SF33 Attachment C-1 BAFB_PWS Enclosure 1 Acronyms and Definitions.pdf

PDF 98 KB Posted

Attached to
Sources Sought for Beale AFB Optimized Remediation Contract (ORC) Federal contract opportunity
Solicitation number
W9123820S0001
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document contains a sources sought notice and draft performance work statement for an optimized remediation contract at Beale Air Force Base in California. The United States Army Corps of Engineers is seeking information from businesses interested in a ten-year environmental remediation services contract to conduct site restoration activities at fifteen Installation Restoration Program sites and eight Military Munitions Response Program sites. Responses to the sources sought notice are due by July 31, 2019 and will be used to determine contractor capabilities, qualifications, and the appropriate small business set-aside prior to issuing a request for proposal in fiscal year 2020. The resulting firm-fixed-price contract will require the contractor to maintain established remedies, implement optimization efforts, and achieve site-specific performance objectives.

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought for Beale AFB Optimized Remediation Contract (ORC), newest first.
File Type Posted
SF33 Attachment C-1 BAFB_FY20_PWS_20200305.pdf PDF
SF33 Attachment C-1 Beale_AFB_Enclosure_2B_GFI_List_20200227.xlsx XLSX spreadsheet
SF33 Attachment C-1 Beale AFB_Enclosure 2B GFI List_20200218.xlsx XLSX spreadsheet
SF33 Attachment C-1 BAFB_PWS_Enclosure 2A AR GFI Feb 2020.xlsx XLSX spreadsheet
Beale AFB_FY20_PWS_20200204.pdf PDF
Contractor Attendees.pdf PDF
Landfills_LF002_LF003.pdf PDF
RC_LUCs_Sites.pdf PDF
GW_Site_Maps.pdf PDF
Beale_AFB_Access_and_Directions.pdf PDF
SS010.pdf PDF
OT584.pdf PDF
W9123820R0002 BAFB ORC Solicitation (draft) 13-Jan-2020.pdf PDF
SF33 Attachment C-1 Beale AFB_Enclosure 2B GFI List_20200113.xlsx XLSX spreadsheet
Itinerary_BAFB_ORC_Site_Visit_28_Jan_2020.xlsx XLSX spreadsheet
SF33 Attachment C-1 BAFB_PWS_Enclosure 2A AR List 20200114.xlsx XLSX spreadsheet
SF33 Attachment C-1 BAFB_PWS Attachment 2. CPSMR template- 25Aug2019.docx DOCX document
SF33 Attachment C-1 BAFB_PWS Attachment 6. Interim Guidance on 1-4 Dioxane, Environmental Restoration Program.pdf PDF
SF33 Attachment C-1 BAFB_PWS_Enclosure 2A AR List.xlsx XLSX spreadsheet
SF33 Attachment C-1 Beale AFB_FY20_PWS_20200110.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 4. AFGM2019-32-01, AFFF Related Waste Mgmt Implementation Guidance.pdf PDF
SF33 Attachment C-1 BAFB_PWS Enclosure 4 OPSEC Addendum 20190607.pdf PDF
SF33 Attachment C-1 BAFB_PWS_Enclosure 3 GFP 20190827.xlsx XLSX spreadsheet
SF33 Attachment B-1 Beale AFB_FY20_Sub-CLIN Structure_20200110.xlsx XLSX spreadsheet
SF33 Attachment C-1 BAFB_PWS Attachment 7. BAFB_PWS Attachment QASP Template v1 20191019.DOCX DOCX document
SF33 Attachment C-1 BAFB_PWS Attachment 1. ORC PMP Guidance v1.0_20191115.pdf PDF
SF33 Attachment C-1 BAFB_PWS_Enclosure 2B GFI List_20191205.xlsx XLSX spreadsheet
SF33 Attachment L-1 Labor Category Qualifications 1 Dec 2019.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 3. Optimization Benefit Template_190710.docx DOCX document
W9123820R0002 BAFB ORC Solicitation (draft) 13-Jan-2020.pdf PDF
SF33 Attachment L-3 ORC PMP Guidance v1.0_20191115.pdf PDF
SF33 Attachment C-1 BAFB_PWS Attachment 5. Ensuring Chemistry Data Fact Sheet April 2013.pdf PDF
SF33 Attachment J-2 SCA Wage Determination Yuba County, CA.pdf PDF
SF33 Attachment J-2 DBA Wage Determination Yuba County, CA.pdf PDF
SF33 Attachment L-2 Past Performance Quality Questionaire.docx DOCX document
SF33 Attachment C-1 BAFB_FY20_PWS_V8_20191120.pdf PDF
SF33 Attachment B-1 BAFB_Sub-CLIN Structure_20191120.xlsx XLSX spreadsheet
W9123820R0002 BAFB ORC Solicitation (draft).pdf PDF
Beale_AFB_FY20_Draft_PWS_20190524.pdf PDF
Beale_AFB_FY20_Draft_Sub-CLIN_Structure_20190524.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure 1: Acronyms and Definitions

