This document contains a sources sought notice and draft performance work statement for an optimized remediation contract at Beale Air Force Base in California. The U.S. Army Corps of Engineers is seeking information from businesses to conduct environmental remediation activities at 23 identified sites, including maintenance of established remedies, implementation of optimization efforts, and achievement of site objectives. Services will include environmental remediation, construction, and architectural and engineering work. The resulting ten-year firm-fixed-price contract is anticipated to be awarded using best-value tradeoff procedures. Interested businesses are requested to respond by July 31, 2019 with information on their capabilities, example projects of similar size and scope, and business size designation. Responses are limited to ten pages by email only.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Beale AFB ORC Installation Site CLIN/Sub-CLIN Number CLIN/Sub-CLIN Description Projected Award Date (Pending availability of funding and bona fide need) Period of Performance (Proposed Periods of Performance shall not extend beyond 4 Years per SubCLIN. Actual PoPs shall not exceed 5 years per SubCLIN. Proposed and Actual overall contract PoP shall not exceed 10 years from contract award)
| N/A | N/A | 0001 | Complete Project Management Plan (PMP) | ||
| N/A | N/A | 0001AA | Complete PMP | Base Year | Four years from obligation of the Sub-CLIN |
| N/A | N/A | 0001AB | Update PMP | Optional Task | Three years from obligation of the Sub-CLIN |
| N/A | N/A | 0001AC | Update PMP | Optional Task | Three years from obligation of the Sub-CLIN |
| N/A | N/A | 0002 | Complete Quality Assurance Surveillance Plan (QASP) | ||
| N/A | N/A | 0002AA | Complete QASP | Base Year | Four years from obligation of the Sub-CLIN |
| N/A | N/A | 0002AB | Update QASP | Optional Task | Three years from obligation of the Sub-CLIN |
| N/A | N/A | 0002AC | Update QASP | Optional Task | Three years from obligation of the Sub-CLIN |
| N/A | N/A | 0003 | Develop Integrated Master Schedule (IMS)/Milestone Payment Schedule (MPS) and Update Monthly | ||
| N/A | N/A | 0003AA | Develop IMS/MPS and Update Monthly | Base Year | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0003AB | Update IMS/MPS Monthly - Year 2 | Option Year - FY21 | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0003AC | Update IMS/MPS Monthly - Year 3 | Option Year - FY22 | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0003AD | Update IMS/MPS Monthly - Year 4 | Option Year - FY23 | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0003AE | Update IMS/MPS Monthly - Year 5 | Option Year - FY24 | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0003AF | Update IMS/MPS Monthly - Year 6 | Option Year - FY25 | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0003AG | Update IMS/MPS Monthly - Year 7 | Option Year - FY26 | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0003AH | Update IMS/MPS Monthly - Year 8 | Option Year - FY27 | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0003AJ | Update IMS/MPS Monthly - Year 9 | Option Year - FY28 | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0003AK | Update IMS/MPS Monthly - Year 10 | Option Year - FY29 | One year from obligation of the Sub-CLIN |
| N/A | N/A | 0004 | Complete 1,4-Dioxane sampling in accordance with paragraph 8.1.1.f. of the PWS | Optional Task | One year from obligation of the CLIN |
| Beale AFB | N/A | 0005 | Complete Basewide Quality Program Plans (QPPs) | ||
| Beale AFB | N/A | 0005AA | Complete Basewide QPP | Base Year | Four years from obligation of the Sub-CLIN |
| Beale AFB | N/A | 0005AB | Update Basewide QPP | Optional Task | Three years from obligation of the Sub-CLIN |
| Beale AFB | N/A | 0005AC | Update Basewide QPP | Optional Task | Three years from obligation of the Sub-CLIN |
| Beale AFB | N/A | 0006 | Develop a Land Use Control Implementation Plan | Optional Task | One year from obligation of the CLIN |
| Beale AFB | CG041-010 | 0007 | Conduct RA-O | ||
| Beale AFB | CG041-010 | 0007CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-010 | 0007CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-010 | 0007CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-010 | 0007CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-010 | 0007CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-010 | 0007CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-010 | 0007CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-010 | 0007CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-010 | 0007CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-010 | 0007CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-016 | 0008 | Conduct RA-O | ||
| Beale AFB | CG041-016 | 0008CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-016 | 0008CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-016 | 0008CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-016 | 0008CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-016 | 0008CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-016 | 0008CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-016 | 0008CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-016 | 0008CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-016 | 0008CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-016 | 0008CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-017 | 0009 | Achieve Remedy in Place | ||
| Beale AFB | CG041-017 | 0009AA | Achieve Remedy in Place | Option Year - FY21 | Four years from obligation of the Sub-CLIN |
| Beale AFB | CG041-017 | 0009CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-017 | 0009CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-017 | 0009CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-017 | 0009CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-017 | 0009CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-017 | 0009CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-017 | 0009CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-017 | 0009CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-017 | 0009CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-017 | 0009CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-018 | 0010 | Conduct RA-O and Reduce LCCs | ||
