This document provides details for a federal construction contract opportunity issued by the Department of the Army Corps of Engineers Engineering District Sacramento. The solicitation seeks bids for the Sacramento River East Levee Contract 3 Project, which involves constructing approximately 2 miles of seepage cutoff walls along the levee through methods including open trench soil-bentonite, slag cement-cement-bentonite, and deep mix cutoff walls. The scope also requires relocating and removing levee encroachments, replacing City of Sacramento Sump 70, and handling, importing, and disposing of soils. All work must be completed by December 2022 with levee reconstruction finished by 30 September 2022. The estimated contract value is between $25-100 million. Bids are open unrestricted but contractors must be on the Pre-Qualified Sources List. The solicitation will proceed under NAICS code 237990 with a size standard of $39.5 million and product service code Y1LC.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KLEINFELDER/STANTEC ARCF 2016 SREL Contract 3
SPECIFICATIONS
Attachments
Specification Attachments
Attachment to Specification Section 01 00 00 Paragraph 1.10:
Contractor Equipment Data Sheet - CESPK FORM 450
Prepared by various entities.
CONTRACTOR EQUIPMENT DATA SHEET
(Data to be furnished by Contractor for all equipment to be used on modifications as required under the Special Provisions of the Contract.)
DATE
CONTRACTOR CONTRACT NUMBER
1. EQUIPMENT DESCRIPTION
2. MODEL AND SERIES
3. YEAR PURCHASED
4. PURCHASE PRICE AT YEAR PURCHASED
5. LIST PRICE, YEAR OF MANUFACTURE
6. YEAR MANUFACTURED
7. EQUIPMENT HORSEPOWER
8. CARRIER HORSEPOWER
9. FUEL TYPE
10. SHIPPING WEIGHT
11. TIRE SIZE: FRONT - ______________________ DRIVE - _______________________ TRAILING - _______________________
REMARKS:
CESPK FORM 450 1 SEP 92 (Edition of Apr 84 will be used) FormFlow 2.2, ver 1
Attachment to Specification Section 01 00 00 Paragraph 1.17.4:
Project Partnership Agreement (PPA)
Prepared by USACE.
CESPD-DE
E
SOUTH PACIFIC DIVISION, U.S. ARMY CORPS OF ENGINEERS
Burton Federal Building
Office Box 36023 450 Golden Gate Avenue
SAN FRANCISCO, CALIFORNIA 94102
MEMORANDUM FOR Commander, Sacramento District, ATTN: CESPK-PM-C
SUBJECT: Approval of the American River Common Features 2016 Flood Risk Management Project - Project Partnership Agreement (PPA)
1. References:
a. Memorandum, CESPK-PM-C, 21 DEC 2018, subject: American River Common Features 2016 Draft Project Partnership Agreement, as amended.
b. Memorandum, CECW-I , 03 DEC 2018 , subject: American River Common Features Flood Risk Management Project- Project Partnership Agreement (PPA).
c. Memorandum, CECW-P, 29 JUN 2018, subject: Notification of Appropriations Committees Prior to Execution of Project Partnership Agreements.
2. The District Support Team (DST) reviewed the Project Partnership Agreement (PPA) package for construction of the American River Common Features 2016. The enclosed PPA conforms to the draft PPA provided in reference 1.b. and is legally sufficient. The PPA is approved for execution and authority is hereby delegated to the Sacramento District Engineer to execute the PPA.
3. The DST will notify you once Congressional Notification is completed in accordance with Reference 1.c. The PPA is planned to be executed on or after 24 JAN 2019. Please provide the DST with an electronic copy of the executed PPA.
4. The point of contact for this action is Jessica Burton Evans, (415)503-6736, or Jessica.L.BurtonEvans@usace.army.mil.
Encl
BUILDING STRONG!
gadier General, USA ommanding
PROJECT PARTNERSHIP AGREEMENT
BETWEEN
THE DEPARTMENT OF THE ARMY
AND
THE CENTRAL VALLEY FLOOD PROTECTION BOARD
AND
THE SACRAMENTO AREA FLOOD CONTROL AGENCY
FOR
THE AMERICAN RIVER COMMON FEATURES 2016
FLOOD RISK MANAGEMENT PROJECT
THIS AGREEMENT is entered into thiscll!/l day 4 ,ll!!J�y and between the Department of the Army (hereinafter the "Government"), represented by the District Commander for the Sacramento District, and the Central Valley Flood Protection Board, represented by its Board President, and the Sacramento Area Flood Control Agency, represented by its Executive Director. The Central Valley Flood Protection Board and the Sacramento Area Flood Control Agency, are hereinafter referred to as the "Non-Federal Sponsors".