ACRONYMS

AF Air Force AFCEC Air Force Civil Engineer Center AFI Air Force Instruction AGC Advanced Geophysical Classification API American Petroleum Institute APP Accident Prevention Plan ASTM American Society for Testing and Materials BCA Business Case Analysis BCE Base Civil Engineer CA Cost Analysis CAC Common Access Card CADD Computer-Aided Design and Drafting CD Compact Disk CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CIP Common Installation Picture CLIN Contract Line Item Number CMRA Contractor Manpower Reporting Application COC Contaminant of Concern CFR Code of Federal Regulations CONUS Continental United States COR Contracting Officer’s Representative CPSMR Contractor’s Progress, Status, and Management Report CQP Construction Quality Plan CSDGM Content Standards for Digital Geospatial Metadata CSM Conceptual Site Model CWM Chemical Warfare Materiel DAGCAP DoD Advanced Geophysical Classification Accreditation Program DERP Defense Environmental Remediation Program DD Decision Document DLH Data Loading Handbook DoD Department of Defense DQO Data Quality Objectives EE Engineering Evaluation EESOH-MIS Enterprise Environmental, Safety, and Occupational Health Management

Information System ELAP Environmental Laboratory Accreditation Program EMS Environmental Management System EO Executive Order EOD Explosive Ordnance Disposal EPCRA Emergency Planning and Community Right-to-Know Act ERP Environmental Restoration Program ERPIMS Environmental Resources Program Information Management System ERPTools Environmental Resources Program Tools

ESD Explanation of Significant Differences ESRI Environmental Systems Research Institute ESTCP Environmental Security Technology Certification Program FAR Federal Acquisition Regulation FFA Federal Facility Agreement FGDC Federal Geographic Data Committee FY Fiscal Year GCO Geophysical Classification Organization GFI Government Furnished Information GFP Government Furnished Property GIO Geospatial Integration Office GIS Geographic Information System GPS Global Positioning Systems GSR Green and Sustainable Remediation HSP Health and Safety Plan IBC International Building Code IMS Integrated Master Schedule IRP Installation Restoration Program ITRC Interstate Technology and Regulatory Council KO Contracting Officer LCC Life-Cycle Cost LTM Long-Term Management MC Munitions Constituents MCL Maximum Concentration Level MDL Master Document List MDS Mission Data Set MEC Munitions and Explosives of Concern MMRP Military Munitions Response Program MOU Memorandum of Understanding MPS Milestone Payment Schedule MXD Map Exchange File NACE National Association of Corrosions Engineers NAD83 North American Datum 1983 NCP National Contingency Plan NEC National Electrical Code NFA No Further Action NFPA National Fire Protection Act NOV Notice of Violation NPL National Priorities List OES Optimized Exit Strategy OGC Office of the General Counsel O&M Operations and Maintenance ORC Optimized Remediation Contract OSHA Occupational Safety and Health Administration PA Preliminary Assessment