| Beale AFB | CG041-018 | 0010CA | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-018 | 0010CB | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-018 | 0010CC | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-018 | 0010CD | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-018 | 0010CE | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-018 | 0010CF | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-018 | 0010CG | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-018 | 0010CH | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-018 | 0010CJ | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-018 | 0010CK | Maintain compliance with regulatory requirements and binding agreements, and complete the Reduce LCC Summary Report - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-029 | 0011 | Conduct RA-O | ||
| Beale AFB | CG041-029 | 0011CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-029 | 0011CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-029 | 0011CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-029 | 0011CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-029 | 0011CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-029 | 0011CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-029 | 0011CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-029 | 0011CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-029 | 0011CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-029 | 0011CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-035 | 0012 | Conduct RA-O and Reduce LCCs | ||
| Beale AFB | CG041-035 | 0012CA | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-035 | 0012CB | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-035 | 0012CC | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-035 | 0012CD | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-035 | 0012CE | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-035 | 0012CF | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-035 | 0012CG | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-035 | 0012CH | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-035 | 0012CJ | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-035 | 0012CK | Maintain compliance with regulatory requirements and binding agreements, and complete the Reduce LCC Summary Report - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-039 | 0013 | Conduct RA-O | ||
| Beale AFB | CG041-039 | 0013CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-039 | 0013CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-039 | 0013CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-039 | 0013CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-039 | 0013CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-039 | 0013CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-039 | 0013CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-039 | 0013CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-039 | 0013CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-039 | 0013CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-508 | 0014 | Conduct RA-O | ||
| Beale AFB | CG041-508 | 0014CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-508 | 0014CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-508 | 0014CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-508 | 0014CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-508 | 0014CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-508 | 0014CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-508 | 0014CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-508 | 0014CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-508 | 0014CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-508 | 0014CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-509 | 0015 | Achieve Response Complete | ||
| Beale AFB | CG041-509 | 0015AA | Optimize the site in support of Response Complete | Base Year | Five years from obligation of the Sub-CLIN |
| Beale AFB | CG041-509 | 0015AB | Achieve Response Complete | Option Year - Upon Completion of 0015AA | Five years from obligation of 0015AA |
| Beale AFB | CG041-509 | 0015CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-509 | 0015CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-509 | 0015CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-509 | 0015CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-509 | 0015CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-509 | 0015CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-509 | 0015CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-509 | 0015CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-509 | 0015CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-509 | 0015CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-517 | 0016 | Conduct RA-O | ||
| Beale AFB | CG041-517 | 0016CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-517 | 0016CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-517 | 0016CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-517 | 0016CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-517 | 0016CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-517 | 0016CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-517 | 0016CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG041-517 | 0016CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-517 | 0016CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG041-517 | 0016CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG044 | 0017 | Achieve Remedy in Place | ||
| Beale AFB | CG044 | 0017AA | Achieve ROD | Base Year | Two years from obligation of the Sub-CLIN |