WITNESSETH, THAT:
WHEREAS, construction of the locally preferred plan for the American River Common Features flood risk management project located within the metropolitan area of Sacramento, California (hereinafter the "Project", as defined in Article I.A. of this Agreement) was authorized by Section 1401(2)(7) of the Water Resources Development Act of 2016, Public Law 114-322;
WHEREAS, Section 103 of the Water Resources Development Act of 1986, Public Law 99-662, as amended (33 U.S.C. 2213), specifies the cost-sharing requirements applicable to the Project;
WHEREAS, the Non-Federal Sponsors are responsible for 100 percent of the construction costs in excess of that required for construction of the national economic development plan (hereinafter the "NED Plan", as defined in Article LB. of this Agreement);
WHEREAS, appropriations provided under the Construction heading, Title N, Division B of the Bipartisan Budget Act of 2018, Public Law 115-123 enacted February 9, 2018 (hereinafter "BBA 2018"), currently estimated at $1,565,750,000, are available to undertake construction of the Project as limited by the costs of the NED Plan, and the Non-Federal Sponsors acknowledge that they will not be financing their required non Federal cash contribution as allowed under the provisions of BBA 2018;
WHEREAS, the provisions of Section 902 of the Water Resources Development Act of 1986, as amended, do not apply to the funds provided in BBA 2018 that will be used for construction of the Project;
WHEREAS, 33 U.S.C. 701h authorizes the Government to undertake, at the Non Federal Sponsors' full expense, additional work while the Government is carrying out the Project; and
WHEREAS, the Government and the Non-Federal Sponsors have the full authority and capability to perform in accordance with the terms of this Agreement and acknowledge that Section 221 of the Flood Control Act of 1970, as amended (42 U.S.C.
l 962d-5b ), provides that this Agreement shall be enforceable in the appropriate district court of the United States.
NOW, THEREFORE, the parties agree as follows:
ARTICLE I - DEFINITIONS
A. The term "Project" means the locally preferred plan (LPP) consisting of the construction of levee improvement measures to address seepage, stability, erosion and overtopping concerns identified for the East levee of the Sacramento River downstream of the American River to Freeport, East levee of the Natomas East Main Drainage Canal (NEMDC), Arcade Creek, and Magpie Creek, as well as erosion control measures for specific locations along the American River, and widening of the Sacramento Weir and Bypass to deliver more flood flows into the Yolo Bypass, as generally described in the American River Watershed Common Features General Reevaluation Report, dated December 2015 and approved by the Chief of Engineers on April 26, 2016. (hereinafter the "Decision Document"). Authorization of the LPP includes 1 mile of levee raise compared to the 7 miles of levee raises included in the National Economic Development (NED) plan.
B. The term "NED Plan" means the national economic development plan consisting of the construction of levee improvement measures to address seepage, stability, erosion and overtopping concerns identified for the East levee of the Sacramento River downstream of the American River to Freeport, East levee of the Natomas East Main Drainage Canal (NEMDC), Arcade Creek, and Magpie Creek, as well as erosion control measures for specific locations along the American River, as generally described in the Decision Document.
C. The term "construction costs" means all costs incurred by the Government and Non-Federal Sponsors in accordance with the terms of this Agreement that are directly related to design and construction of the Project. The term includes, but is not necessarily limited to: the Government's costs and the Non-Federal Sponsors' creditable contributions pursuant to the terms of the Design Agreement executed on August 28, 201 7; the costs of historic preservation activities except for data recovery for historic properties; the Government's costs of engineering, design, and construction; the Government's supervision and administration costs; the Non-Federal Sponsors' creditable costs for providing real property interests, placement area improvements, relocations and in-kind contributions that are allocated by the Government to the NED Plan; and the costs incurred by the Non-Federal Sponsors for the real property interests, placement area improvements, relocations, and design and construction work that are allocated by the Government to the LPP incremental costs. The term does not include any costs for operation, maintenance, repair, rehabilitation, or replacement; dispute resolution; participation by the Government and the Non-Federal Sponsors in the Project Coordination Team to discuss significant issues and actions; audits; additional work; or betterments; or the Non-Federal Sponsors' cost of negotiating this Agreement.
D. The term "NED Plan costs" means the sum of all construction costs that would have been incurred by the Government and Non-Federal Sponsors had the NED Plan been constructed.
E. The term "LPP incremental costs" means construction costs of the Project that are in excess of the NED Plan costs, as determined by the Government.
F. The term "real property interests" means lands, easements, and rights-of-way, including those required for relocations and borrow and dredged material placement areas. Acquisition of real property interests may require the performance of relocations.
G. The term "relocation" means the provision of a functionally equivalent facility to the owner of a utility, cemetery, highway, railroad (excluding existing railroad bridges and approaches thereto), or public facility when such action is required in accordance with applicable legal principles of just compensation. Providing a functionally equivalent facility may include the alteration, lowering, raising, or replacement and attendant demolition of the affected facility or part thereof.
H. The term "placement area improvements" means the improvements required on real property interests to enable the ancillary placement of material that has been dredged or excavated during construction, operation, and maintenance of the Project, including, but not limited to, retaining dikes, wasteweirs, bulkheads, embankments, monitoring features, stilling basins, and de-watering pumps and pipes.
I. The term "functional portion thereof' means a portion of the Project that has been completed and that can function independently, as determined in writing by the District Commander for Sacramento District (hereinafter the "District Commander"), although the remainder of the Project is not yet complete.
J. The term "in-kind contributions" means those materials or services provided by the Non-Federal Sponsors for the NED Plan that are identified as being integral to the Project by the Division Commander for South Pacific Division (hereinafter the "Division Commander"). To be integral to the Project, the material or service must be part of the work that the Government would otherwise have undertaken for design and construction of the Project. The in-kind contributions also include any investigations performed by the Non-Federal Sponsors for the NED Plan to identify the existence and extent of any hazardous substances that may exist in, on, or under real property interests required for the NED Plan.