PAO Public Affairs Officer PFAS Per- and Polyfluoroalkyl Substances PMP Project Management Plan PMR Project Management Review PO Performance Objective POC Point of Contact POP Period of Performance PP Performance Period PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QAPP Quality Assurance Project Plans QC Quality Control QPP Quality Program Plan QSM Quality Systems Manual RA-O Remedial Action – Operation RAB Restoration Advisory Board RC Response Complete RCRA Resource Conservation and Recovery Act RECAP Risk Evaluation Corrective Action Program RFI RCRA Facility Investigation RIP Remedy in Place ROD Record of Decision SARA Superfund Amendments and Reauthorization Act SC Site Closeout SDG Sample Delivery Group SDSFIE Spatial Data Standards for Facilities, Infrastructure, and Environment SERDP Strategic Environmental Research and Development Program SI Site Inspection SSHP Site Safety and Health Plan SSI Supplemental Site Investigation SSPC Steel Structures and Painting Counsel TCE Trichloroethylene UFC Uniform Fire Code UFP Uniform Federal Policy USACE United States Army Corps of Engineers USEPA United States Environmental Protection Agency UTM Universal Transverse Mercator UXO Unexploded Ordnance WBS Work Breakdown Structure WP Work Plan

DEFINITIONS

The definitions included in this Enclosure were adapted from the following sources:

1. New Jersey Department of Environmental Protection Site Remediation Program Technical Guidance for Preparation and Submission of a Conceptual Site Model dated 16 December 2011.

2. Air Force Instruction 32-7020 dated 7 November 2014.

3. Council on Environmental Quality Aligning National Environmental Policy Act

Processes with Environmental Management Systems, A Guide for NEPA and EMS Practitioners dated April 2007.

4. Interstate Technical Regulatory Council Green and Sustainable Remediation: A Practical Framework dated November 2011.

5. Air Force Civil Engineer Center Optimized Exit Strategy Compendium for Performance- Based Remediation dated October 2014.

6. 42 U.S. Code § 9601 Comprehensive Environmental Response, Compensation, and Liability Act Definitions.

7. United States Environmental Protection Agency Guide to Preparing Superfund Proposed Plans, Records of Decision, and Other Remedy Selection Decision Documents dated July 1999.

8. National Academies Press Contaminants in the Subsurface: Source Zone Assessment and Remediation dated 2005.

In the case where the definition provided below does not align with the source reference, the source reference shall prevail.

Definitions Alternate Objective See PWS Section 1.2.2.

Conceptual Site Model1 A written and/or illustrative representation of the physical, chemical and biological processes that control the transport, migration and actual/potential impacts of contamination (in soil, air, ground water, surface water and/or sediments) to human and/or ecological receptors. It can range from a simple illustration to a more sophisticated comprehensive document and applied to all phases of the remedial process to understand the relationship between sources, migration pathways, and receptors associated with the site or area of concern and identified COCs. It serves to identify currently complete or potentially complete pathways to receptors and the potential for future risks. It should be continually revised to reflect the current understanding of the site during all phases of the investigation, remediation and support the remedial decision.

Decision Document2 A generic name for the document that selects a response action under all legal authorities. All DDs, including PPs and RODs, must go through legal and technical review. The remedial action objectives defined in the DD will be used later in the environmental restoration process to confirm and demonstrate that DOD has met the obligations established in the DD.

Draft Document Document submitted for AF and USACE review and approval. In all respects, Draft Documents shall be complete; substantively correct and consistent with applicable laws, regulations, and DoD/AF policies; in proper format; and free of grammatical and typographical errors. In general, Draft Documents are the initial version reviewed by AF and USACE. Draft Documents shall not be submitted to regulatory agencies for review.

Draft Final Document Document incorporating AF and USACE comments and submitted for regulatory agency review and/or approval. Draft Final Documents may also be required prior to Final Document preparation. Note some documents may initially be submitted to the regulatory agencies as Final with any comments being incorporated into subsequent documents as appropriate (e.g., system status reports, monitoring reports, “data dumps”).

Emerging Contaminant2

Contaminants that either (1) do not have regulatory standards based on peer-reviewed science, or (2) contaminants that have the regulatory standards which may change due to new science, detection capabilities, or pathways.

Environmental Management System3

A structure of procedures and policies used to systematically identify, evaluate, and manage environmental impacts of ongoing activities, products, and services.

