LA
N
K.
F
IS
C
H
ER
K.
F
IS
C
H
ER
R . C
O N
N
M . H
AY
N
ES
R
EV
IS
ED
P H
AS
IN
G P
LA
N
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
XX
XX
XX
-X
X- X-
XX
XX
XX
XX
XX
-X
X- X-
XX
XX
O C
TO
BE
R
SA
C
R
AM
EN
TO
, C
AL
IF
O
R N
IA
SA
C R
AM
EN
TO
D
IS
TR
IC
T
SA
C
R
AM
EN
TO
, C A
J
S
TR
EE
T
IN
-H
O U
SE
D
ES
IG
N
KR
SM
P
B
C
AP
IT
AL
P
R O
JE
C
T
ID
: 1
R
EP
AI
R
F
LI
G H
T
TE
ST
A
PR
O
N B
P H
AS
E
B H
IL
L
AF
B, U
TA
H
AM-01
D R
AW
IN
G F
IL
E
N U
M
BE
R
0-
-0
SP
EC
N U
M
BE
R
N
GRAPHIC SCALE
PHASING PLAN LEGEND
CONCRETE REPLACEMENT AREA
CONTRACTOR STAGING AREA
LOW PROFILE BARRIERS
PHASING NOTES
1. WORK IN PHASE ONE INCLUDES, BUT IS NOT LIMITED TO, EXISTING PAVEMENT
DEMOLITION AND PAVEMENT INSTALLATION IN THE AREAS SHOWN ON THIS
SHEET, AS WELL AS THE SUBSURFACE DRAINAGE PIPES AND STRUCTURES IN
THOSE AREAS.
2. C-130 AIRCRAFT ARE EXPECTED TO ARRIVE TO AND DEPART FROM HANGAR 225
APPROXIMATELY ONCE PER MONTH. BASE WILL PROVIDE THE CONTRACTOR
WITH ADVANCE. EXACT SCHEDULES SHALL BE CONFIRMED WITH THE
CONTRACTING OFFICER PRIOR TO COMMENCING CONCRETE WORK.
CONTRACTOR SHALL BE PROVIDED WITH A MINIMUM OF 30 DAYS PRIOR NOTICE
OF AIRCRAFT ENTERING CONSTRUCTION AREAS.
3. SEE SHEET C-121 FOR OVERALL PHASING NOTES.
4. WORK IN PHASE 1A SHALL NOT BEGIN UNTIL ALL WORK ASSOCIATED WITH THE
ADJACENT NORTH APRON~PHASE 1 AREA HAS BEEN COMPLETED, OR AS
DIRECTED BY THE COR.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 inch = 60 ft.
| Sheets and Views |
| C-122 |
File details come from the government source that posted it. Updated .