K. The term "betterment" means a difference in construction of an element of the Project that results from the application of standards that the Government determines exceed those that the Government would otherwise apply to construction of that element.
L. The term "fiscal year" means one year beginning on October 1st and ending on September 30th of the following year.
M. The term "additional work" means items of work related to, but not cost shared as a part of, the Project that the Government will undertake on the Non-Federal Sponsors' behalf while the Government is carrying out the Project, with the Non-Federal Sponsors responsible for all costs and any liabilities associated with such work.
ARTICLE II - OBLIGATIONS OF THE PARTIES
A. In accordance with Federal laws, regulations, and policies, the Government shall undertake construction of the Project using funds provided in BBA 2018 and funds provided by the Non-Federal Sponsors.
B. The Non-Federal Sponsors shall contribute a minimum of 35 percent, up to a maximum of 50 percent, of the NED Plan costs, and 100 percent of the LPP incremental costs, as follows:
1. The Non-Federal Sponsors shall pay 5 percent of NED Plan costs, with an estimated $1,520,000 in funds already provided by the Non-Federal Sponsors pursuant to the Design Agreement creditable toward that amount.
2. In accordance with Article III, the Non-Federal Sponsors shall provide the real property interests, placement area improvements, and relocations required for construction, operation, and maintenance of the Project. If the Government determines that the Non-Federal Sponsors' estimated credits for real property interests, placement area improvements, and relocations allocated by the Government to the NED Plan will exceed 45 percent of NED Plan costs, the Government, in its sole discretion, may acquire any of the remaining real property interests, construct any of the remaining placement area improvements, or perform any of the remaining relocations with the cost of such work included as a part of the Government's cost of construction. Nothing in this provision affects the Non-Federal Sponsors' responsibility under Article IV for the costs of any cleanup and response related thereto.
3. In providing in-kind contributions, the Non-Federal Sponsors shall obtain all applicable licenses and permits necessary for such work. As functional portions of the work are completed, the Non-Federal Sponsors shall begin operation and maintenance of such work. Upon completion of the work, the Non-Federal Sponsors shall so notify the Government within 30 calendar days and provide the Government with a copy of as-built drawings for the work.
4. After determining the amount to meet the 5 percent required by paragraph B. l ., above, for the then-current fiscal year and after considering the estimated amount of credit that will be afforded to the Non-Federal Sponsors pursuant to paragraphs B.2. and B.3., above, that are allocated by the Government to the NED Plan costs, the Government shall determine the estimated additional amount of funds required from the Non-Federal Sponsors to meet their minimum 35 percent cost share of the NED Plan costs for the then-current fiscal year. No later than 90 calendar days after receipt of notification from the Government, the Non-Federal Sponsors shall provide the full amount of such required funds to the Government in accordance with Article Vl.
5. No later than August 1st prior to each subsequent fiscal year, the Government shall provide the Non-Federal Sponsors with a written estimate of the full amount of funds required from the Non-Federal Sponsors during that fiscal year to meet their cost share for the NED Plan costs. Not later than September 1 st prior to that fiscal year, the Non-Federal Sponsors shall provide the full amount of such required funds to the Government in accordance with Article Vl.
6. After considering the real property interests, placement area improvements, relocations, and design and construction work provided by the Non Federal Sponsors for the Project that are determined by the Government to be in excess of that required for the NED Plan, the Government shall determine the funds required from the Non-Federal Sponsors to cover the remaining LPP incremental costs, and the Non-Federal Sponsors shall provide such funds in advance of the Government performing the work in accordance with Article VLF.
C. To the extent practicable and in accordance with Federal law, regulations, and policies, the Government shall afford the Non-Federal Sponsors the opportunity to review and comment on solicitations for contracts, including relevant plans and specifications, prior to the Government's issuance of such solicitations; proposed contract modifications, including change orders; and contract claims prior to resolution thereof. Ultimately, the contents of solicitations, award of contracts, execution of contract modifications, and resolution of contract claims shall be exclusively within the control of the Government.
D. The Government, as it determines necessary, shall undertake actions associated with historic preservation, including, but not limited to, the identification and treatment of historic properties as those properties are defined in the National Historic Preservation Act (NHP A) of 1966, as amended. All costs incurred by the Government for such work (including the mitigation of adverse effects other than data recovery) shall be included in construction costs and shared in accordance with the provisions of this Agreement. If historic properties are discovered during construction and the effect(s) of construction are determined to be adverse, strategies shall be developed to avoid, minimize or mitigate these adverse effects. In accordance with 54 U.S.C. 312507, up to 1 percent of the total amount authorized to be appropriated for the Project may be applied toward data recovery of historic properties and such costs shall be borne entirely by the Government. In the event that costs associated with data recovery of historic properties exceed 1 percent of the total amount authorized to be appropriated for the Project, in accordance with 54 U.S.C. 312508, the Government will seek a waiver from the 1 percent limitation under 54 U.S.C. 312507 and upon receiving the waiver, will proceed with data recovery at full federal expense. Nothing in this Agreement shall limit or otherwise prevent the Non-Federal Sponsors from voluntarily contributing costs associated with data recovery that exceed 1 percent.
