SF33 Attachment C-1 Beale_AFB_Enclosure_2B_GFI_List_20200227.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- W9123820S0001
About this file
This document contains a sources sought notice and government-furnished information list for an optimized remediation contract at Beale Air Force Base in California. The U.S. Army Corps of Engineers seeks information from businesses to conduct environmental remediation activities including site restoration, remedy maintenance, and optimization at fifteen installation restoration program sites and eight military munitions response program sites over a ten-year period. The solicitation is expected to result in a firm-fixed-price contract awarded using best-value tradeoff procedures. Interested parties must respond with capability statements and project examples by July 31, 2019. The government-furnished information list provides draft reports and documentation for twenty-three sites to support contract performance.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GFI List Template
| GOVERNMENT-FURNISHED INFORMATION (GFI) | |
| ORC Name: | Beale AFB ORC |
| Installation: | Beale Air Force Base |
| Date: | 11/15/19 |
| Item | Document Date | Document Title | Site | DVD Number | |
| 1 | 10/9/19 | Draft Proposed Plan, Munitions Response Sites ML595, SR614, SR615, | |||
| SR617, SR622, ML625, and ED631, Military Munitions Response Program, Beale AFB, CA | Sites ML595, SR614, SR615, |
SR617, SR622, ML625, and ED631
| 2 | 7/16/19 | Draft Final Report, Data Gap Investigation and Feasibility Study, Munitions Response Sites: ML595, SR614, SR615, | |
| SR617, SR622, ML625, and ED631 | Sites ML595, SR614, SR615, |
SR617, SR622, ML625, and ED632
| 3 | 11/26/19 | Draft Site TU002 Remedial Action Completion Report | TU002 | |
| 4 | 10/14/19 | Draft Plume CG041-039 Remedial Action-Construction Completion Report | CG041-039 | |
| 5 | 11/15/19 | Draft Plume CG041-018 Remedial Action-Construction Completion Report | CG041-018 | |
| 6 | 11/25/19 | Draft Plume CG041-017 Groundwater Extraction and Treatment System | ||
| Modification Technical Memorandum | CG041-017 | |||
| 7 | 12/4/19 | Draft Plume CG041-517 Remedial Action-Operation Completion Report | CG041-517 | |
| 8 | 12/2/19 | Draft Site CG041 Optimized Exit Strategy Performance Plan | CG041 | |
| 9 | 1/2/20 | Draft Plume CG041-508 Remedial Action-Operation Completion Report | CG041-508 | |
| 10 | 1/16/20 | January 2020 Restoration Advisory Board Materials | RAB | |
| 11 | 2/4/20 | Site DP038 Propose Surface Water Sampling Locations | DP038 | |
| 12 | 2/4/20 | Site SS507 Vapor Intrusion Data Gap Investigation Data, 1st Sampling Event | SS507 | |
| 12 | 2/5/20 | Draft Site DP038 Surface Water Sampling Meeting Minutes | DP038 | |
| 13 | 11/22/2019 to Present | Site SS043 Remeidal Investigation (RI) Phase 1 and Phase 2 Sampling Analysis | SS043 | |
| 14 | 11/19/2020 to Present | Site SS043 RI Phase 1 and Phase 2 Field Forms | SS043 | |
| 15 | 9/10/19 | Site SS043 RI Phase 1 Laboratory Report | SS043 | |
| 16 | 9/10/19 | Site SS043 RI Phase 1 Laboratory Analytical Results Spreadsheet | SS043 | |
| 17 | 8/2/19 | Site SS043 Soil Vapor Sampling Location Survey Coordinates | SS043 | |
| 18 | 1/15/20 | Site TU002 Rebound Sample Results. | TU002 | |
| 19 | 12/10/2020 to 2/14/2020 | Sites SS010 and OT584 RCRA Facility Inspection (RFI) Boring Logs, MW/VMP As-Builts, GW Sampling Logs, and Field Notes. | SS010 and OT584 | |
| 20 | 1/16/20 | Sites SS010 and OT584 RFI Laboratory Data Packages | SS010 and OT584 | |
| 21 | 6/28/05 | Sky Research LiDAR | 7 MRSs | |
| 22 | 2/1/20 | ICRMP | Basewide | |
| 23 | 8/1/15 | IDP | Basewide | |
| 24 | Wetland Shape Files and Wetland LiDAR | Basewide |
&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2 xx Month 2019 Page &P of &N
File details come from the government source that posted it. Updated .