Attachment 6 - Pricing Schedule.pdf

PDF 209 KB Posted

Attached to
Sacramento River East Levee (SREL) Contract 3
Solicitation number
W9123822B0002
Issued by

About this file

This document contains a pricing schedule and related solicitation for the Sacramento River East Levee Contract 3 federal construction project. The scope of work includes constructing approximately 2 miles of various types of seepage cutoff walls along the levee and relocating multiple encroachments. The pricing schedule provides estimated quantities and unit pricing for line items such as mobilization, clearing, excavation, cutoff wall construction using soil-bentonite, slag cement-cement-bentonite, and deep mix methods, as well as embankment fill, paving, and seeding. It also includes optional line items for cultural preservation, replacing a pumping plant pipe, and additional cutoff wall construction. The related solicitation provides details such as the $25-50 million estimated value, 237990 NAICS code, construction completion by December 2022, and prequalification requirements.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Specification Attachments Part_1.pdf PDF
Amendment 0001 - Pricing Schedule.pdf PDF
Specification Attachments Part_3.pdf PDF
Specification Attachments Part_4.pdf PDF
Amendment 0001.pdf PDF
Specification Attachments Part_7.pdf PDF
Specification Attachments Part_5.pdf PDF
Amendment 0001 - QnAs.pdf PDF
Specification References Part_3.pdf PDF
Amendment 0001 - Wage Determinations CA20210007.29 Oct 21.pdf PDF
Specification References Part_1.pdf PDF
Amendment 0001 - Changes Summary.pdf PDF
Specification Attachments Part_2.pdf PDF
Specification Attachments Part_8.pdf PDF
Amendment 0001 - Revised Drawings.pdf PDF
Amendment 0001 - Revised Specifications.pdf PDF
Specification References Part_4.pdf PDF
Specification References Part_5.pdf PDF
Specification Attachments Part_6.pdf PDF
Specification References Part_2.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
SRELC3 Justification and Approval_Kleinfelder_22 Oct 21_Redacted.pdf PDF
Attachment 1B - Drawings.pdf PDF
Attachment 1A - Drawings.pdf PDF
Attachment 2 - Specifications.pdf PDF
Attachment 7 - Pre-Award Survey.pdf PDF
Solicitation W9123822B0002.pdf PDF
Attachment 5 - Wage Determination CA20210007 22 Oct 21.pdf PDF
Attachment 4 - Specification Reference Documents_Part2.pdf PDF
Attachment 3 - Specification Attachments_Part1.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Schedule - American River Common Features 2016 - Sacramento River East Levee, Contract 3

CLIN 0001 – CUTOFF Wall to (-105' to -45') Stations: 1426+00 – 1530+60 (10,460')

Contract Line

Item No.