E. When the District Commander determines that construction of the Project, or a functional portion thereof, is complete, within 30 calendar days of such determination, the District Commander shall so notify the Non-Federal Sponsors in writing and the Non Federal Sponsors, at no cost to the Government, shall operate, maintain, repair, rehabilitate, and replace the Project, or such functional portion thereof. The Government shall furnish the Non-Federal Sponsors with an Operation, Maintenance, Repair, Rehabilitation, and Replacement Manual (hereinafter the "OMRR&R Manual") and copies of all as-built drawings for the completed work.
1. The Non-Federal Sponsors shall conduct their operation, maintenance, repair, rehabilitation, and replacement responsibilities in a manner compatible with the authorized purpose of the Project and in accordance with applicable Federal laws and specific directions prescribed by the Government in the OMRR&R Manual. The Government and the Non-Federal Sponsors shall consult on any subsequent updates or amendments to the OMRR&R Manual.
2. The Government may enter, at reasonable times and in a reasonable manner, upon real property interests that the Non-Federal Sponsors now or hereafter own or control to inspect the Project, and, if necessary, to unde1iake any work necessary to the functioning of the Project for its authorized purpose. If the Government determines that the Non-Federal Sponsors are failing to perform their obligations under this Agreement and the Non-Federal Sponsors do not correct such failures within a reasonable time after notification by the Government, the Government, at its sole discretion, may undertake any operation, maintenance, repair, rehabilitation, or replacement of the Project. No operation, maintenance, repair, rehabilitation, or replacement by the Government shall relieve the Non-Federal Sponsors of their obligations under this Agreement or preclude the Government from pursuing any other remedy at law or equity to ensure faithful performance of this Agreement.
F. Not less than once each year, the Non-Federal Sponsors shall inform affected interests of the extent of risk reduction afforded by the Project.
G. The Non-Federal Sponsors shall participate in and comply with applicable Federal floodplain management and flood insurance programs.
H. In accordance with Section 402 of the Water Resources Development Act of 1986, as amended (33 U.S.C. 7016-12), the Non-Federal Sponsors shall prepare a floodplain management plan for the Project within one year after the effective date of this Agreement and shall implement such plan not later than one year after completion of construction of the Project. The plan shall be designed to reduce the impacts of future flood events in the project area, including but not limited to, addressing those measures to be undertaken by non-Federal interests to preserve the level of flood risk reduction provided by such work. The Non-Federal Sponsors shall provide an information copy of the plan to the Government.
I. The Non-Federal Sponsors shall publicize floodplain information in the area concerned and shall provide this information to zoning and other regulatory agencies for their use in adopting regulations, or taking other actions, to prevent unwise future development and to ensure compatibility with the Project.
J. The Non-Federal Sponsors shall prevent obstructions or encroachments on the Project (including prescribing and enforcing regulations to prevent such obstructions or encroachments) that might reduce the level of flood risk reduction the Project affords, hinder operation and maintenance of the Project, or interfere with the Project's proper function.
K. The Non-Federal Sponsors shall not use Federal program funds to meet any of their obligations under this Agreement unless the Federal agency providing the funds verifies in writing that the funds are authorized to be used for the Project. Federal program funds are those funds provided by a Federal agency, plus any non-Federal contribution required as a matching share therefor.
L. In carrying out their obligations under this Agreement, the Non-Federal Sponsors shall comply with all the requirements of applicable Federal laws and implementing regulations, including, but not limited to: Section 601 of the Civil Rights Act of 1964 (P.L. 88-352), as amended (42 U.S.C. 2000d), and Department of Defense Directive 5500.11 issued pursuant thereto; the Age Discrimination Act of 1975 (42 U.S.C. 6102); and the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Army Regulation 600-7 issued pursuant thereto.
M. In addition to the ongoing, regular discussions of the parties in the delivery of the Project, the Government and the Non-Federal Sponsors may establish a Project Coordination Team to discuss significant issues or actions. The Government's costs for participation on the Project Coordination Team shall not be included in construction costs that are cost shared but shall be included in calculating the Maximum Cost Limit. The Non-Federal Sponsors' costs for participation on the Project Coordination Team shall not be included in construction costs that are cost shared and shall be paid solely by the Non Federal Sponsors without reimbursement or credit by the Government.
N. The Non-Federal Sponsors may request in writing that the Government perform betterments or additional work on behalf of the Non-Federal Sponsors. Each request shall be subject to review and written approval by the Division Commander. If the Government agrees to such request, the Non-Federal Sponsors, in accordance with Article VLF., must provide funds sufficient to cover the costs of such work in advance of the Government performing the work.
