Amendment 0001 - Changes Summary.pdf
PDF 88 KB Posted
- Attached to
- Sacramento River East Levee (SREL) Contract 3
- Solicitation number
- W9123822B0002
About this file
This document provides an amendment to a solicitation for construction services along the Sacramento River East Levee in California. The amendment revises specification sections, pricing schedules, and drawings for a firm-fixed price contract to construct approximately two miles of seepage cutoff walls including open trench soil-bentonite and slag cement-cement-bentonite cutoff walls as well as deep mix method cutoff walls. Additional work includes relocating and removing multiple levee encroachments, removing and replacing a city sump, and handling, importing, and disposing of soils with all work to be completed by December 2022. Bidders must be on the Pre-Qualified Sources List for included features of work or submit required qualification data to be considered for award from the U.S. Army Corps of Engineers, Engineering District Sacramento for this project with an estimated value between $25-100 million.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. W91238-22-B-0002 Spec No. 2380
1 of 1 AMD-01
AMERICAN RIVER COMMON FEATURES 2016
SACRAMENTO RIVER EAST LEVEE CONTRACT 3
SACRAMENTO, CALIFORNIA
AMENDMENT 01 - SUMMARY:
A) SPECIFICATION 2380
1) Revised Specification Sections 01 00 00, 01 22 00, 01 57 19, 31 00 00, 31 56 13.14, 31 56 13.32, 31 83 13, 32 15 00, 33 40 02, and 33 46 17.
2) Removed PPA from specification attachments.
3) Attachments and Reference documents updated with complete versions.
B) PRICING SCHEDULE
1) Pricing Schedule CLIN 0001, 1.11. Revised "Remove and Dispose
Encroachment – Elevated Structure*" to "Not Used". Revised
Estimated Quantity and Unit fields to a "-" for each.
2) Pricing Schedule CLIN 0001, 1.15. Revised “Remove and Dispose
- Aggregate Base*” quantity from 229 TN to 30 TN and CLIN 1.16
“Remove Aggregate Surfacing*” from 22,303 SY to 22,997 SY.
3) Pricing Schedule CLIN 0001, 1.26. The Contract Line Item has been revised from “Not Used” to “Controlled Levee Degrade” with a quantity of 2,500 LF.
4) Pricing Schedule CLIN 0001, 1.33. Revised “Aggregate Surface
Course*” quantity and measurement units from 4,467 CY to 8,121
TN.
5) Pricing Schedule OPTIONAL CLIN 1003. Revised Contract Line
Item No. numbering from 1007.X to 1003.X.
6) Pricing Schedule OPTIONAL CLIN 1003, 1003.10. Revised "Remove and Dispose Aggregate Base*" to "Not Used". Revised Unit field to a "-".
7) Pricing Schedule OPTIONAL CLIN 1003, 1003.16. Revised
“Aggregate Surface Course*” quantity and measurement units from
80 CY to 140 TN.
C) DRAWINGS
1) Revised Drawings: G-003, G-032, G-081, G-082, G-086, G-112, G-
114, C-610, and C-612.
File details come from the government source that posted it. Updated .