PAVE_PAWS_AMENDMENT_1.pdf

PDF 157 KB Posted

Attached to
PAVE PAWS Electrical Repairs at Beale AFB, W91238-18-R-0021
Solicitation number
W91238-18-R-0021
Issued by

View the file

Other files

File Type Posted
Amendment_0004.pdf PDF
PAVE_PAWS_As-builts.pdf PDF
A07.02_-_Amd_0003_Atch_13_-_4160v_Switchgear_shop_drawings_27Mar18.pdf PDF
A07.02_-_Amd_0003_Atch_15_-_Interconnect_combined-_Generator_Console,_field_and_switchgear_27Nov12.pdf PDF
A07.02_-_Amd_0003_Atch_17_-_PCI_Switchgear_Operation_Sequence_08_18_17.pdf PDF
A07.02_-_Amd_0003_Atch_14_-_Data_Highway_Plus_Interconnection_Diagram_14Mar18.pdf PDF
A07.02_-_Amd_0003_Atch_16_-_Mimic_Panel_Elevation_Diagram_14Mar18.pdf PDF
Amendment_0003.pdf PDF
A07.02_-_Amd_0003_Atch_18_-_Dimensions.docx DOCX document
Atch_12_-_Air_Force_Manual_17-1301_Computer_Security_Manual_10Feb17.pdf PDF
Atch_7_-_PAVE_PAWS_Q_&_A's_Am_0002,_13_Mar_18.xlsx XLSX spreadsheet
Amendment_0002.pdf PDF
Atch_9_-_EasyPower_Model_14Mar18.pdf PDF
Atch_8_-_PLC_SCADA_Configuration_Diagram_14Mar18.pdf PDF
PAVE_PAWS_Q_&_A's_Am_0002,_13_Mar_18.xlsx XLSX spreadsheet
Amendment_2.pdf PDF
Air_Force_Manual_17-1301_Computer_Security_Manual_10Feb17.pdf PDF
PLC_SCADA_Configuration_Diagram_14Mar18.pdf PDF
EasyPower_Model_14Mar18.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
PAVE_PAWS_SPECS_18_JAN_2018.pdf PDF
PAVE_PAWS_Q_&_A's_Am_0001,_1_Mar_18.xlsx XLSX spreadsheet
PAVE_PAWS_SPECS_18_JAN_2018.pdf PDF
Atch_4__Acknowlegement_Form_19Dec17.docx DOCX document
Entry_Access_List_Form_Beale_AFB.xls XLS spreadsheet
Atch_2_Supplemental_Contract_Requirements.docx DOCX document
Atch_1_SOW_04Aug17.pdf PDF
18R0021_Official_Sol.pdf PDF
Atch_3_Wage_Determination_26Jan18.docx DOCX document
Visit_Authorization_Request_Form_Beale_AFB.doc DOC document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation is:

A) To correct the bidder site key to UZR68F-R9Q3I4.

B) Extend the proposal due date to 26 March 2018 at 1400 and extend the inquiry closing date to 15 March 2018.

C) Remove attachments 1, 5, 6, and 7 and incorporate specif ications titled, "PAVE PAWS SPECS 18 JAN 2018" (New Attachment 1) and

"Site Visit Sign-In Sheet" (New Attachment 6). The SOW dated 04AUG17is no longer applicable. The SOW w ithin the spec document is the

SOW to use for proposals.

E) Incorporate spreadsheet titled "PAVE PAWS Q&As Am 0001. 01MAR18" (New Attachment 5). Please note the questions and answ ers on this spreadsheet are from the old bidder inquiry key. We have provided some responses to those questions and all remaining questions on this sheet w ill be answ ered no later than Monday 5 March. Questions on the new bidder inquiry key w ill all be answ ered in the system and not provided on the spreadsheet. The spreadsheet is only for the the questions on the old bidder inquiry key.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0021

X 9B. DATED (SEE ITEM 11)

05-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Mar-2018

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123818R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Atch 1 SOW 04 Aug 17 14 04-AUG-2017

Attachment 02 Atch 2 Supplemental

Contract Requirements

1 05-JAN-2018

Attachment 03 Atch 3 Wage Rate

Determination 26Jan18

51 26-JAN-2018

Attachment 04 Atch 4 Acknowledgement

Form 19Dec17

3 19-DEC-2017

Attachment 05 PAVE PAWS Specs

20Dec17

553 20-DEC-2017

Attachment 06 Entry Access List Beale

AFB

1 06-JAN-2018

Attachment 07 Visitor Authorization

Form Beale AFB

1 05-JAN-2018

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 PAVE PAWS SPECS 18

JAN 2018

548 18-JAN-2018

Attachment 02 Atch 2 Supplemental

Contract Requirements

1 05-JAN-2018

Attachment 03 Atch 3 Wage Rate

Determination 26Jan18

51 26-JAN-2018

Attachment 04 Atch 4 Acknowledgement

Form 19Dec17

3 19-DEC-2017

Attachment 05 PAVE PAWS Q&As Am

0001, 01MAR18

1 01-MAR-2018

Attachment 06 Site Visit Sign In Sheet 4 22-FEB-2018

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 09-Mar-2018 02:00 PM to 26-Mar-2018 02:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been deleted:

52.236-27

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been modified:

INSTRUCTIONS

The following documents must be returned with your quote, bid, or offer.