Item Description Estimated

Quantity Unit Unit Price Total Price

1.1 Mobilization and Demobilization 1 JOB $ $

1.2 Clearing and Grubbing 1 JOB $ $

1.3 Traffic Control 1 JOB $ $

1.4 Storm Water Pollution Control 1 JOB $ $

1.5 Vibration Monitoring 1 JOB $ $

1.6 Restore Ellsworth C. Zacharias Park 1 JOB $ $

1.7 Maintenance of Zacharias Park to April 15, 2023 1 JOB $ $

1.8 Not Used - - $ $

1.9 Not Used - - $ $

1.10 Remove and Dispose Encroachment – Stairway* 36 EA $ $

1.11 Remove and Dispose Encroachment – Elevated

Structure* 2 EA $ $

1.12 Remove, Store, and Reinstall Encroachment –

Elevated Structure* 1 EA $ $

1.13 Topsoil Stripping* 7,739 CY $ $

1.14 Remove and Dispose - Asphalt Concrete* 30 TN $ $

1.15 Remove and Dispose - Aggregate Base* 229 TN $ $

1.16 Remove Aggregate Surfacing* 22,303 SY $ $

1.17 Abandon Existing Piezometer* 2 EA $ $

1.18 Utility Inspect and Restore* 1 EA $ $

1.19 Utility Pole Remove and Dispose* 5 EA $ $

1.20 Abandon Utility* 1 EA $ $

1.21 Not Used - - $ $

1.22 Remove and Dispose Utility - Up to 4' Depth* 9 EA $ $

1.23 Remove and Dispose Utility - Greater than 4'

Depth* 3 EA $ $

1.24 Remove, Store, and Reinstall CLF Gate* 2 EA $ $

1.25 Remove, Store, and Reinstall Gate* 2 EA $ $

1.26 Not Used - - $ $

1.27 Levee Excavation (Levee Degrade and Cutoff

Trench) * 101,996 CY $ $

1.28 SB Cutoff Wall* 559,015 SF $ $

1.29 DMM Cutoff Wall* 282,304 SF $ $

1.30 SCCB Cutoff Wall* 84,700 SF $ $

1.31 Levee Embankment Fill * 103,571 CY $ $

1.32 Aggregate Base* 229 TN $ $

1.33 Aggregate Surface Course* 4,667 CY $ $

1.34 Asphalt Concrete Paving* 34 TN $ $

1.35 Erosion Control Seeding* 8.73 AC $ $

1.36 Archaeological Testing* 4 EA $ $

1.37 Cultural Recovery Trench* 400 LF $ $

TOTAL

NOTE: AC is acre, CY is cubic yard, TN is ton, SF is square Foot, and SY is square yard.

*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.

Bold Italic font signifies revised or newly added information

OPTIONAL CLIN 1001 – Cultural Resources Preservation Cap

Item No.

1001.1 Cultural Resources Preservation Cap 1 JOB $ $

OPTIONAL CLIN 1002 – Sump 70 Pumping Plant Pipe Replacement

Item No.

1002.1 Sump 70 Pumping Plant Pipe Replacement 1 JOB $ $

OPTIONAL CLIN 1003 – CUTOFF: DMM Wall to (98’) Stations: 1424+20 – 1426+00 (180')

Contract Line

Item No.

1007.1 Mobilization and Demobilization 1 JOB $ $

1007.2 Clearing and Grubbing 1 JOB $ $

1007.3 Traffic Control 1 JOB $ $

1007.4 Storm Water Pollution Control 1 JOB $ $

1007.5 Vibration Monitoring 1 JOB $ $

1007.6 Demolition at Sump 70 (STA 1425+50) 1 JOB $ $

1007.7 Sump 70 (STA 1425+50) 1 JOB $ $

1007.8 Remove and Dispose Encroachment – Stairway* 2 EA $ $

1007.9 Topsoil Stripping* 158 CY $ $

1007.10 Remove and Dispose - Aggregate Base* TN $ $

1007.11 Remove Aggregate Surfacing* 451 SY $ $

1007.12 Abandon Existing Piezometer* 2 EA $ $

1007.13 Levee Excavation (Levee Degrade and Cutoff

Trench)* 1,533 CY $ $

1007.14 DMM Cutoff Wall* 18,540 SF $ $

1007.15 Levee Embankment Fill* 1,651 CY $ $

1007.16 Aggregate Surface Course* 80 CY $ $

1007.17 Erosion Control Seeding* .2 AC $ $

TOTAL $

NOTE: AC is acre, CY is cubic yard, TN is ton, SF is square Foot, and SY is square yard.

*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.

Bold Italic font signifies revised or newly added information

Price Schedule Roll-up

Contract Line

Item No.

0001 CUTOFF Wall to (-105' to -45')

1 JOB $ $

1001 Cultural Resource Preservation Cap 1 JOB $ $

1002 Sump 70 Pumping Plant Pipe Replacement 1 JOB $ $

1003 CUTOFF: DMM Wall to (98’) 1 JOB $ $

TOTAL $

Evaluation of Line Items: In order to be considered the low bid for this project, the Government will add the total price for all the options to the total price for the base line item 0001.

CLIN 0001 – CUTOFF Wall to (-105' to -45')
OPTIONAL CLIN 1001 – Cultural Resources Preservation Cap
OPTIONAL CLIN 1002 – Sump 70 Pumping Plant Pipe Replacement
OPTIONAL CLIN 1003 – CUTOFF: DMM Wall to (98’)
CUTOFF Wall to (-105' to -45')