| Beale AFB | CG044 | 0017AB | Achieve Remedial Design | Option Year - Upon Completion of 0017AA | Two years from obligation of the Sub-CLIN |
| Beale AFB | CG044 | 0017AC | Achieve Remedy in Place | Option Year - Upon Completion of 0017AB | Three years from obligation of the Sub-CLIN |
(not to exceed seven years from obligation of 0017AA)
| Beale AFB | CG044 | 0017CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG044 | 0017CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG044 | 0017CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG044 | 0017CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG044 | 0017CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG044 | 0017CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG044 | 0017CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | CG044 | 0017CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG044 | 0017CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | CG044 | 0017CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | DP038 | 0018 | Conduct LTM | ||
| Beale AFB | DP038 | 0018CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | DP038 | 0018CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | DP038 | 0018CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | DP038 | 0018CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | DP038 | 0018CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | DP038 | 0018CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | DP038 | 0018CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | DP038 | 0018CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | DP038 | 0018CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | DP038 | 0018CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | ED631 | 0019 | Achieve Response Complete | ||
| Beale AFB | ED631 | 0019AA | Achieve Remedial Design and Remedial Action Work Plan | Base Year | Four years from obligation of the Sub-CLIN |
| Beale AFB | ED631 | 0019AB | Achieve Response Complete | Option Year - Upon Completion of 0019AA | Four years from obligation of 0019AA |
| Beale AFB | ED631 | 0019CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Option Year - Upon Completion of 0019AB | Three years from obligation of the Sub-CLIN |
| Beale AFB | ED631 | 0019CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - 1 Year after 0019CA | Three years from obligation of the Sub-CLIN |
| Beale AFB | ED631 | 0019CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - 1 Year after 0019CB | Three years from obligation of the Sub-CLIN |
| Beale AFB | ED631 | 0019CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - 1 Year after 0019CC | Obligation of the Sub-CLIN through POP End |
| Beale AFB | ED631 | 0019CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - 1 Year after 0019CD | Obligation of the Sub-CLIN through POP End |
| Beale AFB | ED631 | 0019CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - 1 Year after 0019CE | Obligation of the Sub-CLIN through POP End |
| Beale AFB | FR970 | 0020 | Conduct LTM | ||
| Beale AFB | FR970 | 0020CA | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | FR970 | 0020CB | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | FR970 | 0020CC | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | FR970 | 0020CD | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | FR970 | 0020CE | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | FR970 | 0020CF | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | LF002 | 0021 | Conduct LTM and Reduce LCCs | ||
| Beale AFB | LF002 | 0021CA | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF002 | 0021CB | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF002 | 0021CC | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF002 | 0021CD | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF002 | 0021CE | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF002 | 0021CF | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF002 | 0021CG | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF002 | 0021CH | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | LF002 | 0021CJ | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | LF002 | 0021CK | Maintain compliance with regulatory requirements and binding agreements, and complete the Reduce LCC Summary Report - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | LF003 | 0022 | Conduct LTM and Reduce LCCs | ||
| Beale AFB | LF003 | 0022CA | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF003 | 0022CB | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF003 | 0022CC | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF003 | 0022CD | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF003 | 0022CE | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF003 | 0022CF | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF003 | 0022CG | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF003 | 0022CH | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | LF003 | 0022CJ | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCCs - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | LF003 | 0022CK | Maintain compliance with regulatory requirements and binding agreements, and complete the Reduce LCC Summary Report - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | LF013 | 0023 | Conduct LTM | ||
| Beale AFB | LF013 | 0023CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF013 | 0023CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF013 | 0023CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF013 | 0023CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF013 | 0023CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF013 | 0023CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF013 | 0023CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | LF013 | 0023CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | LF013 | 0023CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | LF013 | 0023CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | ML595 | 0024 | Achieve Response Complete | ||