--The completed Standard Form 1442 with continuation pages, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s DUNS or DUNS+4 Number is entered in the block with its name and address.

--Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.

Note: If the SF 1442 and/or the pricing schedule was changed by amendment, be sure to use the amended pages when submitting your quote, bid, or offer.

--The completed CLIN Schedule with your proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all contract line items and priced sub-line items. Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.

--Your completed Representations, Certifications, and Other Statements of Bidders/Offerors (Section

00 45 00).

--Your Offer Guarantee (e.g., Standard Form 24, “Bid Bond”)

INQUIRIES:

Prospective offerors should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder

Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the QUICK ADD link. Select agency as USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click continue. Fill in all required information and click Add User.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

http://www.fedbizopps.gov/ https://www.projnet.org/projnet

4. The Solicitation Number is : W91238-18-R-0021

The Bidder Inquiry Key is: UZR68F-R9Q3I4 c Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

d. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

e. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

f. The point of contact for this solicitation is:

Contract Specialist: Karen Scott

Telephone: (916) 557-7109

E-MAIL: Karen.Scott@usace.army.mil

DIRECTIONS FOR SUBMITTING OFFERS:

Envelopes/packages containing offers must be sealed, marked and addressed as follows:

MARK ENVELOPES/PACKAGES:

Solicitation No. W91238-18-R-0021

ADDRESS ENVELOPES/PACKAGES TO:

Department of the Army

U.S. Army Engineer District, Sacramento

ATTN: Contracting Division

1325 J Street

Sacramento CA 95814-2922

SPECIAL INSTRUCTION PERTAINING TO HAND-CARRIED OFFERS:

Hand-carried offers must be delivered to: The Building Lobby at 1325 J Street, Sacramento, CA.

Due to security precautions, offerors may no longer hand-carry their offers directly to Contracting Division. Offers may NOT be turned-in at the Security Desk or left unattended elsewhere in the Lobby. Additionally, you are advised that there is no public parking in the Building.

The contract specialist will be in the Building Lobby 20 minutes prior to the closing time to accept hand-carried offers.

Offerors who desire to hand-deliver their offers at an earlier time must coordinate with the contract specialist in advance in order to arrange to be met in the Building Lobby by Contracting Division personnel.

Please ensure that all courier and delivery personnel are aware of these procedures.

mailto:Karen.Scott@usace.army.mil

CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY:

In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work. All offerors will complete and return the Preaward Survey as part of the Price/Cost proposal.

Failure to submit the Preaward Survey in conjunction with the price proposal will not of itself render the offer unacceptable.

Determination of Contractor Responsibility will be completed in accordance with FAR 9.104-1.

If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed Preaward

Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in FAR 9.104-1) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.

The Preaward Survey as a tool used by the Government in determining responsibility of the offeror is submitted as part of the Price/Cost proposal and is separate from the technical proposal's response to the technical evaluation criteria found later in this section. Some of the information required from the offeror for completion of the

Preaward Survey and the technical proposal may be duplicative but it is necessary that the information be provided in full in both places and that the Price/Cost proposal and the Technical proposal be separate documents. DO NOT state, for example, in the technical proposal, "See Price/Cost proposal for past performance information".

AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS DESCRIPTIONS:

a. The internet URL for Corps of Engineers publications is:

http://www.publications.usace.army.mil/

b. Construction Criteria Base (CCB). The Construction Criteria Base (CCB) system available through the

National Institute of Building Sciences includes copies of Corps of Engineers methods and specifications.

Information about the CCB can be obtained from:

http://www.wbdg.org/ccb/ccb.php

ACCEPTANCE OF OFFERS:

A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

System for Award Management (SAM) Registration:

It is a requirement that any and all contractors that intend to do business with the government must be registered in the System for Award Management (SAM) database. No contract may be awarded by the government to any contractor who is not registered in SAM. If your company is not registered in SAM, you must register in order to be eligible for any government award.

The following link provides access to the SAM website:

https://www.sam.gov/portal/public/SAM/ http://www.publications.usace.army.mil/ http://www.wbdg.org/ccb/ccb.php https://www.sam.gov/portal/public/SAM/

If you have difficulties with or questions regarding the SAM registration, the following link has been set up by the

Defense Logistics Agency (DLA) to assist contractors registering for CAGE codes for enrollment and navigation within SAM:

https://www.logisticsinformationservice.dla.mil/CAGETier3/

(End of Summary of Changes) https://www.logisticsinformationservice.dla.mil/CAGETier3/

File details come from the government source that posted it.