Designed to provide order and consistency for organizations to address environmental concerns in a comprehensive manner, an EMS for a Federal agency is intended to ensure that all necessary actions are taken to integrate environmental accountability into day-to-day decision-making and long-term planning processes.

An EMS employs a continuous, rigorous, self-monitoring cycle for continual improvement of environmental performance.

Final Document Document that has received AF and USACE approval, and where applicable, regulatory agency concurrence and/or approval. For documents requiring AF and/or regulatory agency signature, the document will not be considered Final until it is signed by the appropriate signatory(ies).

Green and Sustainable Remediation4

The site-specific employment of products, processes, technologies, and procedures that mitigate contaminant risk to receptors while making decisions that are cognizant of balancing community goals, economic impacts, and net environmental effects.

Land Use Control2 Any type of physical, legal, proprietary or administrative mechanism that restricts the use of, or limits access to, real property to prevent or reduce risks to human health and the environment. Physical mechanisms (i.e., engineering controls) encompass a variety of engineered remedies to contain or reduce contamination and physical barriers to limit access to property, such as landfill caps, fences, or signs. The legal, proprietary, or administrative mechanisms used for LUCs are generally the same as those used for Institutional Controls (ICs), as discussed in the National Contingency Plan. Examples of ICs include deed notices; IC registries, property easements and covenants; installation administrative controls, such as construction and work request review and approval processes; and administrative orders and cleanup agreements.

Life-Cycle Cost (LCC) An estimate of POP and post-POP costs based on proposed activities, activity duration, and assumptions from contract award through Contractor’s projected Site Closeout date (or 30 years for sites with indefinite closeout dates).

Long-Term Management2

Environmental monitoring, review of site conditions, and maintenance of a remedial action to ensure continued protection as designed once a site achieves Response Complete. LTM includes operation and maintenance which are the measures required to maintain the effectiveness of response actions. LTM should not be used until no further environmental restoration response actions are appropriate or anticipated. LTM should not be used to refer to monitoring after RIP (this includes sites for which the selected response action is natural attenuation). Examples of LTM include landfill cap maintenance, leachate disposal, fence monitoring and repair, management of five-year review execution, and LUC maintenance.

Note: the requirements for Five-Year Reviews are in accordance with the PWS and may not be included in LTM required under ORCs.

Optimized Exit Strategy

See PWS Section 1.2.1.

Optimized Remediation Contract

A contract that will effectively and efficiently manage the Air Force ERP in a performance-based, results-oriented, and cost conscious framework. One significant component will be the incorporation of lessons learned during PBRs in the development of ORC performance objectives. ORCs will be firm fixed price contracts and generally cover all known sites at an installation. Contractors will be incentivized to achieve performance objectives in keeping with the end state of choice as determined by a business case analysis of total life cycle cost with the objective of minimizing future Air Force liability and cost to the greatest degree feasible. While that end state of choice is generally RC, ORCs will utilize existing site data to inform realistic performance objective selection.

Performance Goal5 A standard being used to define when an effort has achieved satisfactory performance for a site for which the Performance Objective is OES. In a Performance Model, it is the value for a specific Performance Indicator that distinguishes success from failure of the implemented approach. As such, the Performance Goal is the pass/fail criterion for a given Performance Indicator.

Performance Indicator5 A measurable or calculable feature of an approach, system, or process that provides direct interpretive value with respect to (1) remedial mechanisms or (2) achievement of a remedial objective.

Performance Metric5 A unit of measure for a Performance Indicator.

Performance Model5 A predictive graphic model that describes the expected course of the remediation process (i.e., how conditions are expected to change over time as measured using appropriate Performance Indicators from the current state until the Performance Goal is achieved).

Performance Objective

The contractually required endpoint, status, condition, or requirement.

Performance Period

The contractually required duration to achieve the Performance Objective.

Performance Standard The condition that must be satisfied to demonstrate a Performance Objective has been achieved.

Record of Decision2 The document required by CERCLA containing the final decision and statutory determinations of the lead agency concerning selection of the remedial action at a site(s). This includes any preliminary phase of a remedial action, such as an interim remedial action, which would require an interim ROD.

