Amendment 0001 - Pricing Schedule.pdf
PDF 226 KB Posted
- Attached to
- Sacramento River East Levee (SREL) Contract 3
- Solicitation number
- W9123822B0002
About this file
This document contains a pricing schedule amendment for a federal construction contract to build cutoff walls and perform related work along a section of the Sacramento River East Levee in California. Key details include:
-
The pricing schedule amendment adds and modifies line items for a contract to construct approximately 10,460 linear feet of cutoff walls from station 1426+00 to 1530+60 to depths between -105 and -45 feet, utilizing soil-bentonite, slag cement-cement-bentonite, and deep mix method techniques. It also includes relocating and removing encroachments, removing and replacing a pumping plant, and excavating and disposing of soils.
-
The document outlines estimated quantities and unit prices for 37 line items covering tasks like mobilization, traffic control, wall construction methods, soil handling and placement, restoration, and archaeological work. It includes three optional line items covering cultural resource preservation, replacement of a pumping plant pipe, and additional cutoff wall construction from station 1424+20 to 1426+00.
-
Award will be made to the overall lowest bidder after adding the total prices for the base line items and all three optional line items. Completion is required by December 2022 with reconstruction by September 2022.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule - American River Common Features 2016 - Sacramento River East Levee, Contract 3 Amendment 0001 – November 19, 2021
CLIN 0001 – CUTOFF Wall to (-105' to -45') Stations: 1426+00 – 1530+60 (10,460')
Contract Line
Item No.
Item Description Estimated
Quantity Unit Unit Price Total Price
1.1 Mobilization and Demobilization 1 JOB $ $
1.2 Clearing and Grubbing 1 JOB $ $
1.3 Traffic Control 1 JOB $ $
1.4 Storm Water Pollution Control 1 JOB $ $
1.5 Vibration Monitoring 1 JOB $ $
1.6 Restore Ellsworth C. Zacharias Park 1 JOB $ $
1.7 Maintenance of Zacharias Park to April 15, 2023 1 JOB $ $
1.8 Not Used - - $ $
1.9 Not Used - - $ $
1.10 Remove and Dispose Encroachment – Stairway* 36 EA $ $
1.11 Remove and Dispose Encroachment – Elevated
Structure* Not Used 2 - EA - $ $
1.12 Remove, Store, and Reinstall Encroachment –
Elevated Structure* 1 EA $ $
1.13 Topsoil Stripping* 7,739 CY $ $
1.14 Remove and Dispose - Asphalt Concrete* 30 TN $ $
1.15 Remove and Dispose - Aggregate Base* 229
30 TN $ $
1.16 Remove Aggregate Surfacing* 22,303
22,997 SY $ $
1.17 Abandon Existing Piezometer* 2 EA $ $
1.18 Utility Inspect and Restore* 1 EA $ $
1.19 Utility Pole Remove and Dispose* 5 EA $ $
1.20 Abandon Utility* 1 EA $ $
1.21 Not Used - - $ $
1.22 Remove and Dispose Utility - Up to 4' Depth* 9 EA $ $
1.23 Remove and Dispose Utility - Greater than 4'
Depth* 3 EA $ $
1.24 Remove, Store, and Reinstall CLF Gate* 2 EA $ $
1.25 Remove, Store, and Reinstall Gate* 2 EA $ $
1.26 Not Used Controlled Levee Degrade 2,500 LF $ $
1.27 Levee Excavation (Levee Degrade and Cutoff
Trench) * 101,996 CY $ $
1.28 SB Cutoff Wall* 559,015 SF $ $
1.29 DMM Cutoff Wall* 282,304 SF $ $
1.30 SCCB Cutoff Wall* 84,700 SF $ $
1.31 Levee Embankment Fill * 103,571 CY $ $
1.32 Aggregate Base* 229 TN $ $
1.33 Aggregate Surface Course* 4,667
8,121
CY
TN $ $
1.34 Asphalt Concrete Paving* 34 TN $ $
1.35 Erosion Control Seeding* 8.73 AC $ $
1.36 Archaeological Testing* 4 EA $ $
1.37 Cultural Recovery Trench* 400 LF $ $
TOTAL
NOTE: AC is acre, CY is cubic yard, TN is ton, SF is square Foot, and SY is square yard.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.
Bold Italic font signifies revised or newly added information
OPTIONAL CLIN 1001 – Cultural Resources Preservation Cap
Item No.
1001.1 Cultural Resources Preservation Cap 1 JOB $ $
OPTIONAL CLIN 1002 – Sump 70 Pumping Plant Pipe Replacement
Item No.
1002.1 Sump 70 Pumping Plant Pipe Replacement 1 JOB $ $
OPTIONAL CLIN 1003 – CUTOFF: DMM Wall to (98’) Stations: 1424+20 – 1426+00 (180')
Contract Line
Item No.
1007.1
1003.1 Mobilization and Demobilization 1 JOB $ $
1007.2
1003.2 Clearing and Grubbing 1 JOB $ $
1007.3
1003.3 Traffic Control 1 JOB $ $
1007.4
1003.4 Storm Water Pollution Control 1 JOB $ $
1007.5
1003.5 Vibration Monitoring 1 JOB $ $
1007.6
1003.6 Demolition at Sump 70 (STA 1425+50) 1 JOB $ $
1007.7
1003.7 Sump 70 (STA 1425+50) 1 JOB $ $
1007.8
1003.8 Remove and Dispose Encroachment – Stairway* 2 EA $ $
1007.9
1003.9 Topsoil Stripping* 158 CY $ $
1007.10
1003.10 Remove and Dispose - Aggregate Base* Not Used - TN - $ $ 1007.11
1003.11 Remove Aggregate Surfacing* 451 SY $ $
1007.12
1003.12 Abandon Existing Piezometer* 2 EA $ $
1007.13 1003.13
Levee Excavation (Levee Degrade and Cutoff Trench)* 1,533 CY
1007.14
1003.14 DMM Cutoff Wall* 18,540 SF $ $
1007.15
1003.15 Levee Embankment Fill* 1,651 CY $ $
1007.16
1003.16 Aggregate Surface Course* 80
CY
TN $ $
1007.17
1003.17 Erosion Control Seeding* .2 AC $ $
TOTAL
NOTE: AC is acre, CY is cubic yard, TN is ton, SF is square Foot, and SY is square yard.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.
Bold Italic font signifies revised or newly added information
Price Schedule Roll-up
Contract Line
Item No.
Item Description
Estimated Quantity Unit Unit Price
Total Price
CUTOFF Wall to (-105' to -45')
1 JOB
1001 Cultural Resource Preservation Cap 1 JOB
1002 Sump 70 Pumping Plant Pipe Replacement 1 JOB
1003 CUTOFF: DMM Wall to (98’) 1 JOB
TOTAL
Evaluation of Line Items: In order to be considered the low bid for this project, the Government will add the total price for all the options to the total price for the base line item 0001.
| CLIN 0001 – CUTOFF Wall to (-105' to -45') |
| OPTIONAL CLIN 1001 – Cultural Resources Preservation Cap |
| OPTIONAL CLIN 1002 – Sump 70 Pumping Plant Pipe Replacement |
| OPTIONAL CLIN 1003 – CUTOFF: DMM Wall to (98’) |
| Price Schedule Roll-up |
File details come from the government source that posted it. Updated .