ARTICLE III - REAL PROPERTY INTERESTS, PLACEMENT AREA
IMPROVEMENTS, RELOCATIONS, AND COMPLIANCE WITH PUBLIC LAW 91-
646, AS AMENDED
A. The Government, after consultation with the Non-Federal Sponsors, shall determine the real property interests needed for construction, operation, and maintenance of the Project. The Government shall provide the Non-Federal Sponsors with general written descriptions, including maps as appropriate, of the real property interests that the Government determines the Non-Federal Sponsors must provide for construction, operation, and maintenance of the Project, and shall provide the Non-Federal Sponsors with a written notice to proceed with acquisition. The Non-Federal Sponsors shall acquire the real property interests and shall provide the Government with authorization for entry thereto in accordance with the Government's schedule for construction of the Project. The Non-Federal Sponsors shall ensure that real property interests provided for the Project are retained in public ownership for uses compatible with the authorized purposes of the Project.
B. The Government, after consultation with the Non-Federal Sponsors, shall determine the placement area improvements necessary for construction, operation, and maintenance of the Project, and shall provide the Non-Federal Sponsors with general written descriptions, including maps as appropriate, of such improvements and shall provide the Non-Federal Sponsors with a written notice to proceed with such improvements. The Non-Federal Sponsors shall construct the improvements in accordance with the Government's construction schedule for the Project.
C. The Government, after consultation with the Non-Federal Sponsors, shall determine the relocations necessary for construction, operation, and maintenance of the Project, and shall provide the Non-Federal Sponsors with general written descriptions, including maps as appropriate, of such relocations and shall provide the Non-Federal Sponsors with a written notice to proceed with such relocations. The Non-Federal Sponsors shall perform or ensure the performance of these relocations in accordance with the Government's construction schedule for the Project.
D. To the maximum extent practicable, not laterthan 30 calendar days after the Government provides to the Non-Federal Sponsors written descriptions and maps of the real property interests, placement area improvements, and relocations required for construction, operation, and maintenance of the Project, the Non-Federal Sponsors may request in writing that the Government acquire all or specified portions of such real property interests, construct placement area improvements, or perform the necessary relocations. If the Government agrees to such a request, the Non-Federal Sponsors, in accordance with Article VLF., must provide funds sufficient to cover the costs of the acquisitions, placement area improvements, or relocations in advance of the Government perfotming the work. The Government shall acquire the real property interests, construct the placement area improvements, and perform the relocations, applying Federal laws, policies, and procedures. The Government shall acquire real property interests in the name of the Non-Federal Sponsors except, if acquired by eminent domain, the Government shall convey all of its right, title and interest to the Non-Federal Sponsors by quitclaim deed or deeds. The Non-Federal Sponsors shall accept delivery of such deed or deeds. The Government's providing real property interests, placement area improvements, or performing relocations on behalf of the Non-Federal Sponsors does not alter the Non-Federal Sponsors' responsibility under Article IV for the costs of any cleanup and response related thereto.
E. As required by Sections 210 and 305 of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, Public Law 91-646, as amended (42 U.S.C. 4630 and 4655), and Section 24.4 of the Uniform Regulations contained in 49 C.F.R. Part 24, the Non-Federal Sponsors assure that (1) fair and reasonable relocation payments and assistance shall be provided to or for displaced persons, as are required to be provided by a Federal agency under Sections 4622, 4623 and 4624 of Title 42 of the U.S. Code; (2) relocation assistance programs offering the services described in Section 4625 of Title 42 of the U.S. Code shall be provided to such displaced persons; (3) within a reasonable period of time prior to displacement, comparable replacement dwellings will be available to displaced persons in accordance with Section 4625(c)(3) of Title 42 of the U.S. Code; (4) in acquiring real property, the Non-Federal Sponsors will be guided, to the greatest extent practicable under State law, by the land acquisition policies in Section 4651 and the provision of Section 4652 of Title 42 of the U.S. Code; and (5) property owners will be paid or reimbursed for necessary expenses as specified in Sections 4653 and 4654 of Title 42 of the U.S. Code.
ARTICLE IV - HAZARDOUS SUBSTANCES
A. The Non-Federal Sponsors shall be responsible for undertaking any investigations to identify the existence and extent of any hazardous substances regulated under the Comprehensive Environmental Response, Compensation, and Liability Act (hereinafter "CERCLA") ( 42 U.S.C. 9601-9675), that may exist in, on, or under real property interests required for construction, operation, and maintenance of the Project.
However, for real property interests that the Government determines to be subject to the navigation servitude, only the Government shall perform such investigations unless the District Commander provides the Non-Federal Sponsors with prior specific written direction, in which case the Non-Federal Sponsors shall perform such investigations in accordance with such written direction.
B. In the event it is discovered that hazardous substances regulated under CERCLA exist in, on, or under any of the required real property interests, within 15 calendar days of such discovery, the Non-Federal Sponsors and the Government, in addition to providing any other notice required by applicable law, shall provide written notice to each other, and the Non-Federal Sponsors shall not proceed with the acquisition of such real property interests until the parties agree that the Non-Federal Sponsors should proceed.
C. If hazardous substances regulated under CERCLA are found to exist in, on, or under any required real property interests, the parties shall consider any liability that might arise under CERCLA and determine whether to initiate construction, or if already initiated, whether to continue construction, suspend construction, or terminate construction.
1. Should the parties initiate or continue construction, the Non-Federal Sponsors shall be responsible, as between the Government and the Non-Federal Sponsors, for the costs of cleanup and response, including the costs of any studies and investigations necessary to determine an appropriate response to the contamination. Such costs shall be paid solely by the Non-Federal Sponsors without reimbursement or credit by the Government.