| Beale AFB | ML595 | 0024AA | Achieve Remedial Design and Remedial Action Work Plan | Base Year | Four years from obligation of the Sub-CLIN |
| Beale AFB | ML595 | 0024AB | Achieve Response Complete | Option Year - Upon Completion of 0024AA | Four years from obligation of 0024AA |
| Beale AFB | ML595 | 0024CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Option Year - Upon Completion of 0024AB | Three years from obligation of the Sub-CLIN |
| Beale AFB | ML595 | 0024CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - 1 Year after 0024CA | Three years from obligation of the Sub-CLIN |
| Beale AFB | ML595 | 0024CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - 1 Year after 0024CB | Three years from obligation of the Sub-CLIN |
| Beale AFB | ML595 | 0024CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - 1 Year after 0024CC | Obligation of the Sub-CLIN through POP End |
| Beale AFB | ML595 | 0024CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - 1 Year after 0024CD | Obligation of the Sub-CLIN through POP End |
| Beale AFB | ML595 | 0024CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - 1 Year after 0024CE | Obligation of the Sub-CLIN through POP End |
| Beale AFB | ML625 | 0025 | Achieve Response Complete | ||
| Beale AFB | ML625 | 0025AA | Achieve Remedial Design and Remedial Action Work Plan | Base Year | Four years from obligation of the Sub-CLIN |
| Beale AFB | ML625 | 0025AB | Achieve Response Complete | Option Year - Upon Completion of 0025AA | Four years from obligation of 0025AA |
| Beale AFB | ML625 | 0025CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Option Year - Upon Completion of 0025AB | Three years from obligation of the Sub-CLIN |
| Beale AFB | ML625 | 0025CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - 1 Year after 0025CA | Three years from obligation of the Sub-CLIN |
| Beale AFB | ML625 | 0025CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - 1 Year after 0025CB | Three years from obligation of the Sub-CLIN |
| Beale AFB | ML625 | 0025CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - 1 Year after 0025CC | Obligation of the Sub-CLIN through POP End |
| Beale AFB | ML625 | 0025CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - 1 Year after 0025CD | Obligation of the Sub-CLIN through POP End |
| Beale AFB | ML625 | 0025CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - 1 Year after 0025CE | Obligation of the Sub-CLIN through POP End |
| Beale AFB | OT017 | 0026 | Conduct LTM | ||
| Beale AFB | OT017 | 0026CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT017 | 0026CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT017 | 0026CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT017 | 0026CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT017 | 0026CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT017 | 0026CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT017 | 0026CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT017 | 0026CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | OT017 | 0026CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | OT017 | 0026CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | OT584 | 0027 | Conduct RA-O | ||
| Beale AFB | OT584 | 0027CA | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT584 | 0027CB | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT584 | 0027CC | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT584 | 0027CD | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT584 | 0027CE | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | OT584 | 0027CF | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | OT584 | 0027CG | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | OT584 | 0027CH | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | PL582 | 0028 | Conduct RA-O | ||
| Beale AFB | PL582 | 0028CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | PL582 | 0028CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | PL582 | 0028CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | PL582 | 0028CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | PL582 | 0028CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | PL582 | 0028CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | PL582 | 0028CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | PL582 | 0028CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | PL582 | 0028CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | PL582 | 0028CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SD032 | 0029 | Conduct LTM | ||
| Beale AFB | SD032 | 0029CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | SD032 | 0029CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SD032 | 0029CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SD032 | 0029CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SD032 | 0029CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SD032 | 0029CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SD032 | 0029CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SD032 | 0029CH | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SD032 | 0029CJ | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SD032 | 0029CK | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR614 | 0030 | Achieve Response Complete | ||
| Beale AFB | SR614 | 0030AA | Achieve Remedial Design and Remedial Action Work Plan | Base Year | Four years from obligation of the Sub-CLIN |
| Beale AFB | SR614 | 0030AB | Achieve Response Complete | Option Year - Upon Completion of 0030AA | Four years from obligation of 0029AA |
