SF33 Attachment C-1 Beale AFB_Enclosure 2B GFI List_20200218.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- W9123820S0001
About this file
This sources sought notice is seeking information from potential offerors for an upcoming solicitation to provide environmental remediation services at Beale Air Force Base in California. The ten-year contract will require maintenance of established remedies, implementation of optimization efforts, and achievement of site-specific objectives at fifteen Installation Restoration Program sites and eight Military Munitions Response Program sites. Interested firms should respond with their capability statements, relevant past project experience including examples of multi-site projects, business size, and joint venture information by July 31, 2019. The Army Corps of Engineers Engineering District Sacramento will use responses to help determine acquisition approach and set-aside prior to issuing the solicitation under NAICS code 562910.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GFI List Template
| GOVERNMENT-FURNISHED INFORMATION (GFI) | |
| ORC Name: | Beale AFB ORC |
| Installation: | Beale Air Force Base |
| Date: | 11/15/19 |
| Item | Document Date | Document Title | Site | DVD Number | |
| 1 | 10/9/19 | Draft Proposed Plan, Munitions Response Sites ML595, SR614, SR615, | |||
| SR617, SR622, ML625, and ED631, Military Munitions Response Program, Beale AFB, CA | Sites ML595, SR614, SR615, |
SR617, SR622, ML625, and ED631
| 2 | 7/16/19 | Draft Final Report, Data Gap Investigation and Feasibility Study, Munitions Response Sites: ML595, SR614, SR615, | |
| SR617, SR622, ML625, and ED631 | Sites ML595, SR614, SR615, |
SR617, SR622, ML625, and ED632
| 3 | 11/26/19 | Draft Site TU002 Remedial Action Completion Report | TU002 | |
| 4 | 10/14/19 | Draft Plume CG041-039 Remedial Action-Construction Completion Report | CG041-039 | |
| 5 | 11/15/19 | Draft Plume CG041-018 Remedial Action-Construction Completion Report | CG041-018 | |
| 6 | 11/25/19 | Draft Plume CG041-017 Groundwater Extraction and Treatment System | ||
| Modification Technical Memorandum | CG041-017 | |||
| 7 | 12/4/19 | Draft Plume CG041-517 Remedial Action-Operation Completion Report | CG041-517 | |
| 8 | 12/2/19 | Draft Site CG041 Optimized Exit Strategy Performance Plan | CG041 | |
| 9 | 1/2/20 | Draft Plume CG041-508 Remedial Action-Operation Completion Report | CG041-508 | |
| 10 | 1/16/20 | January 2020 Restoration Advisory Board Materials | RAB | |
| 11 | 2/4/20 | Site DP038 Propose Surface Water Sampling Locations | DP038 | |
| 12 | 2/4/20 | Site SS507 Vapor Intrusion Data Gap Investigation Data, 1st Sampling Event | SS507 | |
| 12 | 2/5/20 | Draft Site DP038 Surface Water Sampling Meeting Minutes | DP038 | |
| 13 | 11/22/2019 to Present | Site SS043 Remeidal Investigation (RI) Phase 1 and Phase 2 Sampling Analysis | SS043 | |
| 14 | 11/19/2020 to Present | Site SS043 RI Phase 1 and Phase 2 Field Forms | SS043 | |
| 15 | 9/10/19 | Site SS043 RI Phase 1 Laboratory Report | SS043 | |
| 16 | 9/10/19 | Site SS043 RI Phase 1 Laboratory Analytical Results Spreadsheet | SS043 | |
| 17 | 8/2/19 | Site SS043 Soil Vapor Sampling Location Survey Coordinates | SS043 | |
| 18 | 1/15/20 | Site TU002 Rebound Sample Results. | TU002 |
&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2 xx Month 2019 Page &P of &N
File details come from the government source that posted it. Updated .