2. In the event the parties cannot reach agreement on how to proceed or the Non-Federal Sponsors fail to provide any funds necessary to pay for cleanup and response costs or to otherwise discharge the Non-Federal Sponsors' responsibilities under this Article upon direction by the Government, the Government may suspend or terminate construction, but may undertake any actions it determines necessary to avoid a release of such hazardous substances.
D. In the event of a discovery, the Non-Federal Sponsors and the Government shall initiate consultation with each other within 15 calendar days in an effort to ensure that responsible parties bear any necessary cleanup and response costs as defined in CERCLA. Any decision made pursuant to this Article shall not relieve any third party from any liability that may arise under CERCLA.
E. As between the Government and the Non-Federal Sponsors, the Non-Federal Sponsors shall be considered the operator of the Project for purposes of CERCLA liability. To the maximum extent practicable, the Non-Federal Sponsors shall operate, maintain, repair, rehabilitate, and replace the Project in a manner that will not cause liability to arise under CERCLA.
ARTICLE V - DOCUMENTATION OF CONSTRUCTION COSTS AND CREDIT
FOR REAL PROPERTY INTERESTS, PLACEMENT AREA IMPROVEMENTS,
RELOCATIONS, AND IN-KIND CONTRIBUTIONS
A. The Government shall include in construction costs the creditable NED Plan costs and LPP incremental costs incurred by the Non-Federal Sponsors in accordance with the provisions of this Article.
B. Documentation of Construction Costs.
1. NED Plan costs. To the maximum extent practicable, no later than 3 months after it provides the Government with authorization for entry onto a real property interest or pays compensation to the owner, whichever occurs later, the Non-Federal Sponsors shall provide the Government with documents sufficient to determine the amount of credit to be provided for the privately owned real property interests for the NED Plan costs in accordance with paragraphs C. l. of this Article. To the maximum extent practicable, no less frequently than on a quarterly basis, the Non-Federal Sponsors shall provide the Government with documentation sufficient for the Government to determine the amount of credit to be provided for other creditable items allocated to the NED Plan in accordance with paragraph C. of this Article.
2. LPP incremental costs. To the maximum extent practicable, the Non Federal Sponsors shall provide the Government with documentation ofLPP incremental costs incurred no less frequently than on a quarterly basis for inclusion in the total construction costs. Such documentation may include invoices and certification of specific payments to contractors, suppliers, and the Non-Federal Sponsors' employees;
and eligible payments for privately owned real property interests, including appraisals, and eligible incidental acquisition costs, and for providing placement area improvements, relocations, and design and construction work. Only LPP incremental costs incurred after the effective date of this Agreement are included in the construction costs, unless such costs were required for work covered by an In-Kind Memorandum of Understanding (hereinafter "In-Kind MOU"). The Government may audit such costs in accordance with Article X.B. to determine reasonableness, allocability, and allowability.
C. The Government and the Non-Federal Sponsors agree that the amount of costs eligible for credit that are allocated by the Government to the NED Plan costs shall be determined and credited in accordance with the following procedures, requirements, and conditions. Such costs shall be subject to audit in accordance with Article X.B. to determine reasonableness, allocability, and allowability of costs.
1. Real Property Interests.
a. General Procedure. Only costs associated with real property interests acquired from private owners after the effective date of this Agreement and allocated to the NED Plan are eligible for credit, unless such real property interests acquired from private owners were required for in-kind contributions covered by an In Kind MOU. The Non-Federal Sponsors shall obtain, for each real property interest acquired from a private owner, an appraisal of the fair market value of such interest that is prepared by a qualified appraiser who is acceptable to the parties. Subject to valid jurisdictional exceptions, the appraisal shall conform to the Uniform Standards of Professional Appraisal Practice. The appraisal must be prepared in accordance with the applicable rules of just compensation, as specified by the Government.
(1) Date of Valuation. For any real property interests acquired from private owners that are required for in-kind contributions covered by an In Kind MOU, the date of initiation of construction shall be used to determine the fair market value. The fair market value of real property interests acquired by the Non Federal Sponsors after the effective date of this Agreement shall be the fair market value of such real property interests at the time the interests are acquired.
(2) Except for real property interests acquired through eminent domain proceedings instituted after the effective date of this Agreement, the Non-Federal Sponsors shall submit an appraisal for each real prope1ty interest to the Government for review and approval no later than, to the maximum extent practicable, 60 calendar days after the Non-Federal Sponsors provide the Government with an authorization for entry for such interest or concludes the acquisition of the interest through negotiation or eminent domain proceedings, whichever occurs later. If, after coordination and consultation with the Government, the Non-Federal Sponsors are unable to provide an appraisal that is acceptable to the Government, the Government shall obtain an appraisal to determine the fair market value of the real prope1ty interest for crediting purposes.