Reduce Life-Cycle Cost

See PWS Section 1.2.3

Remedial Action6 Those actions consistent with permanent remedy taken instead of or in addition to removal actions in the event of a release or threatened release of a hazardous substance into the environment, to prevent or minimize the release of hazardous substances so that they do not migrate to cause substantial danger to present or future public health or welfare or the environment. The term includes, but is not limited to, such actions at the location of the release as storage, confinement, perimeter protection using dikes, trenches, or ditches, clay cover, neutralization, cleanup of released hazardous substances and associated contaminated materials, recycling or reuse, diversion, destruction, segregation of reactive wastes, dredging or excavations, repair or replacement of leaking containers, collection of leachate and runoff, onsite treatment or incineration, provision of alternative water supplies, and any monitoring reasonably required to assure that such actions protect the public health and welfare and the environment. The term includes the costs of permanent relocation of residents and businesses and community facilities where the President determines that, alone or in combination with other measures, such relocation is more cost-effective than and environmentally preferable to the transportation, storage, treatment, destruction, or secure disposition offsite of hazardous substances, or may otherwise be necessary to protect the public health or welfare; the term includes offsite transport and offsite storage, treatment, destruction, or secure disposition of hazardous substances and associated contaminated materials.

Remedial Action – Construction2

The period of time in which a response action is being implemented, but is not yet operating as designed. At the end of this phase of work, a remedy is in place.

Remedial Action Objectives7

Describe what the proposed site cleanup is expected to accomplish.

Note: these are generally defined in the DD.

Remedial Action - Operation2

The period of time that a selected remedy must operate before achieving remedial action objectives. At the end of this phase of work, the response is complete.

Remedial Design7 An engineering phase during which additional technical information and data identified are incorporated into technical drawings and specifications developed for the subsequent remedial action. These specifications are based upon the detailed description of the selected remedy and the cleanup criteria provided in the ROD.

Remedy in Place2

Designation that a final remedial action has been constructed, is functional, and is operating as planned in the RD and would be expected to meet the remedial action objectives detailed in the DD. Examples of RIP are a soil vapor extraction system or an in situ chemical treatment system that is installed and operating as designed and for which performance data indicate the system will achieve remedial action objectives, thus demonstrating proper operation of the system. Because remedial action objectives have not been met, the site cannot be considered RC.

Response Complete2

A milestone signifying that the DoD Component has met the remedial action objectives for a site, documented the determination, and sought regulatory agreement. RC signifies that DoD has determined at the end of the PA/SI or RI that no additional response action is required; achieved RIP and the required RA- O has achieved the remedial action objectives; or where there is no RA-O phase, then the remedial action-construction has achieved the remedial action objectives.

LTM may occur after RC is achieved and precedes Site Closeout.

Site Closeout2 The stage at which the DoD has completed active management and monitoring at an environmental restoration site, and no additional environmental restoration funds will be expended at the site. SC occurs when environmental restoration goals have been achieved that allow unlimited use and unrestricted exposure of the property (e.g., no further LTM, including LUCs, is required).

Note: achieving Site Closeout may include, but not be limited to, the dismantling, removal, recycling, reclamation and/or disposal of all remedial activity systems and ancillary equipment above and underground to return the site to its natural state, well abandonment, and site restoration in accordance with Installation and regulatory requirements.

Source Strength8 The mass of contaminant present in the source zone and its flux from the source zone to the larger groundwater plume. The source strength is intended to convey information not only about the longevity of the source, but also about the size of the plume that would be created due to the flux from the source. Source-strength evaluations shall quantitatively determine the magnitude of each source relative to observed transport and attenuation rates and shall include all applicable COCs. Data gap evaluations to delineate the extent of source-zone contamination shall be performed consistent with state-of-the-science methodologies (e.g., application of high resolution aquifer profiling, DNAPL partitioning tracer tests, vapor-phase tomography, downhole geophysics) and guidance.

Source Zone Delineation8

The location of a primary contaminant source in the subsurface (both horizontally and vertically) to include all applicable phase partitioning (e.g., NAPL, sorbed, dissolved, and vapor) and distribution into low permeability materials.

File details come from the government source that posted it. Updated .