Bid Abstract.pdf
PDF 79 KB Posted
- Attached to
- Sacramento River East Levee (SREL) Contract 3
- Solicitation number
- W9123822B0002
About this file
This document provides bid abstracts for the Sacramento River East Levee Contract 3 opportunity. The opportunity will result in the award of a firm-fixed price construction contract valued between $25-100 million to construct approximately 2 miles of seepage cutoff walls along the Sacramento River East Levee within the Big Pocket area of Sacramento, California. The scope of work includes open trench soil-bentonite and slag cement-cement-bentonite cutoff walls, deep mix method cutoff walls, relocating and removing levee encroachments and Sump 70, and handling, importing, and disposing of soils. All work must be completed by December 2022 with levee reconstruction finished by September 2022. Three contractors submitted bids led by Forgen, Maloney Odin JV, and IGE with total prices of $41.89 million, $41.22 million, and $43.64 million, respectively. The solicitation will be conducted by the US Army Corps of Engineers, Sacramento District and proceed unrestricted using contractors pre-qualified under Solicitation W9123821S0021.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9123822B0002 - SREL Contract 3 – Bid Abstract
Forgen
CLIN 0001 $38,965,822.00
Option CLIN 1001 $11,500.00 Option CLIN 1002 $307,000.00 Option CLIN 1003 $2,606,205.00
GRAND TOTAL $41,890,527.00
Maloney Odin JV
CLIN 0001 $39,231,905.00
Option CLIN 1001 $49,000.00 Option CLIN 1002 $263,000.00 Option CLIN 1003 $1,678,218.00
GRAND TOTAL $41,222,123.00
IGE
CLIN 0001 $41,400,334.00
Option CLIN 1001 $51,079.00 Option CLIN 1002 $23,103.00 Option CLIN 1003 $2,161,618.00
GRAND TOTAL $43,636,134.00
File details come from the government source that posted it. Updated .