(3) The Government shall credit the Non-Federal Sponsors the appraised amount approved by the Government. Where the amount paid or proposed to be paid by the Non-Federal Sponsors exceed the approved appraised amount, the Government, at the request of the Non-Federal Sponsors, shall consider all factors relevant to determining fair market value and, in its sole discretion, after consultation with the Non-Federal Sponsors, may approve in writing an amount greater than the appraised amount for crediting purposes.
b. Eminent Domain Procedure. For real prope1ty interests acquired by eminent domain proceedings instituted after the effective date of this Agreement, the Non-Federal Sponsors shall notify the Government in writing of their intent to institute such proceedings and submit the appraisals of the specific real property interests to be acquired for review and approval by the Government. If the Government provides written approval of the appraisals, the Non-Federal Sponsors shall use the amount set forth in such appraisals as the estimate of just compensation for the purpose of instituting the eminent domain proceeding. If the Government provides written disapproval of the appraisals, the Government and the Non-Federal Sponsors shall consult to promptly resolve the issues that are identified in the Government's written disapproval. In the event the issues cannot be resolved, the Non-Federal Sponsors may use the amount set fo1th in their appraisal as the estimate of just compensation for purpose of instituting the eminent domain proceeding. The fair market value for crediting purposes shall be either the amount of the court award for the real property interests taken or the amount of any stipulated settlement or portion thereof that the Government approves in writing.
c. Waiver of Appraisal. Except as required by paragraph C.l.b. of this Article, the Government may waive the requirement for an appraisal pursuant to this paragraph if, in accordance with 49 C.F.R. Section 24.102(c)(2):
(1) the private owner is donating the real property interest to the Non-Federal Sponsors and releases the Non-Federal Sponsors in writing from their obligation to appraise the real property interest, and the Non-Federal Sponsors submit to the Government a copy of the owner's written release; or
(2) the Non-Federal Sponsors determine that an appraisal is unnecessary because the valuation problem is uncomplicated and the anticipated value of the real property interest proposed for acquisition is estimated at $25,000 or less, based on a review of available data. When the Non-Federal Sponsors determine that an appraisal is unnecessary, the Non-Federal Sponsors shall prepare the written waiver valuation required by 49 C.F .R. Section 24.102( c )(2) and submit a copy thereof to the Government for approval. When the anticipated value of the real property interest exceeds $10,000, the Non-Federal Sponsors must offer the private owner the option of having the Non-Federal Sponsors appraise the real property interest.
d. Incidental Costs. The Government shall include in construction costs and credit towards the Non-Federal Sponsors' share of such costs, the incidental costs the Non-Federal Sponsors incurred in acquiring from private owners any real property interests required pursuant to Article III for the NED Plan, that are documented to the satisfaction of the Government. Only incidental costs incurred after the effective date of this Agreement are eligible for credit, unless such incidental costs were required for in-kind contributions covered by an In-Kind MOU. Such incidental costs shall include closing and title costs, appraisal costs, survey costs, attorney's fees, plat maps, mapping costs, actual amounts expended for payment of any relocation assistance benefits provided in accordance with Article III.E., and other payments by the Non Federal Sponsors for items that are generally recognized as compensable, and required to be paid, by applicable state law due to the acquisition of a real property interest pursuant to Article III.
2. Placement Area Improvements. The Government shall include in construction costs and credit towards the Non-Federal Sponsors' share of such costs, the value of placement area improvements required for the NED Plan. The value shall be equivalent to the costs, documented to the satisfaction of the Government, that the Non Federal Sponsors incurred to provide any placement area improvements required for the Project. Only placement area improvements provided after the effective date of this Agreement are eligible for credit, unless such placement area improvements were required for in-kind contributions covered by an In-Kind MOU. Such costs shall include, but not necessarily be limited to, actual costs of constructing the improvements; planning, engineering, and design costs; supervision and administration costs; and documented incidental costs associated with providing the improvements, but shall not include any costs associated with betterments, as determined by the Government.
3. Relocations. The Government shall include in construction costs and credit towards the Non-Federal Sponsors' share of such costs, the value of any relocations performed by the Non-Federal Sponsors that are directly related to construction, operation, and maintenance of the NED Plan. Only relocations performed after the effective date of this Agreement are eligible for credit, unless such relocations were required for in-kind contributions covered by an In-Kind MOU.
a. For a relocation other than a highway, the value shall be only that portion of relocation costs that the Government determines is necessary to provide a functionally equivalent facility, reduced by depreciation, as applicable, and by the salvage value of any removed items.
b. For a relocation of a highway, which is any highway, roadway, or street, including any bridge thereof, that is owned by a public entity, the value shall be only that portion of relocation costs that would be necessary to accomplish the relocation in accordance with the design standard that the State of California would apply under similar conditions of geography and traffic load, reduced by the salvage value of any removed items.
c. Relocation costs include actual costs of performing the relocation; planning, engineering, and design costs; supervision and administration costs;
and documented incidental costs associated with performance of the relocation, as determined by the Government. Relocation costs do not include any costs associated with betterments, as determined by the Government, nor any additional cost of using new material when suitable used material is available.