| Beale AFB | SR614 | 0030CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Option Year - Upon Completion of 0030AB | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR614 | 0030CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - 1 Year after 0030CA | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR614 | 0030CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - 1 Year after 0030CB | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR614 | 0030CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - 1 Year after 0030CC | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR614 | 0030CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - 1 Year after 0030CD | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR614 | 0030CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - 1 Year after 0030CE | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR615 | 0031 | Achieve Response Complete | ||
| Beale AFB | SR615 | 0031AA | Achieve Remedial Design and Remedial Action Work Plan | Base Year | Four years from obligation of the Sub-CLIN |
| Beale AFB | SR615 | 0031AB | Achieve Response Complete | Option Year - Upon Completion of 0031AA | Four years from obligation of 0030AA |
| Beale AFB | SR615 | 0031CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Option Year - Upon Completion of 0031AB | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR615 | 0031CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - 1 Year after 0031CA | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR615 | 0031CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - 1 Year after 0031CB | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR615 | 0031CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - 1 Year after 0031CC | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR615 | 0031CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - 1 Year after 0031CD | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR615 | 0031CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - 1 Year after 0031CE | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR617 | 0032 | Achieve Response Complete | ||
| Beale AFB | SR617 | 0032AA | Achieve Remedial Design and Remedial Action Work Plan | Base Year | Four years from obligation of the Sub-CLIN |
| Beale AFB | SR617 | 0032AB | Achieve Response Complete | Option Year - Upon Completion of 0032AA | Four years from obligation of 0031AA |
| Beale AFB | SR617 | 0032CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Option Year - Upon Completion of 0032AB | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR617 | 0032CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - 1 Year after 0032CA | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR617 | 0032CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - 1 Year after 0032CB | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR617 | 0032CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - 1 Year after 0032CC | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR617 | 0032CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - 1 Year after 0032CD | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR617 | 0032CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - 1 Year after 0032CE | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR622 | 0033 | Achieve Response Complete | ||
| Beale AFB | SR622 | 0033AA | Achieve Remedial Design and Remedial Action Work Plan | Base Year | Four years from obligation of the Sub-CLIN |
| Beale AFB | SR622 | 0033AB | Achieve Response Complete | Option Year - Upon Completion of 0033AA | Four years from obligation of 0031AA |
| Beale AFB | SR622 | 0033CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Option Year - Upon Completion of 0033AB | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR622 | 0033CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - 1 Year after 0033CA | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR622 | 0033CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - 1 Year after 0033CB | Three years from obligation of the Sub-CLIN |
| Beale AFB | SR622 | 0033CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - 1 Year after 0033CC | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR622 | 0033CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - 1 Year after 0033CD | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SR622 | 0033CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - 1 Year after 0033CE | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SS010 | 0034 | Conduct RA-O | ||
| Beale AFB | SS010 | 0034CA | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS010 | 0034CB | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS010 | 0034CC | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS010 | 0034CD | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS010 | 0034CE | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS010 | 0034CF | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Option Year - FY27 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SS010 | 0034CG | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Option Year - FY28 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SS010 | 0034CH | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Option Year - FY29 | Obligation of the Sub-CLIN through POP End |
| Beale AFB | SS023 | 0035 | Conduct RA-O | ||
| Beale AFB | SS023 | 0035CA | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Base Year | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS023 | 0035CB | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Option Year - FY21 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS023 | 0035CC | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Option Year - FY22 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS023 | 0035CD | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Option Year - FY23 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS023 | 0035CE | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Option Year - FY24 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS023 | 0035CF | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Option Year - FY25 | Three years from obligation of the Sub-CLIN |
| Beale AFB | SS023 | 0035CG | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Option Year - FY26 | Three years from obligation of the Sub-CLIN |
This is the start of the file's text. The full file is on GovTribe.