4. In-Kind Contributions. The Government shall include in construction costs and credit towards the Non-Federal Sponsors' share of such costs, the value of in kind contributions allocated to the NED Plan that are integral to the Project.
a. The value shall be equivalent to the costs, documented to the satisfaction of the Government, that the Non-Federal Sponsors incuned to provide the in kind contributions. Such costs shall include, but not necessarily be limited to, actual costs of constructing the in-kind contributions; engineering and design costs; supervision and administration costs; and documented incidental costs associated with providing the in-kind contributions, but shall not include any costs associated with betterments, as determined by the Government. Appropriate documentation includes invoices and certification of specific payments to contractors, suppliers, and the Non-Federal Sponsors' employees.
b. No credit shall be afforded for interest charges, or any adjustment to reflect changes in price levels between the time the in-kind contributions are completed and credit is afforded; for the value of in-kind contributions obtained at no cost to the Non-Federal Sponsors; for any in-kind contributions performed prior to the effective date of this Agreement unless covered by an In-Kind MOU between the Government and Non-Federal Sponsors; or for costs that exceed the Government's estimate of the cost for such in-kind contributions if they had been provided by the Government.
5. Compliance with Federal Labor Laws. Any credit afforded under the terms of this Agreement is subject to satisfactory compliance with applicable Federal
· labor laws covering non-Federal construction, including, but not limited to, 40 U.S.C.
3141-3148 and 40 U.S.C. 3701-3708 (labor standards originally enacted as the Davis Bacon Act, the Contract Work Hours and Safety Standards Act, and the Copeland Anti Kickback Act), and credit may be withheld, in whole or in part, as a result of the Non Federal Sponsors' failure to comply with their obligations under these laws.
D. Notwithstanding any other provision of this Agreement, the Non-Federal Sponsors shall not be entitled to credit for real property interests that were previously provided as an item of local cooperation for another Federal project; for real property interests (other than those acquired through relocations) that are owned or controlled by public entities; or for any amount that exceeds the value of real property interests, relocations, placement area improvements, or in-kind contributions allocated by the Government to the NED Plan.
ARTICLE VI - PAYMENT OF FUNDS
A. As of the effective date of this Agreement, total construction costs for the Project are projected to be $1,851,993,000, with NED Plan costs projected to be $1,597,400,000, and LPP incremental costs projected to be $254,593,000. The Government share of the NED Plan costs are projected to be $1,038,310,000, and the Non-Federal Sponsors' share of the NED Plan costs are projected to be $559,090,000, which includes the 5 percent contribution of funds projected to be $79,870,000, creditable real property interests, relocations, and placement area improvements projected to be $265,071,000, creditable in-kind contributions projected to be $121,088,000, and the additional amount of funds required to meet the minimum 35 percent cost share projected to be $93,061,000. The LPP incremental costs provided by the Non-Federal Sponsors include real property interests, relocations, and placement area improvements projected to be $36,780,000, design and construction work projected to be $169,232,000, and a contribution of funds projected to be $105,621,000. Costs for betterments are projected to be $0. These amounts are estimates only that are subject to adjustment by the Government and are not to be construed as the total financial responsibilities of the Government and the Non-Federal Sponsors.
B. The Government shall provide the Non-Federal Sponsors with monthly reports setting forth the estimated construction costs, NED Plan costs, and the Government's and Non-Federal Sponsors' estimated shares of such costs; costs incurred by the Government, using both Federal and Non-Federal Sponsors funds, to date; the amount of funds provided by the Non-Federal Sponsors to date; the estimated amount of any creditable real property interests, placement area improvements, and relocations; the estimated amount of any creditable in-kind contributions; and the estimated amount of funds required from the Non-Federal Sponsors during the upcoming fiscal year.
C. The Non-Federal Sponsors shall provide the funds required to meet their share of construction costs by delivering a check payable to "F AO, USAED, Sacramento (L2)" to the District Commander, or verifying to the satisfaction of the Government that the Non-Federal Sponsors have deposited such required funds in an escrow or other account acceptable to the Government, with interest accruing to the Non-Federal Sponsors, or by providing an Electronic Funds Transfer of such required funds in accordance with procedures established by the Government.
D. The Government shall draw from the funds provided by the Non-Federal Sponsors to cover the non-Federal share of construction costs as those costs are incurred.
If the Government determines at any time that additional funds are needed from the Non Federal Sponsors to cover the Non-Federal Sponsors' required share of such construction costs, the Government shall provide the Non-Federal Sponsors with written notice of the amount of additional funds required. Within 90 calendar days from receipt of such notice, the Non-Federal Sponsors shall provide the Government with the full amount of such additional required funds.
E. Upon completion of construction and resolution of all relevant claims and appeals and eminent domain proceedings, the Government shall conduct a final accounting and furnish the Non-Federal Sponsors with the written results of such final accounting. Should the final accounting determine that additional funds are required from the Non-Federal Sponsors, the Non-Federal Sponsors, within 90 calendar days of receipt of written notice from the Government, shall provide the Government with the full amount of such additional required funds. Such final accounting does not limit the Non-Federal Sponsors' responsibility to pay their share of construction costs, including contract claims or any other liability that may become known after the final accounting.
If the final accounting determines that funds provided by the Non-Federal Sponsors exceed the amount of funds required to meet their share of construction costs, the Government shall refund such excess amount, subject to the availability of funds for the refund. In addition, if the final accounting determines that the Non-Federal Sponsors' credit for real property interests, placement area improvements, and relocations combined with credit for in-kind contributions exceed their share of construction costs for the NED Plan, the Government, subject to the availability of funds, shall enter into a separate agreement to reimburse…